SlideShare a Scribd company logo
1 of 7
Training & Educating your Team
10’ Work-Area Rule & the Difference Between
Necessary & Unnecessary LOST TIME
Fail to Plan and You WILL Plan to Fail
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
This Presentation is an incomplete rendition and is to be used ONLY as an
example of P3 Consulting & Training’s customized offerings.
By Remaining in your Work-Area
during required work hours,
Your Productivity will
Automatically Increase.
It’s that Simple.
Reduce LOST TIME the Easy Way
Once you are in your Work-Area
Do NOT Step Past
The Red Line
OnceyouareinyourWork-Area
DoNOTStepPast
TheRedLine
OnceyouareinyourWork-Area
DoNOTStepPast
TheRedLine
Once you are in your Work-Area
Do NOT Step Past
The Red Line
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
What is the Harm in leaving your work area?
• Leaving your Work-Area is Unnecessary Lost
Time which Costs the Job $ .48 a Minute per
worker in Direct Cost on a project with an
average cost per hour of $28.50. (28.50 / 60
Mins. = .48 Cents per minute.)
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
• Lets look at what constitutes Unnecessary
Lost Time vs Necessary Lost Time.
HOW MUCH UNNECESSARY LOST TIME WERE YOU RESPONSIBLE FOR TODAY & HOW DO WE DECREASE NECESSARY LOST TIME?
MORNING:
Minutes Unnecessary Necessary Continuous Improvement Strategy to Reduce LT?
1. Late for Work?------------------------ _________ _________ __________ ________________________________________
2. Stretch & Flex?------------------------ _________ _________ __________ ________________________________________
3. Getting Tools?------------------------ _________ _________ __________ ________________________________________
4. Getting Material?--------------------- _________ _________ __________ ________________________________________
5. Break? ---------------------------------- _________ _________ __________ ________________________________________
6. Unauthorized Breaks?– Leaving WK Area _________ _________ __________ ________________________________________
7. Bathroom Trips?-------– Leaving WK Area _________ _________ __________ ________________________________________
8. Using the Man-lift? ---– Leaving WK Area _________ _________ __________ ________________________________________
9. Goofing with friends?--------------- _________ _________ __________ ________________________________________
10. Getting forgotten Mat & Tools?- – Leaving WK Area _________ _________ __________ ________________________________________
11. Drink of Water?----– Leaving WK Area _________ _________ __________ ________________________________________
12. Redoing Work?------------------------ _________ _________ __________ ________________________________________
13. Waiting on Supervisor?-------------- _________ _________ __________ ________________________________________
14. Looking for Supervisor?---– Leaving WK Area _________ _________ __________ ________________________________________
15. Pre & Post Lunch Travel-------------- _________ _________ __________ ________________________________________
AFTERNOON:
1. Stretch & Flex?-------------------------- _________ _________ __________ ________________________________________
2. Getting Tools?------– Leaving WK Area _________ _________ __________ ________________________________________
3. Getting Material?--– Leaving WK Area _________ _________ __________ ________________________________________
4. Break? ----------------------------------- _________ _________ __________ ________________________________________
5. Unauthorized Breaks?--– Leaving WK Area _________ _________ __________ ________________________________________
6. Bathroom Trips?----– Leaving WK Area _________ _________ __________ ________________________________________
7. Using the Man-lift? ------------------- _________ _________ __________ ________________________________________
8. Goofing with friends?--------------- _________ _________ __________ ________________________________________
9. Getting forgotten Mat & Tools?--– Leaving WK Area _________ _________ __________ ________________________________________
10. Drink of Water?------– Leaving WK Area _________ _________ __________ ________________________________________
11. Redoing Work?-------------------------- _________ _________ __________ ________________________________________
12. Waiting on Supervisor?--------------- _________ _________ __________ ________________________________________
13. Looking for Supervisor?---– Leaving WK Area _________ _________ __________ ________________________________________
14. Cleaning up Work Area?-------------- _________ _________ __________ ________________________________________
15. Leaving Work Area Prematurely?--– Leaving WK Area _________ _________ __________ ________________________________________
16. Putting up Mat & Tools---------------- _________ _________ __________ ________________________________________
TOTAL LOST TIME _________ __________ ___________
X .48 .48 .48
= __________ ___________ ____________
______ Minutes/60 = _____-Hours Lost Time per DAY after DAY after DAY X ________ # of Workers
Daily LOST TIME on a Typical Job
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
WHY did you leave your Work Area?
• Was it because you did not Plan Ahead by
ordering enough Material & the Proper Tools
at least 1-Week in Advance?
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
• Since this was a large project, was there a
well-trained Material & Tool Expediting
Professional on the jobsite?
• Remember, your Failure to Plan Ahead does NOT
Constitute an Emergency Response from the
other team members.
Where is the HIGHER Cost?
• The HIGHER Cost though is the Fall in Productivity due to
the Loss of Momentum when you lose your rhythm.
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
• ADD to that the Lost Production which will result in the
Company having to ADD Workers to meet the
Construction Production Schedule because you left your
work area consistently and did not install as much as was
planned for in the 3-Week Man-Loading Look Ahead.
• Now that the Job is Behind Schedule your customer
Demands that the Crew(s) will also have to work
Overtime.
• Your customer has now Lost Faith in your Company’s
Ability to meet the Schedule & this could cost the
company Future Work.
P3 Productivity Consulting & Training
• We will Audit the Productivity on Selective Jobsites or ALL
of your jobsites.
• We will Compose a Report outlining our Findings &
Recommendations on Means & Methods of Increasing
Productivity.
• We will suggest Customized Systems to keep your workers
Focused on Contributing & Accepting a Continuous
Improvement Culture.
• Remember that to be Successful in the Implementation of
any new System and/or Philosophy, that it Starts at the Top.
P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222

