Which of the following is not a part of Five M’s?
a. Material
b. Machine
c. Motion
d. Method
(Ans:c)
The correct sequence of operations in production planning and control is
a. Routing-Scheduling-Dispatching-Follow up
b. Scheduling-Routing- Dispatching-Follow up
c. Dispatching-Routing-Scheduling- Follow up
d. Routing-Scheduling-Follow up-Dispatching
(Ans:a)
Which of the following is true for ‘Routing’?
a. It is flow of work in the plant
b. Route sheets include list of machine tools that are to be followed
c. It depends upon material handling facilities
d. All of the above
(Ans:d)
Loading may be defined as
a. Sending the raw material to the machine
b. Sending the finished material to the store
c. Assign the work to the facilities
d. Uploading a software in machine control panel
(Ans:c)
Dispatching authorizes the start of production operations by
i. Release of material and components from stores to first process
ii. Release of material from process to process
iii. Issue of drawings instruction sheets
Which of the following is (are) true?
a. Only i
b. Only ii
c. i & ii
d. i , ii & iii
(Ans:d)
The bill of material does not consists of
a. Part number
b. Specifications of part
c. Name of the part
d. Price of the part
(Ans:d)
Procurement cycle time is time consumed for
a. Receiving of raw material
b. Inspection of various raw materials
c. Inspection of purchased components parts
d. All of the above
(Ans:d)
The transit time consist of
a. Time taken by raw material from machine to machine
b. Time consumed in moving the work between various departments
c. Time taken by a worker to machine a component
d. None of the above
(Ans:b)
Master schedule is prepared for
a. Single product continuous production
b. Multi product batch production
c. Assembly product continuous production
d. Single product batch production
(Ans:c)
Which of the following chart is drawn Machine vs time?
a. Man machine chart
b. The load chart
c. The progress chart
d. Curve chart
(Ans:b)
Gantt chart is mostly used for
a. Routing
b. Scheduling
c. Follow up
d. Inspection and quality control
(Ans:b)
Key to chart is provided in
a. Man machine chart
b. The load chart
c. The progress chart
d. Gantt chart
(Ans:d)
Centralized and decentralized are the types of
a. Routing
b. Dispatching
c. Scheduling
d. Follow up
(Ans:b)

More Related Content

What's hot

Robot automatic plug in
Robot automatic plug inRobot automatic plug in
Robot automatic plug in
chen Rory
 
Lab sheet 4 bti1022
Lab sheet 4 bti1022Lab sheet 4 bti1022
Lab sheet 4 bti1022alish sha
 
Excel file to evaluate manufactruing capacity
Excel file to evaluate manufactruing capacityExcel file to evaluate manufactruing capacity
Excel file to evaluate manufactruing capacity
Denis Bourbonneux
 
QED Aero Sales Presentation
QED Aero Sales PresentationQED Aero Sales Presentation
QED Aero Sales PresentationMatt Stiles, MBA
 
Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...
Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...
Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...
NoSQLmatters
 
Accounting grade 10: depreciation
Accounting grade 10: depreciationAccounting grade 10: depreciation
Accounting grade 10: depreciation
NONKULULEKO DIAGO
 

What's hot (6)

Robot automatic plug in
Robot automatic plug inRobot automatic plug in
Robot automatic plug in
 
Lab sheet 4 bti1022
Lab sheet 4 bti1022Lab sheet 4 bti1022
Lab sheet 4 bti1022
 
Excel file to evaluate manufactruing capacity
Excel file to evaluate manufactruing capacityExcel file to evaluate manufactruing capacity
Excel file to evaluate manufactruing capacity
 
QED Aero Sales Presentation
QED Aero Sales PresentationQED Aero Sales Presentation
QED Aero Sales Presentation
 
Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...
Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...
Nathan Ford- Divination of the Defects (Graph-Based Defect Prediction through...
 
