Work Experience
Heavy Truck Mechanic
Falls Auto Spring Inc.
6001 Niagara Falls Blvd.
Niagara Falls, NY 14304
October 2015 to December 2015
Responsibilities
Heavy Truck; Suspension, Steering, Springs, Brakes, Drive Lines, Alignments, Trailers
Medium Truck Repair
Light Truck Repair
CNC Operator CNC Builder
Eastman Machine Company
773 Washington St.
Buffalo, NY 14203
June 2015 to August 2015
Responsibilities
Operate and Setup of CNC Equipment
Build New CNC Equipment from blueprints
Panel Builder Electrical wiring of components, circuits, switches, gauges etc.
Skills Used
Millwright, Welding, Fitting, Machinist, Plumbing, Hydraulics, Pneumatics
Electrical and Computer Programing
Laser Cutting
Millwright
Truesdell Trucking
-
Wilson, NY
-
April 2012 to October 2014
Responsibilities
Repair trucks, bulldozers and wheel loaders. operate earth moving equipment. Load trucks and
operate a topsoil screen plant.
Accomplishments
Filled customers orders. Prevented machinery breakdowns.
Worked independently during operations and repairs.
Skills Used
Caterpillar heavy equipment mechanic repairs and maintenance.
Welding fabrication and repairs.
Electrical, hydraulic and pneumatic equipment repairs.
Millwright Fitter / Welder Mechanic
Sevenson Environmental and Construction
-
Niagara Falls, NY
-
June 2006 to October 2014
Responsibilities
Millwright Fitter Welder Heavy Equipment Mechanic
Over 20 years' experience performing various duties as a Millwright / Maintenance Technician
Including troubleshooting and repairs in heavy industry sectors such as; Oil and Gas Refining,
Power Generation, Steel Mills, and Mining and Environmental Industries
Plant and Facility experienced setting up / and tearing down equipment, implementing
lockout/tagout protocols and providing repairs and preventative maintenance in a High Voltage
industrial setting.
Proven track record of success in a fast paced rapidly changing work environment in all weather,
temperature, heights and confined space conditions.
Skills Used
Millwright and Machining, Welding, Pipefitting
Maintenance Technician Millwright Welder Fitter
Bar Technologies ( formally Bethlehem Steel )
-
Lackawanna, NY
-
June 1996 to November 2006
Maintenance Technician in a Steelmill, a 24/7 Hot Rolling Bar Mill
Duties included repairing and maintaining all machines, equipment and systems in a large steel
production and processing facility.
Installing equipment, machines, wiring and programs to meet specifications.
Performing routine maintenance on equipment and determining when and what kind of
maintenance is needed.
Operations Monitoring- watching gauges , dials and instruments to assure machines and systems
are functioning.
Answering "Mill Calls" (anything that causes production to stop) determining the cause of
operation errors and doing what is necessary to get the mill up and rolling.
Coordinating with 50 Ton crane operators via hand signals or walkie-talkies to rig and safely
perform necessary lifts on a regular basis.
Conducted scheduled safety checks, maintenance and repairs on all sizes and types of cranes,
hoists, draw works and lifts.
Inspected and conducted repairs from snorkel lifts and man-baskets including welding, rigging
pipe fitting and pipe insulation.
Heavy rigging and lifting in excess of 50 ton.
Millwright, Fitter
Niagara Ref-Fuel
-
Niagara Falls, NY
-
June 1993 to December 1995
Millwright Pipe Fitter Welder Mechanical Technician " Energy from Waste "
ADDITIONAL INFORMATION
Heavy Rigging and Heavy equipment operation
Skills

Over 20 years’ experience performing various duties as a millwright / maintenance technician
including troubleshooting and repairs to equipment in heavy industry sectors such as Oil and Gas
Refining
Chemical
Power Generation
Steel Mill
Environmental and Mining industries
 Over 5 years’ experience training new personnel including monitoring all work activities for
progress and quality craftsmanship, conducting performance evaluations, and consulting with
upper management for employee status/progress reports
 Rebuilds and maintains a wide variety of equipment including;
 Motors- electric, hydraulic, pneumatic and gas/diesel
 Maintains a wide variety of equipment including; Furnace, Boilers, Heaters, Blowers, Coolers,
Conveyors, Crushers, Solid and Liquid Separator’s, Mixers, Cooling Towers, Bucket Elevators,
material process and handling equipment.
