SlideShare a Scribd company logo
Sample
www.upp.ae
Commercial printing
 Machines Utilization, No. of make ready, Total printed sheets
and Productivity
 Working Hours and Downtime Details
Effective speed related to the target and Waste percentage
94%
86%
76%
69%
58%
71%
62%
30%
64%
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
Utilization
10,027,309
8,771,916
1,202,640
764,538
530,077
804953
568,979
181,946
563,552
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
Total printed sheets
334
174
332
231 232
262
207
121
308
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
No. of make ready
78%
88% 86%
68% 65%
76%
62%
38%
51%
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
Productivity
4
55
Un planned MR
Un planned RT
284
68%
59
14%
46
11%
27
7%
Expected
Downtime No Work HoursProduction
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Production Time = (Make ready + Running Time)
Unplanned Down Time
343
83%
46
11%
27
6%
Achieved
0.0
2.3
5.3
0.0
0.0
0.0
14.0
11.1
1.0
8.5
2.3
0.0
0.0
0.0
1.3
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Machine Rotoman
Utilization 94%
Availability 62%
Productivity 78%
Quality 94%
OEE 45%
No.of MR 334
no. of Sheets 10,027,309
Achieved Speed 39,192
PT achieved 343
Avearge Speed 50000
PT expected 284
Un planned DT 59
Unutilized time 27
Waste % 6%
263
63%
64
15%
33
8%
56
14%
Expected
-2
65
Un planned MR
Un planned RT
KBA215
326,
78%
33, 8%
56,
14%
Achieved
0.0
9.4
0.0
0.0
0.0
1.0
5.4
2.9
0.0
9.5
1.0
0.0
0.0
0.0
4.0
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine KBA215
Utilization 86%
Availability 68%
Productivity 88%
Quality 95%
OEE 57%
No.of MR 174
no. of Sheets 8,771,916
Achieved Speed 30,815
PT achieved 326
Avearge Speed 40000
PT expected 263
Un planned DT 64
Unutilized time 56
Waste % 5%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
-12
-24
Un planned MR
Un planned RT
Kom8col 2
247
67%
69
19%
50
14%
Achieved
5.5
34.0
6.0
0.0
0.0
0.5
0.0
5.5
2.0
6.0
0.0
2.1
0.0
0.0
5.6
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC…
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine Kom8col 2
Utilization 76%
Availability 42%
Productivity 86%
Quality 97%
OEE 35%
No.of MR 332
no. of Sheets 1,202,640
Achieved Speed 6,843
PT achieved 247
Avearge Speed 8000
PT expected 233
Un planned DT 14
Unutilized time 100
Waste % 3%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
283
65%
-36
-8%
69
16%
50
11%
Expected
Downtime No Work HoursProduction Unplanned Down Time
250
64%
-45
-10%
84
21%
13
3%
Expected
8
-80
Un planned MR
Un planned RT
Kom8col 1
205
68%
84
28%
13
4%
Achieved
0.7
9.1
0.0
0.0
0.0
0.0
0.0
0.7
0.0
3.1
8.0
0.2
0.0
0.0
1.0
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine Kom8col 1
Utilization 69%
Availability 34%
Productivity 68%
Quality 97%
OEE 22%
No.of MR 231
no. of Sheets 764,538
Achieved Speed 5,473
PT achieved 205
Avearge Speed 8000
PT expected 153
Un planned DT 52
Unutilized time 127
Waste % 3%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
267
61%
-85
-19%
59
14%
25
6%
Expected
4
10
Un planned MR
Un planned RT
Kom4col
183
69%
59
22%
25
9%
Achieved
3.9
24.8
5.0
0.0
0.0
1.5
0.0
3.9
0.0
0.0
0.0
18.0
0.0
0.0
1.8
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine Kom4col
Utilization 58%
Availability 24%
