The document contains 20 pages of pictures from TD Williamson in Nivelles, Belgium documenting the repair of a 26" diameter, 10.8mm thick pipe made of X70 steel with an operating pressure of 108 bars at Sasol RLL1 between November and December 2016. The pictures show the weld repair process including coating removal, installation of a repair sleeve, butt and fillet welding, non-destructive testing, coating and the final view before refilling the excavation.