1.0 ARTICLES
1.1 ARTICLE 1:
A Worker Injured Due To Concrete Slab Collapsed
On October 11, 2011, one worker was injured when a concrete slab collapsed in NU Sentral
building under construction at KL Sentral yesterday morning. It is understood that a 35 years old
Bangladeshi was doing the plastering work on the first floor of that building when a third floor
gave way at about 10.30 am. Then, he was rushed to the University Malaya Medical Centre for
medical surgery. The other workers on the first floor managed to escaped from fell down.
The NU Sentral under construction is said to be three times bigger that Mid Valley Megamall
and first green shopping mall in the city.
MRCB representative said all the safety procedures had been adhered to workers were well
equipped with personal protective equipment as required by local authorities. MRCB had
informed to Department of Occupational Safety and Health about this incident.
1.2 ARTICLE 2:
Terengganu Stadium ROOF COLLAPSES – after one year of being built
“peteh ganu peteh”Terengganu last night was qualified for the finals of Malaysian
football.Even though the team lost to”hobin jang hobin” negeri Sembilan team 2-1. Do you know
that Terengganu is a state that has a soccer stadium is beautiful and great. just shortly over a year
after it was officially opened by the YANG DI-PERTUAN AGONG SULTAN MIZAN
ZAINAL ABIDIN, the roof of the stadium named after him in Gong Badak, Kuala Terengganu
collapsed this morning, damaging a few cars that were parked in the vicinity.
2 | P a g e
1.3 ARTICLE 3:
One worker killed, another injured at MRT construction site
In a statement, the MRT Corp said Rijaul Abdul Goni, 40, died on the spot while his compatriot
identified as Shanaullah, 37, has been sent to Kuala Lumpur Hospital. It said a third worker
identified as Rozlu Karim escaped injury.
"Rijaul’s body has been sent to the hospital for a post-mortem. This will reveal the cause of
death, and we will share this information once it is available”, said MRT Corp’s director of
strategic communications & PR Amir Mahmood Razak. He said work has been suspended at the
Semantan site. The work at the Semantan site is contracted to Sunway Construction.
In the incident, the workers were assembling a rebar cage, when the test that held the rebar gave
way and fell on them.
Police and forensics are at the site and investigations have commenced to determine the cause of
incident. Meanwhile, Kuala Lumpur Fire and Rescue Department assistant operations director
Azizan Ismail said the department received a call from the public at 3pm alerting them on the
incident.Azizan said the initial information received stated that the incident occurred at 1.20pm.
“We are puzzled as to why they (MRT Corp) did not alert us on the incident earlier,” said
Azizan. This is the second time in under six months, that the MRT project site has been hit by a
fatal accident.
Last August, MRT Corp’s then chief executive Datuk Azhar Abdul Hamid quit his post after an
accident at its Kota Damansara site took the lives of three Bangladeshi workers. But the
company rejected Azhar’s resignation letter. Much earlier, a motorist’s sedan was crushed when
a metal slab fell on it at the MRT site in Pusat Bandar Damansara. There were no casualties in
that incident. – February 27, 2015.
3 | P a g e
2.0 SUMMARIZATION OF THE EACH ARTICLE
2.1 SUMMARY OF THE ARTICLE 1:
In this case, management should be blame because of lack of safety. Based on this article, that
the concrete slab was still wet and showing that they are just completed the casting work at third
floor of complex building. From my point of view of this incident, the scaffolding which had
been erected to support the structure formwork was inadequately of the strength support.
According to the requirement under Regulations 29, Factory and Machinery (Building
Operations and Works of Engineering) (Safety) Regulations 1986, the erection of formwork
including the shores, braces and other supports shall be supervise and inspected by designated
person (competent person) regularly. Any unsafe condition that been discovered during
inspection shall be rectify immediately. The result of inspection shall be recorded and kept in
properly. The inspection should be carry out before the casting works by designated person.
2.2 SUMMARY OF THE ARTICLE 2:
My point of view about this article is, why the stadium was built at a cost of RM270 million
could collapse just like that. Whether it is due to the negligence of the contractor or it is simply
to expedite the construction of ‘Sukan Sukma Terengganu’. On June 2, 2009, a major part of the
roof construction collapsed under normal weather conditions, including the section above the
royal box. It was only a year after officially opened.
The major cause for the collapse of the roof was identified to be the failure of design and the
materials used. There were also reports of sporadic loud bangs and structure damage prior to the
4 | P a g e
collapse. One of the structural repair job on the roof was scheduled on the day of the collapse
itself, along with some electrical repair works being carried out on other part of the stadium. As
of June 2010, the cleaning work and relocation of the collapsed roof were not finished. This is
one of the shocking accident in Malaysia beside the “the highland tower collapse”. It
remembered us that the project costing millions of dollar does not guarantee safety to the public
as long we do not adopt the entire security before starting construct.
2.3 SUMMARY OF THE ARTICLE 3:
When it comes to Malaysia work-sites it is not "Safety First' but 'Safety Last". Everyone wakes
up after a fatality, then go back to sleep again until the next one. The problem is, our contractors
never believe in the fact that "Prevention is the best than cure" after you determine the
symptoms, which is basically poor safety management and poor attitude.
A study of our laws will reveal that there is a need for self-regulation at the work-place. Who is
interested in self regulation to improve standards. All concerned are more interested in the
bottom line from owners, to developers to main contractors and to sub contractors. Our
regulations on Safety and Health are up to date and the best on with developed countries, but
there is hardly any compliance.
We have to understand that compliance to the law does not necessarily make a workplace safe.
There is a need to manage safety and health with vigor and commitment. We see Japanese
contractors, French contractors completing projects in Malaysia is adopting very high standards
of Safety and Health.
5 | P a g e
3.0 CONCLUSION:
Rapid development of this emerging economy has certainly many benefits to all Malaysians.
However, we also recognize that with the side effects that must be overcome. One of them is
increased danger or risk in the workplace as a result of the use of materials, equipment and
sophisticated processes and many at this time. Of course these risks effectively controlled to
ensure productivity and quality of work in the construction industry can always be maintained at
high levels (Embong Ludin, 1995). High accident in the construction sector can lead to loss of
national manpower and loss of property worth thousands of millions of dollars each year. In the
construction industry, most cases occur in the workplace injury was caused by workers not given
adequate safety training or did not receive training (Grossman, 1996).
Indeed, there is no denying that one of the side effects of rapid economic development in recent
years is the risks that involves the risk of labor accidents and occupational diseases are reported
more serious. Accidents and occupational diseases that affect the development of the country's
high and the loss of manpower. As you know, labor is an important national asset and the
backbone of the development process. Economic and social development cannot be achieved
without contributions from the workers.
The Provisions are complied with by the employer as the Occupational Safety and Health Act
1994 to provide training and provide safety knowledge does not seem to be fully implemented by
the employer. Grounds of high cost of training to be the main reason employers refuse to
implement this requirement (Everett, 1996). According to Davies and Thomasine (1996),
employers in the construction industry to provide various levels of safety and health training to
each employee and officer management. Therefore, the employer or contractor can be said is the
key in determining the safety and health of employees.

