SlideShare a Scribd company logo
1 of 6
Download to read offline
PB+4
PB+4
PB+4
PB+4
PB+4
PB+4
PB+4
PB+7
PB+7
Sotacoberta
Sotacoberta
Sotacoberta
PB+5
PB+5
PB+5
PB+4
AMARI DE COMPTADORS
D'AIGUA 1,30mx0,73mx
2,00m
RITI 1,00mx0,50mx2,00m
ARMARI COMPTADORS
ELECTRICITAT1,50mx0,73mx2,00m
CGP
60cmx
30cmx
150cm
DEL GAS
60cmx
30cmx
150cm
ARMARI COMPTADORS
DE GAS
1,40m x 0,40m x 2,00m
2,54 m
2,78 m
3,81 m
Zona per
Estendre - Roba
Zona
Horts Urbans
R.I.T.S
ZONA
EINES/TAQUILLES
EDIFICI PLURIFAMILIAR SITUAT ENTRE MITGERES.
10 CM.
- ENTORN
LA DE LA CARA SUD DE PB+5.
- CLIMA
HTTP://WWW.TEMPSMATARO.NET/ OBTENIM LA
L'ESTIU NI AL HIVERN.
GAIRE.
ZONA AMB GRANS VENTS.
TOTALMENT A NORD.
TROBA OEST.
TOTALMENT A SUD.
PROJECTE
PB ---> 2 LOCALS COMERCIALS
PSot -1 i PSot -2 ---> DESTINAT APARCAMENT
PLANTA BAIXA_ 2 LOCALS COMERCIALS PLANTA TIPUS_ 3 HABITATGES
PLANTA SOTACOBERTA_ ESTUDIS HABITATGES I TERRASSES PRIVADES
HABITATGES
PROJECTE FINAL DE GRAU
Projecte Executiu d'un edifici plurifamliar entre mitgeres al
L DATA:
8/06/2012
ALUMNE:
Elisabeth Garcia Fuentes
At18049
ESCALA:
1/75
NORD: TEMA:
SISTEMES PASSIUS 001
C
P
PROJECTE FINAL DE GRAU
Projecte Executiu d'un edifici plurifamliar entre mitgeres al
L DATA:
8/06/2012
ALUMNE:
Elisabeth Garcia Fuentes
At18049
ESCALA:
1/75
NORD: TEMA:
SISTEMES PASSIUS 002
C
V
SOTACOBERTA
TEMP. TEMP.
TEMP.
PATI INT. TEMP.
TEMP.
TEMP.
TEMP.
PATI INT. TEMP.
PL SOTACOB
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
+4.01
+0.00
+6.89
+9.77
+12.65
+15.53
+18.41
PLANTA BAIXA
A.R.M.=19.00m
+0.13
+0.13
2,91 m
Sud --> 21 Juny 12:00h.
Josep
Oest --> 21 Juny 16:00 h.
Josep
Josep
Josep
Oest --> 21Des. 16:00 h.
Sud --> 21 Des. 12:00h.
PROJECTE FINAL DE GRAU
Projecte Executiu d'un edifici plurifamliar entre mitgeres al
L DATA:
8/06/2012
ALUMNE:
Elisabeth Garcia Fuentes
At18049
ESCALA:
1/150
NORD: TEMA:
SISTEMES PASSIUS 003
C
F
21 Juny -12:00h
21 Des. -12:00h
L'HIVERN:
OBJECTIU:
ESTIU:
TREIEM OBERTURA
DALT A BAIXA
PER EL MATEIX MOTIU.
MOTIUS:
EN QUAN A LES CARPINTERIES, CON ES TRACTA DE LES OBERTURES I
QUE SIGUI. EXEMPLE: GELOSIA ORIENTABLE ABATIBLE
DE COLOR GRIS FOSC
GELOSIA ORIENTABLE
GELOSIA FIXE
ES PODEN EVITAR TANCANT
AMB LES GELOSIES
PART MASSISSA
PRINCIPALMENT, I GUANYAR EN
CAS QUE INCIDEIXI EL SOL.
GELOSIA FIXE
DE COLOR FOSC (GUANYS)
ALLARGAT PER
EVITAR EL PONT
ALLARGAT PER
EVITAR EL PONT
COS SORTINT
COS SORTINT E: 1/75
COMPLIMENT DEL CTE DB HE S1
PROJECTE:
COMPLEIX
PROJECTE: CLIMA C2
0,73 COMPLEIX
EDIFICI.
QUEDEN EXCLOSOS: MUR TROMBE, HIVERNACLES ADOSSATS...ETC
COMPLIMENT DEL VIDRE DE LES
OBERTURES
PER COMPLIR LA Ulim, BUSCAREM A
TECHNAL, I VEIEM QUE GRAN PART DE
LES FINESTRES AMB TRANCAMENT DE
ES TRIA UNA FINESTRA AMB
S'AJUSTI A LES NECESSITATS.
Ulim SEGON % FORATS (ENTRE 21-30%)
COMPLEIX
CAPA MORTER
ARMAT
