Building a Global Channel
                                       1


                        VISION & UPDATE
                               ON
                       CHANNEL STRATEGY

                           X AV I E R PA N S A E R S
                       OPENERP CHIEF SALES OFFICER

Partners Summit 2012
OpenERP is changing trends
that are turning the
traditional partner
model on END

Partners Summit 2012   2
In any industry ,
the only reason why two
partners decide to enter into a
relationship is because
both find value            added
in it …
Partners Summit 2012   3
Partner Network Coverage
                        4




Partners Summit 2012
Partner Management 2009-2010
                             5


2009                             2010



                                   Launch of new partner
    90 partners
                                   program
    No partner program             150 Partners
                                   Launch of OpenERP
    No partner management
                                   Publisher Warranty



Partners Summit 2012
Partner Management TODAY
                                           6
     2011                                      2012



          330 Partners EMEA/Asia                  Q1 : 70 new partners


          70 Partners Americas                    Activation Ratio 39%

          Light Presence in 70 countries          Good partner identification


           Activation Ratio 20%                   Launch of Partner Portal

           Many first year partners               Reinforce local presence

                                                  Reach 600 partners
           Major Processes change
                                                  Resellers strategy v.s true
           OPENERP Enterprise                     integrators
Partners Summit 2012
Partner Management TOMORROW
                                     7


                       2014

                        2000 partners worldwide

                        Strengthen local presence

                        Activation Ratio 80%
                        Many Resellers (Out of the
                        box model) – Get the Mass !
                        System Integrator model

Partners Summit 2012
Global Partner Network Growth
                                  8

                        Partner Network Growth

  2000

  1600

  1200

    800

    400

       0
                 2009   2010     2011       2012   2014

Partners Summit 2012
Global Partner Grade Split
                                        9

                            Partner Grade Split Chart

                                21
                       54



                                                           Ready
                                                           Silver
                                                           Gold
                                               356




Partners Summit 2012
Partner Network Split Vision
                                     10

                       Partner Network Split - Vision




          Silver
                        READY                           RESELLERS
                                                        MASS Approach


     GOLD




Partners Summit 2012
How to reach 2000 partners ?
How to avoid the churn ?
How to make partners happy?


CREATE PARTNER LOYALTY !


Partners Summit 2012   11
“After 4 years working with
Partners we noticed some
performed much better than
others …”

HOW COME ?


Partners Summit 2012   12
Define clear ROLES
                                       13

                       ROLES                           SERVICES
                               OPENERP Publisher
Marketing                               Account Manager
Develop new versions                    Upgrade to new versions
Maintain Stable versions                Unlimited bug fix on stable versions
Sales                                   Assist to OpenERP Enterprise selling

                               OPENERP Partners
Sales                                   Partner
Customer Implementation                 Custom Development
After-sale service                      Custom Support
Strategy                                Out of the box OR System Integration
Marketing                               Referrals & Branding
Partners Summit 2012
Partner Management : 2 Separate Roles
                                    14




    Ready Partner                           Silver/Gold
       MGMT                               Partner MGMT
 • Activation – OE Selling               • Projects
 • Leverage Competence                   • Presales & Consulting
 • 12Many attitude -                     • Partner review
   Webinars                                methodology*
                                         • 121 Sales Attitude

Partners Summit 2012
Strengthen a strong ecosystem
                                            15


                                        OpenERP

                              Value proposition

                             Partner – Reseller - Distributor
                                                   Propose Managed
                  Sell OpenERP Enterprise
                                                       Services


                                        End-User

                            Finance the Ecosystem

Partners Summit 2012
The Right Balance (1)
                                 16


                       OpenERP        Partner




Partners Summit 2012
The Right Balance (2)
                                 17


                       OpenERP        Partner




Partners Summit 2012
The Right Balance (3)
                                        18


                       OpenERP               Partner

                                             OpenERP
                       Value creation
                                             Enterprise

                          Constant
                                               Train
                       communication

                         Constant
                                                Sell
                         training

                       New versions            Share




Partners Summit 2012
Partner Management Tools
                                     19

   Partner Portal
       Update online leads & opportunities
       Track Support tickets
   Partner Review Methodology
       https://docs.google.com/a/openerp.com/spreadsheet/ccc?key=0A
       mNnLfdyDRQfdHl0bEFFSEJTRTc4YzNhM0s4MHpFY1E#gid=0




Partners Summit 2012
Go-to-Market Strategies
                                  20


                          OUT-OF-THE-BOX
                               V E RS US

                  PROJECT IMPLEMENTATION


                       WHICH ONE TO CHOOSE ?
Partners Summit 2012
Active channel management
benefits               both
                 the vendor and
the channel partner by helping to
grow revenue and protect margins while
maintaining the
Go-To-Market Strategy
Partners Summit 2012          21
Go to Market Strategies – Which one I choose?
                                      22

Choose and stick to a strategy; Do not mix both approaches
                        Project Implementation    Out-of-the-Box
   Target Clients       > 25 users                1 to 25 users
   Partner Profile      IT companies / System     Resellers / Functional
                        Integrators               Experts
   Success factors      Project Management        Sales & Marketing
   Offer                Custom Implementation     Packaged Offer
   Deployment           Local                     Online or Local
                                Growth Strategy
   Custom development   YES                       NO or Very Limited
   Annual Growth        Get bigger clients        Get numerous clients
Partners Summit 2012
I just started with OpenERP as Ready Partner
…

We are a team of 3 people
2 functional experts and 1 qualified sales executive

My customer base is mainly small clients with
identical configuration...

How should I market OpenERP ?


Partners Summit 2012         23
OpenERP
    Implementation Assistance


The OpenERP
       out-of-the-box
           project approach



                  MAXIME GLORIEUX, HEAD OF SAAS & IA
What is an OpenERP Implementation Assistance
                                     out-of-the-box approach




It is an out-of-the-box/standard OpenERP
system deployment that involves the
customer in the configuration of the
database.
OpenERP Implementation Assistance
             Out-of-the-box approach - What is in it ?




       Project duration ?
3 month objective




      Onsite/online ?
Customer’s choice



       Maintenance & migration ?
Included in the proposal
OpenERP Implementation Assistance
       Out-of-the-box : Who   is it for ? / When is it recommended ?



Limited budget (less than €15k)



Customer is willing to actively get involved in the deployment
(learning competencies, customer wants to feel more in control of
his system)

Urgent need to deploy a system (less than 3 months)
OpenERP Implementation Assistance
       Out-of-the-box : Who   is it for ? / When is it recommended ?



Customer is not seeking to integrate 100% of his processes.
(Can afford not to have everything automated.)


  Any companies that can afford not to have all their (specific) needs
    covered from day 1
       > companies willing to have a phased implementation
                > 1st phase will cover all the standard needs
                > 2nd phase later when they will be ready/able to
                invest money for specific adaptations/developments
OpenERP Implementation Assistance sales cycle
                      Out-of-the-box project - How to sell it ?

Implementation Assistance sales cycle


          Qualif            Demo        Prop            Nego          Closing


   1) Qualification of the customer situation, problems, expectations

   2) Demonstration of the system going through main customer needs

   3) Customer tailored implementation proposition with budgetary offer

   4) Negotiation

   5) Closing
OpenERP Implementation Assistance sales cycle
                 Out-of-the-box project - How to sell it ?

      Qualif          Demo            Prop           Nego          Closing


Company details: activity, contact details, locations, contact person, decision
makers, website, size, turnover, number of employees, number of users…

Current way of working: how do they currently manage their activity?
current system in place
Customer needs: what are they looking /for/to change/improve ?
     Onsite/online?
     Standard: list of all standard needs
     Specific: list of everything more specific that might have
     to be done in a second phase
OpenERP Implementation Assistance sales cycle
                Out-of-the-box project - How to sell it ?

      Qualif         Demo            Prop           Nego            Closing


Data import: data import needs (#partners-customers, suppliers, prospects..-,
#products, structure,…)

Budget: envelop defined? If not, are they aware of the cost of an
implementation, reaction on budget range

Timeframe: decision deadline/operational solution deadline + reasons
OpenERP Implementation Assistance sales cycle
                       Out-of-the-box project - How to sell it ?

         Qualif                Demo           Prop               Nego           Closing


                                      Implementation
            DIY                         Assistance
                                                                        Traditional Project


√ Get involved and learn          √ local presence with your        √ ideal for complex needs
- no support from OpenERP             certified expert                  (requiring heavy specific
    or its expert consultant          consultant network                developments)
    network                       √ get involved in your
- time consuming (long                implementation (& learn       √ partner is taking care of
    implementation time)              how to deploy and                 everything
                                      manage your own ERP)
                                  √ low cost                        √ onsite services
                                  - you need to be available
                                      during the deployment          - pay per day of service
                                  - specific needs not covered
OpenERP Implementation Assistance sales cycle
                 Out-of-the-box project - How to sell it ?

       Qualif         Demo              Prop            Nego           Closing



A demonstration should only be done after a full customer qualification and after
the customer has validated his interest for an implementation assistance + is
conscious of the costs.