More Related Content

Viewers also liked

ACC REPORT
ACC REPORTACC REPORT
ACC REPORT
Lillian June
 
CiviCRM 5.0 for Non-Techies
CiviCRM 5.0 for Non-TechiesCiviCRM 5.0 for Non-Techies
CiviCRM 5.0 for Non-Techies
tonymazz
 
Rakuten ichiba
Rakuten ichibaRakuten ichiba
Rakuten ichiba
Crossprof.com
 
The grand design hawking, mlodinow (2010)
The grand design   hawking, mlodinow (2010)The grand design   hawking, mlodinow (2010)
The grand design hawking, mlodinow (2010)
drdvinod
 
Clinical Case 7
Clinical Case 7Clinical Case 7
Clinical Case 7
Venkata Subba Reddy
 
Clinical Case 6
Clinical Case 6Clinical Case 6
Clinical Case 6
Venkata Subba Reddy
 
Scheepsbezoek queen elizabeth 2015
Scheepsbezoek queen elizabeth 2015Scheepsbezoek queen elizabeth 2015
Scheepsbezoek queen elizabeth 2015Luc De Smedt
 
Використання блогів в управлінні персоналом
Використання блогів в управлінні персоналомВикористання блогів в управлінні персоналом
Використання блогів в управлінні персоналом
98911
 
