1. Warehouse Layout
2. Standard Operating Procedure
3. Inventory Reporting System
4. Warehouse Structure Organization
5. Training Warehouse (5S and Preservation)
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Our Experience
Warehouse Layout + 3 Future State Option
Design and Setup SOP/WI, Form. Structure Organizations and Job Requirement
Training Warehouse + Additional Report
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Our Experience
PROJECT : FEASIBILITY STUDY
Feasibility Document Process Business
DELIVERABLES
1. Define Initial Warehouse Cost Structure
2. Feasibility Financial Aspect (NPV, IRR, BEP Analysis)
3. Feasibility Operational Aspect
4. Location and Layout Warehouse
Feasibility Financial Aspect
Feasibility Operational Aspect Location and Layout Warehouse
© PT INTI LOGIKA CIPTA 2015
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Our Experience
PROJECT : WAREHOUSE IMPROVEMENT
Manufacture Company
DELIVERABLES
1. Warehouse 5S Training & Implementation
2. Initiate and Setup 5S Team
3. Warehouse 5S Evaluation & Assessment
4. Inventory & Layout Optimization
Warehouse 5R Before & After Condition Training, Initiate, Control, Measurement
© PT INTI LOGIKA CIPTA 2015
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Our Experience
PROJECT : SETUP WAREHOUSING BUSINESS
Logistics Service Provider Company
DELIVERABLES
1. Warehouse Design and Layout
2. Warehouse Space Costing
3. Develop Warehouse Inventory Report
Date : 26-Sep-11
Nama Proyek : Costing Sewa Space Gudang
Item Jumlah Pemakaian Satuan Pemakaian Harga per Sqm
Sewa gudang 150 Sqm 11,667
Tenaga Kerja 1 Orang 5,000
Penyusutan Pallet 50 Unit 2,083
Telephone 1 667
Air 1 667
Listirik 1 667
Lain -Lain 1 1,667
22,417
3,362,500
Margin 10%
3,698,750
Occupancy 70%
Gudang tersewa (Sqm) 105.0
35,226
250,000
Struktur Biaya Sewa Gudang
Biaya per Sqm
Harga Jual per Sqm
Total Biaya
Total Pendapatan
1,750,000
750,000
312,500
100,000
100,000
100,000
Biaya per Bulan
Company : BMC Logistics
Last Updated : #####################
Item Id Item Description Customer Name Stock Update
10/7/2015 In Out In Out In Out
0001 Indomarco Adi Prima 10 10 - - - - -
0002 Indomarco Adi Prima 20 20 - - - - -
0003 PS Distributor -
0004 Paper Jaya -
0005 Inta Co -
0006 Rico Electronics 26 10 (5) 12 (3) - 12
-
-
-
-
-
-
Indomie Goreng Pedas
Pocari Sweat 350 ml
Pocari Sweat 500 ml
Kertas HVS A4
1-Jan-13 2-Jan-13 3-Jan-13
Handphone Nokia 2660
Playstation 3 HD 80GB
Warehouse Design and Layout
Space Costing (Selling Rate) Template Inventory Report
© PT INTI LOGIKA CIPTA 2015
Our Experience
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
PROJECT : TRANSPORTATION COST ANALYSIS
Freight Forwarding
DELIVERABLES
1. Define trucking cost structure.
2. Suggest and design dashboard trucking calculation.
3. Design template forklift calculation
Define Trucking Cost Struture
Design Dashboard Trucking Calculation
© PT INTI LOGIKA CIPTA 2015
Our Experience
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
PROJECT : WAREHOUSE DESIGN, PRESERVATION AND
HANDLING MATERIAL
Oil and Gas Company
