Skilled and highly motivated Journeyman Steamfitter-Pipefitter. Experienced in both new construction and
maintenance of Alberta’smajoroil sandsfacilities.Experienced with many types and sizes of piping systems,
as well as jointing procedures. Adaptable in working within a team or independently.
Extremely organized with solid interpersonal and communication skills.
Committed to following all safety guidelines and procedures.
Core Competencies
ď‚· WorkingwithQA/QCdepartmentstoensure testing
and documentingrequirements;propermaterial
selectionandstrictadherence toITP’s,
weldprocedures,torqueingandtensioningof
flanges,andweldmappingof joints.
ď‚· Strongabilitytoreadand interpretblueprints,
isometricdrawingsandP&IDs.
 ConductingTHA’s/FLRA’s,reviewingsafety
proceduresandbestpractice documents,and
implementingthe appropriate controls.
ď‚· Riggingpipes/valvessafelyandefficiently
withcrane and hand-rigging.
ď‚· Workingwithoperationstowalkdownlines
to verifyisolationof systemsandensurelock
out/tagout proceduresare inplace.
ď‚· Conductinghydrotests/blow downs.
ď‚· Fabricatingpipingspoolsandfieldrunning
pipe.
Professional Experience
STEAMFITTER-PIPEFITTER
Black and McdonaldLtd. (CNRLHorizon) 2015 Feb. – Present
ď‚· NewConstruction:Activelyparticipatingasa teammemberinvolvedinamajorexpansionof Horizon's
vacuumdistillationanddilutedbitumenrecoveryunits.
ď‚· Contributionsincludebutare notlimitedto:workingwithaweldertofabricate pipingspoolsand
complete fieldwelds,safelyriggingandhoistingpipewithbothcrane andhandrigging,removing
temporarysupportsandshippingbracketsfrommodstoaccommodate the fitupof mod interconnect
joints,installingpipe supports,mentoringapprentices,andactivelyparticipatingindailytool box
meetingsaswell asFLRA/THAsandweeklysafetymeetings,etc.
STEAMFITTER-PIPEFITTER PCL Industrial
Constructors(ConocoPhillipsSurmount2) 2014 Oct. – Dec.
ď‚· NewConstruction:Hydrotestingcrew.
ď‚· Responsible forcloselyreviewingtestpackagesandensuringhydrotestsof manydifferentsizesand
typesof pipingsystemswere carriedoutontime andwithoutincident.
ď‚· Regulardutiesincluded:
Installing/removingblinds,trimmingoutblindsandventstoaccommodate the safe fill/drainof
systemsandremoval of airinthe process,runninghoses,boltingupandtorquingflanges,installing
PSVsand gauges,workingwithQA/QCdepartmentstoensure all testrequirementswere metand
results properlydocumented,etc.Alsoservedasalternate foremanwhenregularforemanattended
safetyandbettersupervisioncourses.
STEAMFITTER-PIPEFITTER
AeconIndustrial Western(SuncorEnergy) 2014, Aug. - Sept.
ď‚· Installedglycol andprocess(bitumen) pipingsystemsassociatedwitheightnew chillersandsix new
heatexchangers,inamajorexpansionof Suncor’seasttankfarm.
ď‚· Dutiesincludedbutwere notlimitedto:Participatingin,andcontributingtodailytool box talksand
weeklysafetymeetings.Conductingfieldlevelriskassessments,identifyinghazards,andimplementing
the appropriate controls.Preparingfieldweldjointsforwelders.Riggingspools/valvesforinstall,and
workingwithbothcranesandhand riggingtosuccessfullyaccomplishthe task.InstalledPipeSupports
and associatedguides/anchors.Boltedupandtorquedflanges,conductedhydrotests/blowdowns,
walkedlinesfordeficiencies,etc.
STEAMFITTER-PIPEFITTER 2014
Jacobs Industrial Services(Syncrude/Shell Albian/NexenLongLake) (contracts:2009/ 2012/2013)
ď‚· Regularly provided maintenance and assisted with new construction projects: MLMR at Syncrude, tank
connectivity,naturalgashandlingexpansionandmajorundergroundprojects.
ď‚· CST Twinningproject:tyinglarge bore frompipelinetonew pumphouses.
ď‚· Fabricated/installedsmall pipingandsupportsinside pumphouses.
ď‚· Performedmaintenance andmajorturnaroundinextractionareaandextractionoutage (2009& 2012).