Accounting grade 10: depreciation
Accounting grade 10: depreciationAccounting grade 10: depreciation
Accounting grade 10: depreciation
 

Similar to Ppc mc qs

Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
amitymbaassignment
 
Plant maintenance
 Plant maintenance Plant maintenance
Plant maintenance
Mr.pradip Waghmare
 
Carquestion
CarquestionCarquestion
Carquestion
RushiMaralkar
 
Total Quality Management - What could be the dimension of quality a) conforma...
Total Quality Management - What could be the dimension of quality a) conforma...Total Quality Management - What could be the dimension of quality a) conforma...
Total Quality Management - What could be the dimension of quality a) conforma...
Suma Kamadod
 
Total Quality Management - In total quality management, what does the ‘qualit...
Total Quality Management - In total quality management, what does the ‘qualit...Total Quality Management - In total quality management, what does the ‘qualit...
Total Quality Management - In total quality management, what does the ‘qualit...
Suma Kamadod
 
Total Quality Management - The most important consideration of an effective t...
Total Quality Management - The most important consideration of an effective t...Total Quality Management - The most important consideration of an effective t...
Total Quality Management - The most important consideration of an effective t...
Suma Kamadod
 
Total Quality Management - Clients are the people for whom the company doing ...
Total Quality Management - Clients are the people for whom the company doing ...Total Quality Management - Clients are the people for whom the company doing ...
Total Quality Management - Clients are the people for whom the company doing ...
Suma Kamadod
 
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Suma Kamadod
 
Total Quality Management - An effective tqm program is often referred to as ...
Total Quality Management - An effective tqm program is often referred to as  ...Total Quality Management - An effective tqm program is often referred to as  ...
Total Quality Management - An effective tqm program is often referred to as ...
Suma Kamadod
 
Total Quality Management - Knowledge is what to do the desire is the motivat...
Total Quality Management - Knowledge is what to do  the desire is the motivat...Total Quality Management - Knowledge is what to do  the desire is the motivat...
Total Quality Management - Knowledge is what to do the desire is the motivat...
Suma Kamadod
 
Total Quality Management - Quality is judged by a) manager b) director c) gov...
Total Quality Management - Quality is judged by a) manager b) director c) gov...Total Quality Management - Quality is judged by a) manager b) director c) gov...
Total Quality Management - Quality is judged by a) manager b) director c) gov...
Suma Kamadod
 
4. construction management
4. construction management4. construction management
4. construction management
Mani Das
 
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Suma Kamadod
 
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Suma Kamadod
 
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Suma Kamadod
 
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Suma Kamadod
 
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Suma Kamadod
 
Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...
Suma Kamadod
 
Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...
Suma Kamadod
 
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Suma Kamadod
 

Similar to Ppc mc qs (20)

Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Plant maintenance
 Plant maintenance Plant maintenance
Plant maintenance
 
Carquestion
CarquestionCarquestion
Carquestion
 
Total Quality Management - What could be the dimension of quality a) conforma...
Total Quality Management - What could be the dimension of quality a) conforma...Total Quality Management - What could be the dimension of quality a) conforma...
Total Quality Management - What could be the dimension of quality a) conforma...
 
Total Quality Management - In total quality management, what does the ‘qualit...
Total Quality Management - In total quality management, what does the ‘qualit...Total Quality Management - In total quality management, what does the ‘qualit...
Total Quality Management - In total quality management, what does the ‘qualit...
 
Total Quality Management - The most important consideration of an effective t...
Total Quality Management - The most important consideration of an effective t...Total Quality Management - The most important consideration of an effective t...
Total Quality Management - The most important consideration of an effective t...
 
Total Quality Management - Clients are the people for whom the company doing ...
Total Quality Management - Clients are the people for whom the company doing ...Total Quality Management - Clients are the people for whom the company doing ...
Total Quality Management - Clients are the people for whom the company doing ...
 
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
 
Total Quality Management - An effective tqm program is often referred to as ...
Total Quality Management - An effective tqm program is often referred to as  ...Total Quality Management - An effective tqm program is often referred to as  ...
Total Quality Management - An effective tqm program is often referred to as ...
 
Total Quality Management - Knowledge is what to do the desire is the motivat...
Total Quality Management - Knowledge is what to do  the desire is the motivat...Total Quality Management - Knowledge is what to do  the desire is the motivat...
Total Quality Management - Knowledge is what to do the desire is the motivat...
 
Total Quality Management - Quality is judged by a) manager b) director c) gov...
Total Quality Management - Quality is judged by a) manager b) director c) gov...Total Quality Management - Quality is judged by a) manager b) director c) gov...
Total Quality Management - Quality is judged by a) manager b) director c) gov...
 