DELIVERABLES
1. Asses existing Warehouse facility
2. Suggest to relay-out and optimizing current warehouse infrastructure
3. Suggest to improve existing material handling
4. Analyze and improve existing SOP and WI document.
5. Develop Preservation and Maintenance Management Tools
Asses existing facility Preservation and Maintenance Tools
Re-layout and Optimization
© PT INTI LOGIKA CIPTA 2015
© PT INTI LOGIKA CIPTA 2015
Our Experience
PROJECT : WAREHOUSE IMPROVEMENT
Telecommunication Company
DELIVERABLES
1. Layout of new warehouse facility
2. Detail storage design
3. SOP and WI for warehouse operation
4. Study and define Warehouse Management System
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Layout new Facility. Tools : ARC, MS.Visio, Sketchup
Design and Sourcing Storage for Telco Product
© PT INTI LOGIKA CIPTA 2015
Our Experience
PROJECT : IMPLEMENTATION STUDY
Telecommunication Company
DELIVERABLES
1. Sourcing vendor racking
2. Sourcing vendor Warehouse Management Systems
3. Implementation SOP/WI and form
4. Implementation Warehouse Management Systems
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Bobot Nama Vendor : Score Akhir
(0 - 100) Nama Sales : 76.80
Aspek Implementasi 25 Aspek Implementasi Penilaian (0-100) Score Atribut
a Deliverytime 55 a Deliverytime 90
b Local / Import 15 b Local / Import 90
c Masa Garansi 30 c Masa Garansi 80
Apek Teknis 15 Aspek Teknis
a Kesesuaian Desain 60 a Kesesuaian Desain 80
b Kustomisasi Desain 20 b Kustomisasi Desain 75
c Kecepatan Feedback 20 c Kecepatan Feedbcak 60
Aspek Biaya 50 Aspek Biaya
a Harga total penawaran 80 a Harga total penawaran 70
b Termin pembayaran 20 b Termin pembayaran 90
Aspek Non Teknis 10 Aspek Non Teknis
a Waktu tanggap/respons time 40 a Waktu tanggap/respons time 60
b Reputasi perusahaan 15 b Reputasi perusahaan 70
c Client Management 20 c Client Management 80
d Partisipasi aktif dalam proyek 25 d Partisipasi aktif dalam proyek 70
3
37.00
4
6.80
No Atribut Penilaian Penilaian Vendor
1
21.75
2
11.25
Item Deadline Deadline Date Status
Completion
Date
Remaining
Day(s)
Kick Off Meeting Week-1 17-Apr-15 16-Apr-15 -
Persiapan - Racking system
Pemilihan vendor racking Week-2 24-Apr-15 24-Apr-15 -
SPK / PO untuk vendor racking Week-3 1-May-15 29-Apr-15 -
Persiapan - WMS
Pemilihan vendor WMS Week-3 1-May-15 22-May-15 -
SPK / PO untuk vendor WMS Week-4 8-May-15 26-May-15 -
Persiapan - Implementasi lainnya
Identifikasi persiapan infrastruktur gudang
Pembuatan Jalusi Week-5 15-May-15 20-May-15 -
Perbaikan lampu gudang Week-5 15-May-15 20-May-15 -
PPE personal Week-3 1-May-15 -
APAR (Alat Pemadam Api ringan) Week-3 1-May-15 -
Cat epoxy Week-3 1-May-15 21-May-15 -
Identifikasi persiapan material handling equipment
Persiapan pengadaan pallet plastik Week-3 1-May-15 13-May-15 -
Identifikasi persiapan training operator forklift Week-4 8-May-15 25-May-15 -
Identifikasi persiapan training pekerja gudang lainnya Week-4 8-May-15 -
Perencanaan instalasi racking dengan vendor Week-4 8-May-15 20-May-15 -
Perencanaan instalasi WMS dengan vendor Week-5 15-May-15 26-May-15 -