(LLANA DE ROCA)
PLACA DE GUIX
MONOCAPA PINTAT
CONSTRUCTIUS (AGAFANT LA MATEIXA TIPOLOGIA
CONSTRUCTIVA) OBTENIM QUE LA U ES CALCULA
AMB LA FORMULA: U=1/(0,38+Rat)
ON Rat (AILLAMENT
U= 1/(0,38+1,14)=0,62 <0,73
COMPLEIX
E:1/15
-2.62
1,91 m
1,00 m
2,56 m
2,65 m
Sud --> 21 Juny 12:00h.
Josep
Oest --> 21 Juny 16:00 h.
Josep
Josep
Josep
Oest --> 21Des. 16:00 h.
Sud --> 21 Des. 12:00h.
PROJECTE FINAL DE GRAU
Projecte Executiu d'un edifici plurifamliar entre mitgeres al
L DATA:
8/12/2012
ALUMNE:
Elisabeth Garcia Fuentes
At18049
ESCALA:
1/150
NORD: TEMA:
SISTEMES PASSIUS 004
C
F
OEST
21 Juny -12:00h
21 Des. -12:00h
L'HIVERN:
ESTIU:
INCIDEIX EL SOL.
OBJECTIU:
L'ESTIU ENS HAUREM DE PROTEGIR AMB PROTECCIONS,
GELOSIES ORIENTABLES ABATIBLES A CADA OBERTURA.
CONTROLEM MILLOR A OEST,
GUANYEM SUP. HAB.
ENS TANQUEM A SUD PER
EVITAR GUANYS A L'ESTIU I
HIVERN
DURANTL'HIVERN.
L'ESTIU.
ENS PUGUI ARRIBAR.
EXEMPLE: GELOSIA ORIENTABLE ABATIBLE
DE COLOR GRIS FOSC
GELOSIA ORIENTABLE
GELOSIA
ORIENTABLE
PER EVITAR LA
SOLAR DIRECTE
ALLARGAT PER
EVITAR EL PONT
PER EVITAR EL
GUANYS PER
ALLARGAT PER
EVITAR EL PONT
COS SORTINT E: 1/75
COMPLIMENT DEL CTE DB HE S1
PROJECTE:
COMPLEIX
CAS.
EDIFICI.
QUEDEN EXCLOSOS: MUR TROMBE,
HIVERNACLES ADOSSATS...ETC
SIMPLIFICADA.
GELOSIA ORIENTABLE
PROJECTE: CLIMA C2
COMPLEIX
ARREBOSSAT
(LLANA DE ROCA)
CAMBRA AIRE
E:1/15
TANT COMPLIRIA.
COMPLEIX
11,55 m
Zona per
Estendre - Roba
Zona
Horts Urbans
R.I.T.S
ZONA
EINES/TAQUILLES
Zona per
Estendre - Roba
Zona
Horts Urbans
R.I.T.S
ZONA
EINES/TAQUILLES
CAIXESDE180L
135cmx65cmx85cm
CAIXESDE180L
135cmx65cmx85cm
CAIXESDE180L
135cmx65cmx85cm
CAIXESDE180L
135cmx65cmx85cm
PROJECTE FINAL DE GRAU
Projecte Executiu d'un edifici plurifamliar entre mitgeres al
L DATA:
8/06/2012
ALUMNE:
Elisabeth Garcia Fuentes
At18049
ESCALA:
1/75
NORD: TEMA:
SISTEMES PASSIUS 005
C
ESTUDI PATI INTERIOR_ASSOLAJAMENT
HABITATGE TIPUS (Dormitori)
HABITATGE TIPUS (Cuina)
PRIMERA PLANTA
A
PATI INTERIOR
E: 1/300
ESTIU- RAIG AFECTA A LA CARA SUD PROVOCANT LA
OMBRA AL PATI
RAIG ESTIU 21 JUNY 16:00h
DURANT L'ESTIU:
CARA OEST: VEIEM QUE
INCIDEIX EL SOL EN ELS DOS
OBJECTIU: S'HAURIEN DE PROTEGIR
DEL SOL D'OEST.
ORIENTABLES ABATIBLES COM A
CARA EST: NO REP SOL EN TOT
OMBRA.
CARA
SUD
COMPLETAMENT EN OMBRA PER TANT ENS
ES TRIEN PLANTES AMB POCA ARREL, AMB
POC MANTENIMENT, I AMB NECESSITAT DE
POCA LLUM.
IDEAL AMB LES CARACTERISTIQUES
ANTERIORS I QUE POT DONAR FRESCOR A
L'AMBIENT.
RAIG HIVERN 21 DES. 12:00h
RAIG HIVERN 21 DES. 16:00h
DURANT L' HIVERN:
CARA SUD:
TOTALMENT EN OMBRA,
NO D'ESTAR TANT
UNA ZONA NO HABITABLE.
CARA NORD:SEMPRE LA
TENIM AMB OMBRA,
ENS PREOCUPA.
CARA
NORD
CARA
OEST
CARA
EST
DURANT HIVERN:
COMPLETAMENT EN
OMBRA.
EN TOTS DOS CASOS
HAUREM D'EVITAR
E: 1/300
ESTIU- RAIG AFECTA A LA CARA SUD PROVOCANT LA