Productivity 65%
Quality 92%
OEE 14%
No.of MR 232
no. of Sheets 150,015
Achieved Speed 5,230
PT achieved 183
Avearge Speed 8000
PT expected 144
Un planned DT 39
Unutilized time 175
Waste % 8%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
289
74%
-42
-11%
46
12%
14
3%
Expected
6
40
Un planned MR
Un planned RT
KBA105
4.4
21.8
5.5
0.0
0.0
2.5
0.0
4.4
0.0
0.8
0.0
2.6
0.0
0.0
3.9
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
248
81%
46
15%
14
4%
Achieved
Production Time = (Make ready + Running Time)
Machine KBA105
Utilization 71%
Availability 32%
Productivity 76%
Quality 96%
OEE 23%
No.of MR 262
no. of Sheets 804,953
Achieved Speed 6,103
PT achieved 248
Avearge Speed 8000
PT expected 210
Un planned DT 38
Unutilized time 123
Waste % 4%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
262
57%
-86
-19%
83
18%
26
6%
Expected
-1
-10
Un planned MR
Un planned RT
KBA74
176
62%
83
29%
26
9%
Achieved
3.5
27.3
15.5
3.8
0.0
2.3
0.0
3.5
0.0
4.0
0.0
19.7
0.0
0.0
3.8
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine KBA74
Utilization 62%
Availability 28%
Productivity 62%
Quality 94%
OEE 16%
No.of MR 207
no. of Sheets 568,979
Achieved Speed 4,969
PT achieved 176
Avearge Speed 8000
PT expected 133
Un planned DT 43
Unutilized time 157
Waste % 6%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
241
54%-144
-32%
29
6%
35
8%
Expected
0
-25
Un planned MR
Un planned RT
Roland500
97
60%
29
18%
35
22% Achieved
2.0
11.2
3.0
0.0
0.4
0.0
0.0
2.0
0.3
0.0
0.0
9.4
0.0
0.0
0.0
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC Checking
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine Roland500
Utilization 30%
Availability 15%
Productivity 38%
Quality 94%
OEE 5%
No.of MR 121
no. of Sheets 181,946
Achieved Speed 3,006
PT achieved 97
Avearge Speed 8000
PT expected 59
Un planned DT 38
Unutilized time 290
Waste % 6%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
247
70%
-34
-11%
51
15%
20
6%
Expected
-1
-20
Un planned MR
Un planned RT
SM52
213
75%
51
18%
20
7%Achieved
5.1
31.9
0.0
0.0
0.0
0.0
0.0
5.1
0.0
0.0
0.0
9.2
0.0
0.0
0.0
pallets change
Blanket cleaning
collecting paper…
Waiting paper for…
Waiting for helpers
Waiting for plates
Remake plates
Waiting QC…
Going to …
Mechanical
Electrical
Wating ink for dry
Filling report
Make Ready Time
Others production…
Production Time = (Make ready + Running Time)
Machine SM52
Utilization 64%
Availability 33%
Productivity 51%
Quality 95%
OEE 16%
No.of MR 308
no. of Sheets 563,552
Achieved Speed 4,099
PT achieved 213
Avearge Speed 8000
PT expected 147
Un planned DT 66
Unutilized time 151
Waste % 5%
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Downtime No Work HoursProduction Unplanned Down Time
334
174
332
231 232
262
207
121
308
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
No. of make ready
6%
5%
3% 3%
8%
4%
6% 6%
5%
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
Waste %
39,192
30,815
6,843
5,473
5,230
6,103
4,969
3,006
4,099
50,000
35,000
8,000
8,000
8,000
8,000
8,000
8,000
8,000
65,000
45,000
16,000
16,000
16,000
18,000
16,000
18,000
16,000
Rotoman
KBA215
Kom8col2
Kom8col1
Kom4col
KBA105
KBA74
Roland500
SM52
Effective Avarge Speed Actual speed
CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
Thank You Very Much..
www.upp.ae