Perencanaan implementasi Prosedur dan IK Week-4 8-May-15 15-May-15 -
Submit All rencana persiapan Week-5 15-May-15 25-May-15 -
Planning Implementation Before After
Vendor Selection / Beauty Contest Project Update Report
Our Experience
PROJECT : DESIGN REGIONAL DISTRIBUTION CENTER
Ministry of Trade – In Collaborate with Local Consultant
DELIVERABLES
1. Capacity Analysis
2. Design and Layout Regional Distribution Center (RDC)
3. Workflow analysis of Regional Distribution Center (RDC)
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Capacity Analysis
Design and Layout
© PT INTI LOGIKA CIPTA 2015
Our Experience
PROJECT : WAREHOUSE DESIGN AND IMPLEMENTATION
FMCG Company – In Collaborate with P2M University of Indonesia
DELIVERABLES
1. Define current state warehouse operation
2. Calculate warehouse capacity
3. Develop pros-cons for future state warehouse operation
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
Define Current State Warehouse Operation (Capacity, Man Power, Storage, etc)
Develop pros-cons for Future State Warehouse Operation
© PT INTI LOGIKA CIPTA 2015
Our Experience
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
© PT INTI LOGIKA CIPTA 2015
PROJECT : WAREHOUSE IMPROVEMENT,
IMPLEMENTATION ISO 9001 AND ISO 22000
Food and Beverages Industry
DELIVERABLES
1. Develop Procedure, Working Instruction and Form
2. Training ISO 9001 and ISO 22000 Awareness
3. Training Audit Internal
4. Implementation
5. Certification and Surveillance Audit
Training /Workshop ISO 9001 and ISO 22000
Develop SOP, WI and Form Design and Layout
Our Experience
OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US
PROJECT : FEASIBILITY STUDY FOR LOGISTICS
BUSINESS
Logistics Company
DELIVERABLES
1. Define cost structure
2. Provide financial projection
3. Trucking Investment Analysis
Trucking Investment
Cash flow Projection Operational Review
DC Origin Jakarta Cost per Trip to Jakarta Barat 470.373Rp Cost per Trip to Jakarta Pusat 439.673Rp
City Destination Jakarta Barat KM per Trip to Jakarta Barat 90 KM per Trip to Jakarta Pusat 70
Jakarta Pusat No Of Trip to Jakarta Barat 38 No Of Trip to Jakarta Pusat 12
Total KM per Month to Jakarta Barat 3.420 Total KM per Month to Jakarta Pusat 840
Cases per Trip 152 Cases per Trip 152
Cases per Month 5.780 Cases per Month 1.825
Cases per Year 69.358 Cases per Year 21.902
Total Trip / Month 50
Total KM / Month 4.260
SUMMARY FIXED COST PER BULAN SUMMARY VARIABEL COST PER BULAN Jakarta Barat SUMMARY VARIABEL COST PER BULAN Jakarta Pusat
Fixed Cost - Truck Investment / Month 6.888.219Rp 82,38% Variable Cost - Fuel / Month 3.864.600Rp 33,55% Variable Cost - Fuel / Month 949.200Rp 29,03%
Fixed Cost - Supporting Equipment / Month 129.167Rp 1,54% Variable Cost - Oil & Maintenance / Month 974.700Rp 8,46% Variable Cost - Oil & Maintenance / Month 239.400Rp 7,32%
Fixed Cost - Trucking Insurance / Month 885.417Rp 10,59% Variable Cost - Tyre Cost / Month 410.400Rp 3,56% Variable Cost - Tyre Cost / Month 100.800Rp 3,08%