 Pipe Fitting Pipe Welding- working under ASME code with pipe, tanks and pressure vessels.
Also pipe insulating and refractory.
 Fabrication; Structural steel, I-beam, channel, plate and pipe. Sub assemblies, Skids, Cat walks
and Rails, Pipe Racks supports and hangers, Valve Assemblies, Hard-facing, Cast Iron repair,
MIG TIG and Arc welding. Brazing, Soldering and Alloy welding.
 Operates forklifts, overhead cranes, portable cranes, JLG and JCB lifts, Bobcats, Front
Loaders
 Tools; pipe threader-cutter, lathe, mag drill, mill, press brake, shear, plater roller, oxy cutting
torch, plasma torch, power and hand tools, torque+ impact wrenches, jack hammer, cutoff saw,
grinder, porta-power, hydraulic jacking, tuggers- winches, come-along.
 Sets up the rigging requirements to move and install a wide variety of equipment up to 50
Tons
 Pumps- Rotary, piston, vane, screw, gear and diaphragm. Also blowers and compressors,
 Reads blueprints- precision measuring, layouts, reads micrometers, dial indicators and calipers
aligns adjusts and torques components to specifications
 Over 15 years’ experience in Facilities Maintenance in an industrial setting, setting up/tearing
down equipment, implementing lock-out/tag-out protocols, Including shift work and long hours
on Plant Outages, Shutdowns, Turn-arounds and New Facility Construction and additions.
Proficient in Troubleshooting and Comprehensive Maintenance practices including Electrical,
Mechanical, Hydraulic, Pneumatic systems including Heating, Cooling and Chemical and Water
Water Quality in High Voltage, Hazardous Materials Facility.
 Strong communications, math, analytical, and problem-solving skills
 Multi-tasks effectively, learns new systems quickly, and completes all projects on-time or
ahead of critical deadlines
 Works well independently or collaboratively in a team environment
 Familiar with using computers, Windows, MS Office, Internet research, and email

Steven Lync1

  • 1.
    Steven Lynch Millwright Niagara Falls,NY 14301 steve2009nf@gmail.com - (716) 201-9667 Private Your phone number and email address are only provided to employers you apply to. Your street address is visible only to you. Desired Job Types:  Part-time  Contract  Temporary  Full-time Authorized to work in the US for any employer Work Experience Heavy Truck Mechanic Falls Auto Spring Inc. 6001 Niagara Falls Blvd. Niagara Falls, NY 14304 October 2015 to December 2015 Responsibilities Heavy Truck; Suspension, Steering, Springs, Brakes, Drive Lines, Alignments, Trailers Medium Truck Repair Light Truck Repair CNC Operator CNC Builder
  • 2.
    Eastman Machine Company 773Washington St. Buffalo, NY 14203 June 2015 to August 2015 Responsibilities Operate and Setup of CNC Equipment Build New CNC Equipment from blueprints Panel Builder Electrical wiring of components, circuits, switches, gauges etc. Skills Used Millwright, Welding, Fitting, Machinist, Plumbing, Hydraulics, Pneumatics Electrical and Computer Programing Laser Cutting Millwright Truesdell Trucking - Wilson, NY - April 2012 to October 2014 Responsibilities Repair trucks, bulldozers and wheel loaders. operate earth moving equipment. Load trucks and operate a topsoil screen plant. Accomplishments Filled customers orders. Prevented machinery breakdowns. Worked independently during operations and repairs. Skills Used Caterpillar heavy equipment mechanic repairs and maintenance. Welding fabrication and repairs. Electrical, hydraulic and pneumatic equipment repairs. Millwright Fitter / Welder Mechanic Sevenson Environmental and Construction - Niagara Falls, NY -
  • 3.