More Related Content

Viewers also liked

Proposta alle aziende 2012 2013 nov12
Proposta alle aziende 2012 2013 nov12Proposta alle aziende 2012 2013 nov12
Proposta alle aziende 2012 2013 nov12Bruno Mazzoleni
 
CISSP Week 5
CISSP Week 5CISSP Week 5
CISSP Week 5jemtallon
 
Моя перша презентація - 5 клас
Моя перша презентація - 5 класМоя перша презентація - 5 клас
Моя перша презентація - 5 клас
Irina Genih
 
E-ARK-iPRES2016-Bern-October-2016
E-ARK-iPRES2016-Bern-October-2016E-ARK-iPRES2016-Bern-October-2016
E-ARK-iPRES2016-Bern-October-2016Sven Schlarb
 
Sustainability Project/ Proyecto de Sostenibilidad
Sustainability Project/ Proyecto de SostenibilidadSustainability Project/ Proyecto de Sostenibilidad
Sustainability Project/ Proyecto de Sostenibilidad
Elisabeth Garcia Fuentes
 
CISSP Week 20
CISSP Week 20CISSP Week 20
CISSP Week 20jemtallon
 
Mon autobiographie
Mon autobiographieMon autobiographie
Mon autobiographieWill Poyser
 
Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01062270
 
access-control-week-2
access-control-week-2access-control-week-2
access-control-week-2jemtallon
 
даша дослідниця подорожує індією
даша дослідниця подорожує індієюдаша дослідниця подорожує індією
даша дослідниця подорожує індією
Irina Genih
 

Viewers also liked (12)

Proposta alle aziende 2012 2013 nov12
Proposta alle aziende 2012 2013 nov12Proposta alle aziende 2012 2013 nov12
Proposta alle aziende 2012 2013 nov12
 
CISSP Week 5
CISSP Week 5CISSP Week 5
CISSP Week 5
 
Моя перша презентація - 5 клас
Моя перша презентація - 5 класМоя перша презентація - 5 клас
Моя перша презентація - 5 клас
 
E-ARK-iPRES2016-Bern-October-2016
E-ARK-iPRES2016-Bern-October-2016E-ARK-iPRES2016-Bern-October-2016
E-ARK-iPRES2016-Bern-October-2016
 
Programari
ProgramariProgramari
Programari
 
Sustainability Project/ Proyecto de Sostenibilidad
Sustainability Project/ Proyecto de SostenibilidadSustainability Project/ Proyecto de Sostenibilidad
Sustainability Project/ Proyecto de Sostenibilidad
 
CISSP Week 20
CISSP Week 20CISSP Week 20
CISSP Week 20
 
Mon autobiographie
Mon autobiographieMon autobiographie
Mon autobiographie
 
iCademy prezentace
iCademy prezentaceiCademy prezentace
iCademy prezentace
 
Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01
 
access-control-week-2
access-control-week-2access-control-week-2
access-control-week-2
 
даша дослідниця подорожує індією
даша дослідниця подорожує індієюдаша дослідниця подорожує індією
даша дослідниця подорожує індією
 

Similar to PP New Design

Final plant layout
Final plant layoutFinal plant layout
Final plant layoutradit12
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
Dr. Bikram Jit Singh
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
Mohammad IFTAKHAR
 
Manual licor 6200 condensado
Manual licor 6200 condensadoManual licor 6200 condensado
Manual licor 6200 condensado
Ignacio Delfino Yurin
 
Quality analysis of hmc
Quality analysis of hmcQuality analysis of hmc
Quality analysis of hmc
Abu Bakar Siddique
 
Machine utilization at krishan and co.
Machine utilization at krishan and co.Machine utilization at krishan and co.
Machine utilization at krishan and co.
rahuluit
 
Cost Control in spinning mills dataSM.ppt
Cost Control in spinning mills dataSM.pptCost Control in spinning mills dataSM.ppt
Cost Control in spinning mills dataSM.ppt
JSathish3
 
Presentation on internship at zsml
Presentation on internship at zsmlPresentation on internship at zsml
Presentation on internship at zsml
Alyssa95
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
SoulmananIndia
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
noelmanroe1
 
zone 3 ppt.pptx
zone 3 ppt.pptxzone 3 ppt.pptx
zone 3 ppt.pptx
NasrullahKhan406671
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
DhruvShah202
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
Parth Patel
 
Factory analysis simulation 2
Factory analysis simulation 2Factory analysis simulation 2
Factory analysis simulation 2
Ra'uf Tailony
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
veeramaniveltraining
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream Mapping
Alwin Thomas
 
Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...
Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...
Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...
Ajjay Kumar Gupta
 
Industrial Attachment
Industrial AttachmentIndustrial Attachment
Industrial Attachment
Taosif Ahmed (陶实甫)
 

Similar to PP New Design (20)

Final plant layout
Final plant layoutFinal plant layout
Final plant layout
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Manual licor 6200 condensado
Manual licor 6200 condensadoManual licor 6200 condensado
Manual licor 6200 condensado
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
Quality analysis of hmc
Quality analysis of hmcQuality analysis of hmc
Quality analysis of hmc
 
Machine utilization at krishan and co.
Machine utilization at krishan and co.Machine utilization at krishan and co.
Machine utilization at krishan and co.
 