Fixed Cost - Trucking Permit / Month 458.333Rp 5,48% Variable Cost - Trip Cost / Month 6.270.000Rp 54,43% Variable Cost - Trip Cost / Month 1.980.000Rp 60,56%
Fixed Cost - Employee / Month -Rp 0,00%
TOTAL FIXED COST / MONTH 8.361.136Rp TOTAL VARIABLE COST / MONTH 11.519.700Rp TOTAL VARIABEL COST / BULAN 3.269.400Rp
TOTAL FIXED COST / TRIP 167.223Rp TOTAL VARIABLE COST / TRIP 303.150Rp TOTAL VARIABEL COST / TRIP 272.450Rp
FIXED COST VARIABLE COST VARIABLE COST
Truck Type Fuel Fuel
Truck Investment 425.000.000Rp Price On the Road include box & reefer system Fuel Consumption (KM / LITRE) 5,00 Fuel Consumption (KM / LITRE) 5,00
Interest 11,50% Yearly Interest Fuel Rate 5.650Rp Fuel rate / litre Fuel Rate 5.650Rp Fuel rate / litre
Salvage value assumption 212.500.000Rp After 60 months Fuel Cost / Trip 101.700Rp Fuel rate x KM per trip / Fuel Consumption Fuel Cost / Trip 79.100Rp Fuel rate x KM per trip / Fuel Consumption
Fixed Cost - Truck Investment / Month 6.888.219Rp Variable Cost - Fuel / Month 3.864.600Rp Biaya BBM / Trip x Jumlah Trip per Bulan Variable Cost - Fuel / Month 949.200Rp Biaya BBM / Trip x Jumlah Trip per Bulan
Supporting Equipment Oil & Maintenance Oil & Maintenance
Rachet 250.000Rp Oil Price / Litre 50.000Rp Oil Price / Litre 50.000Rp
Rotary Lamp 350.000Rp Transmission Oil / KM 0,0020 Litre / KM Transmission Oil / KM 0,0020 Litre / KM
Hydraulic Jack 1.000.000Rp Machine Oil / KM 0,0030 Litre / KM Machine Oil / KM 0,0030 Litre / KM
Others 1.500.000Rp Gardan Oil / KM 0,0001 Litre / KM Gardan Oil / KM 0,0001 Litre / KM
Lifetime (month) 24 Equipment lifetime Oil Cost / Trip 22.950Rp Oil Cost / Trip 17.850Rp
Fixed Cost - Supporting Equipment / Month 129.167Rp Break Maintenance / Trip 900Rp Break Maintenance / Trip 700Rp
Insurance (All Risk) Other Maintenance / Trip 1.800Rp Other Maintenance / Trip 1.400Rp
Yearly Cost 2,5% Oil & Maintenance Cost / Trip 25.650Rp Oil & Maintenance Cost / Trip 19.950Rp
Fixed Cost - Trucking Insurance / Month 885.417Rp Variable Cost - Oil & Maintenance / Month 974.700Rp Variable Cost - Oil & Maintenance / Month 239.400Rp
Trucking Permit Tyre Tyre
STNK 2.500.000Rp Yearly Cost No of Tyre 4 No of Tyre 4
KEUR + Permit 1.500.000Rp per 6 months Tyre Price / Unit 1.500.000Rp Tyre Price / Unit 1.500.000Rp
Fixed Cost - Trucking Permit / Month 458.333Rp Tyre Consumption (KM) 50.000 Tyre Consumption (KM) 50.000
Employee Tyre Cost / Trip 10.800Rp Tyre Cost / Trip 8.400Rp
Driver -Rp Salary, Insurance & THR Variable Cost - Tyre Cost / Month 410.400Rp Variable Cost - Tyre Cost / Month 100.800Rp
Assistant Driver -Rp Salary, Insurance & THR Trip Trip
Fixed Cost - Employee / Month -Rp Driver Incentive 50.000Rp Driver Incentive 50.000Rp
Helper Incentive 25.000Rp Helper Incentive 25.000Rp
Toll 40.000Rp Toll 40.000Rp
Others (Mel, Portal, Escort, Etc) 50.000Rp Others (Mel, Portal, Escort, Etc) 50.000Rp
Total Trip Cost / Trip 165.000Rp Total Trip Cost / Trip 165.000Rp
Variable Cost - Trip Cost / Month 6.270.000Rp Variable Cost - Trip Cost / Month 1.980.000Rp
Colt Diesel Engkel - Frozen

Excelogic Consulting and Training | Our Experience

  • 1.
  • 2.
