Heat Input
•

5 Projects/sources

•

Max Est.
1,100,000Mkwh pa

Z1

Heat Users
•

205 Locations

•

Process & Space heating

Theoretical TE Uptake

•

Z2

Max Est.
718,000Mkwh pa

Network
•

Mapped against road
access & overland pipe
runs

Z3

Z4
Type of Operation
Processing/
manufacturing

27

30

Distribution/
warehousing

67

81

Commerical /Offices

unknown

TE Zones Heat Demand Potential
150,651
362,229

Zone 1

159,736

Zone 2
45,654

Zone 3
Zone 4

400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
0

Heat Demand DECC
calcs
LCSW Study data

Zone 1 Zone 2 Zone 3 Zone 4
•

Pipe run lengths
•
•
•
•

•

•

•

Z1 ~ 14.9km
Z2 ~ 6.3km
Z3 ~ 15.8km
Z4 ~ 4.3km

Project cost est (£3k/m – £2k/m)
• Z1 ~ £44.9M - £32.7M
• Z2 ~ £18.9M - £12.6M
• Z3 ~ £47.4M - £31.6M
• Z4 ~ £12.9M - £8.6M
Total + connection
• £129.3M - £87.9M
Revenue Potential
(£0.018 – £0.028/kwh – based on DECC heat pricing gas lined)

•
•

£12.9M - £20.1M pa

ROI Potential
• 10 to 4.4 years
•
•

Revenue Potential : £12.9M - £20.1M pa
ROI Potential : 10 to 4.4 years

The REALITY IS:What this assumes
Heat uptake

Other UK TEG/DHNs

The AS TEG

100% heat uptake

100% heat uptake

100% v unlikely!

Structures to drive long term
contracts and user sign up (LA
operations, planning etc)

No LA operations
Established planning consents

25+ yrs

3yr max

Incentive
structures
Contract term

None

Heat pricing

Gas linked heat
pricing

Pricing formula

Heat supply only

Real cost of heat delivery
(O&M, space saving, cost
avoidance – personnel etc)

Cost avoidance formula very
different.
Heat supply only LESS cost of existing
assets + is variable (central
procurement etc)

Additional DHN
revenue support

No energy centre

Energy centre (RHI, electricity
revenue etc)

No energy centre

Engagement

LESS than gas link pricing for large
users

Site decisions not just a matter for
the specific location.
“we are already doing a lot – Why
should we do this?”
•

Effect on ROI when varying
•

Capital cost (via discounting)

•

Heat uptake

Maximum capex and minimum heat price

ROI (years) 0% Discounted Capital Cost
140.0
120.0
100.0
80.0

years

100%

60.0

50%
40.0

20%

20.0
0.0

z1

z2

z3

z4

total + con

100%

6.9

23.0

16.5

4.8

10.0

50%

13.8

46.0

33.0

9.6

20.0

20%

34.4

115.0

82.5

24.0

50.0

% of total heat
uptake
ROI (years) 0% Discounted Capital
Cost
140.0
120.0
100.0
80.0
60.0
40.0
20.0
0.0

100%
z1

z2

z3

z4

total +
con

100%

6.9

23.0

16.5

4.8

10.0

50%

13.8

46.0

33.0

9.6

20.0

20%

34.4

115.0

82.5

24.0

50%

50.0

20%

ROI (years) 50% Discounted Capital
Cost
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0

100%
z1

z1

z2

z3

z4

total +
con

100%

1.4

4.6

3.3

1.0

2.0

50%

2.8

9.2

6.6

1.9

4.0

20%

6.9

23.0

16.5

4.8

10.0

50%
20%

total +
con

3.4

11.5

8.2

2.4

5.0

6.9

23.0

16.5

4.8

10.0

20%

100%

z4

50%

25.0
20.0
15.0
10.0
5.0
0.0

z3

100%

ROI (years) 80% Discounted Capital
Cost

z2

17.2

57.5

41.2

12.0

25.0

50%
20%
ROI (years) Variation with Max/MinCapital Estimates ,
0%, 50%, 80% Capital Discounting
and 100%, 50%, 20% Heat uptake
60.0

