Agenda
2
 About Me
 Purdue University EE
 Overview of selected activities
 Reconciliation of DCS & SIS cabinet IO
 Thermowell study
 Wrap Up
 Programmed Motor Protection Relays in BU-521 (Propak)
 This Relay monitors the performance of the motor control starter,
determines if it goes outside acceptable parameters, and trips it
 Wrote a procedure for the relays, which is now in the validation process
 Worked with Rockwell and Eaton
 Work with my supervisor on the instrument air compressor to troubleshoot
the problems using special equipment such as the Fluke 1736 Power Logger ,
and read and learn about this device
 Assisted in use of the Fluke 1736 as it was used to measure voltage and
current of the 3 phases at the same time when energized and tracks it
 The electrical contactor needed to be replaced
3
Overview
 Cataloged the DCS and SIS cabinets: these are the control systems that run the plant and
keep it safe
 Loop sheet is a drafted drawing of the IO module, which show how
the plant was originally designed and modified over time
 DOC 4000 is a recently added software utility that surveys the control
systems to tell what channels are used
 A third resource is the actual field termination strip in the IO cabinet
4
DCS (Distributed Control Systems) & SIS (Safety
Instrument Systems) reconciliation
5
Loop Sheet (ENG) Doc 4000 (Controls) Field (I &E)
Spare
Spare
Example 1: Loop diagram revision not yet complete
Example 2: Spare IO not yet documented with a loop diagram
template
6
Loop Sheet (ENG) Doc 4000 (Controls) Field (I &E)
Example 3: IO point documented, but pending installation
Spare
7
Loop Sheet (ENG) Doc 4000 (Controls) Field (I &E)
Area 100, 239 spares
Area 200, 168 spares
Area 300, 202 spares
Area 500, 115 spares
Area 900, 100 spares
Over 400+ IO modules in the plant checked as well as terminal strips
Hire a contractor to update and redline loopsheets due to high
percentage of inconsistencies found when comparing loopsheets with
the field and DOC4000
8
Findings & Recommendations
 A thermowell is made for holding a temperature element within the pipe; it is
exposed to the process flow and has to withstand process conditions
 Calculate whether a thermowell needs to be replaced, or passes per the most
recent standards
 Many Dimensional and Process data are input to thermowell design
calculation
9
Thermowell Study
 New ASME PTC 19.3 standard (2010) requires more conservative design
 Why are we doing this study? To confirm the thermowells meet new
standard
 Process data for some wells needs to be collected to perform further
calculations, but so far those completed look good
10
Findings & Recommendations
outside the pipe inside the pipe
typical break point
What I enjoyed
 “if your not learning something new everyday your doing
something wrong” John Brubaker
What I didn’t enjoy
 The 3 hours round trip drive which has been some days up
to 5 hrs
Suggestions
 Improve set up with designated engineer and technician as
a mentors
Fall
 Back to school at Purdue
Wrap Up
 Thank you For giving me this opportunity to work here.
12
Thank you & Questions

More Related Content

What's hot

Myths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotMyths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotUpsite Technologies
 
AspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech CompanyAspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech CompanyPete Fletcher
 
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...ATMOsphere Conferences & Events
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingUpsite Technologies
 
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sData Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sUpsite Technologies
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Upsite Technologies
 
IHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationIHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationHydroChem
 
Digital Platform for Energy Management System - Building
Digital Platform for Energy Management System - BuildingDigital Platform for Energy Management System - Building
Digital Platform for Energy Management System - BuildingAvijit Choudhury
 
High Efficiency Solutions EEV & Monitoring Systems
High Efficiency Solutions  EEV & Monitoring SystemsHigh Efficiency Solutions  EEV & Monitoring Systems
High Efficiency Solutions EEV & Monitoring SystemsCAREL Industries S.p.A
 
CAREL solution for managing CO2 compressors rack
CAREL solution for managing CO2 compressors rackCAREL solution for managing CO2 compressors rack
CAREL solution for managing CO2 compressors rackCAREL Industries S.p.A
 
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...Komandur Sunder Raj, P.E.
 
