INTRODUCTION
• BPCL KR a MAH installation
• Automation using SCADA
• Aim – study of existing load shedding scheme
& SCADA based load shedding scheme
ABOUT BPCL KR
• Kochi Refinery, a unit of Bharat Petroleum
Corporation Limited (BPCL), embarked on its
journey in 1966 with a capacity of 50,000
barrels per day.
• BPCL KR - Ambalamugal near the city of Kochi
in Kerala
• The refinery has facilities to evacuate products
to the consuming centers through road, rail,
ships and through pipelines.
• The BPCL installation at Irumpanam, to which
the refinery is connected by pipelines, is the
major product distribution centre of the
refinery.
• Kochi Refinery has taken it as a mission to
make safe living and working a natural mantra
of its employees, contract workers, customers
and the general public.
SINGLE LINE DIAGRAM
POWER SYSTEM IN KR
• 2 KSEB 220 KV grid
• GTG 1 22 MW at 11 KV level
• GTG 2 34.5 MW at 11 KV level
• STG 17.8 MW at 11 KV level
• TG 25 MW at 3.3 KV level
• 2 switch gears 33 KV (HT101) and 11 KV (GIS)
• Critical loads 19.5 MW
LOAD SHEDDING
• Power system normal condition – adequate
generating to meet load
• Load shedding – imbalance b/w supply &
demand
• Types – fast & slow
• Ways – manual & automatic
EXISTING LOAD SHEDDING SCHEME
• Types – overloading of generators
under frequency based
• Feeder based load shedding scheme
• Frequency wise load shedding
• 123.dotx
• Under frequency relays – 7RW 600
• Limitation – load segregation not possible
SCADA
• Supervisory Control and Data Acquisition
• Monitor & control – distributed process
• MTU – master terminal unit
• RTU – remote terminal unit
• HMI – human machine interface
SCADA BASED
• Power deficit – load shedding initiated
• Power balance calculation -
Load to be tripped=Total load-(Total
generation + Margins available in running
generators)
• Tripping command – pre set priority
CONCLUSION
• Complex network – central control room
• Obtain stable plant operation – instability in
supply
• Application of SCADA – various levels
• Replace conventional relays – numerical relays
THANK YOU

More Related Content

What's hot

DG synchronizing Panel Manufacturer and Suppliers in India
DG synchronizing Panel Manufacturer and Suppliers in IndiaDG synchronizing Panel Manufacturer and Suppliers in India
DG synchronizing Panel Manufacturer and Suppliers in India
Mohit Bathineni
 
Rankin Units
Rankin UnitsRankin Units
Rankin Units
Mike Jeffries
 
Power System Operation and Control- Module 1
Power System Operation and Control- Module 1Power System Operation and Control- Module 1
Power System Operation and Control- Module 1
Ansho Anto
 
A modular high power battery system for pulsed
A modular high power battery system for pulsedA modular high power battery system for pulsed
A modular high power battery system for pulsed
Shaurya Tyagi
 
Gagan
GaganGagan
HVDC Interconnections: Scaling-up Electricity Trade
HVDC Interconnections: Scaling-up Electricity TradeHVDC Interconnections: Scaling-up Electricity Trade
HVDC Interconnections: Scaling-up Electricity Trade
energydialog
 
Earthsafe Multi-Function Fuel System Controllers
Earthsafe Multi-Function Fuel System ControllersEarthsafe Multi-Function Fuel System Controllers
Earthsafe Multi-Function Fuel System Controllers
Earthsafe Systems, Inc.
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
Reza Shah Abadi
 

What's hot (8)

DG synchronizing Panel Manufacturer and Suppliers in India
DG synchronizing Panel Manufacturer and Suppliers in IndiaDG synchronizing Panel Manufacturer and Suppliers in India
DG synchronizing Panel Manufacturer and Suppliers in India
 
Rankin Units
Rankin UnitsRankin Units
Rankin Units
 
Power System Operation and Control- Module 1
Power System Operation and Control- Module 1Power System Operation and Control- Module 1
Power System Operation and Control- Module 1
 
A modular high power battery system for pulsed
A modular high power battery system for pulsedA modular high power battery system for pulsed
A modular high power battery system for pulsed
 
Gagan
GaganGagan
Gagan
 
HVDC Interconnections: Scaling-up Electricity Trade
HVDC Interconnections: Scaling-up Electricity TradeHVDC Interconnections: Scaling-up Electricity Trade
HVDC Interconnections: Scaling-up Electricity Trade
 
Earthsafe Multi-Function Fuel System Controllers
Earthsafe Multi-Function Fuel System ControllersEarthsafe Multi-Function Fuel System Controllers
Earthsafe Multi-Function Fuel System Controllers
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 

Similar to ppt

Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
Sarthak Panigrahi
 
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
Sandia National Laboratories: Energy & Climate: Renewables
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and America
Smarter Grid Solutions
 
Planning a successful microgrid
Planning a successful microgridPlanning a successful microgrid
Planning a successful microgrid
TRC Companies, Inc.
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
Aravind Panasa
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013
Sean Chen, PMP, MBA
 
Electrical power system management
Electrical power system managementElectrical power system management
Electrical power system management
Akshay Awadhani
 
Ashwani
AshwaniAshwani
Ashwani
ashwani kumar
 
WQ-2
WQ-2WQ-2
The merits of integrating renewables with smarter grid carilec
The merits of integrating renewables with smarter grid   carilecThe merits of integrating renewables with smarter grid   carilec
The merits of integrating renewables with smarter grid carilec
Rick Case, PMP, P.E.
 