Confident Translation Profile
Confident Translation ProfileConfident Translation Profile
Confident Translation Profile
CONFIDENT Translations Company
 
Tarea6 adrianamunoz
Tarea6 adrianamunozTarea6 adrianamunoz
Tarea6 adrianamunoz
meriannamureq
 

Viewers also liked (10)

ACC REPORT
ACC REPORTACC REPORT
ACC REPORT
 
CiviCRM 5.0 for Non-Techies
CiviCRM 5.0 for Non-TechiesCiviCRM 5.0 for Non-Techies
CiviCRM 5.0 for Non-Techies
 
Rakuten ichiba
Rakuten ichibaRakuten ichiba
Rakuten ichiba
 
The grand design hawking, mlodinow (2010)
The grand design   hawking, mlodinow (2010)The grand design   hawking, mlodinow (2010)
The grand design hawking, mlodinow (2010)
 
Clinical Case 7
Clinical Case 7Clinical Case 7
Clinical Case 7
 
Clinical Case 6
Clinical Case 6Clinical Case 6
Clinical Case 6
 
Scheepsbezoek queen elizabeth 2015
Scheepsbezoek queen elizabeth 2015Scheepsbezoek queen elizabeth 2015
Scheepsbezoek queen elizabeth 2015
 
Використання блогів в управлінні персоналом
Використання блогів в управлінні персоналомВикористання блогів в управлінні персоналом
Використання блогів в управлінні персоналом
 
Confident Translation Profile
Confident Translation ProfileConfident Translation Profile
Confident Translation Profile
 
Tarea6 adrianamunoz
Tarea6 adrianamunozTarea6 adrianamunoz
Tarea6 adrianamunoz
 

Similar to Osha assig.

Study and Transformation of Occupational Health and Safety techniques in Cons...
Study and Transformation of Occupational Health and Safety techniques in Cons...Study and Transformation of Occupational Health and Safety techniques in Cons...
Study and Transformation of Occupational Health and Safety techniques in Cons...
Vatsal Vala
 
1153 3330-1-pb
1153 3330-1-pb1153 3330-1-pb
1153 3330-1-pb
Dr.Madhav Prasad Koirala
 
Construction Industry Literature Review
Construction Industry Literature ReviewConstruction Industry Literature Review
Construction Industry Literature Review
Write My English Paper For Me Bob Jones University
 
01 safety manual
01 safety manual01 safety manual
01 safety manual
Quynh Nguyen
 
Industrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringIndustrial trainning project report for Civil Engineering
Industrial trainning project report for Civil Engineering
Prakash Kumar Jha
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
hemanth kumar
 
IRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction IndustryIRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction Industry
IRJET Journal
 
building construction
building constructionbuilding construction
building construction
chuenmin
 
B CON REPORT
B CON REPORTB CON REPORT
B CON REPORT
JunXiang97
 
Binder1
Binder1Binder1
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
Aditya Pratap Singh
 
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECTL&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
Deepak Kumar
 
Bcon Report
Bcon Report Bcon Report
Bcon Report
En Huey
 
Bcon report final 4.0
Bcon report final 4.0Bcon report final 4.0
Bcon report final 4.0
Yu Xian Liew
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
jolynnTJL
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET Journal
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
Kartini Ibrahim
 
Building Construction Assignment 1
Building Construction Assignment 1 Building Construction Assignment 1
Building Construction Assignment 1
Tan Jaden
 
IRJET- Effective Safety Management in Construction
IRJET-  	  Effective Safety Management in ConstructionIRJET-  	  Effective Safety Management in Construction
IRJET- Effective Safety Management in Construction
IRJET Journal
 
Analysis of safety practices by automobile mechanics at siwdo
Analysis of safety practices by automobile mechanics at siwdoAnalysis of safety practices by automobile mechanics at siwdo
Analysis of safety practices by automobile mechanics at siwdo
Alexander Decker
 

Similar to Osha assig. (20)

Study and Transformation of Occupational Health and Safety techniques in Cons...
Study and Transformation of Occupational Health and Safety techniques in Cons...Study and Transformation of Occupational Health and Safety techniques in Cons...
Study and Transformation of Occupational Health and Safety techniques in Cons...
 
