       Nuclear Power Plants in India




                                                                                                                                        Kudankulam
                                                                                                                                    Location: Tamil Nadu
                                                                                                                         Operator: Nuclear Power Corp of India Ltd
                                                                                                                             Configuration: 2 X 1,000 MW PWR
                                                                                                                                    Operation: 2010-2011
                                                                                                                                    Reactor supplier: AEE
                                                                                                                               T/G supplier: LMZ, Electrosila
                                                                                                                                      EPC: AEE, NPCIL
                           Kaiga                                                                                      Quick facts: This is India’s largest nuclear power
                                                                                  Kakrapar                          project and the Kudankulam units will be the largest
                  Location: Karnataka
                                                                             Location: Gujarat                         generators in India when completed. Talks first
       Operator: Nuclear Power Corp of India Ltd
                                                               Operator: Nuclear Power Corp of India Ltd                began on this $3bn project in 1988, but were
          Configuration: 3 X 220 MW PHWR
                                                                   Configuration: 2 X 220 MW PHWR                     suspended in 1992 following the collapse of the
                 Operation: 2000-2007
                                                                           Operation: 1993-1995                     Soviet Union. Discussions were restarted and in Nov
                Reactor supplier: NPCIL
                                                                         Reactor supplier: NPCIL                      2001, a general agreement was signed between
                  T/G supplier: BHEL
                                                                            T/G supplier: BHEL                      NPCIL and AEE for supply of two VVER-1000 units
 Quick facts: Unit-3 went commercial on 6 May 2007
                                                           Quick facts: Two 700-MW PHWR units are planned of the latest design. Equipment was ordered in Feb
  at 1800hrs. First criticality was 26 Feb 2007, less
                                                                       for construction at this site.               2002, and first concrete was the following month. In
     than 5yrs after first concrete on 30 Mar 2002.
                                                                                                                       Apr 2002, AEE signed a $200mn contract with
                                                             Photograph courtesy of Nuclear Power Corp of India Ltd   Silovye Mashiny for the T/G sets and the Izhora
    Photograph courtesy of Nuclear Power Corp of India Ltd                  Re-posted 23 May 2007
                     Posted 8 Sep 2004                                                                              Factory of Obedinennye Mashinostroitelnye Zavody
                                                                                                                      (OMZ) is under contract to supply the reactors.
                                                                                                                     Russia has granted a state credit to India to cover
                                                                                                                     85% of the cost of equipment supply. Completion
                                                                                                                       was originally scheduled for 2007 but has been
                                                                                                                               delayed by a variety of factors.

                                                                                                                      Photograph by Petr Pavlicek and courtesy of Intl Atomic Energy
                                                                                                                                                Agency
                                                                                                                                         Re-posted 17 Mar 2010




                                                                                                                                           Rajasthan
                                                                                                                                      Location: Rajasthan
                      Madras                                                    Narora
                                                                                                                          Operator: Nuclear Power Corp of India Ltd
                Location: Tamil Nadu                                   Location: Uttar Pradesh
                                                                                                                       Configuration: 1 X 100 MW, 1 X 200 MW, 2 X 220
      Operator: Nuclear Power Corp of India Ltd                Operator: Nuclear Power Corp of India Ltd
                                                                                                                                          MW PHWR
         Configuration: 2 X 170 MW PHWR                           Configuration: 2 X 220 MW PHWR
                                                                                                                                     Operation: 1973-2010
                Operation: 1984-1986                                     Operation: 1991-1992
                                                                                                                             Reactor supplier: CGE, L&T, NPCIL
              Reactor supplier: NPCIL                                  Reactor supplier: NPCIL
                                                                                                                                    T/G supplier: EE, BHEL
                 T/G supplier: BHEL                                       T/G supplier: BHEL
                                                                                                                       Quick facts: RAPS-5 went commercial on 4 Feb
    Photograph courtesy of Nuclear Power Corp of India Ltd   Photograph courtesy of Nuclear Power Corp of India Ltd
                                                                                                                          2010 with UNi-6 to follow later in the year.
                     Posted 8 Sep 2004                                        Posted 8 Sep 2004
                                                                                                                         Photograph courtesy of Nuclear Power Corp of India Ltd
                                                                                                                                          Posted 8 Sep 2004



industcards.com/nuclear-india.htm                                                                                                                                               1/2
06-10-2010                                                    nuclear-india