Status of hvdc links
Status of hvdc linksStatus of hvdc links
Status of hvdc links
abhishek pratap singh
 
HVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyHVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading Technology
Dixit Patel
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
TalhaAbdulRehman2
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdf
HASSAN527910
 
Rex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resumeRex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resume
Rex Scott, P. Eng
 
O&m of hvdc station power grid india
O&m of hvdc station power grid indiaO&m of hvdc station power grid india
O&m of hvdc station power grid india
Vaibhav Jain
 
110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx
SooryajithT
 
POWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHESPOWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHES
mhjit
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
Schneider Electric
 
IPA Power Scotland Conference
IPA Power Scotland ConferenceIPA Power Scotland Conference
IPA Power Scotland Conference
Smarter Grid Solutions
 

Similar to ppt (20)

Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and America
 
Planning a successful microgrid
Planning a successful microgridPlanning a successful microgrid
Planning a successful microgrid
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013
 
Electrical power system management
Electrical power system managementElectrical power system management
Electrical power system management
 
Ashwani
AshwaniAshwani
Ashwani
 
WQ-2
WQ-2WQ-2
WQ-2
 
The merits of integrating renewables with smarter grid carilec
The merits of integrating renewables with smarter grid   carilecThe merits of integrating renewables with smarter grid   carilec
The merits of integrating renewables with smarter grid carilec
 
Status of hvdc links
Status of hvdc linksStatus of hvdc links
Status of hvdc links
 
HVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyHVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading Technology
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdf
 
Rex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resumeRex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resume
 
O&m of hvdc station power grid india
O&m of hvdc station power grid indiaO&m of hvdc station power grid india
O&m of hvdc station power grid india
 
110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx
 
POWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHESPOWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHES
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
 
IPA Power Scotland Conference
IPA Power Scotland ConferenceIPA Power Scotland Conference
IPA Power Scotland Conference
 

ppt

  • 1. WELCOME IMPLEMENTATION OF NEW LOAD SHEDDING SCHEME IN BPCL-KR USING SCADA AKHIL ASHOK T V ALEENA FERNANDEZ
  • 2. INTRODUCTION • BPCL KR a MAH installation • Automation using SCADA • Aim – study of existing load shedding scheme & SCADA based load shedding scheme
  • 3. ABOUT BPCL KR • Kochi Refinery, a unit of Bharat Petroleum Corporation Limited (BPCL), embarked on its journey in 1966 with a capacity of 50,000 barrels per day. • BPCL KR - Ambalamugal near the city of Kochi in Kerala • The refinery has facilities to evacuate products to the consuming centers through road, rail, ships and through pipelines.
  • 4. • The BPCL installation at Irumpanam, to which the refinery is connected by pipelines, is the major product distribution centre of the refinery. • Kochi Refinery has taken it as a mission to make safe living and working a natural mantra of its employees, contract workers, customers and the general public.
  • 6. POWER SYSTEM IN KR • 2 KSEB 220 KV grid • GTG 1 22 MW at 11 KV level • GTG 2 34.5 MW at 11 KV level • STG 17.8 MW at 11 KV level • TG 25 MW at 3.3 KV level • 2 switch gears 33 KV (HT101) and 11 KV (GIS) • Critical loads 19.5 MW
  • 7. LOAD SHEDDING • Power system normal condition – adequate generating to meet load • Load shedding – imbalance b/w supply & demand • Types – fast & slow • Ways – manual & automatic
  • 8. EXISTING LOAD SHEDDING SCHEME • Types – overloading of generators under frequency based • Feeder based load shedding scheme • Frequency wise load shedding • 123.dotx • Under frequency relays – 7RW 600 • Limitation – load segregation not possible
  • 9. SCADA • Supervisory Control and Data Acquisition • Monitor & control – distributed process • MTU – master terminal unit • RTU – remote terminal unit • HMI – human machine interface
  • 10. SCADA BASED • Power deficit – load shedding initiated • Power balance calculation - Load to be tripped=Total load-(Total generation + Margins available in running generators) • Tripping command – pre set priority
  • 11. CONCLUSION • Complex network – central control room • Obtain stable plant operation – instability in supply • Application of SCADA – various levels • Replace conventional relays – numerical relays