Oracle Financials Functional
Training on AP, AR & GL
Online | classroom| Corporate
Training | certifications | placements| support
CONTACT US:
MAGNIFIC TRAINING
INDIA +91-9052666559
USA : +1-678-693-3475
info@magnifictraining.com
www.magnifictraining.com
Oracle Apps Technical Course Contents
Introduction to ERP
Definition of ERP, Overview of popular ERP’S
Comparison of Oracle Apps with other ERP’S
Types of Roles
Types of Projects
AIM documentation standards
Oracle Application Architecture.
Database structure of OA
Using TOAD
Application Object Library
Creating Users
WHO columns
Creating Responsibilities
Menu construction
Request group construction
Application development
Defining concurrent program
Concurrent programs with parameters
Working with multiple concurrent programs
Scheduling the Concurrent Program
Concurrent Program incompatibilities
Creating Request Set
Procedure registration
Value sets
Reports registration
Report development
Report registration
Parametric report registration
Reports with repeating frames
Module Overviews
Inventory Module flow with base tables
Accounts Payable module flow with base tables
Accounts Receivable module flow with base tables
Order Management module flow with base tables
Form registration
Template.fmb
Appstand.fmb
Form development using templates
Form customization concepts
Form Registration Process
Custom.Pll
Interfaces
Introduction to Interfaces
Outbound Interfaces
- Using UTL_FILE package
Inbound Interfaces
- Using SQL * Loader tool
– Conversions
– Overview on conversions
– Difference between Interfaces and conversions
– Working with staging table script
– Developing validations package
– Standards to be followed in conversions
Flex Fields
Types of Flex Fields
Descriptive Flex Fields
Key Flex Fields
Workflows
• Introduction to workflow
• Workflow builder
• Attributes
• Creating Processes
• Sending notifications using workflows
XML Publisher
XML Publisher
Introduction to XML Publisher
Generating XML file using reports
Creating Templates
Creating Data Definitions
Discoverer
• Introduction to Discoverer tool
• Discoverer Administrator
• Creating EUL
• Creating Business Areas
• Discoverer Desktop
• Creating work books
Oracle apps technical online training
oracle apps online training with placement
oracle online training in India
oracle apps online training in uk
oracle apps online training in pune
Question & Answers
Should you require any further
information please do not hesitate to
contact us
• http://www.oraclecourseonline.com
• -oracle apps financial online training
contact us:
• info@magnifictraining.com or +919052666559
• By Real Time Experts from Hyderabad,
• Bangalore
• ,India,USA,Canada,UK, Australia,South
• Africa.
ALL THE BEST GUYS
Oracle Apps
technical,R12,ERP,JAVA online
training
Online | classroom| Corporate
Training | certifications | placements| support
CONTACT US:
MAGNIFIC TRAINING
INDIA +91-9052666559
USA : +1-678-693-3475
info@magnifictraining.com
www.magnifictraining.com
Oracle apps technical online training in
australia
Introduction to ERP
• Definition of ERP, Overview of ERP
• Comparison of Oracle Apps with other ERP
• Types Of Roles
• Types Of Projects
• AIM Documentation Standards
• Oracle Application Architecture
• Database structure of Oracle Application
• Using TOAD
Oracle apps technical online training
inbangalore
Application Object Library
• Application developer and Sysadmin task
• Application Object Library
• Creating Users
• WHO Columns
• Creating Responsibilities
• Menu Construction
• Request group construction
Oracle apps technical online training in
bhubaneswar
Application Development
• Defining concurrent programming
• Concurrent programs with parameters
• Working with multiple concurrent programs
• Scheduling the concurrent program
• Concurrent program incompatibilities
• Creating Request Set
• Procedure registration
• Value sets
Oracle apps technical online training in
chennai
Report Registration
• Report Development
• Report Registration
• Parametric report registration
• Reports with repeating frames
Oracle apps technical online training in
chandigarh
Module Overviews
• Inventory Module flow with base tables
• Accounts Payable module flow with base
tables
• Accounts Receivable module flow with base
tables
• Order Management module flow with base
tables
Oracle apps technical online training in
chicago
Form Registration
• Template.fmb
• Appstand.fmb
• Form development using templates
• Form customization concepts
• Form Registration Process
• Custom.Pll
• Using function Zoom_available()
• Using procedure Event()
Oracle apps technical online training in
delhi
Interfaces
• Introduction to Interfaces
• Outbound Interfaces
• -Using UTL_FILE package
• Inbound Interfaces
• -Using SQL*Loader tool
Oracle apps technical online training in
dubai
Conversions
• Overview on conversions
• Difference between interfaces &
Conversions
• Working with staging table script
• Developing validations package
• Standards to be followed on conversions
Oracle apps technical online training in
hyderabad
Workflows
• Introduction to Workflow
• Workflow builder
• Attributes
• Creating Processes
• Sending notification using workflows
Oracle apps technical online training in
india
XML Publisher
• Introduction to XML Publisher
• Generating XML file using reports
• Creating Templates
• Creating Data Definitions
Oracle apps technical online training in
kolkata
Discover
• Introduction to Discover tool
• Discoverer Administrator
• Creating EUL
• Creating Business Areas
• Discoverer Desktop
• Creating workbooks
Question & Answers
Should you require any further
information please do not hesitate to
contact us
• http://www.oraclecourseonline.com
• -oracle fusion adf online training
contact us:
• info@magnifictraining.com or
+919052666559
• By Real Time Experts from Hyderabad,
• Bangalore
• ,India,USA,Canada,UK, Australia,South
• Africa.
Page 1
CONACT UC:
Magnific training
+91-9052666559
info@magnifictraining.com
www.magnifictraining.com
Oracle apps scm online training
in us,uk,banglore,kolkata
Page 2
Oracle apps scm training in chennai
The Oracle Apps Modules covers in
Oracle SCM Training Course are
1. Inventory
2. Purchasing
3. Order Management
4. Brief Introduction to WIP and BOM Manufacturing Modules
5. Overview on R12 SCM Modules
6. New Features of R12 SCM Modules
Page 3
Oracle apps scm training in mumbai
Course Details
Introduction to Oracle SCM eBusiness
Suite
• Identify the components that comprise an
Oracle Application system
• Navigation to Oracle Applications
• Explain basic application integration
• Identify Entities that are shared between
multiple applications
• Explain different application versions &
database versions
• Multi Org structure and explanation of Sample
Org
• Accounting Basics
Page 4
Oracle apps scm online training in delhi
Inventory Management Fundamentals
What you will learn:
• This class focuses on the features, functions and
benefits of the Oracle Inventory application.
• Students will learn how to set up items, how to use
the various inventory controls available,
• how to do transactions, transfers, and inventory
moves, inventory replenishment, cycle counting and
physical inventory.
• Students will also learn where Inventory fits in the
overall enterprise structure.
• This course reflects the logical flow of the
processes involved in inventory management.
Page 5
Oracle apps scm online training in
australia
Audience
• Functional Implementer
Prerequisites:
• Required Prerequisites:
• Basic understanding of Inventory Management
principles
• 11i eBusiness Suite Essentials for Implementers
Page 6
Oracle apps scm online training in pune
Course Objectives
• Define and maintain a cycle count
• Understand performing inventory transactions using
a mobile device
• Understand the planning and replenishment
methods available in Oracle Inventory including
min-max planning,
• reorder-point planning, replenishment counting,
and Kanban replenishment
• Understand the overall inventory process in Oracle
Inventory
• Understand the structure of an inventory
organization in Oracle Inventory
• Understand the role of an item-master organization
• Define items in Oracle Inventory
Page 7
Oracle apps scm online training in
hyderabad
Course Topics
• Receipt to Issue
• Understanding the Receipt to Issue Lifecycle
• Understanding Receiving Inventory
• Understanding Transferring Inventory
• Understanding Issuing Inventory
Page 8
Oracle apps scm online training in india
Defining Inventory Organizations
• Understanding the Multi-Org Feature in Oracle
Applications
• Understanding the Structure of an Inventory
Organization
• Learning to model an Enterprise in Oracle
Applications
Page 9
Oracle apps scm online training in
london
Defining and Maintaining Items, Overview
• Organization Structure, Overview
• Defining Items, Overview
• Item Attributes and Statuses, Overview
• Assigning Items to Organizations, Overview
Page 10
Oracle apps scm online training in dubai
Defining and Maintaining Items, Fundamentals
• Defining Units of Measure
• Explaining Item Attributes and Statuses
• Defining the Item Master Organization
• Defining Items
• Defining Item Deletion Constraints
• Setting up Item Profile Options
• Understanding Implementation Considerations
Page 11
Oracle apps scm online training in
zimbabwe
Inventory Controls, Concepts
• Explaining Subinventories
• Explaining Locator Control
• Explaining Revision Control
• Explaining Lot Control
• Explaining Serial Control
Page 12
Inventory Controls,
Fundamentals
• Defining Subinventories
• Defining Locator Control
• Defining Revision Control
• Defining Lot Control
• Generating Serial Numbers
Page 13
Transacting Inventory, Concepts
• Explaining Transaction Flows
• Explaining Transaction Types
• Explaining Move Orders
• Explaining Shortage Alerts and Notifications
• Explaining Mobile Transactions
Page 14
Transaction Setup
• Setting Up Transaction Managers, Transaction Types, and
Transaction Reasons
• Setting up Shipping Networks
• Setting Up Movement Statistics
• Setting Up Account Aliases
• Setting Up Move Orders
• Setting Up Alerts Notifications and Reports
• Setting Up Profile Options
Page 15
Question & Answers
Page 16
Should you require any further
information please do not hesitate to
contact us
http://www.oraclecourseonline.com
-oracle apps scm online training
contact us:
info@magnifictraining.com or
+919052666559
By Real Time Experts from Hyderabad,
Bangalore
,India,USA,Canada,UK,
Australia,South
Africa.
Page 17
ALL THE BEST GUYS
Page 18
Oracle CRM Administrator training
and placements
Online | classroom| Corporate
Training | certifications | placements| support
CONTACT US:
MAGNIFIC TRAINING
INDIA +91-9052666559
USA : +1-678-693-3475
info@magnifictraining.com
www.magnifictraining.com
Oracle apps crm online training in australia
Agenda
• Overview of Presentation
– Opening Premise
– The 4Cs
• Socialized CRM On Demand
– Where can I get it?
– a Strategy
– Implementation
– Sales Teams
– Marketing Teams
– Sharing, Mashup, Metrics
• Old Model, New Model
– Practical Suggestions
– Some Examples
• Myth or Reality?
Oracle apps crm online training in bangalore
Overview
• The objective of this presentation is to address in
very high-level terms some of the principles,
challenges and applications of Social CRM in a
CRM On Demand deployment.
• The high-level agenda is :
• Where does Social CRM fit in to the CRM On
Demand Big Picture?
– Why is it important to CRM business?
– What Strategy might a company need?
– What Tools might a company need?
Oracle apps crm online training in
bhubaneswar
CRM : An Opening Premise
• Traditional Customer Relationship Management
• Twenty years ago, businesses knew every client, every contact, their wives,
children and pets.
• Then we spent the next twenty years trying to dehumanize the relationship
– Reduced physical sales interaction in showrooms and shops
– increased virtual showrooms like the Internet
– Distanced support systems from the customer
– Created self service systems to eliminate interaction
• This is an extreme example, but it is true to some extent in most industries
and companies
Oracle apps crm online training in chennai
CRM : An Opening Premise (suite)
• Businesses then woke up and realized they needed to
analyze, slice and dice all the interactions they had so
carefully virtualized and computerized:
– Customer Trend Analysis
– Performance Analysis
– Sales Analysis
• But at some point, the customer was going to want to
talk to a human – so they jumped on Community
Boards, Blogs, and now Social Networking
Oracle apps crm online training in delhi
The 4 Cs
– Social CRM (re)humanizes relationships with
customers
– Using the power of the Web 2.0 collaborative
tools and the 4 Cs
• Collaboration
• Creativity
• Conversation
• Community creation
Oracle apps crm online training in dubai
Socialized CRM On Demand : Where can I get it?