1153 3330-1-pb
1153 3330-1-pb1153 3330-1-pb
1153 3330-1-pb
 
Construction Industry Literature Review
Construction Industry Literature ReviewConstruction Industry Literature Review
Construction Industry Literature Review
 
01 safety manual
01 safety manual01 safety manual
01 safety manual
 
Industrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringIndustrial trainning project report for Civil Engineering
Industrial trainning project report for Civil Engineering
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
 
IRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction IndustryIRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction Industry
 
building construction
building constructionbuilding construction
building construction
 
B CON REPORT
B CON REPORTB CON REPORT
B CON REPORT
 
Binder1
Binder1Binder1
Binder1
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
 
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECTL&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
 
Bcon Report
Bcon Report Bcon Report
Bcon Report
 
Bcon report final 4.0
Bcon report final 4.0Bcon report final 4.0
Bcon report final 4.0
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
 
Building Construction Assignment 1
Building Construction Assignment 1 Building Construction Assignment 1
Building Construction Assignment 1
 
IRJET- Effective Safety Management in Construction
IRJET-  	  Effective Safety Management in ConstructionIRJET-  	  Effective Safety Management in Construction
IRJET- Effective Safety Management in Construction
 
Analysis of safety practices by automobile mechanics at siwdo
Analysis of safety practices by automobile mechanics at siwdoAnalysis of safety practices by automobile mechanics at siwdo
Analysis of safety practices by automobile mechanics at siwdo
 

Recently uploaded

3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
ABHILASH DUTTA
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 

Recently uploaded (20)

3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 

Osha assig.