Illinois ASHRAE Research Promotion
Illinois ASHRAE Research PromotionIllinois ASHRAE Research Promotion
Illinois ASHRAE Research PromotionIllinois ASHRAE
 
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveFor Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveUpsite Technologies
 
CAREL Hecu Sistema - The REAL capacity modulation for C-Stores
CAREL Hecu Sistema - The REAL capacity modulation for C-StoresCAREL Hecu Sistema - The REAL capacity modulation for C-Stores
CAREL Hecu Sistema - The REAL capacity modulation for C-StoresCAREL Industries S.p.A
 
Mechanical subcooling of R744 processes with R718 in industrial and commercia...
Mechanical subcooling of R744 processes with R718 in industrial and commercia...Mechanical subcooling of R744 processes with R718 in industrial and commercia...
Mechanical subcooling of R744 processes with R718 in industrial and commercia...ATMOsphere Conferences & Events
 
Thesis Defense Presentation Summer 2015
Thesis Defense Presentation Summer 2015Thesis Defense Presentation Summer 2015
Thesis Defense Presentation Summer 2015Neha Shigrekar
 

What's hot (20)

Myths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotMyths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's Not
 
AspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech CompanyAspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech Company
 
Showcase ppt ver 8
Showcase ppt ver 8Showcase ppt ver 8
Showcase ppt ver 8
 
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
Energy savings using IntelliCOOL cassette smart integrated variable speed coo...
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
 
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T'sData Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
Data Center Cooling Efficiency: Understanding the Science of the 4 Delta T's
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
 
Poster
PosterPoster
Poster
 
IHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationIHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant Optimisation
 
Achieving ASHRAE 90 plus 30
Achieving ASHRAE 90 plus 30Achieving ASHRAE 90 plus 30
Achieving ASHRAE 90 plus 30
 
Digital Platform for Energy Management System - Building
Digital Platform for Energy Management System - BuildingDigital Platform for Energy Management System - Building
Digital Platform for Energy Management System - Building
 
High Efficiency Solutions EEV & Monitoring Systems
High Efficiency Solutions  EEV & Monitoring SystemsHigh Efficiency Solutions  EEV & Monitoring Systems
High Efficiency Solutions EEV & Monitoring Systems
 
CAREL solution for managing CO2 compressors rack
CAREL solution for managing CO2 compressors rackCAREL solution for managing CO2 compressors rack
CAREL solution for managing CO2 compressors rack
 
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
 
CT635_LR
CT635_LRCT635_LR
CT635_LR
 
Illinois ASHRAE Research Promotion
Illinois ASHRAE Research PromotionIllinois ASHRAE Research Promotion
Illinois ASHRAE Research Promotion
 
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually ExclusiveFor Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
For Most Data Centers, Liquid and Air Cooling Will Not be Mutually Exclusive
 
CAREL Hecu Sistema - The REAL capacity modulation for C-Stores
CAREL Hecu Sistema - The REAL capacity modulation for C-StoresCAREL Hecu Sistema - The REAL capacity modulation for C-Stores
CAREL Hecu Sistema - The REAL capacity modulation for C-Stores
 
Mechanical subcooling of R744 processes with R718 in industrial and commercia...
Mechanical subcooling of R744 processes with R718 in industrial and commercia...Mechanical subcooling of R744 processes with R718 in industrial and commercia...
Mechanical subcooling of R744 processes with R718 in industrial and commercia...
 
Thesis Defense Presentation Summer 2015
Thesis Defense Presentation Summer 2015Thesis Defense Presentation Summer 2015
Thesis Defense Presentation Summer 2015
 

Viewers also liked

Java interview questions and answers
Java interview questions and answersJava interview questions and answers
Java interview questions and answersKrishnaov
 
Modelo PEISOR Poisont
Modelo PEISOR PoisontModelo PEISOR Poisont
Modelo PEISOR PoisontAlfonso Rojas
 
Resume Justin Mattke 020816
Resume Justin Mattke 020816Resume Justin Mattke 020816
Resume Justin Mattke 020816Justin Mattke
 
Justine Louagie, 22-year old Creative Communicator
Justine Louagie, 22-year old Creative CommunicatorJustine Louagie, 22-year old Creative Communicator
Justine Louagie, 22-year old Creative CommunicatorJustine Louagie
 
List of Completed Projects September 2015
List of Completed Projects September  2015List of Completed Projects September  2015
List of Completed Projects September 2015Haroon Pasha Dar
 
Recursos procesales civiles hector oberg yañez
Recursos procesales civiles hector  oberg  yañezRecursos procesales civiles hector  oberg  yañez
Recursos procesales civiles hector oberg yañezCarlos Cruz
 
