This story, featured in Pile Buck Magazine, explains how a forward-thinking contractor broke with tradition to install bridge foundations on the PA Turnpike/I-95 Connector Project in Pennsylvania. PKF Mark III historically relied on a crane-suspended pile hammer. Its decision to rent RTG pile driving rigs from Equipment Corporation of America (ECA) is paying off with doubled productivity, reduced labor, increased safety, and cost-savings.