50.0

40.0

30.0
100%
50%
20.0

20%
100% uptake at min cap

10.0

50% uptake at min cap
20% uptake at min cap

0.0

0%

50%

80%

100%

10.0

5.0

2.0

50%

20.0

10.0

4.0

20%

50.0

25.0

10.0

100% uptake at min cap

4.4

2.2

0.9

50% uptake at min cap

8.7

4.4

1.7

20% uptake at min cap

21.9

10.9

4.4

Only realistic scenario.
Use this to inform the model
1. Standard DHN/TEG business model does not apply.
2. Establish a workable business model rather than trying to make the
model work.
3. Fundamentals and risks of this model will be dictated by:-

a) The private/corporate heat users.
b) The cost of the infrastructure.
4. To achieve an acceptable ROI will take financial input from Public
and Private sectors.
•

Use a mixture of existing instruments eg:•

Part PFI type for main infrastructure

•

Standard debt for small supply grids within a
neighbourhood/industrial complex

5. Must drive down the capital repayment burden, to
6. Enable short term contracting of TE to work.

More Related Content

Similar to Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Thermal Energy Grid

Ost corp present mei
Ost corp present meiOst corp present mei
Ost corp present meiwmjenner
 
GOBUILK Manila by SCG : Digital Construction Community for the Philippines
GOBUILK Manila by SCG : Digital Construction Community for the PhilippinesGOBUILK Manila by SCG : Digital Construction Community for the Philippines
GOBUILK Manila by SCG : Digital Construction Community for the Philippines
Builk Thailand
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Increasing Inductor Lifetime by Predicting Coil Copper Temperatures Presentation
Increasing Inductor Lifetime by Predicting Coil Copper Temperatures PresentationIncreasing Inductor Lifetime by Predicting Coil Copper Temperatures Presentation
Increasing Inductor Lifetime by Predicting Coil Copper Temperatures Presentation
Fluxtrol Inc.
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportNatalie Reid
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
Gensol Engineering Limited
 
AIA Chicago Presentation
AIA Chicago PresentationAIA Chicago Presentation
AIA Chicago Presentation
Christian Cianfrone
 
R&D Enabling Decarbonisation of Heat - SEAI RDD Conference
R&D Enabling Decarbonisation of Heat - SEAI RDD ConferenceR&D Enabling Decarbonisation of Heat - SEAI RDD Conference
R&D Enabling Decarbonisation of Heat - SEAI RDD Conference
Seamus Hoyne
 
What's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & MoreWhat's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & More
Upsite Technologies
 
The $1,000 Internet Exchange
The $1,000 Internet ExchangeThe $1,000 Internet Exchange
The $1,000 Internet Exchange
Internet Society
 
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
Mohawk Innovative Technology
 
Water Power FDR Presentation
Water Power FDR PresentationWater Power FDR Presentation
Water Power FDR PresentationNicholas Clements
 
A Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of ElectronicsA Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of Electronics
Kamal Karimanal
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1Bhushan Velis
 
The Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsThe Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial Buildings
Center for Energy and Environment
 
District Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar RailDistrict Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar RailJaygopal Kottilil
 
Complete Presentation for Applications
Complete Presentation for ApplicationsComplete Presentation for Applications
Complete Presentation for ApplicationsMichael Bullington
 
HVAC analysis.pptx
HVAC analysis.pptxHVAC analysis.pptx
HVAC analysis.pptx
kylenesti2
 

Similar to Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Thermal Energy Grid (20)

Ost corp present mei
Ost corp present meiOst corp present mei
Ost corp present mei
 
GOBUILK Manila by SCG : Digital Construction Community for the Philippines
GOBUILK Manila by SCG : Digital Construction Community for the PhilippinesGOBUILK Manila by SCG : Digital Construction Community for the Philippines
GOBUILK Manila by SCG : Digital Construction Community for the Philippines
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Increasing Inductor Lifetime by Predicting Coil Copper Temperatures Presentation
Increasing Inductor Lifetime by Predicting Coil Copper Temperatures PresentationIncreasing Inductor Lifetime by Predicting Coil Copper Temperatures Presentation
Increasing Inductor Lifetime by Predicting Coil Copper Temperatures Presentation
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
AIA Chicago Presentation
AIA Chicago PresentationAIA Chicago Presentation
AIA Chicago Presentation
 