OMBRA AL PATI
DURANT L'ESTIU:
CARA SUD:
HABITATGES INCIDEIX EL SOL,
CARA NORD:SEMPRE EN
OMBRA, NO LA TRACTEM
DORMITORIS
CUINES
ESCALA
DURANT L'ESTIU:
PER LA MITGERA I LA PART COBERTA.
ZONA D'OMBRA LA DESTINEM A SECATGE DE ROBA I LES
ELS USUARIS DEL L'EDIFICI PUGUIN CULTIVAR I FER ELS SEUS
HORTS. (ZONA D'HORTS URBANS)
DURANT HIVERN:
LA TERRASSA QUEDA TOTA EN OMBRA.
CAIXONS I LA MITGERA) ES PROPOSA DE FER UNA COBERTA NO
RAIG ESTIU 21 JUNY 12:00h
E: 1/300
ESTIU- RAIG AFECTA A LA CARA SUD PROVOCANT LA OMBRA AL PATIPER DONAR FRESCOR AL PATI
INTERIOR CREANT UN
MICROCLIMA
PANELL/REIXA FUSTA
PER LA PLANTA
PLANTA POTO (PERENNE)
EXEMPLE D'HORTS URBANS EN CIUTAT.
A'
B'B
PROTECCIONS
A OEST
EXEMPLE GELOSIA ABATIBLE DE COLOR
RESTRICTIU L'HIVERN.
PATI INTERIOR E: 1/50
E: 1/75
COMPLIMENT DEL CTE DB HE S1
ANTERIORMENT.
PROJECTE: CLIMA C2
AGAFANT
LA MATEIXA TIPOLOGIA CONSTRUCTIVA) OBTENIM QUE LA U ES
CALCULA AMB LA FORMULA: U=1/(0,35+Rat)
ON Rat (AILLAMENT
U= 1/(0,35+2,29)=0,38 <0,41
COMPLEIX
EL COMPLIMENT DE LA COBERTA VENTILADA S'ESPECIFICA EN
A3_SOTACOBERTA.
ACABAT
MORTER EXTRUIT
CAPES
IMPER. PENDENTS
LLOSA
MASSISA
PROJECTE FINAL DE GRAU
Projecte Executiu d'un edifici plurifamliar entre mitgeres al
L DATA:
8/06/2012
ALUMNE:
Elisabeth Garcia Fuentes
At18049
ESCALA:
1/75
NORD: TEMA:
SISTEMES PASSIUS 006
C
ESTUDIS PATIS SOTACOBERTA + COBERTA
RAIG HIVERN 21 DES. 12:00h
DURANT L'ESTIU:
CARA SUD: INCIDEIX EL SOL TOTALMENT.
llosa de la coberta) PER EVITAR GUANYS I
OBERTURES.
CARA NORD: CONTINUAMENT EN OMBRA.
NO ENS PERJUDICA A L'ESTIU.
CARA OEST: INCIDEIX EL SOL TOTALMENT.
: PROTECCIONS AMB GELOSIA
REGULABLE.
RAIG ESTIU 21 JUNY 12:00h
DURANT HIVERN:
CARA SUD :
OMBRA.
CARA NORD:
EN OMBRA.
A L'HIVERN SI QUE ENS AFECTA.
OMBRA
ESTIU
VOLADIU
(40cm)
OEST
NORD
ED.FRONTAL
SUD
RAIG ESTIU 21 JUNY 16:00h
RAIG HIVERN 21 DES. 16:00h
DURANT L'ESTIU:
DURANT L'HIVERN:
CARA
FREDA
GUANYS PER
GUANYS PER
VOLADIU (40cm)
DIRECTE (ESTIU)
PATI INTERIOR
DURANT L'ESTIU:
QUEDA TAPAT PER LA OMBRA PROJECTADA PER
LA MITGERA I EL VOLADIU.
DURANT L'HIVERN:
QUEDA TOTALMENT EN OMBRA.
L'HIVERN, JA QUE L'ESTIU TENIM MOLT POCA
LA MATEIXA EN ELS PATIS EXTERIORS.
PATIS
SOTACOBERTA
PATI
INTERIOR
DURANT L'ESTIU I HIVERN:
L'ESTIU, HEM D'EVITAR ELS GUANYS.
ES PROPOSA UNA COBERTA VENTILADA PRINCIPALMENT PER EVITAR
GUANYS DURANT L'ESTIU.
PRECINDIM DE OBERTURES EN LA CARA
NORD I DEIXEM UNICAMENT UNA
CARA OEST:
INCIDEIX EL SOL TOTALMENT
GUANYS.
E: 1/200 E: 1/200
B
B'
A
A'
C'C
E: 1/75
PATIS SOTACOBERTA + COBERTA
PATIS (PISOS SOTACOBERTA)
E: 1/75
COBERTA
COMPLIMENT CTE DB HE S1
PROJECTE: CLIMA C2
TAULELL
CAMBRA D'AIRE
LLOSA MASSISSA
E:1/10
AGAFANT LA MATEIXA TIPOLOGIA CONSTRUCTIVA) OBTENIM QUE LA U ES
CALCULA AMB LA FORMULA: U=1/(0,48+Rat)
ON Rat (AILLAMENT
U= 1/(0,48+2,29)=0,36 <0,41
COMPLEIX