                                                                                                  Tarapur 3&4
                                                                                              Location: Maharashtra
                                                                                   Operator: Nuclear Power Corp of India Ltd
                     Tarapur 1&2                                                       Configuration: 2 X 540 MW PHWR
                 Location: Maharashtra                                                        Operation: 2005-2006
        Operator: Nuclear Power Corp of India Ltd                                            Reactor supplier: NPCIL
           Configuration: 2 X 160 MW BWR                                                       T/G supplier: BHEL
                    Operation: 1969                                           Quick facts: In Oct 1998, groundbreaking for the first
           Reactor supplier: General Electric                                   500-MW class PHWRs at Tarapur was held after
             T/G supplier: General Electric                                   many delays. Unit-4 went critical on 6 Mar 2005 and
                  EPC: General Electric                                        commercial on 12 Sep 2005 and the new reactors
            Quick facts: A turnkey project.                                   were dedicated to the nation in August 2007. At the
                                                                               time, they were the biggest generating units in the
     Photograph courtesy of Nuclear Power Corp of India Ltd                   country. In Sep 2009, the new units were reported to
                      Posted 8 Sep 2004
                                                                                     be producing electricity at Rs2.70/kW.

                                                                               Photograph courtesy of Department of Atomic Energy (DAE)
                                                                                                 Posted 13 Sep 2008




 Abbreviations


 Updated 06/02/10

 Home




industcards.com/nuclear-india.htm                                                                                                   2/2

More Related Content

What's hot

Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
Engineers Australia
 
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA
 
ABWR Reactor Core Neutronics
ABWR Reactor Core NeutronicsABWR Reactor Core Neutronics
ABWR Reactor Core Neutronics
myatom
 
7th International Forum Russian Power 2006
7th International Forum Russian Power 20067th International Forum Russian Power 2006
7th International Forum Russian Power 2006
Alexander Abolmasov
 
Geothermal
GeothermalGeothermal
Nuclear energy sop_14
Nuclear energy sop_14Nuclear energy sop_14
Nuclear energy sop_14
Anas Vj
 
1.2 power plant module2 batch3
1.2 power plant module2 batch31.2 power plant module2 batch3
1.2 power plant module2 batch3
daisydhei
 
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Smithers Apex
 
Usafa jan 2013
Usafa jan 2013Usafa jan 2013
Usafa jan 2013
Jacob Anderson
 
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
Paul van der Linden
 
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
Funseam - Fundación para la Sostenibilidad Energética y Ambiental
 
Thin films in India(april 18,2012)
Thin films in India(april 18,2012)Thin films in India(april 18,2012)
Thin films in India(april 18,2012)
RESolve Energy Consultants
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata Presentation
HitReach
 
Black & Veatch Power Generation
Black & Veatch Power GenerationBlack & Veatch Power Generation
Black & Veatch Power Generation
Bacchus219
 
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Morgan
 
Mo Ti Presentation
Mo Ti PresentationMo Ti Presentation
Mo Ti Presentation
xingjun78
 
Grid
GridGrid
Issues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sectorIssues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sector
VIKING Life-Saving Equipment A/S
 
Business Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - BrownBusiness Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - Brown
sustg
 
China wind power fy2010 agm presentation
China wind power fy2010 agm presentationChina wind power fy2010 agm presentation
China wind power fy2010 agm presentation
TMX Equicom
 

What's hot (20)

Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
AREVA, business & strategy overview - January 2009 - Appendix 1 to 6
 
ABWR Reactor Core Neutronics
ABWR Reactor Core NeutronicsABWR Reactor Core Neutronics
ABWR Reactor Core Neutronics
 
7th International Forum Russian Power 2006
7th International Forum Russian Power 20067th International Forum Russian Power 2006
7th International Forum Russian Power 2006
 
Geothermal
GeothermalGeothermal
Geothermal
 
Nuclear energy sop_14
Nuclear energy sop_14Nuclear energy sop_14
Nuclear energy sop_14
 
1.2 power plant module2 batch3
1.2 power plant module2 batch31.2 power plant module2 batch3
1.2 power plant module2 batch3
 