R&D Enabling Decarbonisation of Heat - SEAI RDD Conference
R&D Enabling Decarbonisation of Heat - SEAI RDD ConferenceR&D Enabling Decarbonisation of Heat - SEAI RDD Conference
R&D Enabling Decarbonisation of Heat - SEAI RDD Conference
 
What's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & MoreWhat's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & More
 
The $1,000 Internet Exchange
The $1,000 Internet ExchangeThe $1,000 Internet Exchange
The $1,000 Internet Exchange
 
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
 
Water Power FDR Presentation
Water Power FDR PresentationWater Power FDR Presentation
Water Power FDR Presentation
 
A Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of ElectronicsA Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of Electronics
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1
 
The Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsThe Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial Buildings
 
District Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar RailDistrict Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar Rail
 
Complete Presentation for Applications
Complete Presentation for ApplicationsComplete Presentation for Applications
Complete Presentation for Applications
 
HVAC analysis.pptx
HVAC analysis.pptxHVAC analysis.pptx
HVAC analysis.pptx
 
main_brochure
main_brochuremain_brochure
main_brochure
 

More from The Future Economy Network

Nikki Jones
Nikki JonesNikki Jones
Furong Li
Furong LiFurong Li
Oliver Spink
Oliver SpinkOliver Spink
Sarah Eager
Sarah EagerSarah Eager
Peter Dennis
Peter DennisPeter Dennis
david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...
The Future Economy Network
 
Laura Zuluaga Cardona University of Bath Business university collaboration 14...
Laura Zuluaga Cardona University of Bath Business university collaboration 14...Laura Zuluaga Cardona University of Bath Business university collaboration 14...
Laura Zuluaga Cardona University of Bath Business university collaboration 14...
The Future Economy Network
 
Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...
Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...
Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...
The Future Economy Network
 
david coley university of bath are buildings evil stbah 14062018
david coley university of bath are buildings evil stbah 14062018david coley university of bath are buildings evil stbah 14062018
david coley university of bath are buildings evil stbah 14062018
The Future Economy Network
 
Tilly shaw ets quick wins breakfast 21 nov 2017
Tilly shaw ets quick wins breakfast 21 nov 2017Tilly shaw ets quick wins breakfast 21 nov 2017
Tilly shaw ets quick wins breakfast 21 nov 2017
The Future Economy Network
 
Steve sliney collecteco quick wins 21 nov 2017
Steve sliney collecteco quick wins 21 nov 2017Steve sliney collecteco quick wins 21 nov 2017
Steve sliney collecteco quick wins 21 nov 2017
The Future Economy Network
 
Paul albone future economy group quick wins and little things go green 21 nov 17
Paul albone future economy group quick wins and little things go green 21 nov 17Paul albone future economy group quick wins and little things go green 21 nov 17
Paul albone future economy group quick wins and little things go green 21 nov 17
The Future Economy Network
 
Dorothy stein greengage it quick wins 27 nov 2017
Dorothy stein greengage it quick wins 27 nov 2017Dorothy stein greengage it quick wins 27 nov 2017
Dorothy stein greengage it quick wins 27 nov 2017
The Future Economy Network
 
Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...
Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...
Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...
The Future Economy Network
 
Paul younger hewitt studios colleges to car ports low carbon business breakfa...
Paul younger hewitt studios colleges to car ports low carbon business breakfa...Paul younger hewitt studios colleges to car ports low carbon business breakfa...
Paul younger hewitt studios colleges to car ports low carbon business breakfa...
The Future Economy Network
 
Kim collins integral engineering design clt and innovation in construction lo...
Kim collins integral engineering design clt and innovation in construction lo...Kim collins integral engineering design clt and innovation in construction lo...
Kim collins integral engineering design clt and innovation in construction lo...
The Future Economy Network
 
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
The Future Economy Network
 
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
The Future Economy Network
 
Michael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulationMichael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulation
The Future Economy Network
 
Henry rock evans max fordham lcbb 160517 performance versus regulation
Henry rock evans max fordham lcbb 160517 performance versus regulationHenry rock evans max fordham lcbb 160517 performance versus regulation
Henry rock evans max fordham lcbb 160517 performance versus regulation
The Future Economy Network
 

More from The Future Economy Network (20)

Nikki Jones
Nikki JonesNikki Jones
Nikki Jones
 
Furong Li
Furong LiFurong Li
Furong Li
 
Oliver Spink
Oliver SpinkOliver Spink
Oliver Spink
 
Sarah Eager
Sarah EagerSarah Eager
Sarah Eager
 
Peter Dennis
Peter DennisPeter Dennis
Peter Dennis
 
david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...david mason, low carbon construction - challenges, trends and technologies, l...
david mason, low carbon construction - challenges, trends and technologies, l...
 