More Related Content

Viewers also liked

Hemophilia
HemophiliaHemophilia
Hemophiliagisellg
 
SCAPE Skalierbare Langzeitarchivierung
SCAPE Skalierbare LangzeitarchivierungSCAPE Skalierbare Langzeitarchivierung
SCAPE Skalierbare LangzeitarchivierungSven Schlarb
 
eBook Unified Communications
eBook Unified Communications eBook Unified Communications
eBook Unified Communications Khiara McMillin
 
Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01062270
 

Viewers also liked (9)

Discover La Cianella
Discover La CianellaDiscover La Cianella
Discover La Cianella
 
Compu
CompuCompu
Compu
 
Hemophilia
HemophiliaHemophilia
Hemophilia
 
SCAPE Skalierbare Langzeitarchivierung
SCAPE Skalierbare LangzeitarchivierungSCAPE Skalierbare Langzeitarchivierung
SCAPE Skalierbare Langzeitarchivierung
 
iCademy prezentace
iCademy prezentaceiCademy prezentace
iCademy prezentace
 
eBook Unified Communications
eBook Unified Communications eBook Unified Communications
eBook Unified Communications
 
PP New Design
PP New DesignPP New Design
PP New Design
 
Memories photos
Memories photosMemories photos
Memories photos
 
Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01
 

Similar to Sustainability Project/ Proyecto de Sostenibilidad

Zmr heating load calculation
Zmr heating load calculationZmr heating load calculation
Zmr heating load calculationZMERLY & CO
 
OVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishOVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishRoberto Ovalle
 
Updated power point lpg
Updated power point lpgUpdated power point lpg
Updated power point lpgmiguel1054
 
An intro to the physics of passive solar
An intro to the physics of passive solarAn intro to the physics of passive solar
An intro to the physics of passive solarGerren D. Simms
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektMorten Lund
 
Solar design lecture 2020
Solar design lecture 2020 Solar design lecture 2020
Solar design lecture 2020 JiashuoZhang
 
Solar Calculation (44 slide)
 Solar Calculation (44 slide) Solar Calculation (44 slide)
Solar Calculation (44 slide)Rami Hassbini
 
Solar Water Heater With Copper Pipeline
Solar Water Heater With Copper Pipeline Solar Water Heater With Copper Pipeline
Solar Water Heater With Copper Pipeline Lizbeth Patatuchi
 

Similar to Sustainability Project/ Proyecto de Sostenibilidad (13)

Zmr heating load calculation
Zmr heating load calculationZmr heating load calculation
Zmr heating load calculation
 
Modules de toiture en 2 réduit
Modules de toiture en 2 réduitModules de toiture en 2 réduit
Modules de toiture en 2 réduit
 
OVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishOVALLE roberto - portfolio English
OVALLE roberto - portfolio English
 
Updated power point lpg
Updated power point lpgUpdated power point lpg
Updated power point lpg
 
SA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
SA Equip - SA Flexiheat SAPH15 400CEA ATEX HeatersSA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
SA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
 
An intro to the physics of passive solar
An intro to the physics of passive solarAn intro to the physics of passive solar
An intro to the physics of passive solar
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
 
Solar design lecture 2020
Solar design lecture 2020 Solar design lecture 2020
Solar design lecture 2020
 
Climatic analysis of a built form
Climatic analysis of a built formClimatic analysis of a built form
Climatic analysis of a built form
 
Site Analysis
Site AnalysisSite Analysis
Site Analysis
 
Solar Calculation (44 slide)
 Solar Calculation (44 slide) Solar Calculation (44 slide)
Solar Calculation (44 slide)
 
Solar Water Heater With Copper Pipeline
Solar Water Heater With Copper Pipeline Solar Water Heater With Copper Pipeline
Solar Water Heater With Copper Pipeline
 