• Online Forums and Communities
– Were the original place where people could go to moan, praise
or otherwise judge products and services
• YouTube
– Started out as a place to watch America’s Funniest Videos, now
recognized as a vehicle for consumer concern (try searching for
a Supermarket chain) and a place for companies to position
themselves in a more freeform environment
– Savvy CRM users position videos in Channels
• Twitter
– The most obvious channel for near real-time communications
with peer groups
– Positive Media Buzz
– Geographic and time-bound searches available
Oracle apps crm online training in
hyderabad
Socialized CRM On Demand : Where can I get it?
• Facebook
– 250,000 businesses have a presence on Facebook
• Digg / StumbleUpon
– Viral Web Page linking
• Slideshare
– PDF /PPT and other documents]
– Groups, Links and Favorites
– Integration with LinkedIn, Facebook, Twitter
• DocStoc
– Sharing PDFs and embedding content
– Groups, Links and Favorites
• Blogs (blogspot, wordpress etc)
Oracle apps crm online training in india
Socializing CRM On Demand as a Strategy
• Part One - Internal Strategy for CRM On Demand
Users
• Open the Door in phases and certain groups
– Opening your OCOD to new sources of information
• Adding Fields for common Social Networking site in the
Contact form
• Feeding the CRM On Demand System
• Sales :Targeted feeds from online information sources
• Marketing : Effective Monitoring of Feedback and customer
Buzz
• General : Monitoring and Assessing feedback, converting it
to actionable information
Oracle apps crm online training in kolkata
Socializing CRM On Demand as a Strategy
• Part Two - External Strategy for your Customers
• Engage dialogue
– Organize and Classify your Online Presence
• Videos, Blogs, Forums
– Encourage and monitor the 4Cs
• New Segmentation and new Criteria for Lead Generation
• Various Approaches
– Short Term
• Twitter dialogue and monitoring during Trade Show or Product Launch
for example
– Medium Term
• Establishing Document Library in Slideshare or DocStoc
– Long Term and Ongoing
• Facebook presence
Oracle apps crm online training in kerala
Socialized CRM On Demand : Where are the
Customers
• Where are my customers and what are they
talking about?
– are you committed to authentically join the
conversation with the customer?
– Know how to look and how to interpret conversations
• Your Customers are smart, and see through you
– exploiting a new tactic for the sake of gaining market
share. Customers want dialogue, not a one way street
– Do you go online as a brand, as a team, as multiple
employees, and what is your strategy?
Oracle apps crm online training in london
Socialized CRM On Demand : Where are the
Customers
• Implementation Methods to expose the networks
back into CRM On Demand include
– RSS Feeds
– Twitter Feed (either live or in filtered feed)
– Introducing Social News or Shared Documents into
the Homepage
– Channelled Audio and Video to Homepage from
YouTube
– Web Site Forms should contain relevant fields for
Networking IDs
– Embedding Facebook and other Social Widgets
Oracle apps crm online training in mumbai
Socializing CRM On Demand : Sales Teams
• Levers
– Based on Data from the “Where” Exercise
• Provide LinkedIn Information
• Provide DocStoc / Slideshare Access to private or
public documents
• Feeds from Competitors
• Challenges
• For best practice, requires that Sales personnel share
information with each other. You may have to adjust
– Your Sales Stages and your Workflow
Oracle apps crm online training in pune
Socializing CRM On Demand : Marketing
• Levers
– Often drive the “Where” Exercises
• Targets of Campaign
• Visitor to Trade Show
– Facebook Groups, Pages to gauge
– Youtube
• Channel release of new corporate video, Google Analytics for
results
• Challenges
– May reveal weakness in your marketing lists and
databases
– Requires filtering for volume and pertinence
Oracle apps crm online training in usa
Social CRM On Demand : Sharing
• Provide the Basics
– Make Bookmarking and Tagging easy
• Encourage users to learn how to use the Favorites & Sticky
Notes in CRM On Demand
• Reward people who link or contact you on your Web site
• Maintain a list in CRM On Demand of all Web Site Contacts and
link them to LinkedIn profiles
• Reward the regions who generate the most links and the
community members who contribute the most
– Mashup
• Let CRM On Demand users see their data in new ways
• Let them search and find unstructured content and link it to
CRM On Demand data
• Let them share this with others (within reason)
Oracle apps crm online training in uk
Social CRM On Demand : Mashup
• Mashup
– Use internal and external data to create new ways of
understanding customer or prospect behavior
• Map Prospects, Projects or Service Requests by Type or
Channel to LinkedIn Groups, Google Maps, other data
• Twitter followers imported and campaigned in OCOD then
segmented / assessed
– Find / map Channel Partners and focus on recruitment
areas
– DocStoc or similar for project documents
• Public or Private Collections
– CRM On Demand and “visual” mapping tool -
• For example Mindmap Pro
Oracle apps crm online training in singapore
Socializing CRM On Demand : Metrics
• Like everything else in CRM, data without
measurement or objectives is just, well, data
– Lead Conversion
– Sales Cycle Time to Close
– Hits / Leads from Web Sites / Blogs / other Sources
– Feedback Loop
– Calculating ROI is tough
• Marketing Segmentation can take advantage of the
new data and criteria
• More advanced data analysis may be required beyond
segmentation
– Analysis of behavior over time
Oracle apps crm online training in south
africa
One More Time!• Collaboration
– Use the Favorites and Messaging Features in CRM On Demand
– Embed enabling tools and identifiers (Twitter, Facebook , Slideshare) in Signatures,
Web Applets
– Set up Slideshare Private Groups to collaborate on collateral and other « internet »
information sources
– Set up Web Forms with adapted field on your Web Site
• Creativity
– Challenge users to create content
• Conversation
– Blog your OCOD users or your customer and keep the channel open
• Communication
– Talk to your Web Form respondants!
– Reward collaborative behaviour internally and externally
– Link to Blog / Youtube Channel / Twitter Feed in OCOD Homepage
Oracle apps crm remoteserver access
Now for Some Simple Examples
CRM On Demand Home Page
With DocStoc Visual
Document Library
& Twitter Feed Targeting
Mashup
Oracle apps crm online training and
certification
DocStoc Applet
• DocStoc Applet Uses
– Display DocStoc Documents in graphical
format to users of CRM On Demand
– Provide One-Click Access to embedded
documents or Download by Sales Users and
email to Customers in the conversation
– Can be interest-based (filtered)
Where are people talking?
• Where are conversations happening?
– Expect to poll and query Twitter, Facebook
and other online communities
– Are you monitoring competitor conversations
too? Why not?
• Manual Queries or automated services
Twitter Applet
• Twitter Applet Uses
– Short Term Monitoring of event in an specific
town or locality
– Longer Term Brand and Buzz Monitoring
– Contact Detection and Interested Party /
Influencer detection
– Follow Tweeters directly from Applet
– Save as Service Requests or Notes or Leads in
CRM On Demand
– Create Forum Discussions based on Content or
Questions
Where are people talking? Where are my customers?
Feed Management inside CRM On Demand
• RSS Lead Generator
with Filtering of RSS
data and creation of
CRM Leads
• Leverage Facebook
RSS Feed and others
to provide one stop
shop
Network Integration
• Examples of platforms like Ning
– allows creation of Social Networks
and supplies user and
management tools
• Apps can connect to CMS or other
sources to integrate them into your
Social Network
• Facebook API and Social Widgets
allow a degree of exposure to the
Social Network for relatively small
effort
– Enables you to follow what the
conversations are about
– Expect the unexpected
Mashup the Conversation Data
CRM On Demand Mashup – Targeting Geographically by Date, Status etc
Explanation
• Mashup (Opportunities, Tweets etc) with
Google Maps
– Create Visual Segments for Campaigns
– Analyze Target Areas
– Identify hotspots and Competitor activity
– Target ineffective sales efforts or gaps in
coverage
Myth or Reality
• A Socialized CRM On Demand , does it
exist today?
– Does it exist in your implementation?
• Possible?
• Feasible?
• Desirable?
• Cost Effective?
Why it probably doesn’t exist today
• The weakness of the solutions illustrated
– The methodology of selling and servicing embedded in the CRM is still
rooted in the old world
• CRM processes are based on old models
– Any extension to any existing CRM system will largely be a cosmetic
one
• Making noises or making gestures in the right direction
– Most of the solutions proposed are data mart exploitation
• Simple data upload and presentation
• No analysis or call to action based on the information
• No proactive element for the user or the community
– We are playing an old game
• Quick, on XXX (insert social network name)..they’re talking about us!
• XXX Is the new Youtube – stick our corporate videos up there!
– We are not listening, we are still trying to dictate
Socialized CRM On Demand
• With CRM On Demand
– How do you find conversations?
– How do you nurture and maintain conversations?
– Is it possible to collaborate with externals?
– Can you make a community based around CRM
On Demand?
• CRM On Demand is a CRM tool
– Social CRM is not a Tool
Socialized CRM On Demand 2
• An opportunity exists for integration
partners to deliver a (relatively) painless
way of implementing parts of the Social
CRM process set inside an existing CRM
solution
Conclusion
• Fly with what you have, but realize that it
will never allow you to completely
implement a Social CRM process set
Question & Answers
Should you require any further
information please do not hesitate to
contact us
• http://www.oraclecourseonline.com
• -oracle crm online training
contact us:
• info@magnifictraining.com or
+919052666559
• By Real Time Experts from Hyderabad,
• Bangalore
• ,India,USA,Canada,UK, Australia,South
• Africa.
<Insert Picture Here>
Oracle Fusion Middleware Training with placements
and certification
CONTACT US:
USA:+1-6786933994,+1-6786933475
INDIA:+91-9052666559,040-69990056
Mail:info@magnifictraining.com
ISV Migration Center Team
• Who we Are ISV Migration Center Team is a team of senior technical consultants based in
Eastern and Central Europe and represents Oracle's technical investment for partners.
• Mission Statement
latest technology
Enable partners to rapidly and successfully adopt and implement Oracle
• What do we Offer Whether you are selling Oracle technology, building business solutions,
including hosted Internet solutions or providing system integration and implementation services
for Oracle technology, IMC Team can help you succeed.
• How can we assist We offer a wide range of free services for partners such as one2one
assistance, webinars, seminars and hands-on workshops.
Contacts:
USA:+1-6786933994,+1-6786933475
INDIA:+91-9052666559,040-69990056
Mail:info@magnifictraining.com
2
<Insert Picture Here>
Oracle fusion soa online training in australia
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
Oracle SOA Suite 10g
SCA – key enabler of the SOA Suite 11g
properties
Service Component Architecture:
Java interface
WSDL portType •
•
•
language-neutral
component model
assembly model
S S
C1service R
wire
• Specifications backed by a growing number
leading industry vendors
ofBinding:
SOAP
JMS
JCS
…
S
C2
component
R R
Being standardized at OASIS, the international
standards consortium
open
reference
composite
SCA terminology:
•
•
•
•
•
Composite: deployment unit
Service: entry-point into composite
Component: provides logic
Reference: refers to external services
Wire: connects services, components and references
– no special semantic.