CHECKLIST (before agreeing to do a presentation):
  Do I know what the customer is doing (his industry sector/activity) ?
  Do I know what he is looking for (what are the areas of OpenERP he is
  interested in in regard to his company management needs) ?
OpenERP Implementation Assistance sales cycle
                     Out-of-the-box project - How to sell it ?

           Qualif         Demo              Prop            Nego           Closing


    CHECKLIST (continued):
      Can I show him most of his needs without wasting too much time
      configuring a database specifically for him ?
      and last but not least:
      Is it worth spending time with this prospect ? Are they serious about
      implementing a new ERP (timeframe, budget,...)? Are they willing to pay
      for our services should the demo be successful ?

>          If you have a 'no' or do not know the answer to any of the          above
    questions then you should not agree to make a demo and           rather ask the
    customer the right questions before committing.
OpenERP Implementation Assistance sales cycle
                Out-of-the-box project - How to sell it ?

      Qualif         Demo            Prop           Nego          Closing


High level presentation:
  You do not need to show every detail of a module or view for this first
  presentation

Vison :
    Create a vision in the customer mind rather than purely showing
   functionalities
   Ultimately, you want your customer/prospect to feel like they are missing
   something by not using OpenERP for their company management.
OpenERP Implementation Assistance sales cycle
                 Out-of-the-box project - How to sell it ?

      Qualif          Demo         Prop           Nego           Closing


Identify potential issues :

Ask the customer what is refraining him from choosing OpenERP.

      -nothing ? Ask the customer whether he wants an offer reminding
      him about the budget range
      -identify customer processes not covered in OpenERP preventing
      him from deploying the software
OpenERP Implementation Assistance sales cycle
               Out-of-the-box project - How to sell it ?

      Qualif        Demo          Prop            Nego          Closing



A proposition should only be done when :

     - customer has arrested his choice on OpenERP,
     - validated implementation approach,
     - pre-agreed on the project cost,
     - decision timing is within next 8 weeks
OpenERP Implementation Assistance sales cycle
         Out-of-the-box project - How to sell it ?

Qualif      Demo      Prop           Nego          Closing
OpenERP Implementation Assistance sales cycle
               Out-of-the-box project - How to sell it ?

     Qualif         Demo             Prop           Nego          Closing




The negotiation and closing are the easiest parts of this sales cycle.

If the customer has indeed understood everything in the previous stages + is
    ready to take a decision, it is purely formalizing the agreement and
    sorting out logistical details to get the project started.
OpenERP Implementation Assistance
         Out-of-the-box approach : How can you be part of it ?


We, OpenERP, do the selling and assign the project to you
  exemples


If it is your first project, you can decide to use this project as
an opportunity to gain experience in an implementation
assistance by being an intermediary between the customer
and OpenERP.


 You have a customer interested, you do the selling, position a
number days of onsite intervention. You come with your
signed contract and we can help you should you need
assistance until you feel completely confident doing it without
us.
OpenERP Implementation Assistance
          Out-of-the-box approach : Summary of key messages


Huge market potential

Faster, easier sales cycle – average of less than 6 weeks from first
contact to closing

Reduced risk > commitment to deliver support, not to deliver a
project

Customer commitment is critical to the success of this kind of
implementation approach
> If the customer does not get involved, nothing will be done
Implementation Assistance
       Delivery
                       42

                PRESENTER

             GRÉGOIRE KRIEG
      F U N C T I O N A L C O N S U LTA N T
Assisting the client
43
5 steps approach
                                       44




 Initial               Configuration
           Trainings                        Validation   Adaptation
Analysis                 / Import

                                                                      Upselling
Initial Analysis
                 45



          1.Resources


           2. Roles     O         P       C


                        ?     ?       ?
OpenERP




 CLIENT    3. Tools
                                              Q&A
Initial Analysis
                          46


Objectives:
- Understand scope
- Highlight priorities            Explain



   OpenERP

                         Understand
                                            Validate
     CLIENT
Intial Analysis - Insights
                                       47

 Initial               Configuration
           Trainings                         Validation   Adaptation
Analysis                 / Import

                                                                       Upselling




Insist that the offer is limited in time
Highlight client’s responsability of consolidating
information and human resources for the project
Make sure to start on SaaS to avoid server configuration
problems
Trainings
      48



                ½ day per
            functional domain

                 PARTNER


                 CLIENT

in depth   Objective:
           Skills Transfer
Trainings - Insights
                                       49

 Initial               Configuration
           Trainings                        Validation   Adaptation
Analysis                 / Import

                                                                      Upselling

 Attach importance to spacing of trainings
    Recommend client watch videos before
    Suggest client actively use test database before
    Ask of client to go through process of asking questions before
 Be able to focus on client’s business issues
 Take advantage of the form of the skills transfer:
 face to face, no language barrier
Configuration and Import
               50


My Business’
 Processes




                        Configuration
 CLIENT
                          / Import




  Trainings
Configuration and Import
                   51


     CLIENT PROGRESSION
                                    DEADLINES
  Create
  Users



  Define
Sales Team



  Import                  Problem
 Products                  Solved
             OpenERP
Configuration / Import - Insights
                                         52

 Initial                 Configuration
            Trainings                         Validation   Adaptation
Analysis                   / Import

                                                                        Upselling
Importance of smooth transition :
   Be active in set up of deadlines for configuration
   Follow up regularly on completion of deadlines
Importance of client’s project management:
   Client’s human resources should be active and free
   Client should make use of guides and adapt if needed
   Client should go through process of structuring needs (use of flowcharts
   and Q&A)
Import issues : client should go through process of identifying
relevant data and adapting it
Use of support hours = answer configuration issues
Validation
               53



     OpenERP         CLIENT




Objective: Check & suggest
Validation - Insights
                                       54

 Initial               Configuration
           Trainings                        Validation   Adaptation
Analysis                 / Import

                                                                      Upselling


Be active in planning regular checks of client’s configuration to
continue smooth planification
Avoid latter complications by identifying configuration errors
early
Insist client make use of test database phase for trying out
different configurations
Recommend using webex live sessions to make suggestions
and feedback more efficient
Adaptation
              55




                   OpenERP




Objective:
Apply light
variations
Adaptation - Insights
                                       56

 Initial               Configuration
           Trainings                        Validation   Adaptation
Analysis                 / Import

                                                                      Upselling

Do not rush into this step: client needs to have a good
understanding of OpenERP standard features
Make sure client knows what he wants: make him express
clearly his needs and avoid carrying out the modifications
too soon
Form of modifcations: add fields directly in production
database
Upselling
                        57



   C   CUSTOMER NEEDS

                                CLIENT
                                                Trainings
                 S
                 P
                 E
 OpenERP         C            PARTNER
STANDARD         I
                 F
                 I           Objective:
                 C
                             Discover
                             opportunities
Upselling
                           58



      C   CUSTOMER NEEDS



                    S
                    P                PARTNER
                    E
  OpenERP           C
 STANDARD           I
                    F
                    I
Implementation
  Assistance        C
                                Objective:
                                Act on opportunities
Summary
                                                   59
                                                                      O   P   C


               • Understand Scope, Explain Roles, Resources & Tools
  Initial
 Analysis                                                             X       X

               • Transfer skills                                          X   X
 Trainings




Configuratio
               • Practical use by client, assistance by OpenERP       X       X
 n Import




               • Control, validation and suggestions                  X       X
Verification




               • Apply light variations                               X       X
Adaptation




               • Out of Scope                                             X   X
 Upselling
I am a system integrator …
We are a team of 10 people
3 functional experts, 4 developers; 1 project director and
2 experienced sales

I have a large ERP integration experience but not
much OpenERP…

My clients are always different and need deep
customization & running critical applications

How should I market OpenERP ?
Partners Summit 2012         60
Partner First Project Support
                 PRESENTER

               S A N D R O B O T TA

             ACCOUNT MANAGER

              SAMUEL MARTINS

       PROJECT AND SERVICES DIRECTOR
It starts with …




YOU HAVE A PROJECT
      Oppty !
but huh …




What now ?
Tell us about it !




            • we integrate your project in our CRM

            • we secure the lead

            • we make it manageable from your partner portal
Your forecast is our forecast !

Partners’ forecast and OpenERP’s forecast should be
aligned

We stay in sync with your forecast through the partner
review meetings

Assess your resources and specify the OpenERP
involvement and revenue split
Let’s talk about money
Standard split of revenues
                                67


                          Partner    OpenERP
100%
 90%
 80%
 70%
 60%
 50%
 40%
 30%
 20%
 10%
  0%




The revenue and related services are split 85%-15% between Partner and
  OpenERP. Traditional ERP publishers take 35% of the project revenue!
Need more info to convince ?


The partner portal
The partner portal
                           69

Get samples of brochures, presentation slides, comparison
       with competitors, contracts, RFP templates,
 implementation methodology,… in your partner portal.
Back to the project …
 how much it cost ?
Checklist




Do you know what it takes to qualify
and estimate a project completely ?
Build a long term vision

Avoid the one shot

Trigger a reflection on their 2y-3y business initiatives

Sell a roadmap
Next steps


OpenERP suggested approach


     • Software Assessment      done
1

     • Professional Analysis
2                                      No free pre sales
     • Implementation
3




     Free              Billed      Billed but deducted from the
                                   implementation quote
Why selling a pre analysis ?