  • 1. 1 | P a g e 1.0 ARTICLES 1.1 ARTICLE 1: A Worker Injured Due To Concrete Slab Collapsed On October 11, 2011, one worker was injured when a concrete slab collapsed in NU Sentral building under construction at KL Sentral yesterday morning. It is understood that a 35 years old Bangladeshi was doing the plastering work on the first floor of that building when a third floor gave way at about 10.30 am. Then, he was rushed to the University Malaya Medical Centre for medical surgery. The other workers on the first floor managed to escaped from fell down. The NU Sentral under construction is said to be three times bigger that Mid Valley Megamall and first green shopping mall in the city. MRCB representative said all the safety procedures had been adhered to workers were well equipped with personal protective equipment as required by local authorities. MRCB had informed to Department of Occupational Safety and Health about this incident. 1.2 ARTICLE 2: Terengganu Stadium ROOF COLLAPSES – after one year of being built “peteh ganu peteh”Terengganu last night was qualified for the finals of Malaysian football.Even though the team lost to”hobin jang hobin” negeri Sembilan team 2-1. Do you know that Terengganu is a state that has a soccer stadium is beautiful and great. just shortly over a year after it was officially opened by the YANG DI-PERTUAN AGONG SULTAN MIZAN ZAINAL ABIDIN, the roof of the stadium named after him in Gong Badak, Kuala Terengganu collapsed this morning, damaging a few cars that were parked in the vicinity.
  • 2. 2 | P a g e 1.3 ARTICLE 3: One worker killed, another injured at MRT construction site In a statement, the MRT Corp said Rijaul Abdul Goni, 40, died on the spot while his compatriot identified as Shanaullah, 37, has been sent to Kuala Lumpur Hospital. It said a third worker identified as Rozlu Karim escaped injury. "Rijaul’s body has been sent to the hospital for a post-mortem. This will reveal the cause of death, and we will share this information once it is available”, said MRT Corp’s director of strategic communications & PR Amir Mahmood Razak. He said work has been suspended at the Semantan site. The work at the Semantan site is contracted to Sunway Construction. In the incident, the workers were assembling a rebar cage, when the test that held the rebar gave way and fell on them. Police and forensics are at the site and investigations have commenced to determine the cause of incident. Meanwhile, Kuala Lumpur Fire and Rescue Department assistant operations director Azizan Ismail said the department received a call from the public at 3pm alerting them on the incident.Azizan said the initial information received stated that the incident occurred at 1.20pm. “We are puzzled as to why they (MRT Corp) did not alert us on the incident earlier,” said Azizan. This is the second time in under six months, that the MRT project site has been hit by a fatal accident. Last August, MRT Corp’s then chief executive Datuk Azhar Abdul Hamid quit his post after an accident at its Kota Damansara site took the lives of three Bangladeshi workers. But the company rejected Azhar’s resignation letter. Much earlier, a motorist’s sedan was crushed when a metal slab fell on it at the MRT site in Pusat Bandar Damansara. There were no casualties in that incident. – February 27, 2015.
  • 3. 3 | P a g e 2.0 SUMMARIZATION OF THE EACH ARTICLE 2.1 SUMMARY OF THE ARTICLE 1: In this case, management should be blame because of lack of safety. Based on this article, that the concrete slab was still wet and showing that they are just completed the casting work at third floor of complex building. From my point of view of this incident, the scaffolding which had been erected to support the structure formwork was inadequately of the strength support. According to the requirement under Regulations 29, Factory and Machinery (Building Operations and Works of Engineering) (Safety) Regulations 1986, the erection of formwork including the shores, braces and other supports shall be supervise and inspected by designated person (competent person) regularly. Any unsafe condition that been discovered during inspection shall be rectify immediately. The result of inspection shall be recorded and kept in properly. The inspection should be carry out before the casting works by designated person. 2.2 SUMMARY OF THE ARTICLE 2: My point of view about this article is, why the stadium was built at a cost of RM270 million could collapse just like that. Whether it is due to the negligence of the contractor or it is simply to expedite the construction of ‘Sukan Sukma Terengganu’. On June 2, 2009, a major part of the roof construction collapsed under normal weather conditions, including the section above the royal box. It was only a year after officially opened. The major cause for the collapse of the roof was identified to be the failure of design and the materials used. There were also reports of sporadic loud bangs and structure damage prior to the
  • 4. 4 | P a g e collapse. One of the structural repair job on the roof was scheduled on the day of the collapse itself, along with some electrical repair works being carried out on other part of the stadium. As of June 2010, the cleaning work and relocation of the collapsed roof were not finished. This is one of the shocking accident in Malaysia beside the “the highland tower collapse”. It remembered us that the project costing millions of dollar does not guarantee safety to the public as long we do not adopt the entire security before starting construct. 2.3 SUMMARY OF THE ARTICLE 3: When it comes to Malaysia work-sites it is not "Safety First' but 'Safety Last". Everyone wakes up after a fatality, then go back to sleep again until the next one. The problem is, our contractors never believe in the fact that "Prevention is the best than cure" after you determine the symptoms, which is basically poor safety management and poor attitude. A study of our laws will reveal that there is a need for self-regulation at the work-place. Who is interested in self regulation to improve standards. All concerned are more interested in the bottom line from owners, to developers to main contractors and to sub contractors. Our regulations on Safety and Health are up to date and the best on with developed countries, but there is hardly any compliance. We have to understand that compliance to the law does not necessarily make a workplace safe. There is a need to manage safety and health with vigor and commitment. We see Japanese contractors, French contractors completing projects in Malaysia is adopting very high standards of Safety and Health.
  • 5. 5 | P a g e 3.0 CONCLUSION: Rapid development of this emerging economy has certainly many benefits to all Malaysians. However, we also recognize that with the side effects that must be overcome. One of them is increased danger or risk in the workplace as a result of the use of materials, equipment and sophisticated processes and many at this time. Of course these risks effectively controlled to ensure productivity and quality of work in the construction industry can always be maintained at high levels (Embong Ludin, 1995). High accident in the construction sector can lead to loss of national manpower and loss of property worth thousands of millions of dollars each year. In the construction industry, most cases occur in the workplace injury was caused by workers not given adequate safety training or did not receive training (Grossman, 1996). Indeed, there is no denying that one of the side effects of rapid economic development in recent years is the risks that involves the risk of labor accidents and occupational diseases are reported more serious. Accidents and occupational diseases that affect the development of the country's high and the loss of manpower. As you know, labor is an important national asset and the backbone of the development process. Economic and social development cannot be achieved without contributions from the workers. The Provisions are complied with by the employer as the Occupational Safety and Health Act 1994 to provide training and provide safety knowledge does not seem to be fully implemented by the employer. Grounds of high cost of training to be the main reason employers refuse to implement this requirement (Everett, 1996). According to Davies and Thomasine (1996), employers in the construction industry to provide various levels of safety and health training to each employee and officer management. Therefore, the employer or contractor can be said is the key in determining the safety and health of employees.