SOA Suite 11g SCA Service Infrastructure
One unified infrastructure to manage
BPEL Rules
Application
composers
Human
Task
SCA Composite
IDE
adapters
Business
Rules
Human
Workflow
Mediator BPELSOAComposite Editor
Repository
Policy ManagerCommon JCA-based connectivity infrastructure
Optimized
binding
SOA
Operations
Web-based
console
B2B
BAM Oracle Service Bus
11g Service Infrastructure
Mediation
Mediation
BPEL orchestration
Human Tasks Web
services
Business Rules and
SOA 10g to 11g mapping
Role SOA Suite 10g SOA Suite 11g
Java EE container OC4J Weblogic
Management consoles BPEL Console, OESB Console, OWSM Console, Enterprise Manager Fusion Middleware
Enterprise Manager (OC4J), BAM Management Control, Weblogic Console
Orchestration Oracle BPEL Process Manager BPEL Process Service Component
Human interaction Human Workflow Engine Human Workflow Service Component
Externalize logic Oracle Business Rules Business Rules Service Component
Transformation, Routing, Oracle ESB Inside an application/composite: Oracle
Fan-out, etc Mediator Service Component, Enterprise-
wide: Oracle Service Bus
Apps and systems JCAAdapters JCAAdapters
connectivity
Business dashboards Oracle BAM (.NET-based) Oracle BAM (JEE-based)
Security OWSM (proxy and gateway modes) OWSM (proxy), OEG (gateway)
Upgrade - High level steps
•
•
•
Plan out Upgrade
Create 11g SOA install/domain and load
Migrate/Deploy applications to 11g
balancer from scratch
•
•
SOA JDeveloper projects
BAM Reports/Data Objects/Alerts
•
•
•
Configure 11g system from scratch
Migrate clients if necessary
Secure 11g system from scratch (example
OWSM policies)
Cutover to 11g production system
Identity Management,
•
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
Comparing Oracle SOA Suite on OC4J and Oracle
WebLogic Server
SOA Suite 11g installation
Server-side installation:
•
•
•
•
•
Install
Install
Install
Install
Oracle Database for SOA components
database schemas using RCU
Oracle
Oracle
Weblogic binaries
SOA Suite binaries
Create Weblogic domain with SOA Suite components
Client-side (developer machines) installation:
•
•
Install
Install
Jdeveloper
SOA Extensions for JDeveloper
SOA Suite 11.1.1.5 installation: server-side
• You can use existing Oracle DB instance or create a new
one (recommended)
• Oracle SOA suite 11.1.1.5 certified with Oracle DB
10.2.0.4+, 11.1.0.7+ or 11.2.0.1+
• RCU (Repository Creation Utility) used
to create the schemas needed for the
corresponding
components
Fusion Middleware
SOA Suite 11.1.1.5 installation: server-side
• Install Weblogic 10.3.5, new Middleware home
(MW_HOME) will be created as a result
• Install SOA Suite 11.1.1.5 binaries into MW_HOME. Specific
SOA ORACLE_HOME will be created
SOA Suite 11.1.1.5 installation: server-side
• Start Fusion Middleware Configuration Wizard to create new
domain:
Specify
<SOA_ORACLE_HOME>/common/bin/config.sh
• products to be configured
inside the domain
• Specify domain name, location,
ports for managed servers, etc…
• Start Admin Server and managed
server (s)
SOA Suite 11.1.1.5 installation: server-side
Important notes:
• To install SOA Suite environment for production deployment,
follow the Enterprise Deployment Guide for Oracle SOA Suite
and Oracle Fusion Middleware High Availability Guide
• Developers can install SOA Suite locally as well if they have
enough resources on the laptops
SOA Suite 11.1.1.5 installation: client-side
•
•
Install
Install
JDeveloper 11.1.1.5
JDev SOA Extension
• Always use the same version
for SOA server-side and
JDeveloper
JDeveloper• 11.1.2.1 does
!
not
have SOA Extension
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
SOA Suite 10.1.3  11g Project Upgrade Path
Mostly transparent project upgrade: Open your 10g
anyProject or Application in JDeveloper 11g, apply
manual steps and re-deploy!
JDeveloper
3. deployor command-line
2. save1. open
11g SOA Suite
Server
10.1.3 ESB or BPEL project 11g composite project
Upgrade in JDeveloper
•
•
•
In-place upgrade of application/project.
Can upgrade any project, not just SOA projects.
All HTTP WSDL references in project must be accessible, so
SOA 10g should be up and running.
• Logs are in …/jdeveloper/upgrade/logs.
Upgrade in JDeveloper
ESB project -> SOA Composite
Upgrade in JDeveloper
• Analyze the warnings
in the log files
generated during the
upgrade process
Command Line Upgrade
•
•
•
•
Ant script available to upgrade SOA projects.
Cannot upgrade whole Applications.
Upgraded directory different than source directory.
Does not Upgrade .jpr files. Opening project in Jdeveloper
creates .jpr file.
multiple• Can merge BPEL source directories to a single
upgraded target directory.
•
•
•
All HTTP WSDL references in project must be accessible.
Logs in …/jdeveloper/upgrade/logs
Same codebase used for JDeveloper upgrade.
Upgrading SOA Suite 10g Projects Using Ant
Before you begin, set environment variables
set ORACLE_HOME=<MIDDLEWARE_HOME>jdeveloper
cd %ORACLE_HOME%
binsoaversion.cmd
Upgrade an 10g ESB service to an 11g Composite application
component:
with Mediator
ant -f %ORACLE_HOME%binant-sca-upgrade.xml mediator -Dsource
C:projects10.1.3EmployeeEmployeeService -Dtarget C:projects11gR1 -DappName
Employee
Merge several 10g BPEL processes to an 11g Composite application:
ant -f %ORACLE_HOME%binant-sca-upgrade.xml bpel -Dsource
"C:projects10.1.3EmployeeEmployeeSalaryApproval;c:projects10.1.3...
...EmployeeEmployeeInfo" -Dtarget C:projects11gR1 -DappName Employee
Manual steps
• Strong attempt made to automate project upgrade as much
11g.as
•
•
possible given large differences between 10g and
Not always possible.
A few things deferred due to time constraints.
• Artifacts upgraded are BPEL processes, ESB services,
Rules dictionaries, Human Workflow tasks, Adapters. Some
limitations apply.
• SOA configuration plans, fault policies, build files are not
upgraded
BPEL instance Migration
• Right now there is no support on for BPEL instance
migration, or audit trail migration. Oracle investigating
feasibility of instance migration.
• Two choices for cutting over long running processes to 11g:
•
•
Side by Side Upgrade
Grace period cutover
BPEL instance Migration
Side by Side Upgrade
•
•
10g
10g
and 11g systems run side by side.
system has all long running processes in retired state so
no new process instances can be created.
•
•
Clients are switched over to 11g.
10g system continues running until all callbacks arrive to
complete long running processes.
• 10g system is decommissioned.
BPEL instance Migration
Grace period cutover
• 10g system has all long running processes in retired state so
no new process instances can be created.
• After a grace period, all 10g long running processes are
killed.
•
•
10g
11g
system
system
is
is
decommissioned.
brought up in production.
Configuration/Deployment Upgrade
• 10g configuration files not automatically upgraded to 11g
configuration files. 11g has to be configured using EM,
JMX/Mbean APIs or WLST scripts instead.
• SOA Composite properties can be customized in the
deployment plan.
• Cannot automatically upgrade from 10g SOA deployment
plan
10g
to 11g deployment plan.
• SOA deployment units cannot be upgraded to 11g
deployment units. Need to upgrade source instead and
generate deployment unit.
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
BAM upgrade steps overview
•
•
RCU creates the schema for 11g
tool
BAM
Use Upgrade assistant (UA) to copy data
objects/reports/alerts from 10g BAM system database to 11g
BAM system database directly
•
•
•
•
10g Enterprise Link is no longer supported
Native
Native
support
support
for
for
JMS
ODI
connectivity in 11g
integration in 11g
Configure 10g SOA
11g.
clients to talk to BAM 11g or migrate 10g
SOA clients to
• Note: 10g SOA interoperates with 11g BAM, 11g SOA interop with 10g BAM is not
certified.
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
Securing SOA composites
OWSM Migration
• 11g SOA install auto-deploys 11g OWSM policy manager
• 10g OWSM policies do not migrate to 11g OWSM as they
are syntactically different. Refer to OWSM guide for 10g
policy to 11g policy mapping.
• 10g OWSM Monitor functionality is provided by EM SOA Mgt
Pack for 11g AppServer.
Securing SOA composites
OWSM Migration
• If
•
10g BPEL/ESB is secured using OWSM agent, then
There’s no need for agent migration as agent is
runtime
built-in the 11g SOA
• Using JDev/EM, attach 11g OWSM policy to the migrated SOA
composite.
• If
•
•
10g BPEL/ESB is secured using OWSM Gateway, then
Continue to use 10g OWSM Gateway
Or, start using 11g built-in agents by attaching 11g OWSM policies
SOA composite.
to
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
Upgrading DVMs and XREFs
• XPath functions to access domain value maps (DVMs) and
cross
when
reference tables (XREFs) are upgraded automatically
you open projects in JDeveloper 11g;
• You must manually extract the DVMs and XREFs from
Oracle ESB 10g repository and load them to the MDS
Repository. Scripts/utilities are provided;
Migrate DVMs
• Export DVM metadata to archive:
<ESB10g_Oracle_Home>/export.sh metadata10g.zip
• Convert the ZIP file to an Oracle SOA Suite archive file
cd <SOA11g_Oracle_Home>/bin
ant -f ant-sca-upgrade.xml upgrade-xrefdvm
-Dsource=location_of_the_zip_file
-Dtarget=location_of_the_soa_archive
Output file will be automatically called sca_XrefDvmFiles10g_rev1.0.jar
•
•
•
Create new application in Jdeveloper 11g
Import->SOA Archive into SOA project
Create jar file with DVM metadata and deploy it to MDS
Migrate XREFs
XREF_DATA table has changed in 11g, so special procedure
is required for migration
• Create public DB link dblink10g in SOA 11g DB to access
SOA 10g DB
• Extract XREF10gto11gDataUpgradeUtility located in the
RCU_HOME/rcu/integration/soainfra/sql/xref
• Modify Upgrade10gXrefTo11gXref.sql pointing to the shared
MDS data location
•
•
Execute the Upgrade10gXrefTo11gXref.sql
Drop dblink10g DB link
Technology adapters migration
• Run 11g Adapter Configuration
upgrade;
Wizard for each adapter
after SOA project
• Adapter header variables in 10g defined in the adapter
WSDL
activity
file, in 11g they are the properties defined in Invoke
in BPEL process or Assign values dialog in Mediator;
• Non-managed connections are not supported in 11g, check
adapter WSDL files before upgrade;
•
•
Description lost after upgrade of technology adapter
See the Upgrade guide for more details
Human Workflows migration
• Human Workflows in 10g are
the
defined in .tform files, UI is
created with jsp pages in same JDev project, deployed
together;
• Human Workflows in 11g are
for
defined in .task files, separate
ADF projects are created UI, deployed separately;
• During upgrade JDeveloper 11g automatically creates a new
project
Manual
for the task UI and upgrades the task detail pages;
• modifications of the WorkflowTask XSD may be
required, refer to the Upgrade Guide for details
Client and Invoked Service Migration
• Some 11g APIs are compatible with equivalent 10g APIs,
some are different.
•
•
•
•
Worklist APIs are compatible.
B2B APIs are compatible.
Custom Sensor APIs are compatible.
BPEL APIs are functionally roughly equivalent
changes.
Rules SDK APIs are a functional superset.
with signature
•
• 11g uses ws-addressing 1.0. Need patch for 10g BPEL
client.
URLs• in 11g has different syntax. (includes callback URL
used by invoked services).
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
Best Practices
Before migration
• Ensure that SOA Suite 10g Projects are Up and Running on Latest
SOA 10g Release
Jdeveloper 11g•
•
Install
Install
the
the
with SOA Extension (currently 11.1.1.5)
latest SOA Suite 11g version (currently 11.1.1.5) . Quick
start guide for SOA Suite 11g
• Configure
adapters,
all the necessary resources (JDBC connection pools, JCA
JMS queues, etc)
•
•
Order matters!