• If you succeed, you exclude competitors


• It limits the risk of irrelevant project cost estimation


• It builds up intimacy and trust with the customer, leading to
  higher implementation quotes

• We are cheaper than the competitors as there is no license costs
  but we don’t offer free services
When to sell the analysis?


Only once the customer is excited and convinced by the
product

Even if he is still assessing competitors solutions
Offer structure


Pre analysis      4 - 8 days
Engage us in your sales visits !




• introduce us to your prospect

• Contact builds trust

• We can help selling the pre-analysis and the
Enterprise contract
Offer structure
A pain ?




Do I have the
ressources ?
Subcontract to avoid bottlenecks


Don’t be slowed down by a lack of resources. We can help you
deliver successfully.

  Problem                                Solution
  No project manager                     OpenERP consulting
  Need a functional expert               OpenERP consulting
  Not enough developers                  OpenERP Offshore developers
  No time to train employees/customers   Official training/webinar
  Wasting time on technical issues       OpenERP Enterprise
  Need to migrate custom instance        Custom module migration
Happy selling !
Supporting partners, but HOW?

GAP-analysis         POC         GAP-analysis   Estimation     Planning




  Detailed        Functional      Technical




                                                                              OpenERP Enterprise
  analysis         analysis        analysis




                 Developments    Integration
Developments      & Unit tests      tests



                                    User
Client testing   User training   Acceptance
                                   testing



                     Live
                                    Data                       Warranty
Deployment       environment
                                  migration
                                                 Go live
                                                             period support
                   release



   Post
Deployment        L1 support      L2 support
 support
Project Support – phase by phase

 GAP-analysis   POC   GAP-analysis   Estimation   Planning




The purpose of the Gap Analysis is to
  Evaluate the project scope
  Determine the customization level which will be required
  Assess the investments required
  Plan the project
  Organise the project governance
Project Support – phase by phase

  GAP-analysis   POC   GAP-analysis   Estimation   Planning
                                                              HOW?
Step 1: Company Mind Maps – Interviews:
Project Support – phase by phase

   GAP-analysis   POC   GAP-analysis   Estimation   Planning
                                                               HOW?
Step 2: Key Users Mind Maps – Interviews:
Project Support – phase by phase

   GAP-analysis   POC   GAP-analysis   Estimation   Planning
                                                               HOW?
Step 3: Define the GAPS and Estimates:

                                                                 List the GAP’s


                                                                 Weight the GAP’s :

                                                                 • Complexity
                                                                 • Analysis
                                                                 • Development
Project Support – phase by phase

   GAP-analysis   POC   GAP-analysis   Estimation   Planning
                                                               HOW?
Step 3: Define the GAPS and Estimates:

                                                                Estimation based on:

                                                                • Project Management
                                                                • Analysis
                                                                • Development
                                                                • Testing
                                                                • Migration
                                                                • Deployment
                                                                • Support
Project Support – phase by phase

   GAP-analysis   POC    GAP-analysis   Estimation   Planning
                                                                HOW?
Step 4: Plan the Project




Plan the project trying to phase development in small sprints:

• short analysis/development time => Quick in customer’s hand


                  => Be AGILE
Project Support – phase by phase

 GAP-analysis   POC   GAP-analysis   Estimation   Planning




The deliverables of the Gap Analysis are :
  Gap Analysis reporting (Needs, Scope, Risks, GAP’s)
  Gap Analysis Matrix
  Project Road map
  Financial estimate
  Agreement on validation process and project
Project Support – phase by phase

GAP-analysis      POC         GAP-analysis   Estimation   Planning




OpenERP will assist the partner in :

   Training the partner on the various tools and methodologies
       Mind Maps
       Estimation sheet,...
   Reviewing the Partner’s Gap Analysis
   Performing the work load estimate together with the Partner
   Providing a matrix to estimate the overhaul cost
Project Support – phase by phase

GAP-analysis    POC      GAP-analysis   Estimation   Planning




Partner will be in charge of:

   Conducting the customer interviews
   Filling the Gap Analysis Matrix
   Performing the work load estimate together with OpenERP
   Preparing the detailed project planning
   Setting up the project organisation (governance, project management
   tools, reporting, ...)
   Defining with customer the validation process at the various level
Project Support – phase by phase

GAP-analysis   POC     GAP-analysis   Estimation   Planning




Knowledge to be transferred during that stage:

   Tools to conduct end user interviews (Mind Maps)
   Tools to report the Gap Analysis (Gap analysis matrix)
   Gap analysis documentation : Needs, Scope, Risks (planning,
   pending decisions), GAP’s
   Functional expertise on OpenERP
   Expertise about assessing the development time required
Project Support – phase by phase

 Detailed   Functional   Technical                  Development      Integration
             analysis     analysis
                                     Developments   s & Unit tests      tests
 analysis




The Analysis purpose is to
  Design the solution
  Validate the solution
  Finalise the development estimation
  from both a functional and technical point of view

The Development purpose is to
  Implement the solution,
  Test the solution
  Validate the solution with Key Users
Project Support – phase by phase

Detailed   Functional   Technical                        Development      Integration
            analysis     analysis
                                          Developments   s & Unit tests      tests
analysis




BE AGILE
                                    Short Project Cycles:

                                    • Increase Project visibility with client
                                    (demo’s, user tests,...)

                                    • Keep control of requirements (quick
                                    technical and functional validation)

                                    • Increase quality (early testing allows
                                    you to identify issues early and solve
                                    them)
Project Support – phase by phase

Detailed    Functional   Technical                  Development      Integration
             analysis     analysis
                                     Developments   s & Unit tests      tests
analysis




How to analyse:
       Use the Detailed analysis template to define:
          Process description and workflows
Project Support – phase by phase

Detailed    Functional   Technical                  Development      Integration
             analysis     analysis
                                     Developments   s & Unit tests      tests
analysis



           Views and wizards using mockups
Project Support – phase by phase

  Detailed       Functional    Technical                       Development          Integration
                  analysis      analysis
                                                Developments   s & Unit tests          tests
  analysis



                Access rights
             Objects          User type 1    User type 2        User Type 3
                                    Rights       Rights                  Rights
   Name                             CRUD           C                            R

   Address,…                           No          D                            U


“Rights” = access rights.
    “C” = create : user can create a new value for the object,
    ”R” = read : user can read/access the object,
    “U” = update : user can modify an existing object,
    “D” = delete : user can delete an existing object,
    “No”: user has no access to the object.
Project Support – phase by phase

Detailed   Functional    Technical                   Development      Integration
            analysis      analysis
                                      Developments   s & Unit tests      tests
analysis




  Change requests




                        Change Request Flow
Project Support – phase by phase

  Detailed        Functional   Technical                   Development      Integration
                   analysis     analysis
                                            Developments   s & Unit tests      tests
  analysis




The deliverables of the Analysis are :
 Detailed description of
             Processes and Activities
             Views, Workflows and Wizards
             Access rights
             Reports and Data Model
 Detailed interface description
 Infrastructure setup
 High level Test Plan
 Review workload estimates and planning
Project Support – phase by phase

 Detailed   Functional   Technical                  Development      Integration
             analysis     analysis
                                     Developments   s & Unit tests      tests
 analysis




The deliverables of the Developments are :
 Software configuration
 Custom modules
 Interfaces
 Data Import tools
 Test plan
Project Support – phase by phase

 Detailed      Functional      Technical                    Developments    Integration
                analysis        analysis     Developments    & Unit tests      tests
 analysis




OpenERP will assist the partner in :
  Training the partner on the various tools and methodologies
      Analysis templates
      Analysis best practice
  Validate the analysis :
      The feasibility
      The functional and technical choices
      The final estimates
Project Support – phase by phase

 Detailed   Functional     Technical                  Developments    Integration
             analysis       analysis   Developments    & Unit tests      tests
 analysis




OpenERP will assist the partner in :
  Setting Runbot Buildbot
  Code review for custom modules
  Bug correction (reporting, following,...)
  Data mapping for data import
Project Support – phase by phase

 Detailed      Functional     Technical                       Developments    Integration
                analysis       analysis        Developments    & Unit tests      tests
 analysis




Partner will be in charge of:
  Prepare the analysis:
      Agree Process definition and workflows
      Design the new views and wizards
      Define access rights
      Define interfaces
  Perform developments (process, interfaces, migrations scripts)
  Unit test the code
  Perform integration testing including interfaces and migration
Project Support – phase by phase

 Detailed   Functional     Technical                  Developments    Integration
             analysis       analysis   Developments    & Unit tests      tests
 analysis




Knowledge to be transferred during that stage:

  Methodology and templates to perform a detailed analysis
  Tools to design screen mock-ups
  Functional expertise on OpenERP
  Knowledge about how to customize reports, view, access rights
  Technical knowledge to interface OpenERP with other software
  Expertise about assessing the development time required to meet
  customer’s requirements to finalise the cost estimate
Project Support – phase by phase

 Detailed   Functional     Technical                  Developments    Integration
             analysis       analysis   Developments    & Unit tests      tests
 analysis




Knowledge to be transferred during that stage:

  Development best practices
  How to set up a Runbot/ Buildbot
  Methodologies for bug reporting in OpenERP
  How to import data into OpenERP
  How to test OpenERP
Project Support – phase by phase

                                    User
Client testing   User training   Acceptance
                                   testing




The Client Testing purpose is to

    Train the client End Users
    Handover the application to the client
    Allow the client to perform end to end testing including:
                 Application
                 Interfaces
                 Access rights
                 Outputs
                 Reports
    Put in place the support tools (Bugs shared view,
    governance,...)
Project Support – phase by phase

                                    User
Client testing   User training   Acceptance
                                   testing




Bugs shared view
Project Support – phase by phase

                                     User
 Client testing   User training   Acceptance
                                    testing




The deliverables of the Client Testing (UAT) are :

  Training material
  User guides
  Full test report
  Approval for production deployment
Project Support – phase by phase

                                      User
Client testing   User training     Acceptance
                                     testing




OpenERP will assist the partner in :
 Creating the support processes through OpenERP
 Training the partner on how to report a bug to OpenERP
Project Support – phase by phase

                                      User
Client testing   User training     Acceptance
                                     testing




Partner will be in charge of :
 Write the training material
 Prepare the user guides
 Support the testing team
 Set the support process up through OpenERP
 Report the bugs to OpenERP
Project Support – phase by phase

                                       User
 Client testing   User training     Acceptance
                                      testing




Knowledge to be transferred during that stage:
  How to provide an efficient OpenERP training and building
  training materials
  How to use OpenERP to deliver high quality support to the
  customer
Project Support – phase by phase

                 Live                            Warranty       Post
                             Data
Deployment   environment
                           migration
                                       Go live    period    Deployment   L1 support   L2 support
               release                           support      support



   The (post) Deployment purpose is

       Deliver the solution into the production server
       Migrate the data if any
       Launch the production activities
       Support users (Question / bug fixing,...)
Project Support – phase by phase

                 Live                            Warranty       Post
                             Data
Deployment   environment
                           migration
                                       Go live    period    Deployment   L1 support   L2 support
               release                           support      support



   OpenERP will assist the partner in:

       Solving Core OpenERP bugs covered by OE
       Support complex bugs solving




Note that OE is applicable since project day 1 for all
                 Core OpenERP Bugs
Project Support – phase by phase

                 Live                            Warranty       Post
                             Data
Deployment   environment
                           migration
                                       Go live    period    Deployment   L1 support   L2 support
               release                           support      support



   Partner will be in charge of:

       Deploying the production environment
       Smoke test the environment
       Migrate the data
       Cover the warranty period
       Provide L1/L2 support as agreed in SLA
       Maintain the OpenERP bug shared view
Purpose and Objectives

OpenERP = Software editor
Working with partners = our core Business
   Go to Market strength
   Scalability
   Localization
Partner = OpenERP’s Image at Client side
Partner = Selling OpenERP’s brand
Partner & OpenERP’s responsibility to succeed projects
            => IT IS a SHARED challenge
The Challenge

OpenERP = Software editor
Working with partners = our core Business
   Go to Market strength
   Scalability
   Localization
Partner = OpenERP’s Image at Client side
Partner = Selling OpenERP’s brand
Partner & OpenERP’s responsibility to succeed projects
            => IT IS a SHARED challenge
OpenERP Enterprise
                                117



                       THE ULTIMATE CLIENT
                              VALUE




Partners Summit 2012
What is OpenERP Enterprise?
                                         118


   The solution/protection to all unexpected issues.


        Bug fixes                                 Unlimited
        Upgrades/Migrations                       Unlimited
        Functional & technical support           Limited hours
        Security alerts & patches                  Proactive
        Private modules                            Allowed
        White labeling                             Allowed




Partners Summit 2012
OpenERP Enterprise – No Pain
                                    119


“Avoid & Get rid of the pain ... Focus on value added
  services instead”

   The pain starts early in the implementation process
       Don’t waste time/money due to unexpected bugs during the
       implementation phase.
       Selling OpenERP Enterprise @ GO LIVE is old fashioned and useless.
       Include OpenERP Enterprise pricing in your original quotation.
       Discuss your original quotation with your account manager. He will
       check if the pricing is relevant and support you selling it.

Partners Summit 2012
OpenERP Enterprise – A Commodity
                                        120


   You are not alone
       OpenERP Enterprise is an insurance contract for you & your
       customer.
       OpenERP Enterprise is a way to secure your customers in the long
       term.
           Benefit from selling new features through upgrades
           Don’t let them running old OpenERP versions on which you will not want
           to offer services anymore
       OpenERP Enterprise guarantees to have the publisher on your side.




Partners Summit 2012
Joint Sales Pitch – OpenERP Enterprise
                                      121

    Some statistics on OpenERP Enterprise conversion rate
       90% success rate when your account manager is selling OpenERP
       Enterprise for/with the partner
       30% success rate when the partner is selling on his own
   Why?
       A new partner is not always aware of all contract terms
       A partner is more focused selling the entire projects
       In some cases, an end-user prefer to get a direct contact with the
       publisher in order to understand the value proposition




Partners Summit 2012
OpenERP Enterprise – Pricing
                                     122

   We have public prices for small projects. You should
   contact your Account manager for bigger ones.
       We consider 15% of the TCO a minimum amount.
       We don’t do less than 10% (not profitable for us)
   How to count the number of users:
       We take into account the number of users at the term of the
       contract (in 1 year), not at the beginning of the contract.
       We might adapt pricing to light users.
   Don’t forget your partner level discount (10-15-20%).
   Higher discounts are available with multi-years contracts

Partners Summit 2012
OpenERP Enterprise – Case 1
                                     123


   Company ABC selected OpenERP & a partner in order to
   replace its existing CRM...
       TCO = 60K€
       Max 35 users & 15 users after 1 year
       No IT expertise
       IT staff = 0
   OpenERP Enterprise Proposal – standard pricing

            1 Year Commitment       Year 1    Year 2

            OpenERP Enterprise     3,950 €    9,950 €


Partners Summit 2012
OpenERP Enterprise – Case 2
                                         124

   Company ABC selected OpenERP & a partner in order to
   replace its existing home made ERP...
       TCO = 500K€
       150 full users, 650 light users
       Try to manage partner expectation by announcing 25 users during
       implementation phase
       Need payroll, time management, provisioning, budget, accounting
       ERP internal Team = 4 people
   OpenERP Enterprise Proposal – less than 15% of TCO
       3 Years Commitment      Year 1           Year 2     Year 3
        OpenERP Enterprise    35,000 €         35,000 €   35,000 €

Partners Summit 2012
OpenERP Enterprise – Case 3
                                          125

   Company ABC selected OpenERP & a partner in order to
   replace its existing proprietary ERP...
       TCO = 1M€
       550 Full Users & requiring to migrate every year
       Massive change processes work
       Need MRP, Supply Chain, POS, Accounting, Billing, Inventory, etc…
       Internal ERP Team = 7 people
   OpenERP Enterprise Proposal – 15% less than TCO
       2 Years Commitment      Year 1            Year 2     Year 3 (Optional)
        OpenERP Enterprise    55,000 €          40,000 €        35,000 €
        Selected competitor   125,000 €         125,000 €      125,000 €

Partners Summit 2012
Partner KEY actions
                               126



                 WHAT A PARTNER DOES
                  NOT WANT TO MISS
               TOGETHER WITH OPENERP !



Partners Summit 2012
Top 10 mistakes of partners TODAY
                                         127

1.    Selling OpenERP Enterprise separately from the main project quote
2.    Selling OpenERP Enterprise after GO LIVE
3.    OpenERP ? A nice to have – Should be a MUST have
4.    Too much focus acquiring new clients rather than converting customer base
5.    Developing FIRST, Selling AFTER
6.    Low pricing value: a better product should have a higher price
7.    Wasting too much time on non-valuable prospects due to weak
      qualification (no budget)
8.    Chilly to migrate – keeping client base on old versions
9.    No demonstration skills
10.   No funnel transparency

Partners Summit 2012
PARTNER ACTION #1
   Understand, Monitor & Manage
   Deployment
   methodologies
          Follow regular webinars www.eventbrite.com




Partners Summit 2012                128
PARTNER ACTION #2
   Understand, Monitor & Manage
   Sales Technics
          Follow regular webinars www.eventbrite.com
          How to sell OpenERP webinars




Partners Summit 2012                129
PARTNER ACTION #3
   Accept & Improve
   Funnel Transparency
          Partner portal improvement
             Partner will be able to update leads & opportunities status
             Support Ticket tracking system
          Share your leads with OPENERP




Partners Summit 2012                     130
PARTNER ACTION #5
   Share, Publish and Contribute to
   Referrals



Partners Summit 2012   131
PARTNER ACTION #6
   Monitor & Improve
   Staff Competences
          Follow OpenERP functional trainings
          Follow OpenERP technical trainings
          Follow OpenERP Sales trainings
          Follow regular OpenERP webinars
          Become OpenERP certified



Partners Summit 2012                 132
PARTNER ACTION #7
   Learn & Practice
   Demonstration skills
          A good DEMO gets your prospects excited
          A good DEMO insures you to be shortlisted
          A good DEMO sets the expectation right
          A good DEMO is worth a thousand words
          Competitors have better presentations, but no DEMO



Partners Summit 2012                133
PARTNER ACTION # 8
   Design, Structure & Integrate
   A good quotation
          Integrate OpenERP Enterprise in any quote
          Integrate partner managed services




Partners Summit 2012                 134
PARTNER ACTION # 9
   Forecast, Maintain & Grow
   OpenERP revenue
          To get 40K Revenue Target; forecast 120K in pipeline
          Sell multi year services contracts
          Ensure OpenERP Contracts renewals
          OpenERP Business Plan – A true commitment
          OpenERP Services – We are on your side
             Consulting
             Trainings
             Off-Shore
             Support


Partners Summit 2012                     135
Subcontract to avoid bottlenecks
                                          136


   Don’t be slowed down by a lack of resources. We can help you
   deliver successfully.