    © PT INTILOGIKA CIPTA 2015 PROJECT : WAREHOUSE MANAGEMENT Oil & Gas Company DELIVERABLES 1. Warehouse Layout 2. Standard Operating Procedure 3. Inventory Reporting System 4. Warehouse Structure Organization 5. Training Warehouse (5S and Preservation) OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Our Experience Warehouse Layout + 3 Future State Option Design and Setup SOP/WI, Form. Structure Organizations and Job Requirement Training Warehouse + Additional Report
  • 3.
    OUR TEAM OURSERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Our Experience PROJECT : FEASIBILITY STUDY Feasibility Document Process Business DELIVERABLES 1. Define Initial Warehouse Cost Structure 2. Feasibility Financial Aspect (NPV, IRR, BEP Analysis) 3. Feasibility Operational Aspect 4. Location and Layout Warehouse Feasibility Financial Aspect Feasibility Operational Aspect Location and Layout Warehouse © PT INTI LOGIKA CIPTA 2015
  • 4.
    OUR TEAM OURSERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Our Experience PROJECT : WAREHOUSE IMPROVEMENT Manufacture Company DELIVERABLES 1. Warehouse 5S Training & Implementation 2. Initiate and Setup 5S Team 3. Warehouse 5S Evaluation & Assessment 4. Inventory & Layout Optimization Warehouse 5R Before & After Condition Training, Initiate, Control, Measurement © PT INTI LOGIKA CIPTA 2015
  • 5.
    OUR TEAM OURSERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Our Experience PROJECT : SETUP WAREHOUSING BUSINESS Logistics Service Provider Company DELIVERABLES 1. Warehouse Design and Layout 2. Warehouse Space Costing 3. Develop Warehouse Inventory Report Date : 26-Sep-11 Nama Proyek : Costing Sewa Space Gudang Item Jumlah Pemakaian Satuan Pemakaian Harga per Sqm Sewa gudang 150 Sqm 11,667 Tenaga Kerja 1 Orang 5,000 Penyusutan Pallet 50 Unit 2,083 Telephone 1 667 Air 1 667 Listirik 1 667 Lain -Lain 1 1,667 22,417 3,362,500 Margin 10% 3,698,750 Occupancy 70% Gudang tersewa (Sqm) 105.0 35,226 250,000 Struktur Biaya Sewa Gudang Biaya per Sqm Harga Jual per Sqm Total Biaya Total Pendapatan 1,750,000 750,000 312,500 100,000 100,000 100,000 Biaya per Bulan Company : BMC Logistics Last Updated : ##################### Item Id Item Description Customer Name Stock Update 10/7/2015 In Out In Out In Out 0001 Indomarco Adi Prima 10 10 - - - - - 0002 Indomarco Adi Prima 20 20 - - - - - 0003 PS Distributor - 0004 Paper Jaya - 0005 Inta Co - 0006 Rico Electronics 26 10 (5) 12 (3) - 12 - - - - - - Indomie Goreng Pedas Pocari Sweat 350 ml Pocari Sweat 500 ml Kertas HVS A4 1-Jan-13 2-Jan-13 3-Jan-13 Handphone Nokia 2660 Playstation 3 HD 80GB Warehouse Design and Layout Space Costing (Selling Rate) Template Inventory Report © PT INTI LOGIKA CIPTA 2015
  • 6.
    Our Experience OUR TEAMOUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US PROJECT : TRANSPORTATION COST ANALYSIS Freight Forwarding DELIVERABLES 1. Define trucking cost structure. 2. Suggest and design dashboard trucking calculation. 3. Design template forklift calculation Define Trucking Cost Struture Design Dashboard Trucking Calculation © PT INTI LOGIKA CIPTA 2015
  • 7.
    Our Experience OUR TEAMOUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US PROJECT : WAREHOUSE DESIGN, PRESERVATION AND HANDLING MATERIAL Oil and Gas Company DELIVERABLES 1. Asses existing Warehouse facility 2. Suggest to relay-out and optimizing current warehouse infrastructure 3. Suggest to improve existing material handling 4. Analyze and improve existing SOP and WI document. 5. Develop Preservation and Maintenance Management Tools Asses existing facility Preservation and Maintenance Tools Re-layout and Optimization © PT INTI LOGIKA CIPTA 2015
  • 8.