Sustainability Project/ Proyecto de Sostenibilidad

  • 1. PB+4 PB+4 PB+4 PB+4 PB+4 PB+4 PB+4 PB+7 PB+7 Sotacoberta Sotacoberta Sotacoberta PB+5 PB+5 PB+5 PB+4 AMARI DE COMPTADORS D'AIGUA 1,30mx0,73mx 2,00m RITI 1,00mx0,50mx2,00m ARMARI COMPTADORS ELECTRICITAT1,50mx0,73mx2,00m CGP 60cmx 30cmx 150cm DEL GAS 60cmx 30cmx 150cm ARMARI COMPTADORS DE GAS 1,40m x 0,40m x 2,00m 2,54 m 2,78 m 3,81 m Zona per Estendre - Roba Zona Horts Urbans R.I.T.S ZONA EINES/TAQUILLES EDIFICI PLURIFAMILIAR SITUAT ENTRE MITGERES. 10 CM. - ENTORN LA DE LA CARA SUD DE PB+5. - CLIMA HTTP://WWW.TEMPSMATARO.NET/ OBTENIM LA L'ESTIU NI AL HIVERN. GAIRE. ZONA AMB GRANS VENTS. TOTALMENT A NORD. TROBA OEST. TOTALMENT A SUD. PROJECTE PB ---> 2 LOCALS COMERCIALS PSot -1 i PSot -2 ---> DESTINAT APARCAMENT PLANTA BAIXA_ 2 LOCALS COMERCIALS PLANTA TIPUS_ 3 HABITATGES PLANTA SOTACOBERTA_ ESTUDIS HABITATGES I TERRASSES PRIVADES HABITATGES PROJECTE FINAL DE GRAU Projecte Executiu d'un edifici plurifamliar entre mitgeres al L DATA: 8/06/2012 ALUMNE: Elisabeth Garcia Fuentes At18049 ESCALA: 1/75 NORD: TEMA: SISTEMES PASSIUS 001 C P
  • 2. PROJECTE FINAL DE GRAU Projecte Executiu d'un edifici plurifamliar entre mitgeres al L DATA: 8/06/2012 ALUMNE: Elisabeth Garcia Fuentes At18049 ESCALA: 1/75 NORD: TEMA: SISTEMES PASSIUS 002 C V SOTACOBERTA TEMP. TEMP. TEMP. PATI INT. TEMP. TEMP. TEMP. TEMP. PATI INT. TEMP.
  • 3. PL SOTACOB PLANTA 1 PLANTA 2 PLANTA 3 PLANTA 4 PLANTA 5 +4.01 +0.00 +6.89 +9.77 +12.65 +15.53 +18.41 PLANTA BAIXA A.R.M.=19.00m +0.13 +0.13 2,91 m Sud --> 21 Juny 12:00h. Josep Oest --> 21 Juny 16:00 h. Josep Josep Josep Oest --> 21Des. 16:00 h. Sud --> 21 Des. 12:00h. PROJECTE FINAL DE GRAU Projecte Executiu d'un edifici plurifamliar entre mitgeres al L DATA: 8/06/2012 ALUMNE: Elisabeth Garcia Fuentes At18049 ESCALA: 1/150 NORD: TEMA: SISTEMES PASSIUS 003 C F 21 Juny -12:00h 21 Des. -12:00h L'HIVERN: OBJECTIU: ESTIU: TREIEM OBERTURA DALT A BAIXA PER EL MATEIX MOTIU. MOTIUS: EN QUAN A LES CARPINTERIES, CON ES TRACTA DE LES OBERTURES I QUE SIGUI. EXEMPLE: GELOSIA ORIENTABLE ABATIBLE DE COLOR GRIS FOSC GELOSIA ORIENTABLE GELOSIA FIXE ES PODEN EVITAR TANCANT AMB LES GELOSIES PART MASSISSA PRINCIPALMENT, I GUANYAR EN CAS QUE INCIDEIXI EL SOL. GELOSIA FIXE DE COLOR FOSC (GUANYS) ALLARGAT PER EVITAR EL PONT ALLARGAT PER EVITAR EL PONT COS SORTINT COS SORTINT E: 1/75 COMPLIMENT DEL CTE DB HE S1 PROJECTE: COMPLEIX PROJECTE: CLIMA C2 0,73 COMPLEIX EDIFICI. QUEDEN EXCLOSOS: MUR TROMBE, HIVERNACLES ADOSSATS...ETC COMPLIMENT DEL VIDRE DE LES OBERTURES PER COMPLIR LA Ulim, BUSCAREM A TECHNAL, I VEIEM QUE GRAN PART DE LES FINESTRES AMB TRANCAMENT DE ES TRIA UNA FINESTRA AMB S'AJUSTI A LES NECESSITATS. Ulim SEGON % FORATS (ENTRE 21-30%) COMPLEIX CAPA MORTER ARMAT (LLANA DE ROCA) PLACA DE GUIX MONOCAPA PINTAT CONSTRUCTIUS (AGAFANT LA MATEIXA TIPOLOGIA CONSTRUCTIVA) OBTENIM QUE LA U ES CALCULA AMB LA FORMULA: U=1/(0,38+Rat) ON Rat (AILLAMENT U= 1/(0,38+1,14)=0,62 <0,73 COMPLEIX E:1/15