Laura Zuluaga Cardona University of Bath Business university collaboration 14...
Laura Zuluaga Cardona University of Bath Business university collaboration 14...Laura Zuluaga Cardona University of Bath Business university collaboration 14...
Laura Zuluaga Cardona University of Bath Business university collaboration 14...
 
Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...
Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...
Josie Gough Innovate UK Sustainability and Funding Opportunities low carbon i...
 
david coley university of bath are buildings evil stbah 14062018
david coley university of bath are buildings evil stbah 14062018david coley university of bath are buildings evil stbah 14062018
david coley university of bath are buildings evil stbah 14062018
 
Tilly shaw ets quick wins breakfast 21 nov 2017
Tilly shaw ets quick wins breakfast 21 nov 2017Tilly shaw ets quick wins breakfast 21 nov 2017
Tilly shaw ets quick wins breakfast 21 nov 2017
 
Steve sliney collecteco quick wins 21 nov 2017
Steve sliney collecteco quick wins 21 nov 2017Steve sliney collecteco quick wins 21 nov 2017
Steve sliney collecteco quick wins 21 nov 2017
 
Paul albone future economy group quick wins and little things go green 21 nov 17
Paul albone future economy group quick wins and little things go green 21 nov 17Paul albone future economy group quick wins and little things go green 21 nov 17
Paul albone future economy group quick wins and little things go green 21 nov 17
 
Dorothy stein greengage it quick wins 27 nov 2017
Dorothy stein greengage it quick wins 27 nov 2017Dorothy stein greengage it quick wins 27 nov 2017
Dorothy stein greengage it quick wins 27 nov 2017
 
Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...
Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...
Richard Howroyd B&NES Council Rich Osborn Fresh Range PIPEN Dynamic Procureme...
 
Paul younger hewitt studios colleges to car ports low carbon business breakfa...
Paul younger hewitt studios colleges to car ports low carbon business breakfa...Paul younger hewitt studios colleges to car ports low carbon business breakfa...
Paul younger hewitt studios colleges to car ports low carbon business breakfa...
 
Kim collins integral engineering design clt and innovation in construction lo...
Kim collins integral engineering design clt and innovation in construction lo...Kim collins integral engineering design clt and innovation in construction lo...
Kim collins integral engineering design clt and innovation in construction lo...
 
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
 
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
Healthcheck your workspace skanska go green low carbon workshop 25 july 2017
 
Michael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulationMichael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulation
 
Henry rock evans max fordham lcbb 160517 performance versus regulation
Henry rock evans max fordham lcbb 160517 performance versus regulationHenry rock evans max fordham lcbb 160517 performance versus regulation
Henry rock evans max fordham lcbb 160517 performance versus regulation
 

Recently uploaded

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 

Recently uploaded (20)