       Problem                                  Solution
       No project manager                       OpenERP consulting
       Need a functional expert                 OpenERP consulting
       Not enough developers                    OpenERP Offshore developers
       No time to train employees/customers     Official training/webinar
       Wasting time on technical issues         OpenERP Enterprise
       Need to migrate custom instance          Custom module migration
       No salesperson                           We cannot help you ☺


Partners Summit 2012
PARTNER ACTION # 10
   Do not fail your
   First OpenERP Projects
          Join your efforts with OpenERP during your first project
          Success Rate is over 60%
          You will learn from it for the next ones
          Ensure a win-win situation between OpenERP & YOU




Partners Summit 2012                   137
PARTNER ACTION # 11
   Promote
   OpenERP
          Publish success stories
          Use social media like twitter, Facebook, LinkedIn
          Organize Joint Event with OpenERP
          Publish white papers




Partners Summit 2012                   138
PARTNER ACTION # 12
   Choose, Brand & Develop
   The Right OpenERP
   Strategy
          Out-of-the-Box
          System integration (project implementation)




Partners Summit 2012                 139
PARTNER ACTION # 13
   Ensure & Maintain
   High Quality Standards
          Whenever if you are a Certified Training Partner (CTP)
          Whenever if you are a New partner
          Whenever if you are a Current partner
          Whatever grade you have




Partners Summit 2012                  140
PARTNER ACTION # 14
   OpenERP commits on developing a
   great product
   Partners commit on a
   creating Values &
   Revenue to ensure a sain
   & great future
Partners Summit 2012   141
PARTNER ACTION # 15

   Focus on Client           Base
   Rather than wasting to much time on

   Getting New clients


Partners Summit 2012   142
Sell to your client base (1)
                             143

   It costs 5-7 times more to acquire a new customer than it
   does to sell to an existing customer!
   Selling to existing customers is less risky than starting
   new projects from scratch, for fixed price projects.
   You are in strong position to negotiate a good price when
   you sell to an existing customer.
   It's very difficult to grow by always looking for new
   customers. Your install base is an asset.



Partners Summit 2012
Sell to your client base (2)
                                144



A new version should not be a constraint or cost to migrate, it's
an opportunity to propose new services to your customer base.

The more you get revenue from your customer base, the more
you will be able to grow and scale.

Be sure you know how to benefit from a new version and how
to package OpenERP Enterprise in your offers. OpenERP SA
releases new versions every 6 months. This allows partners to
deliver more value to their customer base.

Partners Summit 2012
From the early beginning
till today and surely
tomorrow we all enjoyed
working with YOU fellow
partners !
The Channel Team
Partners Summit 2012   145
THANK YOU
                       146




