Gold Corp. Penasquito Mine Mexico M3 Engineering & Construction I designed reinforced concrete masonry/steel buildings with clear spans of 70 feet for this project using Mexican wind and seismic codes (in Spanish). I also conducted structural surveys, designed repairs, and designed new structures and buildings for Asarco, Freeport McMoran and BHP Billiton.
Searchlight Minerals Clarkdale Slag Project Clarkdale, AZ Cimetta Engineering & Construction. In addition to being the project manager  for most of this project, I completed  surveys and structural designs for other  mining clients. I designed the leaching unit, above, in  modular form for easy shipment and installation. I designed the modifications to the existing  building to support this 50 ton vibratory mill. The small photo shows the mill being installed into the building (rear of photo).
UOP, LLC. Modular Continuous Catalyst  Recovery (CCR) Unit.  All equipment, piping, wiring, instruments, etc. are installed in the shop, and the completed modules are shipped to the site to be erected - as the photo shows. While working at UOP, I both  designed and sold several of these units.
While at UOP, LLC, I a) worked with our general contractor to estimate and price the project; b) with assistance from a colleague and the general contractor we sold the project; and c) I was the project manager for the year-long, fast track project.  During this year I also sold three additional multi-million dollar projects. The Project. Aux Sable Liquid  Products. 40,000 barrels per day gasoline treating unit.  $5 million installed cost.
Fermilab. Gimli Enterprises, Inc.  As President of Gimli, my staff and  I assisted the staff of Fermilab in  the design of various structures and  test equipment which were used  in high energy particle experiments .
Braidwood Generating  Station. Braidwood, IL I worked on the design of this electric generating station, and can recall visiting the site  when the reactor for Unit 2 was positioned on the ground, waiting to be installed in the containment building (the cylindrical structures) I have 15 years experience designing industrial plants including those of the magnitude and sophistication of this nuclear electric generating plant.

More Related Content

Viewers also liked

A Guide for pi sheet
A Guide for pi sheetA Guide for pi sheet
A Guide for pi sheetSelf Employed
 
Vatican en de media: het Cantalamessa incident
Vatican en de media: het Cantalamessa incidentVatican en de media: het Cantalamessa incident
Vatican en de media: het Cantalamessa incidentAlfred Driessen
 
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse StardustEclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse StardustSopra Steria
 
Evolutie, wetenschappelijk model of seculier geloof
Evolutie, wetenschappelijk model of seculier geloofEvolutie, wetenschappelijk model of seculier geloof
Evolutie, wetenschappelijk model of seculier geloofAlfred Driessen
 
geloof en het postmodernisme
geloof en het postmodernismegeloof en het postmodernisme
geloof en het postmodernismeAlfred Driessen
 
Life and Quantum Biology
Life and Quantum BiologyLife and Quantum Biology
Life and Quantum BiologyAlfred Driessen
 

Viewers also liked (7)

A Guide for pi sheet
A Guide for pi sheetA Guide for pi sheet
A Guide for pi sheet
 
Vatican en de media: het Cantalamessa incident
Vatican en de media: het Cantalamessa incidentVatican en de media: het Cantalamessa incident
Vatican en de media: het Cantalamessa incident
 
Meaning of Christmas
Meaning of ChristmasMeaning of Christmas
Meaning of Christmas
 
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse StardustEclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
 
Evolutie, wetenschappelijk model of seculier geloof
Evolutie, wetenschappelijk model of seculier geloofEvolutie, wetenschappelijk model of seculier geloof
Evolutie, wetenschappelijk model of seculier geloof
 
geloof en het postmodernisme
geloof en het postmodernismegeloof en het postmodernisme
geloof en het postmodernisme
 
Life and Quantum Biology
Life and Quantum BiologyLife and Quantum Biology
Life and Quantum Biology
 

Similar to Pat Resume Photos

SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015Stan Fraley
 
Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009dalw
 
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Roger Breedlove
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME shortDuane Pooley
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTj Dickey
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
AlanWestResume_9 Aug 16_DD
AlanWestResume_9 Aug 16_DDAlanWestResume_9 Aug 16_DD
AlanWestResume_9 Aug 16_DDAlan West
 

Similar to Pat Resume Photos (20)

projects
projectsprojects
projects
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
 
Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009
 
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
 
Viswanath_AMD
Viswanath_AMDViswanath_AMD
Viswanath_AMD
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 
At Alex
At AlexAt Alex
At Alex
 
jim1res2016
jim1res2016jim1res2016
jim1res2016
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Ilia Mayer
Ilia MayerIlia Mayer
Ilia Mayer
 
YURESUME
YURESUMEYURESUME
YURESUME
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
AlanWestResume_9 Aug 16_DD
AlanWestResume_9 Aug 16_DDAlanWestResume_9 Aug 16_DD
AlanWestResume_9 Aug 16_DD
 
Ashok Guin CV
Ashok Guin CVAshok Guin CV
Ashok Guin CV
 

Recently uploaded

Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingWSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Decarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceDecarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceIES VE
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...caitlingebhard1
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....rightmanforbloodline
 

Recently uploaded (20)

Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation Computing
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Decarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational PerformanceDecarbonising Commercial Real Estate: The Role of Operational Performance
Decarbonising Commercial Real Estate: The Role of Operational Performance
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 

Pat Resume Photos

  • 1. Gold Corp. Penasquito Mine Mexico M3 Engineering & Construction I designed reinforced concrete masonry/steel buildings with clear spans of 70 feet for this project using Mexican wind and seismic codes (in Spanish). I also conducted structural surveys, designed repairs, and designed new structures and buildings for Asarco, Freeport McMoran and BHP Billiton.
  • 2. Searchlight Minerals Clarkdale Slag Project Clarkdale, AZ Cimetta Engineering & Construction. In addition to being the project manager for most of this project, I completed surveys and structural designs for other mining clients. I designed the leaching unit, above, in modular form for easy shipment and installation. I designed the modifications to the existing building to support this 50 ton vibratory mill. The small photo shows the mill being installed into the building (rear of photo).
  • 3. UOP, LLC. Modular Continuous Catalyst Recovery (CCR) Unit. All equipment, piping, wiring, instruments, etc. are installed in the shop, and the completed modules are shipped to the site to be erected - as the photo shows. While working at UOP, I both designed and sold several of these units.
  • 4. While at UOP, LLC, I a) worked with our general contractor to estimate and price the project; b) with assistance from a colleague and the general contractor we sold the project; and c) I was the project manager for the year-long, fast track project. During this year I also sold three additional multi-million dollar projects. The Project. Aux Sable Liquid Products. 40,000 barrels per day gasoline treating unit. $5 million installed cost.
  • 5. Fermilab. Gimli Enterprises, Inc. As President of Gimli, my staff and I assisted the staff of Fermilab in the design of various structures and test equipment which were used in high energy particle experiments .
  • 6. Braidwood Generating Station. Braidwood, IL I worked on the design of this electric generating station, and can recall visiting the site when the reactor for Unit 2 was positioned on the ground, waiting to be installed in the containment building (the cylindrical structures) I have 15 years experience designing industrial plants including those of the magnitude and sophistication of this nuclear electric generating plant.