Start with a pilot project, do not use the Big Bang approach
Best Practices
During and after migration
• Recompile the migrated projects (11g BPEL compiler is stricter
than 10g);
• Think about rearranging the artifacts into the corresponding
folders (xsd, wsdl and other file types). Change the referencing
artifacts accordingly;
• Run 11g Adapter Configuration Wizard for each adapter to verify
the adapters configuration;
• If you are using adapter header variables in SOA 10g BPEL
projects, you have manually set them in the Invoke activity
Best Practices
During and after migration
• Refer to project for abstract WSDL and HTTP URL for concrete WSDL.
• Create configuration plans for deployment of the SOA 11g composites
• Use MDS to share WSDLs, XSD, DVM, EDL event files and other
artifacts across projects (oramds://<path_to_the_resource>). If you are
accessing any file from bpel xmllib you need to change the URL to MDS
URL:
Best Practices
During and after migration
• Do not blindly 1:1 migrate every BPEL /ESB project to the
corresponding composite. You can not leverage SCA benefits by having
many fine grained composites.
Use SOA Suite 11g partitions, it has some similarities with BPEL
domains and ESB System/Service Groups in 10g
Explore the performance tuning options available in the SOA Suite 11g,
look at Oracle® Fusion Middleware Performance and Tuning Guide
Production deployment architecture is different in SOA Suite 11g.
•
•
•
Example: usage of Coherence instead of JGroups for cluster wide
deployment. Look at Oracle® Fusion Middleware Enterprise
Deployment Guide for Oracle SOA Suite
<Insert Picture Here>
Agenda
•
•
•
•
•
•
•
•
SOA Suite 10g
SOA
and 11g Architecture comparison
Setting
Oracle
Oracle
up Suite 11g environment
BPEL / Oracle ESB projects migration
BAM migration
Security components migration
Upgrading Other Oracle SOA Suite Technologies
Best practices
Getting more information
Getting more information
• Oracle® Fusion Middleware Upgrade Guide for
WebCenter, and ADF 11g Release 1 (11.1.1)
Oracle® Fusion Middleware Developer's Guide
Suite 11g Release 1 (11.1.1)
Oracle SOA Suite,
• for Oracle SOA
• Quick Start Guide for Oracle SOA Suite - detailed download, install
and configuration instructions
Oracle SOA Suite 11g Handbook by Lukas Jellema.•
Questions
Should you require any further
information please do not hesitate to
contact us
http://www.oraclecourseonline.com
-oracle apps technical training
contact us:
info@magnifictraining.com or +919052666559
By Real Time Experts from Hyderabad,
Bangalore
,India,USA,Canada,UK, Australia,South
Africa.
©2011 Oracle Corporation
ALL THE BEST GUYS
Oracle Fusion Middleware 11g:
Build Applications with ADF
Online | classroom| Corporate
Training | certifications | placements| support
CONTACT US:
MAGNIFIC TRAINING
INDIA +91-9052666559
USA : +1-678-693-3475
info@magnifictraining.com
www.magnifictraining.com
Comprehensive
Offering
Complete
Designed to
Work Together
Integrated
Standards-
Based
Architecture
Open
Industry
Leader
Best of
Breed
#1
Oracle fusion adf online training in australia
Oracle Application Development Framework
Oracle fusion adf online training in
bangalore
1. Oracle, una apuesta segura
2. Ciclo de Vida, la web evoluciona muy rápido
3. Fusion Architecture
4. Aplicaciones Ricas
5. +150 componentes
6. Movilidad / Multicanalidad
7. JDeveloper: entorno unificado
8. Core de Fusion Middleware & Fusion Applications
9. Estándares Java y SOA
10.Integración del puesto de trabajo
Best of Breed
Complete
Open
Integrated
SOFTWARE, HARDWARE, COMPLETE
Complete Solutions
Complete Choice
1Oracle, una apuesta segura
Oracle’s Architectural Vision
• Engineered to work together
• Tested together
• Certified together
• Packaged together
• Deployed together
• Upgraded together
• Managed together
• Supported together
1Oracle, una apuesta segura
Only Oracle Delivers Complete Solutions1
Oracle IBM Microsoft HP SAP
Vertical Apps
Horizontal Apps
Middleware
Database
Operating System
Virtualization
Servers
Storage
Management
Oracle, una apuesta segura
Leader in Key Segments
• Database
• Database on Solaris
• Database Share on Linux
• Embedded Database
• Data Warehousing
• Development Language (Java)
• Unix Server
• Tape Storage
• Middleware
• CRM
• Enterprise Performance Management
• Human Capital Management
• Banking
• Communications
• Financial Services
• Professional Services
• Public Sector
• Retail
Oracle is #1 in modern middleware according to several independent research studies
1Oracle, una apuesta segura
• Leader in Market Share
• Leader in Growth
• Leader in Performance
• Leader in Price Performance
• Largest Partner Ecosystem
• Largest Developer Community
1The Leader in Middleware
Oracle, una apuesta segura
11ª compañía de software empresarial del mundo
Oracle, una apuesta segura
• +100.000 empleados en más de 145 países
– +25.000 desarrolladores
– +10.000 técnicos de soporte
– +15.000 consultores expertos
• +300.000 clientes
• +20.000 partners
11ª compañía de software empresarial en España
Oracle, una apuesta segura
• En España desde 1986
• +1000 Empleados y oficinas en Madrid, Barcelona,
Bilbao, Valencia, Sevilla, Lisboa y Oporto
– Servicios Locales: Consultoría, Formación y Soporte
• +7.000 clientes
• +500 Partners
Ciclo de vida
2HTML5 vs Flash
Ciclo de vida
2Soporte 24x7
Ciclo de vida
2Soporte 24x7
Fusion Architecture
3Components
• Oracle JDeveloper
• Integrated enterprise development tool
• Oracle ADF
• Simpler development of standards-based applications
• Oracle SOA Suite
• Integration and agility
• Oracle WebCenter
• Web 2.0 for the enterprise
Business LogicView Data
Task
Complete
Assign
Task
Human Workflow
Service
BPEL
ProcessBusiness
Activity
Monitoring
OrchestrationHuman interaction Policy evaluationMonitoring
User Interface
ADF Faces components
Business Services
JSR-227
Data
Binding
Web Services
DB
Schema
WebCenter
Events
Rules
Engine
results
facts
Fusion Architecture
3
Fusion Architecture
3
Web Desktop Mobile Office
Database Web Services Legacy Systems Apps Unlimited
Fusion Architecture
3
Fusion Architecture
3
Business Services
Data Services
Model
Controller
JSF
View
Desktop Browser-Based
Struts
Office
ADF
Swing
JSP
EJB BAMADFbc PortletsBIBPELWeb ServicesJava
ADF Faces
MetadataServices(MDS)
Mobile
Database Web Services Legacy Systems Apps Unlimited
JSFADF Controller
ADF Binding
Aplicaciones Ricas
Usuario Profesional vs Usuario Ocasional
Evolución de Aplicaciones Nativas hacia Web
4
Aplicaciones Ricas
Usuario Profesional vs Usuario Ocasional
Evolución de Aplicaciones Nativas hacia Web
4
+150 componentes
5ADF Faces Rich Client Components
• Ajax enabled
• Pluggable look and feel
• Accessibility & internationalization
• The usual components plus:
• Charts, gantt, geo-map, pivot, calendars
• Built in advanced functionality:
• Drag and drop framework
• Dialog and pop-up framework
• “Active Data” - Dashboards / push updates (comet)
• Templating and declarative components
+150 componentes
5Calendar Component
• Time related data
• Month, week, day
and list views
• Action hook points
• Pop-ups
• Drag and drop
+150 componentes
5Hierarchy Viewer
• Graph
• Gauge
• Geographic Map
• Pivot Table
• Gantt Chart
+150 componentes
5Data Visualization Tools (DVT)
+150 componentes
5Data Visualization Components
5Data Visualization Components
+150 componentes
• Two approaches:
• ADF Mobile Browser
• ADF Mobile Client
• Extend your existing
application
• Reuse business services
• Same development
concepts
Movilidad / Multicanalidad
6Oracle ADF Mobile
• Delivers mobile-optimized
native look-and-feel user
interface to mobile
browsers
• Adjusts to device’s browser
capabilities
Movilidad / Multicanalidad
6ADF Mobile Browser
• Renders to an on-
device mobile client
with device-native UI
components
Movilidad / Multicanalidad
6ADF Mobile Client
Movilidad / Multicanalidad
6
Java EE Bus. Logic
JavaServer FacesADF Mobile Infrastructure
Components
Renderers
ADF Faces / WebCenterTrinidadMobile Client
Skinning
Portlets
CSS
Native UIs HTML (5.0) AJAX FlashWAP 2.0
Movilidad / Multicanalidad
6ADF Mobile Architecture
Oracle Lite server
Connected Devices
SQLite mSync
Agent
Disconnected Devices
Common
Business
Model
ADF
Browser
Client
ADF Mobile Client
Direct Service
AccessLocal
Data
Access
Sync
Automatically or
on Demand
Oracle 11g
JDeveloper: entorno unificado
7
• Java EE
• Web User Interfaces
• Web Services
• SOA
• WebCenter / Portlets
• Database
• XML
Enterprise IDE
JDeveloper: entorno unificado
7Full Lifecycle Support
JDeveloper: entorno unificado
7
JDeveloper: entorno unificado
7
SOA
Web 2.0
Java
JDeveloper: entorno unificado
7
Visual
Dialog
Code
Choice of Development Styles
Fusion Middleware & Applications
8Oracle’s Fusion Strategy
• Oracle Fusion Architecture
• Blueprint for SOA-based Enterprise Solutions
• Oracle Fusion Middleware
• Technology Infrastructure for Next Gen Applications
• Oracle Fusion Applications
• Protect, Extend, Evolve through Fusion Architecture and Middleware
Fusion Middleware
8
Fusion Middleware
8Oracle WebCenter Spaces
Fusion Middleware
8Oracle BPM WorkList
Fusion Middleware
Oracle BPM Process Spaces8
Fusion Middleware
Oracle Business Intelligence8
• Use the attribute columns or
“hierarchical column” in Answers
8BI Answers: Display Any Hierarchy in Tabular or Outline Format
Fusion Middleware
Fusion Middleware
8Oracle Enterprise Manager
Fusion Applications
8
Enterprise Applications
Industry Applications
• Aero & Defense
• Automotive
• Chemicals
• Consumer Products
• Communications
• Edu & Research
• Engr & Construction
• Financial Services
• Health Care
• High Technology
• Industrial Mfg
• Life Sciences
• Media & Entertain
• Natural Resources
• Oil & Gas
• Prof Services
• Public Sector
• Retail
• Travel & Transport
• Utilities
• CRM
• EPM
• ERP
• GRC
• HCM
• SCM
Analytic
Apps
Fusion Applications
8
Fusion Applications
8
Fusion Applications
8
Fusion Applications
8
Fusion Applications
8Siebel E-Commerce – ADF 10.1.3
Fusion Applications
8HCM
Fusion Applications
8Projects
Fusion Applications
8Procurement
Estándares Java y SOA
9Oracle, leadership in Open Standards
Estándares Java y SOA
9
Java EE SOA Web 2.0
Estándares Java y SOA
9
Desarrollo basado en estándares
• EJB 3 (JSR-220)
• JSF (JSR-127): Trinidad
• Data Binding (JSR-227)
• Portlets (JSR-168)
• …
Integración del puesto de trabajo
10
Integración del puesto de trabajo
10
• Excel Spreadsheets
connected to Java
Business services
through ADF binding
• Familiar working
environment
• Connected or
disconnected
• Leverage business
services and security
from your application
Integración del puesto de trabajo
10Integración con Windows y Office
MSFT Office
Secure
Declarative
Binding
Bulk
Transactions
Connected
Disconnected
Integración del puesto de trabajo
10Integración con Windows y Office
• Permitir al usuario trabajar con las herramientas de
trabajo habituales
• El mejor interfaz es el que el usuario ya conoce:
Microsoft Office, Excel, Word, Powerpoint, Outlook
Integración del puesto de trabajo
10UI Development in Excel
Question & Answers
Should you require any further
information please do not hesitate to
contact us
• http://www.oraclecourseonline.com
• -oracle fusion adf online training
contact us:
• info@magnifictraining.com or +919052666559
• By Real Time Experts from Hyderabad,
• Bangalore
• ,India,USA,Canada,UK, Australia,South
• Africa.