Partners Summit 2012

OpenERP - Vision & Update on Channel Strategy

  • 1.
    Building a GlobalChannel 1 VISION & UPDATE ON CHANNEL STRATEGY X AV I E R PA N S A E R S OPENERP CHIEF SALES OFFICER Partners Summit 2012
  • 2.
    OpenERP is changingtrends that are turning the traditional partner model on END Partners Summit 2012 2
  • 3.
    In any industry, the only reason why two partners decide to enter into a relationship is because both find value added in it … Partners Summit 2012 3
  • 4.
    Partner Network Coverage 4 Partners Summit 2012
  • 5.
    Partner Management 2009-2010 5 2009 2010 Launch of new partner 90 partners program No partner program 150 Partners Launch of OpenERP No partner management Publisher Warranty Partners Summit 2012
  • 6.
    Partner Management TODAY 6 2011 2012 330 Partners EMEA/Asia Q1 : 70 new partners 70 Partners Americas Activation Ratio 39% Light Presence in 70 countries Good partner identification Activation Ratio 20% Launch of Partner Portal Many first year partners Reinforce local presence Reach 600 partners Major Processes change Resellers strategy v.s true OPENERP Enterprise integrators Partners Summit 2012
  • 7.
    Partner Management TOMORROW 7 2014 2000 partners worldwide Strengthen local presence Activation Ratio 80% Many Resellers (Out of the box model) – Get the Mass ! System Integrator model Partners Summit 2012
  • 8.
    Global Partner NetworkGrowth 8 Partner Network Growth 2000 1600 1200 800 400 0 2009 2010 2011 2012 2014 Partners Summit 2012
  • 9.
    Global Partner GradeSplit 9 Partner Grade Split Chart 21 54 Ready Silver Gold 356 Partners Summit 2012
  • 10.
    Partner Network SplitVision 10 Partner Network Split - Vision Silver READY RESELLERS MASS Approach GOLD Partners Summit 2012
  • 11.
    How to reach2000 partners ? How to avoid the churn ? How to make partners happy? CREATE PARTNER LOYALTY ! Partners Summit 2012 11
  • 12.
    “After 4 yearsworking with Partners we noticed some performed much better than others …” HOW COME ? Partners Summit 2012 12
  • 13.
    Define clear ROLES 13 ROLES SERVICES OPENERP Publisher Marketing Account Manager Develop new versions Upgrade to new versions Maintain Stable versions Unlimited bug fix on stable versions Sales Assist to OpenERP Enterprise selling OPENERP Partners Sales Partner Customer Implementation Custom Development After-sale service Custom Support Strategy Out of the box OR System Integration Marketing Referrals & Branding Partners Summit 2012
  • 14.
    Partner Management :2 Separate Roles 14 Ready Partner Silver/Gold MGMT Partner MGMT • Activation – OE Selling • Projects • Leverage Competence • Presales & Consulting • 12Many attitude - • Partner review Webinars methodology* • 121 Sales Attitude Partners Summit 2012
  • 15.
    Strengthen a strongecosystem 15 OpenERP Value proposition Partner – Reseller - Distributor Propose Managed Sell OpenERP Enterprise Services End-User Finance the Ecosystem Partners Summit 2012
  • 16.
    The Right Balance(1) 16 OpenERP Partner Partners Summit 2012
  • 17.
    The Right Balance(2) 17 OpenERP Partner Partners Summit 2012
  • 18.
    The Right Balance(3) 18 OpenERP Partner OpenERP Value creation Enterprise Constant Train communication Constant Sell training New versions Share Partners Summit 2012
  • 19.
    Partner Management Tools 19 Partner Portal Update online leads & opportunities Track Support tickets Partner Review Methodology https://docs.google.com/a/openerp.com/spreadsheet/ccc?key=0A mNnLfdyDRQfdHl0bEFFSEJTRTc4YzNhM0s4MHpFY1E#gid=0 Partners Summit 2012
  • 20.
    Go-to-Market Strategies 20 OUT-OF-THE-BOX V E RS US PROJECT IMPLEMENTATION WHICH ONE TO CHOOSE ? Partners Summit 2012
  • 21.
    Active channel management benefits both the vendor and the channel partner by helping to grow revenue and protect margins while maintaining the Go-To-Market Strategy Partners Summit 2012 21
  • 22.
    Go to MarketStrategies – Which one I choose? 22 Choose and stick to a strategy; Do not mix both approaches Project Implementation Out-of-the-Box Target Clients > 25 users 1 to 25 users Partner Profile IT companies / System Resellers / Functional Integrators Experts Success factors Project Management Sales & Marketing Offer Custom Implementation Packaged Offer Deployment Local Online or Local Growth Strategy Custom development YES NO or Very Limited Annual Growth Get bigger clients Get numerous clients Partners Summit 2012
  • 23.
    I just startedwith OpenERP as Ready Partner … We are a team of 3 people 2 functional experts and 1 qualified sales executive My customer base is mainly small clients with identical configuration... How should I market OpenERP ? Partners Summit 2012 23
  • 24.
    OpenERP Implementation Assistance The OpenERP out-of-the-box project approach MAXIME GLORIEUX, HEAD OF SAAS & IA
  • 25.
    What is anOpenERP Implementation Assistance out-of-the-box approach It is an out-of-the-box/standard OpenERP system deployment that involves the customer in the configuration of the database.
  • 26.
    OpenERP Implementation Assistance Out-of-the-box approach - What is in it ? Project duration ? 3 month objective Onsite/online ? Customer’s choice Maintenance & migration ? Included in the proposal
  • 27.
    OpenERP Implementation Assistance Out-of-the-box : Who is it for ? / When is it recommended ? Limited budget (less than €15k) Customer is willing to actively get involved in the deployment (learning competencies, customer wants to feel more in control of his system) Urgent need to deploy a system (less than 3 months)
  • 28.
    OpenERP Implementation Assistance Out-of-the-box : Who is it for ? / When is it recommended ? Customer is not seeking to integrate 100% of his processes. (Can afford not to have everything automated.) Any companies that can afford not to have all their (specific) needs covered from day 1 > companies willing to have a phased implementation > 1st phase will cover all the standard needs > 2nd phase later when they will be ready/able to invest money for specific adaptations/developments
  • 29.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Implementation Assistance sales cycle Qualif Demo Prop Nego Closing 1) Qualification of the customer situation, problems, expectations 2) Demonstration of the system going through main customer needs 3) Customer tailored implementation proposition with budgetary offer 4) Negotiation 5) Closing
  • 30.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing Company details: activity, contact details, locations, contact person, decision makers, website, size, turnover, number of employees, number of users… Current way of working: how do they currently manage their activity? current system in place Customer needs: what are they looking /for/to change/improve ? Onsite/online? Standard: list of all standard needs Specific: list of everything more specific that might have to be done in a second phase
  • 31.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing Data import: data import needs (#partners-customers, suppliers, prospects..-, #products, structure,…) Budget: envelop defined? If not, are they aware of the cost of an implementation, reaction on budget range Timeframe: decision deadline/operational solution deadline + reasons
  • 32.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing Implementation DIY Assistance Traditional Project √ Get involved and learn √ local presence with your √ ideal for complex needs - no support from OpenERP certified expert (requiring heavy specific or its expert consultant consultant network developments) network √ get involved in your - time consuming (long implementation (& learn √ partner is taking care of implementation time) how to deploy and everything manage your own ERP) √ low cost √ onsite services - you need to be available during the deployment - pay per day of service - specific needs not covered
  • 33.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing A demonstration should only be done after a full customer qualification and after the customer has validated his interest for an implementation assistance + is conscious of the costs. CHECKLIST (before agreeing to do a presentation): Do I know what the customer is doing (his industry sector/activity) ? Do I know what he is looking for (what are the areas of OpenERP he is interested in in regard to his company management needs) ?
  • 34.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing CHECKLIST (continued): Can I show him most of his needs without wasting too much time configuring a database specifically for him ? and last but not least: Is it worth spending time with this prospect ? Are they serious about implementing a new ERP (timeframe, budget,...)? Are they willing to pay for our services should the demo be successful ? > If you have a 'no' or do not know the answer to any of the above questions then you should not agree to make a demo and rather ask the customer the right questions before committing.
  • 35.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing High level presentation: You do not need to show every detail of a module or view for this first presentation Vison : Create a vision in the customer mind rather than purely showing functionalities Ultimately, you want your customer/prospect to feel like they are missing something by not using OpenERP for their company management.
  • 36.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing Identify potential issues : Ask the customer what is refraining him from choosing OpenERP. -nothing ? Ask the customer whether he wants an offer reminding him about the budget range -identify customer processes not covered in OpenERP preventing him from deploying the software
  • 37.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing A proposition should only be done when : - customer has arrested his choice on OpenERP, - validated implementation approach, - pre-agreed on the project cost, - decision timing is within next 8 weeks
  • 38.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing
  • 39.
    OpenERP Implementation Assistancesales cycle Out-of-the-box project - How to sell it ? Qualif Demo Prop Nego Closing The negotiation and closing are the easiest parts of this sales cycle. If the customer has indeed understood everything in the previous stages + is ready to take a decision, it is purely formalizing the agreement and sorting out logistical details to get the project started.
  • 40.
    OpenERP Implementation Assistance Out-of-the-box approach : How can you be part of it ? We, OpenERP, do the selling and assign the project to you exemples If it is your first project, you can decide to use this project as an opportunity to gain experience in an implementation assistance by being an intermediary between the customer and OpenERP. You have a customer interested, you do the selling, position a number days of onsite intervention. You come with your signed contract and we can help you should you need assistance until you feel completely confident doing it without us.
  • 41.
    OpenERP Implementation Assistance Out-of-the-box approach : Summary of key messages Huge market potential Faster, easier sales cycle – average of less than 6 weeks from first contact to closing Reduced risk > commitment to deliver support, not to deliver a project Customer commitment is critical to the success of this kind of implementation approach > If the customer does not get involved, nothing will be done
  • 42.
    Implementation Assistance Delivery 42 PRESENTER GRÉGOIRE KRIEG F U N C T I O N A L C O N S U LTA N T
  • 43.
  • 44.
    5 steps approach 44 Initial Configuration Trainings Validation Adaptation Analysis / Import Upselling
  • 45.
    Initial Analysis 45 1.Resources 2. Roles O P C ? ? ? OpenERP CLIENT 3. Tools Q&A
  • 46.
    Initial Analysis 46 Objectives: - Understand scope - Highlight priorities Explain OpenERP Understand Validate CLIENT
  • 47.
    Intial Analysis -Insights 47 Initial Configuration Trainings Validation Adaptation Analysis / Import Upselling Insist that the offer is limited in time Highlight client’s responsability of consolidating information and human resources for the project Make sure to start on SaaS to avoid server configuration problems
  • 48.
    Trainings 48 ½ day per functional domain PARTNER CLIENT in depth Objective: Skills Transfer
  • 49.
    Trainings - Insights 49 Initial Configuration Trainings Validation Adaptation Analysis / Import Upselling Attach importance to spacing of trainings Recommend client watch videos before Suggest client actively use test database before Ask of client to go through process of asking questions before Be able to focus on client’s business issues Take advantage of the form of the skills transfer: face to face, no language barrier