  • 4. -2.62 1,91 m 1,00 m 2,56 m 2,65 m Sud --> 21 Juny 12:00h. Josep Oest --> 21 Juny 16:00 h. Josep Josep Josep Oest --> 21Des. 16:00 h. Sud --> 21 Des. 12:00h. PROJECTE FINAL DE GRAU Projecte Executiu d'un edifici plurifamliar entre mitgeres al L DATA: 8/12/2012 ALUMNE: Elisabeth Garcia Fuentes At18049 ESCALA: 1/150 NORD: TEMA: SISTEMES PASSIUS 004 C F OEST 21 Juny -12:00h 21 Des. -12:00h L'HIVERN: ESTIU: INCIDEIX EL SOL. OBJECTIU: L'ESTIU ENS HAUREM DE PROTEGIR AMB PROTECCIONS, GELOSIES ORIENTABLES ABATIBLES A CADA OBERTURA. CONTROLEM MILLOR A OEST, GUANYEM SUP. HAB. ENS TANQUEM A SUD PER EVITAR GUANYS A L'ESTIU I HIVERN DURANTL'HIVERN. L'ESTIU. ENS PUGUI ARRIBAR. EXEMPLE: GELOSIA ORIENTABLE ABATIBLE DE COLOR GRIS FOSC GELOSIA ORIENTABLE GELOSIA ORIENTABLE PER EVITAR LA SOLAR DIRECTE ALLARGAT PER EVITAR EL PONT PER EVITAR EL GUANYS PER ALLARGAT PER EVITAR EL PONT COS SORTINT E: 1/75 COMPLIMENT DEL CTE DB HE S1 PROJECTE: COMPLEIX CAS. EDIFICI. QUEDEN EXCLOSOS: MUR TROMBE, HIVERNACLES ADOSSATS...ETC SIMPLIFICADA. GELOSIA ORIENTABLE PROJECTE: CLIMA C2 COMPLEIX ARREBOSSAT (LLANA DE ROCA) CAMBRA AIRE E:1/15 TANT COMPLIRIA. COMPLEIX
  • 5. 11,55 m Zona per Estendre - Roba Zona Horts Urbans R.I.T.S ZONA EINES/TAQUILLES Zona per Estendre - Roba Zona Horts Urbans R.I.T.S ZONA EINES/TAQUILLES CAIXESDE180L 135cmx65cmx85cm CAIXESDE180L 135cmx65cmx85cm CAIXESDE180L 135cmx65cmx85cm CAIXESDE180L 135cmx65cmx85cm PROJECTE FINAL DE GRAU Projecte Executiu d'un edifici plurifamliar entre mitgeres al L DATA: 8/06/2012 ALUMNE: Elisabeth Garcia Fuentes At18049 ESCALA: 1/75 NORD: TEMA: SISTEMES PASSIUS 005 C ESTUDI PATI INTERIOR_ASSOLAJAMENT HABITATGE TIPUS (Dormitori) HABITATGE TIPUS (Cuina) PRIMERA PLANTA A PATI INTERIOR E: 1/300 ESTIU- RAIG AFECTA A LA CARA SUD PROVOCANT LA OMBRA AL PATI RAIG ESTIU 21 JUNY 16:00h DURANT L'ESTIU: CARA OEST: VEIEM QUE INCIDEIX EL SOL EN ELS DOS OBJECTIU: S'HAURIEN DE PROTEGIR DEL SOL D'OEST. ORIENTABLES ABATIBLES COM A CARA EST: NO REP SOL EN TOT OMBRA. CARA SUD COMPLETAMENT EN OMBRA PER TANT ENS ES TRIEN PLANTES AMB POCA ARREL, AMB POC MANTENIMENT, I AMB NECESSITAT DE POCA LLUM. IDEAL AMB LES CARACTERISTIQUES ANTERIORS I QUE POT DONAR FRESCOR A L'AMBIENT. RAIG HIVERN 21 DES. 12:00h RAIG HIVERN 21 DES. 16:00h DURANT L' HIVERN: CARA SUD: TOTALMENT EN OMBRA, NO D'ESTAR TANT UNA ZONA NO HABITABLE. CARA NORD:SEMPRE LA TENIM AMB OMBRA, ENS PREOCUPA. CARA NORD CARA OEST CARA EST DURANT HIVERN: COMPLETAMENT EN OMBRA. EN TOTS DOS CASOS HAUREM D'EVITAR E: 1/300 ESTIU- RAIG AFECTA A LA CARA SUD PROVOCANT LA OMBRA