Oracle financials functional training on ap, ar & gl

Oracle financials functional training on ap, ar & gl

  • 1.
    Oracle Financials Functional Trainingon AP, AR & GL Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA +91-9052666559 USA : +1-678-693-3475 info@magnifictraining.com www.magnifictraining.com
  • 2.
    Oracle Apps TechnicalCourse Contents Introduction to ERP Definition of ERP, Overview of popular ERP’S Comparison of Oracle Apps with other ERP’S Types of Roles Types of Projects AIM documentation standards Oracle Application Architecture. Database structure of OA Using TOAD
  • 3.
    Application Object Library CreatingUsers WHO columns Creating Responsibilities Menu construction Request group construction
  • 4.
    Application development Defining concurrentprogram Concurrent programs with parameters Working with multiple concurrent programs Scheduling the Concurrent Program Concurrent Program incompatibilities Creating Request Set Procedure registration Value sets
  • 5.
    Reports registration Report development Reportregistration Parametric report registration Reports with repeating frames
  • 6.
    Module Overviews Inventory Moduleflow with base tables Accounts Payable module flow with base tables Accounts Receivable module flow with base tables Order Management module flow with base tables
  • 7.
    Form registration Template.fmb Appstand.fmb Form developmentusing templates Form customization concepts Form Registration Process Custom.Pll
  • 8.
    Interfaces Introduction to Interfaces OutboundInterfaces - Using UTL_FILE package Inbound Interfaces - Using SQL * Loader tool
  • 9.
    – Conversions – Overviewon conversions – Difference between Interfaces and conversions – Working with staging table script – Developing validations package – Standards to be followed in conversions
  • 10.
    Flex Fields Types ofFlex Fields Descriptive Flex Fields Key Flex Fields
  • 11.
    Workflows • Introduction toworkflow • Workflow builder • Attributes • Creating Processes • Sending notifications using workflows
  • 12.
    XML Publisher XML Publisher Introductionto XML Publisher Generating XML file using reports Creating Templates Creating Data Definitions
  • 13.
    Discoverer • Introduction toDiscoverer tool • Discoverer Administrator • Creating EUL • Creating Business Areas • Discoverer Desktop • Creating work books
  • 14.
    Oracle apps technicalonline training oracle apps online training with placement oracle online training in India oracle apps online training in uk oracle apps online training in pune
  • 15.
  • 16.
    Should you requireany further information please do not hesitate to contact us • http://www.oraclecourseonline.com • -oracle apps financial online training contact us: • info@magnifictraining.com or +919052666559 • By Real Time Experts from Hyderabad, • Bangalore • ,India,USA,Canada,UK, Australia,South • Africa.
  • 17.
  • 19.
    Oracle Apps technical,R12,ERP,JAVA online training Online| classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA +91-9052666559 USA : +1-678-693-3475 info@magnifictraining.com www.magnifictraining.com
  • 20.
    Oracle apps technicalonline training in australia Introduction to ERP • Definition of ERP, Overview of ERP • Comparison of Oracle Apps with other ERP • Types Of Roles • Types Of Projects • AIM Documentation Standards • Oracle Application Architecture • Database structure of Oracle Application • Using TOAD
  • 21.
    Oracle apps technicalonline training inbangalore Application Object Library • Application developer and Sysadmin task • Application Object Library • Creating Users • WHO Columns • Creating Responsibilities • Menu Construction • Request group construction
  • 22.
    Oracle apps technicalonline training in bhubaneswar Application Development • Defining concurrent programming • Concurrent programs with parameters • Working with multiple concurrent programs • Scheduling the concurrent program • Concurrent program incompatibilities • Creating Request Set • Procedure registration • Value sets
  • 23.
    Oracle apps technicalonline training in chennai Report Registration • Report Development • Report Registration • Parametric report registration • Reports with repeating frames
  • 24.
    Oracle apps technicalonline training in chandigarh Module Overviews • Inventory Module flow with base tables • Accounts Payable module flow with base tables • Accounts Receivable module flow with base tables • Order Management module flow with base tables
  • 25.
    Oracle apps technicalonline training in chicago Form Registration • Template.fmb • Appstand.fmb • Form development using templates • Form customization concepts • Form Registration Process • Custom.Pll • Using function Zoom_available() • Using procedure Event()
  • 26.
    Oracle apps technicalonline training in delhi Interfaces • Introduction to Interfaces • Outbound Interfaces • -Using UTL_FILE package • Inbound Interfaces • -Using SQL*Loader tool
  • 27.
    Oracle apps technicalonline training in dubai Conversions • Overview on conversions • Difference between interfaces & Conversions • Working with staging table script • Developing validations package • Standards to be followed on conversions
  • 28.
    Oracle apps technicalonline training in hyderabad Workflows • Introduction to Workflow • Workflow builder • Attributes • Creating Processes • Sending notification using workflows
  • 29.
    Oracle apps technicalonline training in india XML Publisher • Introduction to XML Publisher • Generating XML file using reports • Creating Templates • Creating Data Definitions
  • 30.
    Oracle apps technicalonline training in kolkata Discover • Introduction to Discover tool • Discoverer Administrator • Creating EUL • Creating Business Areas • Discoverer Desktop • Creating workbooks
  • 31.
  • 32.
    Should you requireany further information please do not hesitate to contact us • http://www.oraclecourseonline.com • -oracle fusion adf online training contact us: • info@magnifictraining.com or +919052666559 • By Real Time Experts from Hyderabad, • Bangalore • ,India,USA,Canada,UK, Australia,South • Africa.
  • 34.
    Page 1 CONACT UC: Magnifictraining +91-9052666559 info@magnifictraining.com www.magnifictraining.com Oracle apps scm online training in us,uk,banglore,kolkata
  • 35.
    Page 2 Oracle appsscm training in chennai The Oracle Apps Modules covers in Oracle SCM Training Course are 1. Inventory 2. Purchasing 3. Order Management 4. Brief Introduction to WIP and BOM Manufacturing Modules 5. Overview on R12 SCM Modules 6. New Features of R12 SCM Modules
  • 36.
    Page 3 Oracle appsscm training in mumbai Course Details Introduction to Oracle SCM eBusiness Suite • Identify the components that comprise an Oracle Application system • Navigation to Oracle Applications • Explain basic application integration • Identify Entities that are shared between multiple applications • Explain different application versions & database versions • Multi Org structure and explanation of Sample Org • Accounting Basics
  • 37.
    Page 4 Oracle appsscm online training in delhi Inventory Management Fundamentals What you will learn: • This class focuses on the features, functions and benefits of the Oracle Inventory application. • Students will learn how to set up items, how to use the various inventory controls available, • how to do transactions, transfers, and inventory moves, inventory replenishment, cycle counting and physical inventory. • Students will also learn where Inventory fits in the overall enterprise structure. • This course reflects the logical flow of the processes involved in inventory management.
  • 38.
    Page 5 Oracle appsscm online training in australia Audience • Functional Implementer Prerequisites: • Required Prerequisites: • Basic understanding of Inventory Management principles • 11i eBusiness Suite Essentials for Implementers
  • 39.
    Page 6 Oracle appsscm online training in pune Course Objectives • Define and maintain a cycle count • Understand performing inventory transactions using a mobile device • Understand the planning and replenishment methods available in Oracle Inventory including min-max planning, • reorder-point planning, replenishment counting, and Kanban replenishment • Understand the overall inventory process in Oracle Inventory • Understand the structure of an inventory organization in Oracle Inventory • Understand the role of an item-master organization • Define items in Oracle Inventory
  • 40.
    Page 7 Oracle appsscm online training in hyderabad Course Topics • Receipt to Issue • Understanding the Receipt to Issue Lifecycle • Understanding Receiving Inventory • Understanding Transferring Inventory • Understanding Issuing Inventory
  • 41.
    Page 8 Oracle appsscm online training in india Defining Inventory Organizations • Understanding the Multi-Org Feature in Oracle Applications • Understanding the Structure of an Inventory Organization • Learning to model an Enterprise in Oracle Applications
  • 42.
    Page 9 Oracle appsscm online training in london Defining and Maintaining Items, Overview • Organization Structure, Overview • Defining Items, Overview • Item Attributes and Statuses, Overview • Assigning Items to Organizations, Overview
  • 43.
    Page 10 Oracle appsscm online training in dubai Defining and Maintaining Items, Fundamentals • Defining Units of Measure • Explaining Item Attributes and Statuses • Defining the Item Master Organization • Defining Items • Defining Item Deletion Constraints • Setting up Item Profile Options • Understanding Implementation Considerations
  • 44.
    Page 11 Oracle appsscm online training in zimbabwe Inventory Controls, Concepts • Explaining Subinventories • Explaining Locator Control • Explaining Revision Control • Explaining Lot Control • Explaining Serial Control
  • 45.
    Page 12 Inventory Controls, Fundamentals •Defining Subinventories • Defining Locator Control • Defining Revision Control • Defining Lot Control • Generating Serial Numbers
  • 46.
    Page 13 Transacting Inventory,Concepts • Explaining Transaction Flows • Explaining Transaction Types • Explaining Move Orders • Explaining Shortage Alerts and Notifications • Explaining Mobile Transactions
  • 47.
    Page 14 Transaction Setup •Setting Up Transaction Managers, Transaction Types, and Transaction Reasons • Setting up Shipping Networks • Setting Up Movement Statistics • Setting Up Account Aliases • Setting Up Move Orders • Setting Up Alerts Notifications and Reports • Setting Up Profile Options
  • 48.
  • 49.
    Page 16 Should yourequire any further information please do not hesitate to contact us http://www.oraclecourseonline.com -oracle apps scm online training contact us: info@magnifictraining.com or +919052666559 By Real Time Experts from Hyderabad, Bangalore ,India,USA,Canada,UK, Australia,South Africa.
  • 50.
    Page 17 ALL THEBEST GUYS
  • 51.
  • 52.
    Oracle CRM Administratortraining and placements Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA +91-9052666559 USA : +1-678-693-3475 info@magnifictraining.com www.magnifictraining.com
  • 53.
    Oracle apps crmonline training in australia Agenda • Overview of Presentation – Opening Premise – The 4Cs • Socialized CRM On Demand – Where can I get it? – a Strategy – Implementation – Sales Teams – Marketing Teams – Sharing, Mashup, Metrics • Old Model, New Model – Practical Suggestions – Some Examples • Myth or Reality?
  • 54.
    Oracle apps crmonline training in bangalore Overview • The objective of this presentation is to address in very high-level terms some of the principles, challenges and applications of Social CRM in a CRM On Demand deployment. • The high-level agenda is : • Where does Social CRM fit in to the CRM On Demand Big Picture? – Why is it important to CRM business? – What Strategy might a company need? – What Tools might a company need?
  • 55.