    © PT INTILOGIKA CIPTA 2015 Our Experience PROJECT : WAREHOUSE IMPROVEMENT Telecommunication Company DELIVERABLES 1. Layout of new warehouse facility 2. Detail storage design 3. SOP and WI for warehouse operation 4. Study and define Warehouse Management System OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Layout new Facility. Tools : ARC, MS.Visio, Sketchup Design and Sourcing Storage for Telco Product
  • 9.
    © PT INTILOGIKA CIPTA 2015 Our Experience PROJECT : IMPLEMENTATION STUDY Telecommunication Company DELIVERABLES 1. Sourcing vendor racking 2. Sourcing vendor Warehouse Management Systems 3. Implementation SOP/WI and form 4. Implementation Warehouse Management Systems OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Bobot Nama Vendor : Score Akhir (0 - 100) Nama Sales : 76.80 Aspek Implementasi 25 Aspek Implementasi Penilaian (0-100) Score Atribut a Deliverytime 55 a Deliverytime 90 b Local / Import 15 b Local / Import 90 c Masa Garansi 30 c Masa Garansi 80 Apek Teknis 15 Aspek Teknis a Kesesuaian Desain 60 a Kesesuaian Desain 80 b Kustomisasi Desain 20 b Kustomisasi Desain 75 c Kecepatan Feedback 20 c Kecepatan Feedbcak 60 Aspek Biaya 50 Aspek Biaya a Harga total penawaran 80 a Harga total penawaran 70 b Termin pembayaran 20 b Termin pembayaran 90 Aspek Non Teknis 10 Aspek Non Teknis a Waktu tanggap/respons time 40 a Waktu tanggap/respons time 60 b Reputasi perusahaan 15 b Reputasi perusahaan 70 c Client Management 20 c Client Management 80 d Partisipasi aktif dalam proyek 25 d Partisipasi aktif dalam proyek 70 3 37.00 4 6.80 No Atribut Penilaian Penilaian Vendor 1 21.75 2 11.25 Item Deadline Deadline Date Status Completion Date Remaining Day(s) Kick Off Meeting Week-1 17-Apr-15 16-Apr-15 - Persiapan - Racking system Pemilihan vendor racking Week-2 24-Apr-15 24-Apr-15 - SPK / PO untuk vendor racking Week-3 1-May-15 29-Apr-15 - Persiapan - WMS Pemilihan vendor WMS Week-3 1-May-15 22-May-15 - SPK / PO untuk vendor WMS Week-4 8-May-15 26-May-15 - Persiapan - Implementasi lainnya Identifikasi persiapan infrastruktur gudang Pembuatan Jalusi Week-5 15-May-15 20-May-15 - Perbaikan lampu gudang Week-5 15-May-15 20-May-15 - PPE personal Week-3 1-May-15 - APAR (Alat Pemadam Api ringan) Week-3 1-May-15 - Cat epoxy Week-3 1-May-15 21-May-15 - Identifikasi persiapan material handling equipment Persiapan pengadaan pallet plastik Week-3 1-May-15 13-May-15 - Identifikasi persiapan training operator forklift Week-4 8-May-15 25-May-15 - Identifikasi persiapan training pekerja gudang lainnya Week-4 8-May-15 - Perencanaan instalasi racking dengan vendor Week-4 8-May-15 20-May-15 - Perencanaan instalasi WMS dengan vendor Week-5 15-May-15 26-May-15 - Perencanaan implementasi Prosedur dan IK Week-4 8-May-15 15-May-15 - Submit All rencana persiapan Week-5 15-May-15 25-May-15 - Planning Implementation Before After Vendor Selection / Beauty Contest Project Update Report
  • 10.