  • 50.
    Configuration and Import 50 My Business’ Processes Configuration CLIENT / Import Trainings
  • 51.
    Configuration and Import 51 CLIENT PROGRESSION DEADLINES Create Users Define Sales Team Import Problem Products Solved OpenERP
  • 52.
    Configuration / Import- Insights 52 Initial Configuration Trainings Validation Adaptation Analysis / Import Upselling Importance of smooth transition : Be active in set up of deadlines for configuration Follow up regularly on completion of deadlines Importance of client’s project management: Client’s human resources should be active and free Client should make use of guides and adapt if needed Client should go through process of structuring needs (use of flowcharts and Q&A) Import issues : client should go through process of identifying relevant data and adapting it Use of support hours = answer configuration issues
  • 53.
    Validation 53 OpenERP CLIENT Objective: Check & suggest
  • 54.
    Validation - Insights 54 Initial Configuration Trainings Validation Adaptation Analysis / Import Upselling Be active in planning regular checks of client’s configuration to continue smooth planification Avoid latter complications by identifying configuration errors early Insist client make use of test database phase for trying out different configurations Recommend using webex live sessions to make suggestions and feedback more efficient
  • 55.
    Adaptation 55 OpenERP Objective: Apply light variations
  • 56.
    Adaptation - Insights 56 Initial Configuration Trainings Validation Adaptation Analysis / Import Upselling Do not rush into this step: client needs to have a good understanding of OpenERP standard features Make sure client knows what he wants: make him express clearly his needs and avoid carrying out the modifications too soon Form of modifcations: add fields directly in production database
  • 57.
    Upselling 57 C CUSTOMER NEEDS CLIENT Trainings S P E OpenERP C PARTNER STANDARD I F I Objective: C Discover opportunities
  • 58.
    Upselling 58 C CUSTOMER NEEDS S P PARTNER E OpenERP C STANDARD I F I Implementation Assistance C Objective: Act on opportunities
  • 59.
    Summary 59 O P C • Understand Scope, Explain Roles, Resources & Tools Initial Analysis X X • Transfer skills X X Trainings Configuratio • Practical use by client, assistance by OpenERP X X n Import • Control, validation and suggestions X X Verification • Apply light variations X X Adaptation • Out of Scope X X Upselling
  • 60.
    I am asystem integrator … We are a team of 10 people 3 functional experts, 4 developers; 1 project director and 2 experienced sales I have a large ERP integration experience but not much OpenERP… My clients are always different and need deep customization & running critical applications How should I market OpenERP ? Partners Summit 2012 60
  • 61.
    Partner First ProjectSupport PRESENTER S A N D R O B O T TA ACCOUNT MANAGER SAMUEL MARTINS PROJECT AND SERVICES DIRECTOR
  • 62.
    It starts with… YOU HAVE A PROJECT Oppty !
  • 63.
  • 64.
    Tell us aboutit ! • we integrate your project in our CRM • we secure the lead • we make it manageable from your partner portal
  • 65.
    Your forecast isour forecast ! Partners’ forecast and OpenERP’s forecast should be aligned We stay in sync with your forecast through the partner review meetings Assess your resources and specify the OpenERP involvement and revenue split
  • 66.
  • 67.
    Standard split ofrevenues 67 Partner OpenERP 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% The revenue and related services are split 85%-15% between Partner and OpenERP. Traditional ERP publishers take 35% of the project revenue!
  • 68.
    Need more infoto convince ? The partner portal
  • 69.
    The partner portal 69 Get samples of brochures, presentation slides, comparison with competitors, contracts, RFP templates, implementation methodology,… in your partner portal.
  • 70.
    Back to theproject … how much it cost ?
  • 71.
    Checklist Do you knowwhat it takes to qualify and estimate a project completely ?
  • 72.
    Build a longterm vision Avoid the one shot Trigger a reflection on their 2y-3y business initiatives Sell a roadmap
  • 73.
    Next steps OpenERP suggestedapproach • Software Assessment done 1 • Professional Analysis 2 No free pre sales • Implementation 3 Free Billed Billed but deducted from the implementation quote
  • 74.
    Why selling apre analysis ? • If you succeed, you exclude competitors • It limits the risk of irrelevant project cost estimation • It builds up intimacy and trust with the customer, leading to higher implementation quotes • We are cheaper than the competitors as there is no license costs but we don’t offer free services
  • 75.
    When to sellthe analysis? Only once the customer is excited and convinced by the product Even if he is still assessing competitors solutions
  • 76.
  • 77.
    Engage us inyour sales visits ! • introduce us to your prospect • Contact builds trust • We can help selling the pre-analysis and the Enterprise contract
  • 78.
  • 79.
    A pain ? DoI have the ressources ?
  • 80.
    Subcontract to avoidbottlenecks Don’t be slowed down by a lack of resources. We can help you deliver successfully. Problem Solution No project manager OpenERP consulting Need a functional expert OpenERP consulting Not enough developers OpenERP Offshore developers No time to train employees/customers Official training/webinar Wasting time on technical issues OpenERP Enterprise Need to migrate custom instance Custom module migration
  • 81.
  • 82.
    Supporting partners, butHOW? GAP-analysis POC GAP-analysis Estimation Planning Detailed Functional Technical OpenERP Enterprise analysis analysis analysis Developments Integration Developments & Unit tests tests User Client testing User training Acceptance testing Live Data Warranty Deployment environment migration Go live period support release Post Deployment L1 support L2 support support
  • 83.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning The purpose of the Gap Analysis is to Evaluate the project scope Determine the customization level which will be required Assess the investments required Plan the project Organise the project governance
  • 84.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning HOW? Step 1: Company Mind Maps – Interviews:
  • 85.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning HOW? Step 2: Key Users Mind Maps – Interviews:
  • 86.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning HOW? Step 3: Define the GAPS and Estimates: List the GAP’s Weight the GAP’s : • Complexity • Analysis • Development
  • 87.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning HOW? Step 3: Define the GAPS and Estimates: Estimation based on: • Project Management • Analysis • Development • Testing • Migration • Deployment • Support
  • 88.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning HOW? Step 4: Plan the Project Plan the project trying to phase development in small sprints: • short analysis/development time => Quick in customer’s hand => Be AGILE
  • 89.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning The deliverables of the Gap Analysis are : Gap Analysis reporting (Needs, Scope, Risks, GAP’s) Gap Analysis Matrix Project Road map Financial estimate Agreement on validation process and project
  • 90.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning OpenERP will assist the partner in : Training the partner on the various tools and methodologies Mind Maps Estimation sheet,... Reviewing the Partner’s Gap Analysis Performing the work load estimate together with the Partner Providing a matrix to estimate the overhaul cost
  • 91.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning Partner will be in charge of: Conducting the customer interviews Filling the Gap Analysis Matrix Performing the work load estimate together with OpenERP Preparing the detailed project planning Setting up the project organisation (governance, project management tools, reporting, ...) Defining with customer the validation process at the various level
  • 92.
    Project Support –phase by phase GAP-analysis POC GAP-analysis Estimation Planning Knowledge to be transferred during that stage: Tools to conduct end user interviews (Mind Maps) Tools to report the Gap Analysis (Gap analysis matrix) Gap analysis documentation : Needs, Scope, Risks (planning, pending decisions), GAP’s Functional expertise on OpenERP Expertise about assessing the development time required
  • 93.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis The Analysis purpose is to Design the solution Validate the solution Finalise the development estimation from both a functional and technical point of view The Development purpose is to Implement the solution, Test the solution Validate the solution with Key Users
  • 94.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis BE AGILE Short Project Cycles: • Increase Project visibility with client (demo’s, user tests,...) • Keep control of requirements (quick technical and functional validation) • Increase quality (early testing allows you to identify issues early and solve them)
  • 95.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis How to analyse: Use the Detailed analysis template to define: Process description and workflows
  • 96.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis Views and wizards using mockups
  • 97.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis Access rights Objects User type 1 User type 2 User Type 3 Rights Rights Rights Name CRUD C R Address,… No D U “Rights” = access rights. “C” = create : user can create a new value for the object, ”R” = read : user can read/access the object, “U” = update : user can modify an existing object, “D” = delete : user can delete an existing object, “No”: user has no access to the object.
  • 98.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis Change requests Change Request Flow
  • 99.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis The deliverables of the Analysis are : Detailed description of Processes and Activities Views, Workflows and Wizards Access rights Reports and Data Model Detailed interface description Infrastructure setup High level Test Plan Review workload estimates and planning
  • 100.
    Project Support –phase by phase Detailed Functional Technical Development Integration analysis analysis Developments s & Unit tests tests analysis The deliverables of the Developments are : Software configuration Custom modules Interfaces Data Import tools Test plan
  • 101.
    Project Support –phase by phase Detailed Functional Technical Developments Integration analysis analysis Developments & Unit tests tests analysis OpenERP will assist the partner in : Training the partner on the various tools and methodologies Analysis templates Analysis best practice Validate the analysis : The feasibility The functional and technical choices The final estimates
  • 102.
    Project Support –phase by phase Detailed Functional Technical Developments Integration analysis analysis Developments & Unit tests tests analysis OpenERP will assist the partner in : Setting Runbot Buildbot Code review for custom modules Bug correction (reporting, following,...) Data mapping for data import
  • 103.
    Project Support –phase by phase Detailed Functional Technical Developments Integration analysis analysis Developments & Unit tests tests analysis Partner will be in charge of: Prepare the analysis: Agree Process definition and workflows Design the new views and wizards Define access rights Define interfaces Perform developments (process, interfaces, migrations scripts) Unit test the code Perform integration testing including interfaces and migration
  • 104.
    Project Support –phase by phase Detailed Functional Technical Developments Integration analysis analysis Developments & Unit tests tests analysis Knowledge to be transferred during that stage: Methodology and templates to perform a detailed analysis Tools to design screen mock-ups Functional expertise on OpenERP Knowledge about how to customize reports, view, access rights Technical knowledge to interface OpenERP with other software Expertise about assessing the development time required to meet customer’s requirements to finalise the cost estimate
  • 105.