    Oracle apps crmonline training in bhubaneswar CRM : An Opening Premise • Traditional Customer Relationship Management • Twenty years ago, businesses knew every client, every contact, their wives, children and pets. • Then we spent the next twenty years trying to dehumanize the relationship – Reduced physical sales interaction in showrooms and shops – increased virtual showrooms like the Internet – Distanced support systems from the customer – Created self service systems to eliminate interaction • This is an extreme example, but it is true to some extent in most industries and companies
  • 56.
    Oracle apps crmonline training in chennai CRM : An Opening Premise (suite) • Businesses then woke up and realized they needed to analyze, slice and dice all the interactions they had so carefully virtualized and computerized: – Customer Trend Analysis – Performance Analysis – Sales Analysis • But at some point, the customer was going to want to talk to a human – so they jumped on Community Boards, Blogs, and now Social Networking
  • 57.
    Oracle apps crmonline training in delhi The 4 Cs – Social CRM (re)humanizes relationships with customers – Using the power of the Web 2.0 collaborative tools and the 4 Cs • Collaboration • Creativity • Conversation • Community creation
  • 58.
    Oracle apps crmonline training in dubai Socialized CRM On Demand : Where can I get it? • Online Forums and Communities – Were the original place where people could go to moan, praise or otherwise judge products and services • YouTube – Started out as a place to watch America’s Funniest Videos, now recognized as a vehicle for consumer concern (try searching for a Supermarket chain) and a place for companies to position themselves in a more freeform environment – Savvy CRM users position videos in Channels • Twitter – The most obvious channel for near real-time communications with peer groups – Positive Media Buzz – Geographic and time-bound searches available
  • 59.
    Oracle apps crmonline training in hyderabad Socialized CRM On Demand : Where can I get it? • Facebook – 250,000 businesses have a presence on Facebook • Digg / StumbleUpon – Viral Web Page linking • Slideshare – PDF /PPT and other documents] – Groups, Links and Favorites – Integration with LinkedIn, Facebook, Twitter • DocStoc – Sharing PDFs and embedding content – Groups, Links and Favorites • Blogs (blogspot, wordpress etc)
  • 60.
    Oracle apps crmonline training in india Socializing CRM On Demand as a Strategy • Part One - Internal Strategy for CRM On Demand Users • Open the Door in phases and certain groups – Opening your OCOD to new sources of information • Adding Fields for common Social Networking site in the Contact form • Feeding the CRM On Demand System • Sales :Targeted feeds from online information sources • Marketing : Effective Monitoring of Feedback and customer Buzz • General : Monitoring and Assessing feedback, converting it to actionable information
  • 61.
    Oracle apps crmonline training in kolkata Socializing CRM On Demand as a Strategy • Part Two - External Strategy for your Customers • Engage dialogue – Organize and Classify your Online Presence • Videos, Blogs, Forums – Encourage and monitor the 4Cs • New Segmentation and new Criteria for Lead Generation • Various Approaches – Short Term • Twitter dialogue and monitoring during Trade Show or Product Launch for example – Medium Term • Establishing Document Library in Slideshare or DocStoc – Long Term and Ongoing • Facebook presence
  • 62.
    Oracle apps crmonline training in kerala Socialized CRM On Demand : Where are the Customers • Where are my customers and what are they talking about? – are you committed to authentically join the conversation with the customer? – Know how to look and how to interpret conversations • Your Customers are smart, and see through you – exploiting a new tactic for the sake of gaining market share. Customers want dialogue, not a one way street – Do you go online as a brand, as a team, as multiple employees, and what is your strategy?
  • 63.
    Oracle apps crmonline training in london Socialized CRM On Demand : Where are the Customers • Implementation Methods to expose the networks back into CRM On Demand include – RSS Feeds – Twitter Feed (either live or in filtered feed) – Introducing Social News or Shared Documents into the Homepage – Channelled Audio and Video to Homepage from YouTube – Web Site Forms should contain relevant fields for Networking IDs – Embedding Facebook and other Social Widgets
  • 64.
    Oracle apps crmonline training in mumbai Socializing CRM On Demand : Sales Teams • Levers – Based on Data from the “Where” Exercise • Provide LinkedIn Information • Provide DocStoc / Slideshare Access to private or public documents • Feeds from Competitors • Challenges • For best practice, requires that Sales personnel share information with each other. You may have to adjust – Your Sales Stages and your Workflow
  • 65.
    Oracle apps crmonline training in pune Socializing CRM On Demand : Marketing • Levers – Often drive the “Where” Exercises • Targets of Campaign • Visitor to Trade Show – Facebook Groups, Pages to gauge – Youtube • Channel release of new corporate video, Google Analytics for results • Challenges – May reveal weakness in your marketing lists and databases – Requires filtering for volume and pertinence
  • 66.
    Oracle apps crmonline training in usa Social CRM On Demand : Sharing • Provide the Basics – Make Bookmarking and Tagging easy • Encourage users to learn how to use the Favorites & Sticky Notes in CRM On Demand • Reward people who link or contact you on your Web site • Maintain a list in CRM On Demand of all Web Site Contacts and link them to LinkedIn profiles • Reward the regions who generate the most links and the community members who contribute the most – Mashup • Let CRM On Demand users see their data in new ways • Let them search and find unstructured content and link it to CRM On Demand data • Let them share this with others (within reason)
  • 67.
    Oracle apps crmonline training in uk Social CRM On Demand : Mashup • Mashup – Use internal and external data to create new ways of understanding customer or prospect behavior • Map Prospects, Projects or Service Requests by Type or Channel to LinkedIn Groups, Google Maps, other data • Twitter followers imported and campaigned in OCOD then segmented / assessed – Find / map Channel Partners and focus on recruitment areas – DocStoc or similar for project documents • Public or Private Collections – CRM On Demand and “visual” mapping tool - • For example Mindmap Pro
  • 68.
    Oracle apps crmonline training in singapore Socializing CRM On Demand : Metrics • Like everything else in CRM, data without measurement or objectives is just, well, data – Lead Conversion – Sales Cycle Time to Close – Hits / Leads from Web Sites / Blogs / other Sources – Feedback Loop – Calculating ROI is tough • Marketing Segmentation can take advantage of the new data and criteria • More advanced data analysis may be required beyond segmentation – Analysis of behavior over time
  • 69.
    Oracle apps crmonline training in south africa One More Time!• Collaboration – Use the Favorites and Messaging Features in CRM On Demand – Embed enabling tools and identifiers (Twitter, Facebook , Slideshare) in Signatures, Web Applets – Set up Slideshare Private Groups to collaborate on collateral and other « internet » information sources – Set up Web Forms with adapted field on your Web Site • Creativity – Challenge users to create content • Conversation – Blog your OCOD users or your customer and keep the channel open • Communication – Talk to your Web Form respondants! – Reward collaborative behaviour internally and externally – Link to Blog / Youtube Channel / Twitter Feed in OCOD Homepage
  • 70.
    Oracle apps crmremoteserver access Now for Some Simple Examples CRM On Demand Home Page With DocStoc Visual Document Library & Twitter Feed Targeting Mashup
  • 71.
    Oracle apps crmonline training and certification DocStoc Applet • DocStoc Applet Uses – Display DocStoc Documents in graphical format to users of CRM On Demand – Provide One-Click Access to embedded documents or Download by Sales Users and email to Customers in the conversation – Can be interest-based (filtered)
  • 72.
    Where are peopletalking? • Where are conversations happening? – Expect to poll and query Twitter, Facebook and other online communities – Are you monitoring competitor conversations too? Why not? • Manual Queries or automated services
  • 73.
    Twitter Applet • TwitterApplet Uses – Short Term Monitoring of event in an specific town or locality – Longer Term Brand and Buzz Monitoring – Contact Detection and Interested Party / Influencer detection – Follow Tweeters directly from Applet – Save as Service Requests or Notes or Leads in CRM On Demand – Create Forum Discussions based on Content or Questions
  • 74.
    Where are peopletalking? Where are my customers?
  • 75.
    Feed Management insideCRM On Demand • RSS Lead Generator with Filtering of RSS data and creation of CRM Leads • Leverage Facebook RSS Feed and others to provide one stop shop
  • 76.
    Network Integration • Examplesof platforms like Ning – allows creation of Social Networks and supplies user and management tools • Apps can connect to CMS or other sources to integrate them into your Social Network • Facebook API and Social Widgets allow a degree of exposure to the Social Network for relatively small effort – Enables you to follow what the conversations are about – Expect the unexpected
  • 77.
    Mashup the ConversationData CRM On Demand Mashup – Targeting Geographically by Date, Status etc
  • 78.
    Explanation • Mashup (Opportunities,Tweets etc) with Google Maps – Create Visual Segments for Campaigns – Analyze Target Areas – Identify hotspots and Competitor activity – Target ineffective sales efforts or gaps in coverage
  • 79.
    Myth or Reality •A Socialized CRM On Demand , does it exist today? – Does it exist in your implementation? • Possible? • Feasible? • Desirable? • Cost Effective?
  • 80.
    Why it probablydoesn’t exist today • The weakness of the solutions illustrated – The methodology of selling and servicing embedded in the CRM is still rooted in the old world • CRM processes are based on old models – Any extension to any existing CRM system will largely be a cosmetic one • Making noises or making gestures in the right direction – Most of the solutions proposed are data mart exploitation • Simple data upload and presentation • No analysis or call to action based on the information • No proactive element for the user or the community – We are playing an old game • Quick, on XXX (insert social network name)..they’re talking about us! • XXX Is the new Youtube – stick our corporate videos up there! – We are not listening, we are still trying to dictate
  • 81.
    Socialized CRM OnDemand • With CRM On Demand – How do you find conversations? – How do you nurture and maintain conversations? – Is it possible to collaborate with externals? – Can you make a community based around CRM On Demand? • CRM On Demand is a CRM tool – Social CRM is not a Tool
  • 82.
    Socialized CRM OnDemand 2 • An opportunity exists for integration partners to deliver a (relatively) painless way of implementing parts of the Social CRM process set inside an existing CRM solution
  • 83.
    Conclusion • Fly withwhat you have, but realize that it will never allow you to completely implement a Social CRM process set
  • 84.
  • 85.
    Should you requireany further information please do not hesitate to contact us • http://www.oraclecourseonline.com • -oracle crm online training contact us: • info@magnifictraining.com or +919052666559 • By Real Time Experts from Hyderabad, • Bangalore • ,India,USA,Canada,UK, Australia,South • Africa.
  • 87.
    <Insert Picture Here> OracleFusion Middleware Training with placements and certification CONTACT US: USA:+1-6786933994,+1-6786933475 INDIA:+91-9052666559,040-69990056 Mail:info@magnifictraining.com
  • 88.
    ISV Migration CenterTeam • Who we Are ISV Migration Center Team is a team of senior technical consultants based in Eastern and Central Europe and represents Oracle's technical investment for partners. • Mission Statement latest technology Enable partners to rapidly and successfully adopt and implement Oracle • What do we Offer Whether you are selling Oracle technology, building business solutions, including hosted Internet solutions or providing system integration and implementation services for Oracle technology, IMC Team can help you succeed. • How can we assist We offer a wide range of free services for partners such as one2one assistance, webinars, seminars and hands-on workshops. Contacts: USA:+1-6786933994,+1-6786933475 INDIA:+91-9052666559,040-69990056 Mail:info@magnifictraining.com 2
  • 89.
    <Insert Picture Here> Oraclefusion soa online training in australia Agenda • • • • • • • • SOA Suite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 90.
  • 91.
    SCA – keyenabler of the SOA Suite 11g properties Service Component Architecture: Java interface WSDL portType • • • language-neutral component model assembly model S S C1service R wire • Specifications backed by a growing number leading industry vendors ofBinding: SOAP JMS JCS … S C2 component R R Being standardized at OASIS, the international standards consortium open reference composite SCA terminology: • • • • • Composite: deployment unit Service: entry-point into composite Component: provides logic Reference: refers to external services Wire: connects services, components and references – no special semantic.