    Our Experience PROJECT :DESIGN REGIONAL DISTRIBUTION CENTER Ministry of Trade – In Collaborate with Local Consultant DELIVERABLES 1. Capacity Analysis 2. Design and Layout Regional Distribution Center (RDC) 3. Workflow analysis of Regional Distribution Center (RDC) OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Capacity Analysis Design and Layout © PT INTI LOGIKA CIPTA 2015
  • 11.
    Our Experience PROJECT :WAREHOUSE DESIGN AND IMPLEMENTATION FMCG Company – In Collaborate with P2M University of Indonesia DELIVERABLES 1. Define current state warehouse operation 2. Calculate warehouse capacity 3. Develop pros-cons for future state warehouse operation OUR TEAM OUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US Define Current State Warehouse Operation (Capacity, Man Power, Storage, etc) Develop pros-cons for Future State Warehouse Operation © PT INTI LOGIKA CIPTA 2015
  • 12.
    Our Experience OUR TEAMOUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US © PT INTI LOGIKA CIPTA 2015 PROJECT : WAREHOUSE IMPROVEMENT, IMPLEMENTATION ISO 9001 AND ISO 22000 Food and Beverages Industry DELIVERABLES 1. Develop Procedure, Working Instruction and Form 2. Training ISO 9001 and ISO 22000 Awareness 3. Training Audit Internal 4. Implementation 5. Certification and Surveillance Audit Training /Workshop ISO 9001 and ISO 22000 Develop SOP, WI and Form Design and Layout
  • 13.
    Our Experience OUR TEAMOUR SERVICES OUR APPROACH OUR EXPERIENCE OUR CLIENT CONTACT USABOUT US PROJECT : FEASIBILITY STUDY FOR LOGISTICS BUSINESS Logistics Company DELIVERABLES 1. Define cost structure 2. Provide financial projection 3. Trucking Investment Analysis Trucking Investment Cash flow Projection Operational Review DC Origin Jakarta Cost per Trip to Jakarta Barat 470.373Rp Cost per Trip to Jakarta Pusat 439.673Rp City Destination Jakarta Barat KM per Trip to Jakarta Barat 90 KM per Trip to Jakarta Pusat 70 Jakarta Pusat No Of Trip to Jakarta Barat 38 No Of Trip to Jakarta Pusat 12 Total KM per Month to Jakarta Barat 3.420 Total KM per Month to Jakarta Pusat 840 Cases per Trip 152 Cases per Trip 152 Cases per Month 5.780 Cases per Month 1.825 Cases per Year 69.358 Cases per Year 21.902 Total Trip / Month 50 Total KM / Month 4.260 SUMMARY FIXED COST PER BULAN SUMMARY VARIABEL COST PER BULAN Jakarta Barat SUMMARY VARIABEL COST PER BULAN Jakarta Pusat Fixed Cost - Truck Investment / Month 6.888.219Rp 82,38% Variable Cost - Fuel / Month 3.864.600Rp 33,55% Variable Cost - Fuel / Month 949.200Rp 29,03% Fixed Cost - Supporting Equipment / Month 129.167Rp 1,54% Variable Cost - Oil & Maintenance / Month 974.700Rp 8,46% Variable Cost - Oil & Maintenance / Month 239.400Rp 7,32% Fixed Cost - Trucking Insurance / Month 885.417Rp 10,59% Variable Cost - Tyre Cost / Month 410.400Rp 3,56% Variable Cost - Tyre Cost / Month 100.800Rp 3,08% Fixed Cost - Trucking Permit / Month 458.333Rp 5,48% Variable Cost - Trip Cost / Month 6.270.000Rp 