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
 
Usafa jan 2013
Usafa jan 2013Usafa jan 2013
Usafa jan 2013
 
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
 
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
 
Thin films in India(april 18,2012)
Thin films in India(april 18,2012)Thin films in India(april 18,2012)
Thin films in India(april 18,2012)
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata Presentation
 
Black & Veatch Power Generation
Black & Veatch Power GenerationBlack & Veatch Power Generation
Black & Veatch Power Generation
 
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
 
Mo Ti Presentation
Mo Ti PresentationMo Ti Presentation
Mo Ti Presentation
 
Grid
GridGrid
Grid
 
Issues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sectorIssues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sector
 
Business Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - BrownBusiness Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - Brown
 
China wind power fy2010 agm presentation
China wind power fy2010 agm presentationChina wind power fy2010 agm presentation
China wind power fy2010 agm presentation
 

Similar to Power Plants India - Nuclear - For Sealing Compounds for Power Stations call +91-891-2564393

Power Plants Andhra - - For Sealing Compounds for Power Stations Call +91-89...
Power Plants Andhra - -  For Sealing Compounds for Power Stations Call +91-89...Power Plants Andhra - -  For Sealing Compounds for Power Stations Call +91-89...
Power Plants Andhra - - For Sealing Compounds for Power Stations Call +91-89...
Project Sales Corp
 
India Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalIndia Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar Final
Rahul Walawalkar
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012
rupeshsingh_1
 
Nuclear power corporation of india limited (npcil (2)
Nuclear power corporation of india limited (npcil (2)Nuclear power corporation of india limited (npcil (2)
Nuclear power corporation of india limited (npcil (2)
Saurav Singh
 
General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011
Rameez Shaikh
 
Small Pv Integration On Distribution Pv America 2011 04 04 2011
Small   Pv Integration On Distribution   Pv America 2011   04 04 2011Small   Pv Integration On Distribution   Pv America 2011   04 04 2011
Small Pv Integration On Distribution Pv America 2011 04 04 2011
forrestsmall
 
Gds Trans Actions Vol411
Gds Trans Actions Vol411Gds Trans Actions Vol411
Gds Trans Actions Vol411
Ryan C. Johnson, PE
 
Bhatia small wind[1]
Bhatia small wind[1]Bhatia small wind[1]
Bhatia small wind[1]
satishmnair
 
Enel Green Power Investor Day Rome, April 22 2009
Enel Green Power Investor Day   Rome, April 22 2009Enel Green Power Investor Day   Rome, April 22 2009
Enel Green Power Investor Day Rome, April 22 2009
Enel S.p.A.
 
Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006
Sarjeevan Sainbhi
 
Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
Project Sales Corp
 
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTSUNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
Suat Furkan ISIK
 
Wind Force Newsletter Dec, Edition, 2011
Wind Force Newsletter   Dec, Edition, 2011Wind Force Newsletter   Dec, Edition, 2011
Wind Force Newsletter Dec, Edition, 2011
rupeshsingh_1
 
GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPO
GCAdvisors
 
4144 appendix 2 dpr 1
4144 appendix 2   dpr 14144 appendix 2   dpr 1
4144 appendix 2 dpr 1
ramki71
 
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
SiraskarCom
 
KUDANKULAM POWERPLANT by Khan
KUDANKULAM POWERPLANT by KhanKUDANKULAM POWERPLANT by Khan
KUDANKULAM POWERPLANT by Khan
KapoorKHAN
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
Ratnakar Sortur
 
Converteam presentation
Converteam presentationConverteam presentation
Converteam presentation
victorialambert
 

Similar to Power Plants India - Nuclear - For Sealing Compounds for Power Stations call +91-891-2564393 (20)

Power Plants Andhra - - For Sealing Compounds for Power Stations Call +91-89...
Power Plants Andhra - -  For Sealing Compounds for Power Stations Call +91-89...Power Plants Andhra - -  For Sealing Compounds for Power Stations Call +91-89...
Power Plants Andhra - - For Sealing Compounds for Power Stations Call +91-89...
 
India Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalIndia Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar Final
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012
 
Nuclear power corporation of india limited (npcil (2)
Nuclear power corporation of india limited (npcil (2)Nuclear power corporation of india limited (npcil (2)
Nuclear power corporation of india limited (npcil (2)
 
General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011
 
Small Pv Integration On Distribution Pv America 2011 04 04 2011
Small   Pv Integration On Distribution   Pv America 2011   04 04 2011Small   Pv Integration On Distribution   Pv America 2011   04 04 2011
Small Pv Integration On Distribution Pv America 2011 04 04 2011
 
Gds Trans Actions Vol411
Gds Trans Actions Vol411Gds Trans Actions Vol411
Gds Trans Actions Vol411
 
Bhatia small wind[1]
Bhatia small wind[1]Bhatia small wind[1]
Bhatia small wind[1]
 
Enel Green Power Investor Day Rome, April 22 2009
Enel Green Power Investor Day   Rome, April 22 2009Enel Green Power Investor Day   Rome, April 22 2009
Enel Green Power Investor Day Rome, April 22 2009
 
Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006
 
Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...Power Plants in Karnataka Maharastra - -  For Sealing Compounds for Power Sta...
Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Sta...
 
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTSUNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
 
Wind Force Newsletter Dec, Edition, 2011
Wind Force Newsletter   Dec, Edition, 2011Wind Force Newsletter   Dec, Edition, 2011
Wind Force Newsletter Dec, Edition, 2011
 
GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPO
 
4144 appendix 2 dpr 1
4144 appendix 2   dpr 14144 appendix 2   dpr 1
4144 appendix 2 dpr 1
 
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
KUDANKULAM POWERPLANT by Khan
KUDANKULAM POWERPLANT by KhanKUDANKULAM POWERPLANT by Khan
KUDANKULAM POWERPLANT by Khan
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
 
Converteam presentation
Converteam presentationConverteam presentation
Converteam presentation
 

More from Project Sales Corp

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdf
Project Sales Corp
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024
Project Sales Corp
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
Project Sales Corp
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdf
Project Sales Corp
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024
Project Sales Corp
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdf
Project Sales Corp
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - Global
Project Sales Corp
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
Project Sales Corp
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024
Project Sales Corp
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety Tools
Project Sales Corp
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
Project Sales Corp
 
MOTORS IN STOCK.pdf
MOTORS IN STOCK.pdfMOTORS IN STOCK.pdf
MOTORS IN STOCK.pdf
Project Sales Corp
 
RING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdfRING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdf
Project Sales Corp
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Project Sales Corp
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
Project Sales Corp
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023
Project Sales Corp
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdf
Project Sales Corp
 
Stock - Filters.pdf
Stock - Filters.pdfStock - Filters.pdf
Stock - Filters.pdf
Project Sales Corp
 
Stock - Ballasts.pdf
Stock - Ballasts.pdfStock - Ballasts.pdf
Stock - Ballasts.pdf
Project Sales Corp
 
Stock - Junction Boxes.pdf
Stock - Junction Boxes.pdfStock - Junction Boxes.pdf
Stock - Junction Boxes.pdf
Project Sales Corp
 

More from Project Sales Corp (20)

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdf
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdf
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdf
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - Global
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety Tools
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
 
MOTORS IN STOCK.pdf
MOTORS IN STOCK.pdfMOTORS IN STOCK.pdf
MOTORS IN STOCK.pdf
 
RING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdfRING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdf
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdf
 
Stock - Filters.pdf
Stock - Filters.pdfStock - Filters.pdf
Stock - Filters.pdf
 
Stock - Ballasts.pdf
Stock - Ballasts.pdfStock - Ballasts.pdf
Stock - Ballasts.pdf
 
Stock - Junction Boxes.pdf
Stock - Junction Boxes.pdfStock - Junction Boxes.pdf
Stock - Junction Boxes.pdf
 

Recently uploaded

Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
IndexBug
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
Mariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceXMariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceX
Mariano Tinti
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
Zilliz
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 

Recently uploaded (20)

Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
Mariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceXMariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceX
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 

Power Plants India - Nuclear - For Sealing Compounds for Power Stations call +91-891-2564393