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 

Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Thermal Energy Grid

  • 1.
  • 2.
  • 3. Heat Input • 5 Projects/sources • Max Est. 1,100,000Mkwh pa Z1 Heat Users • 205 Locations • Process & Space heating Theoretical TE Uptake • Z2 Max Est. 718,000Mkwh pa Network • Mapped against road access & overland pipe runs Z3 Z4
  • 4. Type of Operation Processing/ manufacturing 27 30 Distribution/ warehousing 67 81 Commerical /Offices unknown TE Zones Heat Demand Potential 150,651 362,229 Zone 1 159,736 Zone 2 45,654 Zone 3 Zone 4 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 Heat Demand DECC calcs LCSW Study data Zone 1 Zone 2 Zone 3 Zone 4
  • 5. • Pipe run lengths • • • • • • • Z1 ~ 14.9km Z2 ~ 6.3km Z3 ~ 15.8km Z4 ~ 4.3km Project cost est (£3k/m – £2k/m) • Z1 ~ £44.9M - £32.7M • Z2 ~ £18.9M - £12.6M • Z3 ~ £47.4M - £31.6M • Z4 ~ £12.9M - £8.6M Total + connection • £129.3M - £87.9M Revenue Potential (£0.018 – £0.028/kwh – based on DECC heat pricing gas lined) • • £12.9M - £20.1M pa ROI Potential • 10 to 4.4 years
  • 6. • • Revenue Potential : £12.9M - £20.1M pa ROI Potential : 10 to 4.4 years The REALITY IS:What this assumes Heat uptake Other UK TEG/DHNs The AS TEG 100% heat uptake 100% heat uptake 100% v unlikely! Structures to drive long term contracts and user sign up (LA operations, planning etc) No LA operations Established planning consents 25+ yrs 3yr max Incentive structures Contract term None Heat pricing Gas linked heat pricing Pricing formula Heat supply only Real cost of heat delivery (O&M, space saving, cost avoidance – personnel etc) Cost avoidance formula very different. Heat supply only LESS cost of existing assets + is variable (central procurement etc) Additional DHN revenue support No energy centre Energy centre (RHI, electricity revenue etc) No energy centre Engagement LESS than gas link pricing for large users Site decisions not just a matter for the specific location. “we are already doing a lot – Why should we do this?”
  • 7. • Effect on ROI when varying • Capital cost (via discounting) • Heat uptake Maximum capex and minimum heat price ROI (years) 0% Discounted Capital Cost 140.0 120.0 100.0 80.0 years 100% 60.0 50% 40.0 20% 20.0 0.0 z1 z2 z3 z4 total + con 100% 6.9 23.0 16.5 4.8 10.0 50% 13.8 46.0 33.0 9.6 20.0 20% 34.4 115.0 82.5 24.0 50.0 % of total heat uptake
  • 8. ROI (years) 0% Discounted Capital Cost 140.0 120.0 100.0 80.0 60.0 40.0 20.0 0.0 100% z1 z2 z3 z4 total + con 100% 6.9 23.0 16.5 4.8 10.0 50% 13.8 46.0 33.0 9.6 20.0 20% 34.4 115.0 82.5 24.0 50% 50.0 20% ROI (years) 50% Discounted Capital Cost 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 100% z1 z1 z2 z3 z4 total + con 100% 1.4 4.6 3.3 1.0 2.0 50% 2.8 9.2 6.6 1.9 4.0 20% 6.9 23.0 16.5 4.8 10.0 50% 20% total + con 3.4 11.5 8.2 2.4 5.0 6.9 23.0 16.5 4.8 10.0 20% 100% z4 50% 25.0 20.0 15.0 10.0 5.0 0.0 z3 100% ROI (years) 80% Discounted Capital Cost z2 17.2 57.5 41.2 12.0 25.0 50% 20%
  • 9. ROI (years) Variation with Max/MinCapital Estimates , 0%, 50%, 80% Capital Discounting and 100%, 50%, 20% Heat uptake 60.0 50.0 40.0 30.0 100% 50% 20.0 20% 100% uptake at min cap 10.0 50% uptake at min cap 20% uptake at min cap 0.0 0% 50% 80% 100% 10.0 5.0 2.0 50% 20.0 10.0 4.0 20% 50.0 25.0 10.0 100% uptake at min cap 4.4 2.2 0.9 50% uptake at min cap 8.7 4.4 1.7 20% uptake at min cap 21.9 10.9 4.4 Only realistic scenario. Use this to inform the model
  • 10. 1. Standard DHN/TEG business model does not apply. 2. Establish a workable business model rather than trying to make the model work. 3. Fundamentals and risks of this model will be dictated by:- a) The private/corporate heat users. b) The cost of the infrastructure. 4. To achieve an acceptable ROI will take financial input from Public and Private sectors. • Use a mixture of existing instruments eg:• Part PFI type for main infrastructure • Standard debt for small supply grids within a neighbourhood/industrial complex 5. Must drive down the capital repayment burden, to 6. Enable short term contracting of TE to work.