  • 92.
    SOA Suite 11gSCA Service Infrastructure One unified infrastructure to manage BPEL Rules Application composers Human Task SCA Composite IDE adapters Business Rules Human Workflow Mediator BPELSOAComposite Editor Repository Policy ManagerCommon JCA-based connectivity infrastructure Optimized binding SOA Operations Web-based console B2B BAM Oracle Service Bus 11g Service Infrastructure Mediation Mediation BPEL orchestration Human Tasks Web services Business Rules and
  • 93.
    SOA 10g to11g mapping Role SOA Suite 10g SOA Suite 11g Java EE container OC4J Weblogic Management consoles BPEL Console, OESB Console, OWSM Console, Enterprise Manager Fusion Middleware Enterprise Manager (OC4J), BAM Management Control, Weblogic Console Orchestration Oracle BPEL Process Manager BPEL Process Service Component Human interaction Human Workflow Engine Human Workflow Service Component Externalize logic Oracle Business Rules Business Rules Service Component Transformation, Routing, Oracle ESB Inside an application/composite: Oracle Fan-out, etc Mediator Service Component, Enterprise- wide: Oracle Service Bus Apps and systems JCAAdapters JCAAdapters connectivity Business dashboards Oracle BAM (.NET-based) Oracle BAM (JEE-based) Security OWSM (proxy and gateway modes) OWSM (proxy), OEG (gateway)
  • 94.
    Upgrade - Highlevel steps • • • Plan out Upgrade Create 11g SOA install/domain and load Migrate/Deploy applications to 11g balancer from scratch • • SOA JDeveloper projects BAM Reports/Data Objects/Alerts • • • Configure 11g system from scratch Migrate clients if necessary Secure 11g system from scratch (example OWSM policies) Cutover to 11g production system Identity Management, •
  • 95.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 96.
    Comparing Oracle SOASuite on OC4J and Oracle WebLogic Server
  • 97.
    SOA Suite 11ginstallation Server-side installation: • • • • • Install Install Install Install Oracle Database for SOA components database schemas using RCU Oracle Oracle Weblogic binaries SOA Suite binaries Create Weblogic domain with SOA Suite components Client-side (developer machines) installation: • • Install Install Jdeveloper SOA Extensions for JDeveloper
  • 98.
    SOA Suite 11.1.1.5installation: server-side • You can use existing Oracle DB instance or create a new one (recommended) • Oracle SOA suite 11.1.1.5 certified with Oracle DB 10.2.0.4+, 11.1.0.7+ or 11.2.0.1+ • RCU (Repository Creation Utility) used to create the schemas needed for the corresponding components Fusion Middleware
  • 99.
    SOA Suite 11.1.1.5installation: server-side • Install Weblogic 10.3.5, new Middleware home (MW_HOME) will be created as a result • Install SOA Suite 11.1.1.5 binaries into MW_HOME. Specific SOA ORACLE_HOME will be created
  • 100.
    SOA Suite 11.1.1.5installation: server-side • Start Fusion Middleware Configuration Wizard to create new domain: Specify <SOA_ORACLE_HOME>/common/bin/config.sh • products to be configured inside the domain • Specify domain name, location, ports for managed servers, etc… • Start Admin Server and managed server (s)
  • 101.
    SOA Suite 11.1.1.5installation: server-side Important notes: • To install SOA Suite environment for production deployment, follow the Enterprise Deployment Guide for Oracle SOA Suite and Oracle Fusion Middleware High Availability Guide • Developers can install SOA Suite locally as well if they have enough resources on the laptops
  • 102.
    SOA Suite 11.1.1.5installation: client-side • • Install Install JDeveloper 11.1.1.5 JDev SOA Extension • Always use the same version for SOA server-side and JDeveloper JDeveloper• 11.1.2.1 does ! not have SOA Extension
  • 103.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 104.
    SOA Suite 10.1.3 11g Project Upgrade Path Mostly transparent project upgrade: Open your 10g anyProject or Application in JDeveloper 11g, apply manual steps and re-deploy! JDeveloper 3. deployor command-line 2. save1. open 11g SOA Suite Server 10.1.3 ESB or BPEL project 11g composite project
  • 105.
    Upgrade in JDeveloper • • • In-placeupgrade of application/project. Can upgrade any project, not just SOA projects. All HTTP WSDL references in project must be accessible, so SOA 10g should be up and running. • Logs are in …/jdeveloper/upgrade/logs.
  • 106.
    Upgrade in JDeveloper ESBproject -> SOA Composite
  • 107.
    Upgrade in JDeveloper •Analyze the warnings in the log files generated during the upgrade process
  • 108.
    Command Line Upgrade • • • • Antscript available to upgrade SOA projects. Cannot upgrade whole Applications. Upgraded directory different than source directory. Does not Upgrade .jpr files. Opening project in Jdeveloper creates .jpr file. multiple• Can merge BPEL source directories to a single upgraded target directory. • • • All HTTP WSDL references in project must be accessible. Logs in …/jdeveloper/upgrade/logs Same codebase used for JDeveloper upgrade.
  • 109.
    Upgrading SOA Suite10g Projects Using Ant Before you begin, set environment variables set ORACLE_HOME=<MIDDLEWARE_HOME>jdeveloper cd %ORACLE_HOME% binsoaversion.cmd Upgrade an 10g ESB service to an 11g Composite application component: with Mediator ant -f %ORACLE_HOME%binant-sca-upgrade.xml mediator -Dsource C:projects10.1.3EmployeeEmployeeService -Dtarget C:projects11gR1 -DappName Employee Merge several 10g BPEL processes to an 11g Composite application: ant -f %ORACLE_HOME%binant-sca-upgrade.xml bpel -Dsource "C:projects10.1.3EmployeeEmployeeSalaryApproval;c:projects10.1.3... ...EmployeeEmployeeInfo" -Dtarget C:projects11gR1 -DappName Employee
  • 110.
    Manual steps • Strongattempt made to automate project upgrade as much 11g.as • • possible given large differences between 10g and Not always possible. A few things deferred due to time constraints. • Artifacts upgraded are BPEL processes, ESB services, Rules dictionaries, Human Workflow tasks, Adapters. Some limitations apply. • SOA configuration plans, fault policies, build files are not upgraded
  • 111.
    BPEL instance Migration •Right now there is no support on for BPEL instance migration, or audit trail migration. Oracle investigating feasibility of instance migration. • Two choices for cutting over long running processes to 11g: • • Side by Side Upgrade Grace period cutover
  • 112.
    BPEL instance Migration Sideby Side Upgrade • • 10g 10g and 11g systems run side by side. system has all long running processes in retired state so no new process instances can be created. • • Clients are switched over to 11g. 10g system continues running until all callbacks arrive to complete long running processes. • 10g system is decommissioned.
  • 113.
    BPEL instance Migration Graceperiod cutover • 10g system has all long running processes in retired state so no new process instances can be created. • After a grace period, all 10g long running processes are killed. • • 10g 11g system system is is decommissioned. brought up in production.
  • 114.
    Configuration/Deployment Upgrade • 10gconfiguration files not automatically upgraded to 11g configuration files. 11g has to be configured using EM, JMX/Mbean APIs or WLST scripts instead. • SOA Composite properties can be customized in the deployment plan. • Cannot automatically upgrade from 10g SOA deployment plan 10g to 11g deployment plan. • SOA deployment units cannot be upgraded to 11g deployment units. Need to upgrade source instead and generate deployment unit.
  • 115.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 116.
    BAM upgrade stepsoverview • • RCU creates the schema for 11g tool BAM Use Upgrade assistant (UA) to copy data objects/reports/alerts from 10g BAM system database to 11g BAM system database directly • • • • 10g Enterprise Link is no longer supported Native Native support support for for JMS ODI connectivity in 11g integration in 11g Configure 10g SOA 11g. clients to talk to BAM 11g or migrate 10g SOA clients to • Note: 10g SOA interoperates with 11g BAM, 11g SOA interop with 10g BAM is not certified.
  • 117.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 118.
    Securing SOA composites OWSMMigration • 11g SOA install auto-deploys 11g OWSM policy manager • 10g OWSM policies do not migrate to 11g OWSM as they are syntactically different. Refer to OWSM guide for 10g policy to 11g policy mapping. • 10g OWSM Monitor functionality is provided by EM SOA Mgt Pack for 11g AppServer.
  • 119.
    Securing SOA composites OWSMMigration • If • 10g BPEL/ESB is secured using OWSM agent, then There’s no need for agent migration as agent is runtime built-in the 11g SOA • Using JDev/EM, attach 11g OWSM policy to the migrated SOA composite. • If • • 10g BPEL/ESB is secured using OWSM Gateway, then Continue to use 10g OWSM Gateway Or, start using 11g built-in agents by attaching 11g OWSM policies SOA composite. to
  • 120.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 121.
    Upgrading DVMs andXREFs • XPath functions to access domain value maps (DVMs) and cross when reference tables (XREFs) are upgraded automatically you open projects in JDeveloper 11g; • You must manually extract the DVMs and XREFs from Oracle ESB 10g repository and load them to the MDS Repository. Scripts/utilities are provided;
  • 122.
    Migrate DVMs • ExportDVM metadata to archive: <ESB10g_Oracle_Home>/export.sh metadata10g.zip • Convert the ZIP file to an Oracle SOA Suite archive file cd <SOA11g_Oracle_Home>/bin ant -f ant-sca-upgrade.xml upgrade-xrefdvm -Dsource=location_of_the_zip_file -Dtarget=location_of_the_soa_archive Output file will be automatically called sca_XrefDvmFiles10g_rev1.0.jar • • • Create new application in Jdeveloper 11g Import->SOA Archive into SOA project Create jar file with DVM metadata and deploy it to MDS
  • 123.
    Migrate XREFs XREF_DATA tablehas changed in 11g, so special procedure is required for migration • Create public DB link dblink10g in SOA 11g DB to access SOA 10g DB • Extract XREF10gto11gDataUpgradeUtility located in the RCU_HOME/rcu/integration/soainfra/sql/xref • Modify Upgrade10gXrefTo11gXref.sql pointing to the shared MDS data location • • Execute the Upgrade10gXrefTo11gXref.sql Drop dblink10g DB link
  • 124.
    Technology adapters migration •Run 11g Adapter Configuration upgrade; Wizard for each adapter after SOA project • Adapter header variables in 10g defined in the adapter WSDL activity file, in 11g they are the properties defined in Invoke in BPEL process or Assign values dialog in Mediator; • Non-managed connections are not supported in 11g, check adapter WSDL files before upgrade; • • Description lost after upgrade of technology adapter See the Upgrade guide for more details
  • 125.
    Human Workflows migration •Human Workflows in 10g are the defined in .tform files, UI is created with jsp pages in same JDev project, deployed together; • Human Workflows in 11g are for defined in .task files, separate ADF projects are created UI, deployed separately; • During upgrade JDeveloper 11g automatically creates a new project Manual for the task UI and upgrades the task detail pages; • modifications of the WorkflowTask XSD may be required, refer to the Upgrade Guide for details
  • 126.
    Client and InvokedService Migration • Some 11g APIs are compatible with equivalent 10g APIs, some are different. • • • • Worklist APIs are compatible. B2B APIs are compatible. Custom Sensor APIs are compatible. BPEL APIs are functionally roughly equivalent changes. Rules SDK APIs are a functional superset. with signature • • 11g uses ws-addressing 1.0. Need patch for 10g BPEL client. URLs• in 11g has different syntax. (includes callback URL used by invoked services).
  • 127.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 128.