  • 1. 06-10-2010 nuclear-india Nuclear Power Plants in India Kudankulam Location: Tamil Nadu Operator: Nuclear Power Corp of India Ltd Configuration: 2 X 1,000 MW PWR Operation: 2010-2011 Reactor supplier: AEE T/G supplier: LMZ, Electrosila EPC: AEE, NPCIL Kaiga Quick facts: This is India’s largest nuclear power Kakrapar project and the Kudankulam units will be the largest Location: Karnataka Location: Gujarat generators in India when completed. Talks first Operator: Nuclear Power Corp of India Ltd Operator: Nuclear Power Corp of India Ltd began on this $3bn project in 1988, but were Configuration: 3 X 220 MW PHWR Configuration: 2 X 220 MW PHWR suspended in 1992 following the collapse of the Operation: 2000-2007 Operation: 1993-1995 Soviet Union. Discussions were restarted and in Nov Reactor supplier: NPCIL Reactor supplier: NPCIL 2001, a general agreement was signed between T/G supplier: BHEL T/G supplier: BHEL NPCIL and AEE for supply of two VVER-1000 units Quick facts: Unit-3 went commercial on 6 May 2007 Quick facts: Two 700-MW PHWR units are planned of the latest design. Equipment was ordered in Feb at 1800hrs. First criticality was 26 Feb 2007, less for construction at this site. 2002, and first concrete was the following month. In than 5yrs after first concrete on 30 Mar 2002. Apr 2002, AEE signed a $200mn contract with Photograph courtesy of Nuclear Power Corp of India Ltd Silovye Mashiny for the T/G sets and the Izhora Photograph courtesy of Nuclear Power Corp of India Ltd Re-posted 23 May 2007 Posted 8 Sep 2004 Factory of Obedinennye Mashinostroitelnye Zavody (OMZ) is under contract to supply the reactors. Russia has granted a state credit to India to cover 85% of the cost of equipment supply. Completion was originally scheduled for 2007 but has been delayed by a variety of factors. Photograph by Petr Pavlicek and courtesy of Intl Atomic Energy Agency Re-posted 17 Mar 2010 Rajasthan Location: Rajasthan Madras Narora Operator: Nuclear Power Corp of India Ltd Location: Tamil Nadu Location: Uttar Pradesh Configuration: 1 X 100 MW, 1 X 200 MW, 2 X 220 Operator: Nuclear Power Corp of India Ltd Operator: Nuclear Power Corp of India Ltd MW PHWR Configuration: 2 X 170 MW PHWR Configuration: 2 X 220 MW PHWR Operation: 1973-2010 Operation: 1984-1986 Operation: 1991-1992 Reactor supplier: CGE, L&T, NPCIL Reactor supplier: NPCIL Reactor supplier: NPCIL T/G supplier: EE, BHEL T/G supplier: BHEL T/G supplier: BHEL Quick facts: RAPS-5 went commercial on 4 Feb Photograph courtesy of Nuclear Power Corp of India Ltd Photograph courtesy of Nuclear Power Corp of India Ltd 2010 with UNi-6 to follow later in the year. Posted 8 Sep 2004 Posted 8 Sep 2004 Photograph courtesy of Nuclear Power Corp of India Ltd Posted 8 Sep 2004 industcards.com/nuclear-india.htm 1/2
  • 2. 06-10-2010 nuclear-india Tarapur 3&4 Location: Maharashtra Operator: Nuclear Power Corp of India Ltd Tarapur 1&2 Configuration: 2 X 540 MW PHWR Location: Maharashtra Operation: 2005-2006 Operator: Nuclear Power Corp of India Ltd Reactor supplier: NPCIL Configuration: 2 X 160 MW BWR T/G supplier: BHEL Operation: 1969 Quick facts: In Oct 1998, groundbreaking for the first Reactor supplier: General Electric 500-MW class PHWRs at Tarapur was held after T/G supplier: General Electric many delays. Unit-4 went critical on 6 Mar 2005 and EPC: General Electric commercial on 12 Sep 2005 and the new reactors Quick facts: A turnkey project. were dedicated to the nation in August 2007. At the time, they were the biggest generating units in the Photograph courtesy of Nuclear Power Corp of India Ltd country. In Sep 2009, the new units were reported to Posted 8 Sep 2004 be producing electricity at Rs2.70/kW. Photograph courtesy of Department of Atomic Energy (DAE) Posted 13 Sep 2008 Abbreviations Updated 06/02/10 Home industcards.com/nuclear-india.htm 2/2