Ley de adquisiciones, arrendamientos y servicios del
Ley de adquisiciones, arrendamientos y servicios delLey de adquisiciones, arrendamientos y servicios del
Ley de adquisiciones, arrendamientos y servicios delAlfonso Rojas
 
Violência contra mulher: do âmbito privado ao institucional
Violência contra mulher: do âmbito privado ao institucionalViolência contra mulher: do âmbito privado ao institucional
Violência contra mulher: do âmbito privado ao institucionalJoão Alfredo Telles Melo
 
1st SM Results' Analysis
1st SM Results' Analysis1st SM Results' Analysis
1st SM Results' AnalysisPiera Cattaneo
 
Evaluation question 2
Evaluation question 2Evaluation question 2
Evaluation question 2shaydevese
 
Mercado de dinero y capitales
Mercado de dinero y capitalesMercado de dinero y capitales
Mercado de dinero y capitalesMaestros Online
 
«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»
«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»
«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»dnz150of
 

Viewers also liked (20)

Craft provincial jewel-Senior warden
Craft provincial jewel-Senior warden Craft provincial jewel-Senior warden
Craft provincial jewel-Senior warden
 
Fotos
FotosFotos
Fotos
 
Oceanus Classic
Oceanus ClassicOceanus Classic
Oceanus Classic
 
Solda da dobradiça
Solda da dobradiçaSolda da dobradiça
Solda da dobradiça
 
Java interview questions and answers
Java interview questions and answersJava interview questions and answers
Java interview questions and answers
 
No telhado do galpão
No telhado do galpãoNo telhado do galpão
No telhado do galpão
 
Amortizacion
AmortizacionAmortizacion
Amortizacion
 
Modelo PEISOR Poisont
Modelo PEISOR PoisontModelo PEISOR Poisont
Modelo PEISOR Poisont
 
Resume Justin Mattke 020816
Resume Justin Mattke 020816Resume Justin Mattke 020816
Resume Justin Mattke 020816
 
The Wall
The WallThe Wall
The Wall
 
Justine Louagie, 22-year old Creative Communicator
Justine Louagie, 22-year old Creative CommunicatorJustine Louagie, 22-year old Creative Communicator
Justine Louagie, 22-year old Creative Communicator
 
List of Completed Projects September 2015
List of Completed Projects September  2015List of Completed Projects September  2015
List of Completed Projects September 2015
 
Recursos procesales civiles hector oberg yañez
Recursos procesales civiles hector  oberg  yañezRecursos procesales civiles hector  oberg  yañez
Recursos procesales civiles hector oberg yañez
 
Ley de adquisiciones, arrendamientos y servicios del
Ley de adquisiciones, arrendamientos y servicios delLey de adquisiciones, arrendamientos y servicios del
Ley de adquisiciones, arrendamientos y servicios del
 
Sintagma nivel eso
Sintagma nivel esoSintagma nivel eso
Sintagma nivel eso
 
Violência contra mulher: do âmbito privado ao institucional
Violência contra mulher: do âmbito privado ao institucionalViolência contra mulher: do âmbito privado ao institucional
Violência contra mulher: do âmbito privado ao institucional
 
1st SM Results' Analysis
1st SM Results' Analysis1st SM Results' Analysis
1st SM Results' Analysis
 
Evaluation question 2
Evaluation question 2Evaluation question 2
Evaluation question 2
 
Mercado de dinero y capitales
Mercado de dinero y capitalesMercado de dinero y capitales
Mercado de dinero y capitales
 
«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»
«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»
«ІНТЕГРАЦІЯ LEGO-ТЕХНОЛОГІЙ в навчально-виховний процес ДНЗ»
 

Similar to Phillip Arteaga ppt

capstone_final_technical_report
capstone_final_technical_reportcapstone_final_technical_report
capstone_final_technical_reportJeremy Evans
 
Development of a Bench-Top Air-to-Water Heat Pump Experimental Apparatus
Development of a Bench-Top Air-to-Water Heat Pump Experimental ApparatusDevelopment of a Bench-Top Air-to-Water Heat Pump Experimental Apparatus
Development of a Bench-Top Air-to-Water Heat Pump Experimental ApparatusCSCJournals
 
An overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testingAn overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testingBill Spohn
 
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11Emerson Exchange
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordinationHimmelstern
 