STEAMFITTER-PIPEFITTER 2014
TransfieldAssetManagementServices(SuncorEnergy) (contracts:2010/2011/2012)
ď‚· Sustainable Projects/Outage teammember(2014)
ď‚· Responsible for installation of both small and large bore piping (part of booster pump house expansion
to increase tailings/handlingcapacity).
ď‚· Sustainable Projectsteammember;workedonmajorexpansionof RFGpipeline (2012).
ď‚· Providedmaintenance asmemberof outage/turnaroundteam(2011).
ď‚· Maintenance foroutage/turnaroundteam(2010).
ď‚· Communicate effectively;resolve issuesquicklyandbuildstronginternal workingrelationships.
STEAMFITTER-PIPEFITTER 2011 TO 2012
PCL Industrial ConstructorsInc.(Kearl Oil SandsProject)
ď‚· Efficiently assisted with new construction project; maintained clear communications on project
timelines.
ď‚· Assisted as heavy module install crew member comprised of both pipefitters and iron workers; worked
withengineersandcrane operatorstoinstall large,pre-assembledsectionsof the plant(mods).
STEAMFITTER-PIPEFITTER 2008 TO 2009
Lockerbie andHole Industrial/Contracting(SuncorEnergy)
ď‚· Performed maintenance for 10 months; new construction work for 6 months (subcontracted to build
newwatertreatmentandsewage facilitiestoservice Suncorcamps).
ď‚· Fabricatedandinstalledextensivepipingsystemsaccordingtoplanspecifications.
ď‚· Safelyoperatedequipmenttoliftandinstall pre-manufacturedcomponents.
ď‚· Usedtestingequipmenttochecksystemsforleaksandconductoverall final inspections.
Completed Education/Certifications
JourneymanSteamfitter-Pipefitter(RedSeal Certified)
(ApprenticeshipcompletedinAlberta)
HighSchool Diploma
CarletonNorthHighSchool
(NewBrunswick)
Industrial Training
ConstructionSafetyTrainingSystems
ConfinedSpace Entry
Fall Arrest
Aerial WorkPlatform
Self-ContainedBreathingApparatus(SCBA)
RespiratoryProtectiveEquipment(RPE)
StandardFirstAidwithLevel CCPR
H2S Alive

Oscar Brown-Resume-2015

  • 1.
    OSCAR J. BROWN 76Burnham Road, Florenceville, NB, Canada E7L 1Z2 C: (780) 381-8893 H: (506) 392-8366 E: grammy203@msn.com Skilled and highly motivated Journeyman Steamfitter-Pipefitter. Experienced in both new construction and maintenance of Alberta’smajoroil sandsfacilities.Experienced with many types and sizes of piping systems, as well as jointing procedures. Adaptable in working within a team or independently. Extremely organized with solid interpersonal and communication skills. Committed to following all safety guidelines and procedures. Core Competencies  WorkingwithQA/QCdepartmentstoensure testing and documentingrequirements;propermaterial selectionandstrictadherence toITP’s, weldprocedures,torqueingandtensioningof flanges,andweldmappingof joints.  Strongabilitytoreadand interpretblueprints, isometricdrawingsandP&IDs.  ConductingTHA’s/FLRA’s,reviewingsafety proceduresandbestpractice documents,and implementingthe appropriate controls.  Riggingpipes/valvessafelyandefficiently withcrane and hand-rigging.  Workingwithoperationstowalkdownlines to verifyisolationof systemsandensurelock out/tagout proceduresare inplace.  Conductinghydrotests/blow downs.  Fabricatingpipingspoolsandfieldrunning pipe. Professional Experience STEAMFITTER-PIPEFITTER Black and McdonaldLtd. (CNRLHorizon) 2015 Feb. – Present  NewConstruction:Activelyparticipatingasa teammemberinvolvedinamajorexpansionof Horizon's vacuumdistillationanddilutedbitumenrecoveryunits.  Contributionsincludebutare notlimitedto:workingwithaweldertofabricate pipingspoolsand complete fieldwelds,safelyriggingandhoistingpipewithbothcrane andhandrigging,removing temporarysupportsandshippingbracketsfrommodstoaccommodate the fitupof mod interconnect joints,installingpipe supports,mentoringapprentices,andactivelyparticipatingindailytool box meetingsaswell asFLRA/THAsandweeklysafetymeetings,etc. STEAMFITTER-PIPEFITTER PCL Industrial Constructors(ConocoPhillipsSurmount2) 2014 Oct. – Dec.  NewConstruction:Hydrotestingcrew.  Responsible forcloselyreviewingtestpackagesandensuringhydrotestsof manydifferentsizesand typesof pipingsystemswere carriedoutontime andwithoutincident.