More Related Content

Viewers also liked

Staff training day 10 jan 2013 090113
Staff training day 10 jan 2013 090113Staff training day 10 jan 2013 090113
Staff training day 10 jan 2013 090113John Gordon
 
How to Lose an Employee in 10 Days
How to Lose an Employee in 10 DaysHow to Lose an Employee in 10 Days
How to Lose an Employee in 10 DaysAchievers
 
Guidance and counselling
Guidance and counsellingGuidance and counselling
Guidance and counsellingEko Priyanto
 

Viewers also liked (6)

10 Days to DyKnow
10 Days to DyKnow10 Days to DyKnow
10 Days to DyKnow
 
10 Day Startup
10 Day Startup10 Day Startup
10 Day Startup
 
Staff training day 10 jan 2013 090113
Staff training day 10 jan 2013 090113Staff training day 10 jan 2013 090113
Staff training day 10 jan 2013 090113
 
How to Lose an Employee in 10 Days
How to Lose an Employee in 10 DaysHow to Lose an Employee in 10 Days
How to Lose an Employee in 10 Days
 
Top 10 Training Metrics
Top 10 Training MetricsTop 10 Training Metrics
Top 10 Training Metrics
 
Guidance and counselling
Guidance and counsellingGuidance and counselling
Guidance and counselling
 

Similar to P3 Productivity Consulting & Training - 10’ work-area rule & lost time (sample) 10 20 16

Millennium semiconductors company profile
Millennium semiconductors company profileMillennium semiconductors company profile
Millennium semiconductors company profileVaibhav Swasti
 
2015 SEO Checklist - UPDATED
2015 SEO Checklist - UPDATED2015 SEO Checklist - UPDATED
2015 SEO Checklist - UPDATEDBe Dynamic
 
Multifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdf
Multifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdfMultifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdf
Multifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdfMultifamily Insiders
 
Frappe Open Day - December 2014
 Frappe Open Day - December 2014 Frappe Open Day - December 2014
Frappe Open Day - December 2014Nabin Hait
 
· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx
· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx
· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docxodiliagilby
 
Test your idea questionnaire
Test your idea questionnaireTest your idea questionnaire
Test your idea questionnairestartupJamaica
 
L Niven Accelerated Transition
L Niven Accelerated TransitionL Niven Accelerated Transition
L Niven Accelerated Transitionkrita00
 
Amp 415 Extraordinary Success/newtonhelp.com
Amp 415 Extraordinary Success/newtonhelp.com  Amp 415 Extraordinary Success/newtonhelp.com
Amp 415 Extraordinary Success/newtonhelp.com amaranthbeg127
 
Building A Goal Aligned Enterprise Public
Building A Goal Aligned Enterprise   PublicBuilding A Goal Aligned Enterprise   Public
Building A Goal Aligned Enterprise Publicgregflay
 
Qs2 en initial_interview
Qs2 en initial_interviewQs2 en initial_interview
Qs2 en initial_interviewkhayer
 
Developing Employee Lifecycle Plan PowerPoint Presentation Slides
Developing Employee Lifecycle Plan PowerPoint Presentation SlidesDeveloping Employee Lifecycle Plan PowerPoint Presentation Slides
Developing Employee Lifecycle Plan PowerPoint Presentation SlidesSlideTeam
 