    June 2006 toOctober 2014 Responsibilities Millwright Fitter Welder Heavy Equipment Mechanic Over 20 years' experience performing various duties as a Millwright / Maintenance Technician Including troubleshooting and repairs in heavy industry sectors such as; Oil and Gas Refining, Power Generation, Steel Mills, and Mining and Environmental Industries Plant and Facility experienced setting up / and tearing down equipment, implementing lockout/tagout protocols and providing repairs and preventative maintenance in a High Voltage industrial setting. Proven track record of success in a fast paced rapidly changing work environment in all weather, temperature, heights and confined space conditions. Skills Used Millwright and Machining, Welding, Pipefitting Maintenance Technician Millwright Welder Fitter Bar Technologies ( formally Bethlehem Steel ) - Lackawanna, NY - June 1996 to November 2006 Maintenance Technician in a Steelmill, a 24/7 Hot Rolling Bar Mill Duties included repairing and maintaining all machines, equipment and systems in a large steel production and processing facility. Installing equipment, machines, wiring and programs to meet specifications. Performing routine maintenance on equipment and determining when and what kind of maintenance is needed. Operations Monitoring- watching gauges , dials and instruments to assure machines and systems are functioning. Answering "Mill Calls" (anything that causes production to stop) determining the cause of operation errors and doing what is necessary to get the mill up and rolling. Coordinating with 50 Ton crane operators via hand signals or walkie-talkies to rig and safely perform necessary lifts on a regular basis. Conducted scheduled safety checks, maintenance and repairs on all sizes and types of cranes, hoists, draw works and lifts. Inspected and conducted repairs from snorkel lifts and man-baskets including welding, rigging pipe fitting and pipe insulation. Heavy rigging and lifting in excess of 50 ton. Millwright, Fitter
  • 4.
    Niagara Ref-Fuel - Niagara Falls,NY - June 1993 to December 1995 Millwright Pipe Fitter Welder Mechanical Technician " Energy from Waste " ADDITIONAL INFORMATION Heavy Rigging and Heavy equipment operation Skills  Over 20 years’ experience performing various duties as a millwright / maintenance technician including troubleshooting and repairs to equipment in heavy industry sectors such as Oil and Gas Refining Chemical Power Generation Steel Mill Environmental and Mining industries  Over 5 years’ experience training new personnel including monitoring all work activities for progress and quality craftsmanship, conducting performance evaluations, and consulting with upper management for employee status/progress reports  Rebuilds and maintains a wide variety of equipment including;  Motors- electric, hydraulic, pneumatic and gas/diesel  Maintains a wide variety of equipment including; Furnace, Boilers, Heaters, Blowers, Coolers, Conveyors, Crushers, Solid and Liquid Separator’s, Mixers, Cooling Towers, Bucket Elevators, material process and handling equipment.  Pipe Fitting Pipe Welding- working under ASME code with pipe, tanks and pressure vessels. Also pipe insulating and refractory.  Fabrication; Structural steel, I-beam, channel, plate and pipe. Sub assemblies, Skids, Cat walks and Rails, Pipe Racks supports and hangers, Valve Assemblies, Hard-facing, Cast Iron repair, MIG TIG and Arc welding. Brazing, Soldering and Alloy welding.  Operates forklifts, overhead cranes, portable cranes, JLG and JCB lifts, Bobcats, Front Loaders  Tools; pipe threader-cutter, lathe, mag drill, mill, press brake, shear, plater roller, oxy cutting torch, plasma torch, power and hand tools, torque+ impact wrenches, jack hammer, cutoff saw, grinder, porta-power, hydraulic jacking, tuggers- winches, come-along.  Sets up the rigging requirements to move and install a wide variety of equipment up to 50 Tons  Pumps- Rotary, piston, vane, screw, gear and diaphragm. Also blowers and compressors,  Reads blueprints- precision measuring, layouts, reads micrometers, dial indicators and calipers aligns adjusts and torques components to specifications
  • 5.
     Over 15years’ experience in Facilities Maintenance in an industrial setting, setting up/tearing down equipment, implementing lock-out/tag-out protocols, Including shift work and long hours on Plant Outages, Shutdowns, Turn-arounds and New Facility Construction and additions. Proficient in Troubleshooting and Comprehensive Maintenance practices including Electrical, Mechanical, Hydraulic, Pneumatic systems including Heating, Cooling and Chemical and Water Water Quality in High Voltage, Hazardous Materials Facility.  Strong communications, math, analytical, and problem-solving skills  Multi-tasks effectively, learns new systems quickly, and completes all projects on-time or ahead of critical deadlines  Works well independently or collaboratively in a team environment  Familiar with using computers, Windows, MS Office, Internet research, and email