Presentation kumar
Presentation kumarPresentation kumar
Presentation kumarVivek G Iyer
 
Training Seminar - Standards, Heat Tracing Options & Application Optimization...
Training Seminar - Standards, Heat Tracing Options & Application Optimization...Training Seminar - Standards, Heat Tracing Options & Application Optimization...
Training Seminar - Standards, Heat Tracing Options & Application Optimization...Thorne & Derrick International
 
ECET 365 Success Begins/Newtonhelp.com
ECET 365 Success Begins/Newtonhelp.comECET 365 Success Begins/Newtonhelp.com
ECET 365 Success Begins/Newtonhelp.comledlang1
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfssusera5c9a31
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapHimmelstern
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightHimmelstern
 
Ecet 365 Education Redefined - snaptutorial.com
Ecet 365    Education Redefined - snaptutorial.comEcet 365    Education Redefined - snaptutorial.com
Ecet 365 Education Redefined - snaptutorial.comDavisMurphyC85
 

Similar to Phillip Arteaga ppt (20)

capstone_final_technical_report
capstone_final_technical_reportcapstone_final_technical_report
capstone_final_technical_report
 
Development of a Bench-Top Air-to-Water Heat Pump Experimental Apparatus
Development of a Bench-Top Air-to-Water Heat Pump Experimental ApparatusDevelopment of a Bench-Top Air-to-Water Heat Pump Experimental Apparatus
Development of a Bench-Top Air-to-Water Heat Pump Experimental Apparatus
 
An overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testingAn overview of diagnostic tools used in RESNET testing
An overview of diagnostic tools used in RESNET testing
 
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
 
ML051640380.pdf
ML051640380.pdfML051640380.pdf
ML051640380.pdf
 
Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
Hafiz Muhammad Bilal
Hafiz Muhammad BilalHafiz Muhammad Bilal
Hafiz Muhammad Bilal
 
bhelppt2
bhelppt2bhelppt2
bhelppt2
 
Prsn
PrsnPrsn
Prsn
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 
Cooling tower management
Cooling tower managementCooling tower management
Cooling tower management
 
Presentation kumar
Presentation kumarPresentation kumar
Presentation kumar
 
Training Seminar - Standards, Heat Tracing Options & Application Optimization...
Training Seminar - Standards, Heat Tracing Options & Application Optimization...Training Seminar - Standards, Heat Tracing Options & Application Optimization...
Training Seminar - Standards, Heat Tracing Options & Application Optimization...
 
ECET 365 Success Begins/Newtonhelp.com
ECET 365 Success Begins/Newtonhelp.comECET 365 Success Begins/Newtonhelp.com
ECET 365 Success Begins/Newtonhelp.com
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdf
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
 
Oral Defense V3
Oral Defense V3Oral Defense V3
Oral Defense V3
 
Ecet 365 Education Redefined - snaptutorial.com
Ecet 365    Education Redefined - snaptutorial.comEcet 365    Education Redefined - snaptutorial.com
Ecet 365 Education Redefined - snaptutorial.com
 