Similar to P3 Productivity Consulting & Training - 10’ work-area rule & lost time (sample) 10 20 16 (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Training format
Training formatTraining format
Training format
 
Millennium semiconductors company profile
Millennium semiconductors company profileMillennium semiconductors company profile
Millennium semiconductors company profile
 
2015 SEO Checklist - UPDATED
2015 SEO Checklist - UPDATED2015 SEO Checklist - UPDATED
2015 SEO Checklist - UPDATED
 
Sanjay Patil 23
Sanjay Patil 23Sanjay Patil 23
Sanjay Patil 23
 
Multifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdf
Multifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdfMultifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdf
Multifamily Demo Day - Effective Vendor Demos & Asking the Right Questions.pdf
 
Frappe Open Day - December 2014
 Frappe Open Day - December 2014 Frappe Open Day - December 2014
Frappe Open Day - December 2014
 
· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx
· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx
· Assignment 3 Forced Ranking and TechnologyDue Week 10 and wor.docx
 
Test your idea questionnaire
Test your idea questionnaireTest your idea questionnaire
Test your idea questionnaire
 
Sql server 2008 admin
Sql server 2008 adminSql server 2008 admin
Sql server 2008 admin
 
L Niven Accelerated Transition
L Niven Accelerated TransitionL Niven Accelerated Transition
L Niven Accelerated Transition
 
Ritesh_Update_Resume
Ritesh_Update_ResumeRitesh_Update_Resume
Ritesh_Update_Resume
 
Mohan Dhumale
Mohan DhumaleMohan Dhumale
Mohan Dhumale
 
Amp 415 Extraordinary Success/newtonhelp.com
Amp 415 Extraordinary Success/newtonhelp.com  Amp 415 Extraordinary Success/newtonhelp.com
Amp 415 Extraordinary Success/newtonhelp.com
 
Building A Goal Aligned Enterprise Public
Building A Goal Aligned Enterprise   PublicBuilding A Goal Aligned Enterprise   Public
Building A Goal Aligned Enterprise Public
 
Qs2 en initial_interview
Qs2 en initial_interviewQs2 en initial_interview
Qs2 en initial_interview
 
Transformational things to do with a whiteboard v.3
Transformational things to do with a whiteboard v.3Transformational things to do with a whiteboard v.3
Transformational things to do with a whiteboard v.3
 
Performance Appraisal
Performance AppraisalPerformance Appraisal
Performance Appraisal
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Developing Employee Lifecycle Plan PowerPoint Presentation Slides
Developing Employee Lifecycle Plan PowerPoint Presentation SlidesDeveloping Employee Lifecycle Plan PowerPoint Presentation Slides
Developing Employee Lifecycle Plan PowerPoint Presentation Slides
 

Recently uploaded

Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 

Recently uploaded (20)

Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 

P3 Productivity Consulting & Training - 10’ work-area rule & lost time (sample) 10 20 16