54,43% Variable Cost - Trip Cost / Month 1.980.000Rp 60,56% Fixed Cost - Employee / Month -Rp 0,00% TOTAL FIXED COST / MONTH 8.361.136Rp TOTAL VARIABLE COST / MONTH 11.519.700Rp TOTAL VARIABEL COST / BULAN 3.269.400Rp TOTAL FIXED COST / TRIP 167.223Rp TOTAL VARIABLE COST / TRIP 303.150Rp TOTAL VARIABEL COST / TRIP 272.450Rp FIXED COST VARIABLE COST VARIABLE COST Truck Type Fuel Fuel Truck Investment 425.000.000Rp Price On the Road include box & reefer system Fuel Consumption (KM / LITRE) 5,00 Fuel Consumption (KM / LITRE) 5,00 Interest 11,50% Yearly Interest Fuel Rate 5.650Rp Fuel rate / litre Fuel Rate 5.650Rp Fuel rate / litre Salvage value assumption 212.500.000Rp After 60 months Fuel Cost / Trip 101.700Rp Fuel rate x KM per trip / Fuel Consumption Fuel Cost / Trip 79.100Rp Fuel rate x KM per trip / Fuel Consumption Fixed Cost - Truck Investment / Month 6.888.219Rp Variable Cost - Fuel / Month 3.864.600Rp Biaya BBM / Trip x Jumlah Trip per Bulan Variable Cost - Fuel / Month 949.200Rp Biaya BBM / Trip x Jumlah Trip per Bulan Supporting Equipment Oil & Maintenance Oil & Maintenance Rachet 250.000Rp Oil Price / Litre 50.000Rp Oil Price / Litre 50.000Rp Rotary Lamp 350.000Rp Transmission Oil / KM 0,0020 Litre / KM Transmission Oil / KM 0,0020 Litre / KM Hydraulic Jack 1.000.000Rp Machine Oil / KM 0,0030 Litre / KM Machine Oil / KM 0,0030 Litre / KM Others 1.500.000Rp Gardan Oil / KM 0,0001 Litre / KM Gardan Oil / KM 0,0001 Litre / KM Lifetime (month) 24 Equipment lifetime Oil Cost / Trip 22.950Rp Oil Cost / Trip 17.850Rp Fixed Cost - Supporting Equipment / Month 129.167Rp Break Maintenance / Trip 900Rp Break Maintenance / Trip 700Rp Insurance (All Risk) Other Maintenance / Trip 1.800Rp Other Maintenance / Trip 1.400Rp Yearly Cost 2,5% Oil & Maintenance Cost / Trip 25.650Rp Oil & Maintenance Cost / Trip 19.950Rp Fixed Cost - Trucking Insurance / Month 885.417Rp Variable Cost - Oil & Maintenance / Month 974.700Rp Variable Cost - Oil & Maintenance / Month 239.400Rp Trucking Permit Tyre Tyre STNK 2.500.000Rp Yearly Cost No of Tyre 4 No of Tyre 4 KEUR + Permit 1.500.000Rp per 6 months Tyre Price / Unit 1.500.000Rp Tyre Price / Unit 1.500.000Rp Fixed Cost - Trucking Permit / Month 458.333Rp Tyre Consumption (KM) 50.000 Tyre Consumption (KM) 50.000 Employee Tyre Cost / Trip 10.800Rp Tyre Cost / Trip 8.400Rp Driver -Rp Salary, Insurance & THR Variable Cost - Tyre Cost / Month 410.400Rp Variable Cost - Tyre Cost / Month 100.800Rp Assistant Driver -Rp Salary, Insurance & THR Trip Trip Fixed Cost - Employee / Month -Rp Driver Incentive 50.000Rp Driver Incentive 50.000Rp Helper Incentive 25.000Rp Helper Incentive 25.000Rp Toll 40.000Rp Toll 40.000Rp Others (Mel, Portal, Escort, Etc) 50.000Rp Others (Mel, Portal, Escort, Etc) 50.000Rp Total Trip Cost / Trip 165.000Rp Total Trip Cost / Trip 165.000Rp Variable Cost - Trip Cost / Month 6.270.000Rp Variable Cost - Trip Cost / Month 1.980.000Rp Colt Diesel Engkel - Frozen