  • 2.
     Regulardutiesincluded: Installing/removingblinds,trimmingoutblindsandventstoaccommodate thesafe fill/drainof systemsandremoval of airinthe process,runninghoses,boltingupandtorquingflanges,installing PSVsand gauges,workingwithQA/QCdepartmentstoensure all testrequirementswere metand results properlydocumented,etc.Alsoservedasalternate foremanwhenregularforemanattended safetyandbettersupervisioncourses. STEAMFITTER-PIPEFITTER AeconIndustrial Western(SuncorEnergy) 2014, Aug. - Sept.  Installedglycol andprocess(bitumen) pipingsystemsassociatedwitheightnew chillersandsix new heatexchangers,inamajorexpansionof Suncor’seasttankfarm.  Dutiesincludedbutwere notlimitedto:Participatingin,andcontributingtodailytool box talksand weeklysafetymeetings.Conductingfieldlevelriskassessments,identifyinghazards,andimplementing the appropriate controls.Preparingfieldweldjointsforwelders.Riggingspools/valvesforinstall,and workingwithbothcranesandhand riggingtosuccessfullyaccomplishthe task.InstalledPipeSupports and associatedguides/anchors.Boltedupandtorquedflanges,conductedhydrotests/blowdowns, walkedlinesfordeficiencies,etc. STEAMFITTER-PIPEFITTER 2014 Jacobs Industrial Services(Syncrude/Shell Albian/NexenLongLake) (contracts:2009/ 2012/2013)  Regularly provided maintenance and assisted with new construction projects: MLMR at Syncrude, tank connectivity,naturalgashandlingexpansionandmajorundergroundprojects.  CST Twinningproject:tyinglarge bore frompipelinetonew pumphouses.  Fabricated/installedsmall pipingandsupportsinside pumphouses.  Performedmaintenance andmajorturnaroundinextractionareaandextractionoutage (2009& 2012). STEAMFITTER-PIPEFITTER 2014 TransfieldAssetManagementServices(SuncorEnergy) (contracts:2010/2011/2012)  Sustainable Projects/Outage teammember(2014)  Responsible for installation of both small and large bore piping (part of booster pump house expansion to increase tailings/handlingcapacity).  Sustainable Projectsteammember;workedonmajorexpansionof RFGpipeline (2012).  Providedmaintenance asmemberof outage/turnaroundteam(2011).  Maintenance foroutage/turnaroundteam(2010).  Communicate effectively;resolve issuesquicklyandbuildstronginternal workingrelationships. STEAMFITTER-PIPEFITTER 2011 TO 2012 PCL Industrial ConstructorsInc.(Kearl Oil SandsProject)  Efficiently assisted with new construction project; maintained clear communications on project timelines.  Assisted as heavy module install crew member comprised of both pipefitters and iron workers; worked withengineersandcrane operatorstoinstall large,pre-assembledsectionsof the plant(mods). STEAMFITTER-PIPEFITTER 2008 TO 2009
  • 3.
    Lockerbie andHole Industrial/Contracting(SuncorEnergy) ď‚·Performed maintenance for 10 months; new construction work for 6 months (subcontracted to build newwatertreatmentandsewage facilitiestoservice Suncorcamps). ď‚· Fabricatedandinstalledextensivepipingsystemsaccordingtoplanspecifications. ď‚· Safelyoperatedequipmenttoliftandinstall pre-manufacturedcomponents. ď‚· Usedtestingequipmenttochecksystemsforleaksandconductoverall final inspections. Completed Education/Certifications JourneymanSteamfitter-Pipefitter(RedSeal Certified) (ApprenticeshipcompletedinAlberta) HighSchool Diploma CarletonNorthHighSchool (NewBrunswick) Industrial Training ConstructionSafetyTrainingSystems ConfinedSpace Entry Fall Arrest Aerial WorkPlatform Self-ContainedBreathingApparatus(SCBA) RespiratoryProtectiveEquipment(RPE) StandardFirstAidwithLevel CCPR H2S Alive