4. construction management
4. construction management4. construction management
4. construction management
 
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
 
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...Six Sigma Green Belt - Which of the following tools is most likely to be orga...
Six Sigma Green Belt - Which of the following tools is most likely to be orga...
 
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...Six Sigma Green Belt - Correction, over production, inventory, and motion are...
Six Sigma Green Belt - Correction, over production, inventory, and motion are...
 
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
Six Sigma Green Belt - A calibrated micrometer was used to take 10 replicated...
 
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
Six Sigma Green Belt - Positional, cyclical, and temporal variations are most...
 
Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...Six Sigma Green Belt - The type of chart that presents the value of items in ...
Six Sigma Green Belt - The type of chart that presents the value of items in ...
 
Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...Six Sigma Green Belt - A sample consists of one or more units of product draw...
Six Sigma Green Belt - A sample consists of one or more units of product draw...
 
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...Six Sigma Green Belt - In preparation for construction of a cause and effect ...
Six Sigma Green Belt - In preparation for construction of a cause and effect ...
 

More from Rajeshwar Deshmukh

Keys
KeysKeys
Working drawings
Working drawingsWorking drawings
Working drawings
Rajeshwar Deshmukh
 
Question bank ppc
Question bank   ppcQuestion bank   ppc
Question bank ppc
Rajeshwar Deshmukh
 
Camd
Camd Camd
1.3 thread fastener
1.3 thread fastener1.3 thread fastener
1.3 thread fastener
Rajeshwar Deshmukh
 

More from Rajeshwar Deshmukh (6)

Keys
KeysKeys
Keys
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Question bank ppc
Question bank   ppcQuestion bank   ppc
Question bank ppc
 
Camd
Camd Camd
Camd
 
1.3 thread fastener
1.3 thread fastener1.3 thread fastener
1.3 thread fastener
 
Rms questionnire
Rms questionnireRms questionnire
Rms questionnire
 

Recently uploaded

To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
Fwdays
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
CatarinaPereira64715
 

Recently uploaded (20)

To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 

Ppc mc qs

  • 1. Which of the following is not a part of Five M’s? a. Material b. Machine c. Motion d. Method (Ans:c) The correct sequence of operations in production planning and control is a. Routing-Scheduling-Dispatching-Follow up b. Scheduling-Routing- Dispatching-Follow up c. Dispatching-Routing-Scheduling- Follow up d. Routing-Scheduling-Follow up-Dispatching (Ans:a) Which of the following is true for ‘Routing’? a. It is flow of work in the plant b. Route sheets include list of machine tools that are to be followed c. It depends upon material handling facilities d. All of the above (Ans:d) Loading may be defined as a. Sending the raw material to the machine b. Sending the finished material to the store c. Assign the work to the facilities d. Uploading a software in machine control panel (Ans:c) Dispatching authorizes the start of production operations by i. Release of material and components from stores to first process ii. Release of material from process to process iii. Issue of drawings instruction sheets Which of the following is (are) true? a. Only i b. Only ii c. i & ii d. i , ii & iii (Ans:d) The bill of material does not consists of a. Part number b. Specifications of part c. Name of the part d. Price of the part (Ans:d) Procurement cycle time is time consumed for a. Receiving of raw material b. Inspection of various raw materials c. Inspection of purchased components parts d. All of the above
  • 2. (Ans:d) The transit time consist of a. Time taken by raw material from machine to machine b. Time consumed in moving the work between various departments c. Time taken by a worker to machine a component d. None of the above (Ans:b) Master schedule is prepared for a. Single product continuous production b. Multi product batch production c. Assembly product continuous production d. Single product batch production (Ans:c) Which of the following chart is drawn Machine vs time? a. Man machine chart b. The load chart c. The progress chart d. Curve chart (Ans:b) Gantt chart is mostly used for a. Routing b. Scheduling c. Follow up d. Inspection and quality control (Ans:b) Key to chart is provided in a. Man machine chart b. The load chart c. The progress chart d. Gantt chart (Ans:d) Centralized and decentralized are the types of a. Routing b. Dispatching c. Scheduling d. Follow up (Ans:b)