    Best Practices Before migration •Ensure that SOA Suite 10g Projects are Up and Running on Latest SOA 10g Release Jdeveloper 11g• • Install Install the the with SOA Extension (currently 11.1.1.5) latest SOA Suite 11g version (currently 11.1.1.5) . Quick start guide for SOA Suite 11g • Configure adapters, all the necessary resources (JDBC connection pools, JCA JMS queues, etc) • • Order matters! Start with a pilot project, do not use the Big Bang approach
  • 129.
    Best Practices During andafter migration • Recompile the migrated projects (11g BPEL compiler is stricter than 10g); • Think about rearranging the artifacts into the corresponding folders (xsd, wsdl and other file types). Change the referencing artifacts accordingly; • Run 11g Adapter Configuration Wizard for each adapter to verify the adapters configuration; • If you are using adapter header variables in SOA 10g BPEL projects, you have manually set them in the Invoke activity
  • 130.
    Best Practices During andafter migration • Refer to project for abstract WSDL and HTTP URL for concrete WSDL. • Create configuration plans for deployment of the SOA 11g composites • Use MDS to share WSDLs, XSD, DVM, EDL event files and other artifacts across projects (oramds://<path_to_the_resource>). If you are accessing any file from bpel xmllib you need to change the URL to MDS URL:
  • 131.
    Best Practices During andafter migration • Do not blindly 1:1 migrate every BPEL /ESB project to the corresponding composite. You can not leverage SCA benefits by having many fine grained composites. Use SOA Suite 11g partitions, it has some similarities with BPEL domains and ESB System/Service Groups in 10g Explore the performance tuning options available in the SOA Suite 11g, look at Oracle® Fusion Middleware Performance and Tuning Guide Production deployment architecture is different in SOA Suite 11g. • • • Example: usage of Coherence instead of JGroups for cluster wide deployment. Look at Oracle® Fusion Middleware Enterprise Deployment Guide for Oracle SOA Suite
  • 132.
    <Insert Picture Here> Agenda • • • • • • • • SOASuite 10g SOA and 11g Architecture comparison Setting Oracle Oracle up Suite 11g environment BPEL / Oracle ESB projects migration BAM migration Security components migration Upgrading Other Oracle SOA Suite Technologies Best practices Getting more information
  • 133.
    Getting more information •Oracle® Fusion Middleware Upgrade Guide for WebCenter, and ADF 11g Release 1 (11.1.1) Oracle® Fusion Middleware Developer's Guide Suite 11g Release 1 (11.1.1) Oracle SOA Suite, • for Oracle SOA • Quick Start Guide for Oracle SOA Suite - detailed download, install and configuration instructions Oracle SOA Suite 11g Handbook by Lukas Jellema.•
  • 134.
    Questions Should you requireany further information please do not hesitate to contact us http://www.oraclecourseonline.com -oracle apps technical training contact us: info@magnifictraining.com or +919052666559 By Real Time Experts from Hyderabad, Bangalore ,India,USA,Canada,UK, Australia,South Africa. ©2011 Oracle Corporation
  • 135.
  • 137.
    Oracle Fusion Middleware11g: Build Applications with ADF Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA +91-9052666559 USA : +1-678-693-3475 info@magnifictraining.com www.magnifictraining.com
  • 138.
    Comprehensive Offering Complete Designed to Work Together Integrated Standards- Based Architecture Open Industry Leader Bestof Breed #1 Oracle fusion adf online training in australia Oracle Application Development Framework
  • 139.
    Oracle fusion adfonline training in bangalore 1. Oracle, una apuesta segura 2. Ciclo de Vida, la web evoluciona muy rápido 3. Fusion Architecture 4. Aplicaciones Ricas 5. +150 componentes 6. Movilidad / Multicanalidad 7. JDeveloper: entorno unificado 8. Core de Fusion Middleware & Fusion Applications 9. Estándares Java y SOA 10.Integración del puesto de trabajo Best of Breed Complete Open Integrated
  • 140.
    SOFTWARE, HARDWARE, COMPLETE CompleteSolutions Complete Choice 1Oracle, una apuesta segura
  • 141.
    Oracle’s Architectural Vision •Engineered to work together • Tested together • Certified together • Packaged together • Deployed together • Upgraded together • Managed together • Supported together 1Oracle, una apuesta segura
  • 142.
    Only Oracle DeliversComplete Solutions1 Oracle IBM Microsoft HP SAP Vertical Apps Horizontal Apps Middleware Database Operating System Virtualization Servers Storage Management Oracle, una apuesta segura
  • 143.
    Leader in KeySegments • Database • Database on Solaris • Database Share on Linux • Embedded Database • Data Warehousing • Development Language (Java) • Unix Server • Tape Storage • Middleware • CRM • Enterprise Performance Management • Human Capital Management • Banking • Communications • Financial Services • Professional Services • Public Sector • Retail Oracle is #1 in modern middleware according to several independent research studies 1Oracle, una apuesta segura
  • 144.
    • Leader inMarket Share • Leader in Growth • Leader in Performance • Leader in Price Performance • Largest Partner Ecosystem • Largest Developer Community 1The Leader in Middleware Oracle, una apuesta segura
  • 145.
    11ª compañía desoftware empresarial del mundo Oracle, una apuesta segura • +100.000 empleados en más de 145 países – +25.000 desarrolladores – +10.000 técnicos de soporte – +15.000 consultores expertos • +300.000 clientes • +20.000 partners
  • 146.
    11ª compañía desoftware empresarial en España Oracle, una apuesta segura • En España desde 1986 • +1000 Empleados y oficinas en Madrid, Barcelona, Bilbao, Valencia, Sevilla, Lisboa y Oporto – Servicios Locales: Consultoría, Formación y Soporte • +7.000 clientes • +500 Partners
  • 147.
  • 148.
  • 149.
  • 150.
    Fusion Architecture 3Components • OracleJDeveloper • Integrated enterprise development tool • Oracle ADF • Simpler development of standards-based applications • Oracle SOA Suite • Integration and agility • Oracle WebCenter • Web 2.0 for the enterprise
  • 151.
    Business LogicView Data Task Complete Assign Task HumanWorkflow Service BPEL ProcessBusiness Activity Monitoring OrchestrationHuman interaction Policy evaluationMonitoring User Interface ADF Faces components Business Services JSR-227 Data Binding Web Services DB Schema WebCenter Events Rules Engine results facts Fusion Architecture 3
  • 152.
  • 153.
    Web Desktop MobileOffice Database Web Services Legacy Systems Apps Unlimited Fusion Architecture 3
  • 154.
    Fusion Architecture 3 Business Services DataServices Model Controller JSF View Desktop Browser-Based Struts Office ADF Swing JSP EJB BAMADFbc PortletsBIBPELWeb ServicesJava ADF Faces MetadataServices(MDS) Mobile Database Web Services Legacy Systems Apps Unlimited JSFADF Controller ADF Binding
  • 155.
    Aplicaciones Ricas Usuario Profesionalvs Usuario Ocasional Evolución de Aplicaciones Nativas hacia Web 4
  • 156.
    Aplicaciones Ricas Usuario Profesionalvs Usuario Ocasional Evolución de Aplicaciones Nativas hacia Web 4
  • 157.
    +150 componentes 5ADF FacesRich Client Components • Ajax enabled • Pluggable look and feel • Accessibility & internationalization • The usual components plus: • Charts, gantt, geo-map, pivot, calendars • Built in advanced functionality: • Drag and drop framework • Dialog and pop-up framework • “Active Data” - Dashboards / push updates (comet) • Templating and declarative components
  • 158.
    +150 componentes 5Calendar Component •Time related data • Month, week, day and list views • Action hook points • Pop-ups • Drag and drop
  • 159.
  • 160.
    • Graph • Gauge •Geographic Map • Pivot Table • Gantt Chart +150 componentes 5Data Visualization Tools (DVT)
  • 161.
  • 162.
  • 163.
    • Two approaches: •ADF Mobile Browser • ADF Mobile Client • Extend your existing application • Reuse business services • Same development concepts Movilidad / Multicanalidad 6Oracle ADF Mobile
  • 164.
    • Delivers mobile-optimized nativelook-and-feel user interface to mobile browsers • Adjusts to device’s browser capabilities Movilidad / Multicanalidad 6ADF Mobile Browser
  • 165.
    • Renders toan on- device mobile client with device-native UI components Movilidad / Multicanalidad 6ADF Mobile Client
  • 166.
    Movilidad / Multicanalidad 6 JavaEE Bus. Logic JavaServer FacesADF Mobile Infrastructure Components Renderers ADF Faces / WebCenterTrinidadMobile Client Skinning Portlets CSS Native UIs HTML (5.0) AJAX FlashWAP 2.0
  • 167.
    Movilidad / Multicanalidad 6ADFMobile Architecture Oracle Lite server Connected Devices SQLite mSync Agent Disconnected Devices Common Business Model ADF Browser Client ADF Mobile Client Direct Service AccessLocal Data Access Sync Automatically or on Demand Oracle 11g
  • 168.
    JDeveloper: entorno unificado 7 •Java EE • Web User Interfaces • Web Services • SOA • WebCenter / Portlets • Database • XML Enterprise IDE
  • 169.
  • 170.
  • 171.
  • 172.
  • 173.
    Fusion Middleware &Applications 8Oracle’s Fusion Strategy • Oracle Fusion Architecture • Blueprint for SOA-based Enterprise Solutions • Oracle Fusion Middleware • Technology Infrastructure for Next Gen Applications • Oracle Fusion Applications • Protect, Extend, Evolve through Fusion Architecture and Middleware
  • 174.
  • 175.
  • 176.
  • 177.
  • 178.
  • 179.
    • Use theattribute columns or “hierarchical column” in Answers 8BI Answers: Display Any Hierarchy in Tabular or Outline Format Fusion Middleware
  • 180.
  • 181.
    Fusion Applications 8 Enterprise Applications IndustryApplications • Aero & Defense • Automotive • Chemicals • Consumer Products • Communications • Edu & Research • Engr & Construction • Financial Services • Health Care • High Technology • Industrial Mfg • Life Sciences • Media & Entertain • Natural Resources • Oil & Gas • Prof Services • Public Sector • Retail • Travel & Transport • Utilities • CRM • EPM • ERP • GRC • HCM • SCM Analytic Apps
  • 182.
  • 183.
  • 184.
  • 185.
  • 186.
  • 187.
  • 188.
  • 189.
  • 190.
    Estándares Java ySOA 9Oracle, leadership in Open Standards
  • 191.
    Estándares Java ySOA 9 Java EE SOA Web 2.0
  • 192.
    Estándares Java ySOA 9 Desarrollo basado en estándares • EJB 3 (JSR-220) • JSF (JSR-127): Trinidad • Data Binding (JSR-227) • Portlets (JSR-168) • …
  • 193.
  • 194.
    Integración del puestode trabajo 10 • Excel Spreadsheets connected to Java Business services through ADF binding • Familiar working environment • Connected or disconnected • Leverage business services and security from your application
  • 195.
    Integración del puestode trabajo 10Integración con Windows y Office MSFT Office Secure Declarative Binding Bulk Transactions Connected Disconnected
  • 196.
    Integración del puestode trabajo 10Integración con Windows y Office • Permitir al usuario trabajar con las herramientas de trabajo habituales • El mejor interfaz es el que el usuario ya conoce: Microsoft Office, Excel, Word, Powerpoint, Outlook
  • 197.
    Integración del puestode trabajo 10UI Development in Excel
  • 198.
  • 199.
    Should you requireany further information please do not hesitate to contact us • http://www.oraclecourseonline.com • -oracle fusion adf online training contact us: • info@magnifictraining.com or +919052666559 • By Real Time Experts from Hyderabad, • Bangalore • ,India,USA,Canada,UK, Australia,South • Africa.