Similateur
SimilateurSimilateur
Similateur
 

Phillip Arteaga ppt

  • 1. I & E ENG Department Summer Intern 2016 August 5, 2016 I & E intern Phillip Arteaga
  • 2. Agenda 2  About Me  Purdue University EE  Overview of selected activities  Reconciliation of DCS & SIS cabinet IO  Thermowell study  Wrap Up
  • 3.  Programmed Motor Protection Relays in BU-521 (Propak)  This Relay monitors the performance of the motor control starter, determines if it goes outside acceptable parameters, and trips it  Wrote a procedure for the relays, which is now in the validation process  Worked with Rockwell and Eaton  Work with my supervisor on the instrument air compressor to troubleshoot the problems using special equipment such as the Fluke 1736 Power Logger , and read and learn about this device  Assisted in use of the Fluke 1736 as it was used to measure voltage and current of the 3 phases at the same time when energized and tracks it  The electrical contactor needed to be replaced 3 Overview
  • 4.  Cataloged the DCS and SIS cabinets: these are the control systems that run the plant and keep it safe  Loop sheet is a drafted drawing of the IO module, which show how the plant was originally designed and modified over time  DOC 4000 is a recently added software utility that surveys the control systems to tell what channels are used  A third resource is the actual field termination strip in the IO cabinet 4 DCS (Distributed Control Systems) & SIS (Safety Instrument Systems) reconciliation
  • 5. 5 Loop Sheet (ENG) Doc 4000 (Controls) Field (I &E) Spare Spare Example 1: Loop diagram revision not yet complete
  • 6. Example 2: Spare IO not yet documented with a loop diagram template 6 Loop Sheet (ENG) Doc 4000 (Controls) Field (I &E)
  • 7. Example 3: IO point documented, but pending installation Spare 7 Loop Sheet (ENG) Doc 4000 (Controls) Field (I &E)
  • 8. Area 100, 239 spares Area 200, 168 spares Area 300, 202 spares Area 500, 115 spares Area 900, 100 spares Over 400+ IO modules in the plant checked as well as terminal strips Hire a contractor to update and redline loopsheets due to high percentage of inconsistencies found when comparing loopsheets with the field and DOC4000 8 Findings & Recommendations
  • 9.  A thermowell is made for holding a temperature element within the pipe; it is exposed to the process flow and has to withstand process conditions  Calculate whether a thermowell needs to be replaced, or passes per the most recent standards  Many Dimensional and Process data are input to thermowell design calculation 9 Thermowell Study
  • 10.  New ASME PTC 19.3 standard (2010) requires more conservative design  Why are we doing this study? To confirm the thermowells meet new standard  Process data for some wells needs to be collected to perform further calculations, but so far those completed look good 10 Findings & Recommendations outside the pipe inside the pipe typical break point
  • 11. What I enjoyed  “if your not learning something new everyday your doing something wrong” John Brubaker What I didn’t enjoy  The 3 hours round trip drive which has been some days up to 5 hrs Suggestions  Improve set up with designated engineer and technician as a mentors Fall  Back to school at Purdue Wrap Up
  • 12.  Thank you For giving me this opportunity to work here. 12 Thank you & Questions

Editor's Notes

  1. MOTOR protection RELAY ( A RELAY IN THIS CASE IS A DEVICE THAT MONITOR THE PERFORMANCE OF A MOTOR STARTER )If the motor was going outside of the parameters programed it could cause it to trip ( you don’t want to work on anything that powerful) The device we used checked the current and voltage at the same time on all three phases once we got the data off the device we realized everything was good on our end, we had other issue like we smelled burning we didn’t know what it came from… the fan inside the bus was the issue for that smell it had burned out, the electrical contactor needed to be replaced and then we were good, but some other issues that occurred coupling between the motor and compressor the metal coupling was twisted and thwarted
  2. This is an example of some of my results (loop sheet is a drafted drawing out the IO module that is how the plant was originally designed) DOC 4000( was a recently added software utility that survey the control systems to tell what chancels are used) Last this a terminal strip which is the field DOC 4000 GOES INTO THE CONTROL SYSTEMS AND COLLECTS THE INFO IN A CONVIENT FORM AND DIPLACES IT FOR NON PROGRAMMERS…. EXPLAIN SOFT POINT AND HOW IT HAS TO BE CHANGE BY THE CONTROLS SYSTEM
  3. The doc4000 shows spare (no loop sheet so you actually have to go in the field to see the module has been wired out to a terminal strip so from doc 4000, we don’t know if those things exist )
  4. The reason this is important is because the engineers designing additional new instruments need to know if there are spare channels Also the tech and operators need to know what there pulling out since some documents terminals do not have loop sheets Also if there was a problem and it was an emergency situation and you couldn’t even access that area you would have no way except for going out in the field to figure out what is on the terminal strip and where it goes
  5. The reason this is important is because the engineers designing additional new instruments need to know if there are spare channels Also the tech and operators need to know what there pulling out since some documents terminals do not have loop sheets Also if there was a problem and it was an emergency situation and you couldn’t even access that area you would have no way except for going out in the field to figure out what is on the terminal strip and where it goes
  6. 2010 new standard with new design guidance , themorwell is only made for holding a temperature element, it is expose to the process flow and has to withstand, one of the ways a thermowell can fail is by shedding vortez ( the flow is affected by thermowell causing the tornados or vortex shedding off the thermowell bounding off the thermowell causing it to vibrate) from fatigue over the years the standard for designing has change such as the new standard in 2010, the reason we go thru this is because we have had thermowell break the reason this is important we don’t want a hole in the pipe or hitting downstream machinery TEST WELLS NEED FOR START UP EXPERIMENT VS WHAT NEED TO CONTROL ON A DAILY BASIS