    Project Support –phase by phase Detailed Functional Technical Developments Integration analysis analysis Developments & Unit tests tests analysis Knowledge to be transferred during that stage: Development best practices How to set up a Runbot/ Buildbot Methodologies for bug reporting in OpenERP How to import data into OpenERP How to test OpenERP
  • 106.
    Project Support –phase by phase User Client testing User training Acceptance testing The Client Testing purpose is to Train the client End Users Handover the application to the client Allow the client to perform end to end testing including: Application Interfaces Access rights Outputs Reports Put in place the support tools (Bugs shared view, governance,...)
  • 107.
    Project Support –phase by phase User Client testing User training Acceptance testing Bugs shared view
  • 108.
    Project Support –phase by phase User Client testing User training Acceptance testing The deliverables of the Client Testing (UAT) are : Training material User guides Full test report Approval for production deployment
  • 109.
    Project Support –phase by phase User Client testing User training Acceptance testing OpenERP will assist the partner in : Creating the support processes through OpenERP Training the partner on how to report a bug to OpenERP
  • 110.
    Project Support –phase by phase User Client testing User training Acceptance testing Partner will be in charge of : Write the training material Prepare the user guides Support the testing team Set the support process up through OpenERP Report the bugs to OpenERP
  • 111.
    Project Support –phase by phase User Client testing User training Acceptance testing Knowledge to be transferred during that stage: How to provide an efficient OpenERP training and building training materials How to use OpenERP to deliver high quality support to the customer
  • 112.
    Project Support –phase by phase Live Warranty Post Data Deployment environment migration Go live period Deployment L1 support L2 support release support support The (post) Deployment purpose is Deliver the solution into the production server Migrate the data if any Launch the production activities Support users (Question / bug fixing,...)
  • 113.
    Project Support –phase by phase Live Warranty Post Data Deployment environment migration Go live period Deployment L1 support L2 support release support support OpenERP will assist the partner in: Solving Core OpenERP bugs covered by OE Support complex bugs solving Note that OE is applicable since project day 1 for all Core OpenERP Bugs
  • 114.
    Project Support –phase by phase Live Warranty Post Data Deployment environment migration Go live period Deployment L1 support L2 support release support support Partner will be in charge of: Deploying the production environment Smoke test the environment Migrate the data Cover the warranty period Provide L1/L2 support as agreed in SLA Maintain the OpenERP bug shared view
  • 115.
    Purpose and Objectives OpenERP= Software editor Working with partners = our core Business Go to Market strength Scalability Localization Partner = OpenERP’s Image at Client side Partner = Selling OpenERP’s brand Partner & OpenERP’s responsibility to succeed projects => IT IS a SHARED challenge
  • 116.
    The Challenge OpenERP =Software editor Working with partners = our core Business Go to Market strength Scalability Localization Partner = OpenERP’s Image at Client side Partner = Selling OpenERP’s brand Partner & OpenERP’s responsibility to succeed projects => IT IS a SHARED challenge
  • 117.
    OpenERP Enterprise 117 THE ULTIMATE CLIENT VALUE Partners Summit 2012
  • 118.
    What is OpenERPEnterprise? 118 The solution/protection to all unexpected issues. Bug fixes Unlimited Upgrades/Migrations Unlimited Functional & technical support Limited hours Security alerts & patches Proactive Private modules Allowed White labeling Allowed Partners Summit 2012
  • 119.
    OpenERP Enterprise –No Pain 119 “Avoid & Get rid of the pain ... Focus on value added services instead” The pain starts early in the implementation process Don’t waste time/money due to unexpected bugs during the implementation phase. Selling OpenERP Enterprise @ GO LIVE is old fashioned and useless. Include OpenERP Enterprise pricing in your original quotation. Discuss your original quotation with your account manager. He will check if the pricing is relevant and support you selling it. Partners Summit 2012
  • 120.
    OpenERP Enterprise –A Commodity 120 You are not alone OpenERP Enterprise is an insurance contract for you & your customer. OpenERP Enterprise is a way to secure your customers in the long term. Benefit from selling new features through upgrades Don’t let them running old OpenERP versions on which you will not want to offer services anymore OpenERP Enterprise guarantees to have the publisher on your side. Partners Summit 2012
  • 121.
    Joint Sales Pitch– OpenERP Enterprise 121 Some statistics on OpenERP Enterprise conversion rate 90% success rate when your account manager is selling OpenERP Enterprise for/with the partner 30% success rate when the partner is selling on his own Why? A new partner is not always aware of all contract terms A partner is more focused selling the entire projects In some cases, an end-user prefer to get a direct contact with the publisher in order to understand the value proposition Partners Summit 2012
  • 122.
    OpenERP Enterprise –Pricing 122 We have public prices for small projects. You should contact your Account manager for bigger ones. We consider 15% of the TCO a minimum amount. We don’t do less than 10% (not profitable for us) How to count the number of users: We take into account the number of users at the term of the contract (in 1 year), not at the beginning of the contract. We might adapt pricing to light users. Don’t forget your partner level discount (10-15-20%). Higher discounts are available with multi-years contracts Partners Summit 2012
  • 123.
    OpenERP Enterprise –Case 1 123 Company ABC selected OpenERP & a partner in order to replace its existing CRM... TCO = 60K€ Max 35 users & 15 users after 1 year No IT expertise IT staff = 0 OpenERP Enterprise Proposal – standard pricing 1 Year Commitment Year 1 Year 2 OpenERP Enterprise 3,950 € 9,950 € Partners Summit 2012
  • 124.
    OpenERP Enterprise –Case 2 124 Company ABC selected OpenERP & a partner in order to replace its existing home made ERP... TCO = 500K€ 150 full users, 650 light users Try to manage partner expectation by announcing 25 users during implementation phase Need payroll, time management, provisioning, budget, accounting ERP internal Team = 4 people OpenERP Enterprise Proposal – less than 15% of TCO 3 Years Commitment Year 1 Year 2 Year 3 OpenERP Enterprise 35,000 € 35,000 € 35,000 € Partners Summit 2012
  • 125.
    OpenERP Enterprise –Case 3 125 Company ABC selected OpenERP & a partner in order to replace its existing proprietary ERP... TCO = 1M€ 550 Full Users & requiring to migrate every year Massive change processes work Need MRP, Supply Chain, POS, Accounting, Billing, Inventory, etc… Internal ERP Team = 7 people OpenERP Enterprise Proposal – 15% less than TCO 2 Years Commitment Year 1 Year 2 Year 3 (Optional) OpenERP Enterprise 55,000 € 40,000 € 35,000 € Selected competitor 125,000 € 125,000 € 125,000 € Partners Summit 2012
  • 126.
    Partner KEY actions 126 WHAT A PARTNER DOES NOT WANT TO MISS TOGETHER WITH OPENERP ! Partners Summit 2012
  • 127.
    Top 10 mistakesof partners TODAY 127 1. Selling OpenERP Enterprise separately from the main project quote 2. Selling OpenERP Enterprise after GO LIVE 3. OpenERP ? A nice to have – Should be a MUST have 4. Too much focus acquiring new clients rather than converting customer base 5. Developing FIRST, Selling AFTER 6. Low pricing value: a better product should have a higher price 7. Wasting too much time on non-valuable prospects due to weak qualification (no budget) 8. Chilly to migrate – keeping client base on old versions 9. No demonstration skills 10. No funnel transparency Partners Summit 2012
  • 128.
    PARTNER ACTION #1 Understand, Monitor & Manage Deployment methodologies Follow regular webinars www.eventbrite.com Partners Summit 2012 128
  • 129.
    PARTNER ACTION #2 Understand, Monitor & Manage Sales Technics Follow regular webinars www.eventbrite.com How to sell OpenERP webinars Partners Summit 2012 129
  • 130.
    PARTNER ACTION #3 Accept & Improve Funnel Transparency Partner portal improvement Partner will be able to update leads & opportunities status Support Ticket tracking system Share your leads with OPENERP Partners Summit 2012 130
  • 131.
    PARTNER ACTION #5 Share, Publish and Contribute to Referrals Partners Summit 2012 131
  • 132.
    PARTNER ACTION #6 Monitor & Improve Staff Competences Follow OpenERP functional trainings Follow OpenERP technical trainings Follow OpenERP Sales trainings Follow regular OpenERP webinars Become OpenERP certified Partners Summit 2012 132
  • 133.
    PARTNER ACTION #7 Learn & Practice Demonstration skills A good DEMO gets your prospects excited A good DEMO insures you to be shortlisted A good DEMO sets the expectation right A good DEMO is worth a thousand words Competitors have better presentations, but no DEMO Partners Summit 2012 133
  • 134.
    PARTNER ACTION #8 Design, Structure & Integrate A good quotation Integrate OpenERP Enterprise in any quote Integrate partner managed services Partners Summit 2012 134
  • 135.
    PARTNER ACTION #9 Forecast, Maintain & Grow OpenERP revenue To get 40K Revenue Target; forecast 120K in pipeline Sell multi year services contracts Ensure OpenERP Contracts renewals OpenERP Business Plan – A true commitment OpenERP Services – We are on your side Consulting Trainings Off-Shore Support Partners Summit 2012 135
  • 136.
    Subcontract to avoidbottlenecks 136 Don’t be slowed down by a lack of resources. We can help you deliver successfully. Problem Solution No project manager OpenERP consulting Need a functional expert OpenERP consulting Not enough developers OpenERP Offshore developers No time to train employees/customers Official training/webinar Wasting time on technical issues OpenERP Enterprise Need to migrate custom instance Custom module migration No salesperson We cannot help you ☺ Partners Summit 2012
  • 137.
    PARTNER ACTION #10 Do not fail your First OpenERP Projects Join your efforts with OpenERP during your first project Success Rate is over 60% You will learn from it for the next ones Ensure a win-win situation between OpenERP & YOU Partners Summit 2012 137
  • 138.
    PARTNER ACTION #11 Promote OpenERP Publish success stories Use social media like twitter, Facebook, LinkedIn Organize Joint Event with OpenERP Publish white papers Partners Summit 2012 138
  • 139.
    PARTNER ACTION #12 Choose, Brand & Develop The Right OpenERP Strategy Out-of-the-Box System integration (project implementation) Partners Summit 2012 139
  • 140.
    PARTNER ACTION #13 Ensure & Maintain High Quality Standards Whenever if you are a Certified Training Partner (CTP) Whenever if you are a New partner Whenever if you are a Current partner Whatever grade you have Partners Summit 2012 140
  • 141.
    PARTNER ACTION #14 OpenERP commits on developing a great product Partners commit on a creating Values & Revenue to ensure a sain & great future Partners Summit 2012 141
  • 142.
    PARTNER ACTION #15 Focus on Client Base Rather than wasting to much time on Getting New clients Partners Summit 2012 142
  • 143.
    Sell to yourclient base (1) 143 It costs 5-7 times more to acquire a new customer than it does to sell to an existing customer! Selling to existing customers is less risky than starting new projects from scratch, for fixed price projects. You are in strong position to negotiate a good price when you sell to an existing customer. It's very difficult to grow by always looking for new customers. Your install base is an asset. Partners Summit 2012
  • 144.
    Sell to yourclient base (2) 144 A new version should not be a constraint or cost to migrate, it's an opportunity to propose new services to your customer base. The more you get revenue from your customer base, the more you will be able to grow and scale. Be sure you know how to benefit from a new version and how to package OpenERP Enterprise in your offers. OpenERP SA releases new versions every 6 months. This allows partners to deliver more value to their customer base. Partners Summit 2012
  • 145.
    From the earlybeginning till today and surely tomorrow we all enjoyed working with YOU fellow partners ! The Channel Team Partners Summit 2012 145
  • 146.
    THANK YOU 146 Partners Summit 2012