  • 1. Training & Educating your Team 10’ Work-Area Rule & the Difference Between Necessary & Unnecessary LOST TIME Fail to Plan and You WILL Plan to Fail P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222 This Presentation is an incomplete rendition and is to be used ONLY as an example of P3 Consulting & Training’s customized offerings.
  • 2. By Remaining in your Work-Area during required work hours, Your Productivity will Automatically Increase. It’s that Simple. Reduce LOST TIME the Easy Way Once you are in your Work-Area Do NOT Step Past The Red Line OnceyouareinyourWork-Area DoNOTStepPast TheRedLine OnceyouareinyourWork-Area DoNOTStepPast TheRedLine Once you are in your Work-Area Do NOT Step Past The Red Line P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
  • 3. What is the Harm in leaving your work area? • Leaving your Work-Area is Unnecessary Lost Time which Costs the Job $ .48 a Minute per worker in Direct Cost on a project with an average cost per hour of $28.50. (28.50 / 60 Mins. = .48 Cents per minute.) P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222 • Lets look at what constitutes Unnecessary Lost Time vs Necessary Lost Time.
  • 4. HOW MUCH UNNECESSARY LOST TIME WERE YOU RESPONSIBLE FOR TODAY & HOW DO WE DECREASE NECESSARY LOST TIME? MORNING: Minutes Unnecessary Necessary Continuous Improvement Strategy to Reduce LT? 1. Late for Work?------------------------ _________ _________ __________ ________________________________________ 2. Stretch & Flex?------------------------ _________ _________ __________ ________________________________________ 3. Getting Tools?------------------------ _________ _________ __________ ________________________________________ 4. Getting Material?--------------------- _________ _________ __________ ________________________________________ 5. Break? ---------------------------------- _________ _________ __________ ________________________________________ 6. Unauthorized Breaks?– Leaving WK Area _________ _________ __________ ________________________________________ 7. Bathroom Trips?-------– Leaving WK Area _________ _________ __________ ________________________________________ 8. Using the Man-lift? ---– Leaving WK Area _________ _________ __________ ________________________________________ 9. Goofing with friends?--------------- _________ _________ __________ ________________________________________ 10. Getting forgotten Mat & Tools?- – Leaving WK Area _________ _________ __________ ________________________________________ 11. Drink of Water?----– Leaving WK Area _________ _________ __________ ________________________________________ 12. Redoing Work?------------------------ _________ _________ __________ ________________________________________ 13. Waiting on Supervisor?-------------- _________ _________ __________ ________________________________________ 14. Looking for Supervisor?---– Leaving WK Area _________ _________ __________ ________________________________________ 15. Pre & Post Lunch Travel-------------- _________ _________ __________ ________________________________________ AFTERNOON: 1. Stretch & Flex?-------------------------- _________ _________ __________ ________________________________________ 2. Getting Tools?------– Leaving WK Area _________ _________ __________ ________________________________________ 3. Getting Material?--– Leaving WK Area _________ _________ __________ ________________________________________ 4. Break? ----------------------------------- _________ _________ __________ ________________________________________ 5. Unauthorized Breaks?--– Leaving WK Area _________ _________ __________ ________________________________________ 6. Bathroom Trips?----– Leaving WK Area _________ _________ __________ ________________________________________ 7. Using the Man-lift? ------------------- _________ _________ __________ ________________________________________ 8. Goofing with friends?--------------- _________ _________ __________ ________________________________________ 9. Getting forgotten Mat & Tools?--– Leaving WK Area _________ _________ __________ ________________________________________ 10. Drink of Water?------– Leaving WK Area _________ _________ __________ ________________________________________ 11. Redoing Work?-------------------------- _________ _________ __________ ________________________________________ 12. Waiting on Supervisor?--------------- _________ _________ __________ ________________________________________ 13. Looking for Supervisor?---– Leaving WK Area _________ _________ __________ ________________________________________ 14. Cleaning up Work Area?-------------- _________ _________ __________ ________________________________________ 15. Leaving Work Area Prematurely?--– Leaving WK Area _________ _________ __________ ________________________________________ 16. Putting up Mat & Tools---------------- _________ _________ __________ ________________________________________ TOTAL LOST TIME _________ __________ ___________ X .48 .48 .48 = __________ ___________ ____________ ______ Minutes/60 = _____-Hours Lost Time per DAY after DAY after DAY X ________ # of Workers Daily LOST TIME on a Typical Job P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222
  • 5. WHY did you leave your Work Area? • Was it because you did not Plan Ahead by ordering enough Material & the Proper Tools at least 1-Week in Advance? P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222 • Since this was a large project, was there a well-trained Material & Tool Expediting Professional on the jobsite? • Remember, your Failure to Plan Ahead does NOT Constitute an Emergency Response from the other team members.
  • 6. Where is the HIGHER Cost? • The HIGHER Cost though is the Fall in Productivity due to the Loss of Momentum when you lose your rhythm. P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222 • ADD to that the Lost Production which will result in the Company having to ADD Workers to meet the Construction Production Schedule because you left your work area consistently and did not install as much as was planned for in the 3-Week Man-Loading Look Ahead. • Now that the Job is Behind Schedule your customer Demands that the Crew(s) will also have to work Overtime. • Your customer has now Lost Faith in your Company’s Ability to meet the Schedule & this could cost the company Future Work.
  • 7. P3 Productivity Consulting & Training • We will Audit the Productivity on Selective Jobsites or ALL of your jobsites. • We will Compose a Report outlining our Findings & Recommendations on Means & Methods of Increasing Productivity. • We will suggest Customized Systems to keep your workers Focused on Contributing & Accepting a Continuous Improvement Culture. • Remember that to be Successful in the Implementation of any new System and/or Philosophy, that it Starts at the Top. P3 Productivity & Continuous Improvement Consulting & Training - Copyright 2016 Stu Jardine - 281.740.4222