Cost Control in spinning mills dataSM.ppt
Cost Control in spinning mills dataSM.pptCost Control in spinning mills dataSM.ppt
Cost Control in spinning mills dataSM.ppt
 
Presentation on internship at zsml
Presentation on internship at zsmlPresentation on internship at zsml
Presentation on internship at zsml
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
zone 3 ppt.pptx
zone 3 ppt.pptxzone 3 ppt.pptx
zone 3 ppt.pptx
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Factory analysis simulation 2
Factory analysis simulation 2Factory analysis simulation 2
Factory analysis simulation 2
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream Mapping
 
Sip
SipSip
Sip
 
Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...
Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...
Copper Sulphate- Manufacturing Plant, Detailed Project Report, Profile, Busin...
 
Industrial Attachment
Industrial AttachmentIndustrial Attachment
Industrial Attachment
 

PP New Design

  • 2. Commercial printing  Machines Utilization, No. of make ready, Total printed sheets and Productivity  Working Hours and Downtime Details Effective speed related to the target and Waste percentage
  • 3. 94% 86% 76% 69% 58% 71% 62% 30% 64% Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 Utilization 10,027,309 8,771,916 1,202,640 764,538 530,077 804953 568,979 181,946 563,552 Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 Total printed sheets 334 174 332 231 232 262 207 121 308 Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 No. of make ready 78% 88% 86% 68% 65% 76% 62% 38% 51% Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 Productivity
  • 4. 4 55 Un planned MR Un planned RT 284 68% 59 14% 46 11% 27 7% Expected Downtime No Work HoursProduction CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Production Time = (Make ready + Running Time) Unplanned Down Time 343 83% 46 11% 27 6% Achieved 0.0 2.3 5.3 0.0 0.0 0.0 14.0 11.1 1.0 8.5 2.3 0.0 0.0 0.0 1.3 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Machine Rotoman Utilization 94% Availability 62% Productivity 78% Quality 94% OEE 45% No.of MR 334 no. of Sheets 10,027,309 Achieved Speed 39,192 PT achieved 343 Avearge Speed 50000 PT expected 284 Un planned DT 59 Unutilized time 27 Waste % 6%
  • 5. 263 63% 64 15% 33 8% 56 14% Expected -2 65 Un planned MR Un planned RT KBA215 326, 78% 33, 8% 56, 14% Achieved 0.0 9.4 0.0 0.0 0.0 1.0 5.4 2.9 0.0 9.5 1.0 0.0 0.0 0.0 4.0 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine KBA215 Utilization 86% Availability 68% Productivity 88% Quality 95% OEE 57% No.of MR 174 no. of Sheets 8,771,916 Achieved Speed 30,815 PT achieved 326 Avearge Speed 40000 PT expected 263 Un planned DT 64 Unutilized time 56 Waste % 5% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 6. -12 -24 Un planned MR Un planned RT Kom8col 2 247 67% 69 19% 50 14% Achieved 5.5 34.0 6.0 0.0 0.0 0.5 0.0 5.5 2.0 6.0 0.0 2.1 0.0 0.0 5.6 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC… Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine Kom8col 2 Utilization 76% Availability 42% Productivity 86% Quality 97% OEE 35% No.of MR 332 no. of Sheets 1,202,640 Achieved Speed 6,843 PT achieved 247 Avearge Speed 8000 PT expected 233 Un planned DT 14 Unutilized time 100 Waste % 3% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) 283 65% -36 -8% 69 16% 50 11% Expected Downtime No Work HoursProduction Unplanned Down Time