AL PATI DURANT L'ESTIU: CARA SUD: HABITATGES INCIDEIX EL SOL, CARA NORD:SEMPRE EN OMBRA, NO LA TRACTEM DORMITORIS CUINES ESCALA DURANT L'ESTIU: PER LA MITGERA I LA PART COBERTA. ZONA D'OMBRA LA DESTINEM A SECATGE DE ROBA I LES ELS USUARIS DEL L'EDIFICI PUGUIN CULTIVAR I FER ELS SEUS HORTS. (ZONA D'HORTS URBANS) DURANT HIVERN: LA TERRASSA QUEDA TOTA EN OMBRA. CAIXONS I LA MITGERA) ES PROPOSA DE FER UNA COBERTA NO RAIG ESTIU 21 JUNY 12:00h E: 1/300 ESTIU- RAIG AFECTA A LA CARA SUD PROVOCANT LA OMBRA AL PATIPER DONAR FRESCOR AL PATI INTERIOR CREANT UN MICROCLIMA PANELL/REIXA FUSTA PER LA PLANTA PLANTA POTO (PERENNE) EXEMPLE D'HORTS URBANS EN CIUTAT. A' B'B PROTECCIONS A OEST EXEMPLE GELOSIA ABATIBLE DE COLOR RESTRICTIU L'HIVERN. PATI INTERIOR E: 1/50 E: 1/75 COMPLIMENT DEL CTE DB HE S1 ANTERIORMENT. PROJECTE: CLIMA C2 AGAFANT LA MATEIXA TIPOLOGIA CONSTRUCTIVA) OBTENIM QUE LA U ES CALCULA AMB LA FORMULA: U=1/(0,35+Rat) ON Rat (AILLAMENT U= 1/(0,35+2,29)=0,38 <0,41 COMPLEIX EL COMPLIMENT DE LA COBERTA VENTILADA S'ESPECIFICA EN A3_SOTACOBERTA. ACABAT MORTER EXTRUIT CAPES IMPER. PENDENTS LLOSA MASSISA
  • 6. PROJECTE FINAL DE GRAU Projecte Executiu d'un edifici plurifamliar entre mitgeres al L DATA: 8/06/2012 ALUMNE: Elisabeth Garcia Fuentes At18049 ESCALA: 1/75 NORD: TEMA: SISTEMES PASSIUS 006 C ESTUDIS PATIS SOTACOBERTA + COBERTA RAIG HIVERN 21 DES. 12:00h DURANT L'ESTIU: CARA SUD: INCIDEIX EL SOL TOTALMENT. llosa de la coberta) PER EVITAR GUANYS I OBERTURES. CARA NORD: CONTINUAMENT EN OMBRA. NO ENS PERJUDICA A L'ESTIU. CARA OEST: INCIDEIX EL SOL TOTALMENT. : PROTECCIONS AMB GELOSIA REGULABLE. RAIG ESTIU 21 JUNY 12:00h DURANT HIVERN: CARA SUD : OMBRA. CARA NORD: EN OMBRA. A L'HIVERN SI QUE ENS AFECTA. OMBRA ESTIU VOLADIU (40cm) OEST NORD ED.FRONTAL SUD RAIG ESTIU 21 JUNY 16:00h RAIG HIVERN 21 DES. 16:00h DURANT L'ESTIU: DURANT L'HIVERN: CARA FREDA GUANYS PER GUANYS PER VOLADIU (40cm) DIRECTE (ESTIU) PATI INTERIOR DURANT L'ESTIU: QUEDA TAPAT PER LA OMBRA PROJECTADA PER LA MITGERA I EL VOLADIU. DURANT L'HIVERN: QUEDA TOTALMENT EN OMBRA. L'HIVERN, JA QUE L'ESTIU TENIM MOLT POCA LA MATEIXA EN ELS PATIS EXTERIORS. PATIS SOTACOBERTA PATI INTERIOR DURANT L'ESTIU I HIVERN: L'ESTIU, HEM D'EVITAR ELS GUANYS. ES PROPOSA UNA COBERTA VENTILADA PRINCIPALMENT PER EVITAR GUANYS DURANT L'ESTIU. PRECINDIM DE OBERTURES EN LA CARA NORD I DEIXEM UNICAMENT UNA CARA OEST: INCIDEIX EL SOL TOTALMENT GUANYS. E: 1/200 E: 1/200 B B' A A' C'C E: 1/75 PATIS SOTACOBERTA + COBERTA PATIS (PISOS SOTACOBERTA) E: 1/75 COBERTA COMPLIMENT CTE DB HE S1 PROJECTE: CLIMA C2 TAULELL CAMBRA D'AIRE LLOSA MASSISSA E:1/10 AGAFANT LA MATEIXA TIPOLOGIA CONSTRUCTIVA) OBTENIM QUE LA U ES CALCULA AMB LA FORMULA: U=1/(0,48+Rat) ON Rat (AILLAMENT U= 1/(0,48+2,29)=0,36 <0,41 COMPLEIX