  • 7. 250 64% -45 -10% 84 21% 13 3% Expected 8 -80 Un planned MR Un planned RT Kom8col 1 205 68% 84 28% 13 4% Achieved 0.7 9.1 0.0 0.0 0.0 0.0 0.0 0.7 0.0 3.1 8.0 0.2 0.0 0.0 1.0 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine Kom8col 1 Utilization 69% Availability 34% Productivity 68% Quality 97% OEE 22% No.of MR 231 no. of Sheets 764,538 Achieved Speed 5,473 PT achieved 205 Avearge Speed 8000 PT expected 153 Un planned DT 52 Unutilized time 127 Waste % 3% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 8. 267 61% -85 -19% 59 14% 25 6% Expected 4 10 Un planned MR Un planned RT Kom4col 183 69% 59 22% 25 9% Achieved 3.9 24.8 5.0 0.0 0.0 1.5 0.0 3.9 0.0 0.0 0.0 18.0 0.0 0.0 1.8 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine Kom4col Utilization 58% Availability 24% Productivity 65% Quality 92% OEE 14% No.of MR 232 no. of Sheets 150,015 Achieved Speed 5,230 PT achieved 183 Avearge Speed 8000 PT expected 144 Un planned DT 39 Unutilized time 175 Waste % 8% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 9. 289 74% -42 -11% 46 12% 14 3% Expected 6 40 Un planned MR Un planned RT KBA105 4.4 21.8 5.5 0.0 0.0 2.5 0.0 4.4 0.0 0.8 0.0 2.6 0.0 0.0 3.9 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… 248 81% 46 15% 14 4% Achieved Production Time = (Make ready + Running Time) Machine KBA105 Utilization 71% Availability 32% Productivity 76% Quality 96% OEE 23% No.of MR 262 no. of Sheets 804,953 Achieved Speed 6,103 PT achieved 248 Avearge Speed 8000 PT expected 210 Un planned DT 38 Unutilized time 123 Waste % 4% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 10. 262 57% -86 -19% 83 18% 26 6% Expected -1 -10 Un planned MR Un planned RT KBA74 176 62% 83 29% 26 9% Achieved 3.5 27.3 15.5 3.8 0.0 2.3 0.0 3.5 0.0 4.0 0.0 19.7 0.0 0.0 3.8 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine KBA74 Utilization 62% Availability 28% Productivity 62% Quality 94% OEE 16% No.of MR 207 no. of Sheets 568,979 Achieved Speed 4,969 PT achieved 176 Avearge Speed 8000 PT expected 133 Un planned DT 43 Unutilized time 157 Waste % 6% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 11. 241 54%-144 -32% 29 6% 35 8% Expected 0 -25 Un planned MR Un planned RT Roland500 97 60% 29 18% 35 22% Achieved 2.0 11.2 3.0 0.0 0.4 0.0 0.0 2.0 0.3 0.0 0.0 9.4 0.0 0.0 0.0 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC Checking Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine Roland500 Utilization 30% Availability 15% Productivity 38% Quality 94% OEE 5% No.of MR 121 no. of Sheets 181,946 Achieved Speed 3,006 PT achieved 97 Avearge Speed 8000 PT expected 59 Un planned DT 38 Unutilized time 290 Waste % 6% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 12. 247 70% -34 -11% 51 15% 20 6% Expected -1 -20 Un planned MR Un planned RT SM52 213 75% 51 18% 20 7%Achieved 5.1 31.9 0.0 0.0 0.0 0.0 0.0 5.1 0.0 0.0 0.0 9.2 0.0 0.0 0.0 pallets change Blanket cleaning collecting paper… Waiting paper for… Waiting for helpers Waiting for plates Remake plates Waiting QC… Going to … Mechanical Electrical Wating ink for dry Filling report Make Ready Time Others production… Production Time = (Make ready + Running Time) Machine SM52 Utilization 64% Availability 33% Productivity 51% Quality 95% OEE 16% No.of MR 308 no. of Sheets 563,552 Achieved Speed 4,099 PT achieved 213 Avearge Speed 8000 PT expected 147 Un planned DT 66 Unutilized time 151 Waste % 5% CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS) Downtime No Work HoursProduction Unplanned Down Time
  • 13. 334 174 332 231 232 262 207 121 308 Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 No. of make ready 6% 5% 3% 3% 8% 4% 6% 6% 5% Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 Waste % 39,192 30,815 6,843 5,473 5,230 6,103 4,969 3,006 4,099 50,000 35,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 65,000 45,000 16,000 16,000 16,000 18,000 16,000 18,000 16,000 Rotoman KBA215 Kom8col2 Kom8col1 Kom4col KBA105 KBA74 Roland500 SM52 Effective Avarge Speed Actual speed CALCULATION IS BASED ON 416 HOURS (26 DAYS X 2 SHIFTS X 8 HOURS)
  • 14. Thank You Very Much.. www.upp.ae