Kalundborg Forsyning
supplies sewer system to the
48469 inhabitants in the
municipality of Kalundborg
and 5 other nearby villages
With 817km of sewer pipe
system, 328.3km of
wastewater network,
244.7km rain water and
244.1km of combined sewer
network
www.kalfor.dk
During heavy storms, the combined storm
and wastewater flow is a challenge, as it can
only handle a limited amount of rain
Solution in such circumstance is to provide
structures in the sewer diverting untreated
flow above a certain volume in the
combined sewer system into water bodies
These structures(weirs) are commonly used
to prevent flooding and to control the
untreated volume discharge to water
bodies.
The untreated discharge volume called
combined sewer overflows are a major
pollution concern in urban drainage
management
Calibrated Model is well suited to
understand and control CSOs
www.kalfor.dk
Initial Modelling set-up before
Calibration
Model Result does not fit reasonably
well with measured field data
A reason why it is important to
Calibrate the model
www.kalfor.dk
Data Requirement for Calibration
Flow sensors and rain guage are
installed for Calibration e.g Byens
Mose Kalundborg as a case study
It is crucial for calculating model
reduction factor and initial loss
www.kalfor.dk
Data are stored with a data logger and
transmitted via GPRS to the Blue
North Server
And thereafter they are exported to
Excel
www.kalfor.dk
Analyses are done on the measured
flow and the raingauge to ensure
good quality of data for calibration
www.kalfor.dk
A systematic method to avoid
over/under estimation of water in the
Model
Reduction factor calibration is an
approach that is based on a water
balance principle
www.kalfor.dk
What is Model Calibration??
Making adjustment to the model with
the Calibrated reduction factor and
initial loss
www.kalfor.dk
How is calibration accomplished??
Run simulation and compare Model
result to measured flow data
www.kalfor.dk
Model is Calibrated…what next
- undersized pipes
Locate areas with poor turnover
- Flooded areas
- Combined sewer overflows
www.kalfor.dk
Computed CSOs??
Results compared to legislational
requirement such as:
- Flooding on terrain (must not happen
more than once every n years).
- Flooding of basements (must not happen
more than once every n years).
- Discharge from CSO weirs to receiving
waters (must not happen more than n times
per year
-Total volume from CSOs (must not exceed
a certain threshold amount per year).
www.kalfor.dk
Calibrated model afterwards for capital
Improvement planning , e.g
- Storage capacities for basins
- Pipe Dimensioning
- Green Infrastructure planning
- Process optimization and control of
pumps and treatment facilities
Conclusion
Calibrated models in utilities can create large value as a decision support tool
Based on models for Byens mose we have learned that
 Calibrated models can support operational strategies
 Provides understanding to support capital improvement planning
 Useful now and in the future and needs to be maintained and updated
 All planned activities at Kalundborg Forsyning can be tested with calibrated models before
implementation
CSOs and flood management strategies without a calibrated models might result in a
considerable waste of energy and resources
Thankyoufor listening
Nurudeen Adeyinka Salau
Project Manager/Engineer
Kalundborg Forsyning
Telephone Number: 29257609

More Related Content

What's hot

Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
Luis Domínguez
 
Estimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systemsEstimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systems
sidrarashiddar
 
water mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx ggwater mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx gg
Qasim Ali
 
ASCE/EWRI LID - Marcus Quigley
ASCE/EWRI LID - Marcus QuigleyASCE/EWRI LID - Marcus Quigley
ASCE/EWRI LID - Marcus Quigley
Marcus Quigley
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
sidrarashiddar
 
2008 hydroplogy project-feasibility-of_sapan_project
2008 hydroplogy project-feasibility-of_sapan_project2008 hydroplogy project-feasibility-of_sapan_project
2008 hydroplogy project-feasibility-of_sapan_project
Pravin Kolhe
 
DSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - WangDSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - Wang
Deltares
 
Asset Management with GIS
Asset Management with GISAsset Management with GIS
Asset Management with GIS
Karen Lougee, GISP
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage discharge
Ankit Gola
 
Water sub metering @ nester raga
Water sub metering @ nester ragaWater sub metering @ nester raga
Water sub metering @ nester raga
biomeshubha
 
Water management at Krishna Lilac
Water management at Krishna LilacWater management at Krishna Lilac
Water management at Krishna Lilac
biomeshubha
 
cooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbertcooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbert
John A Herbert
 
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazoneteAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
ACQUEAU, EUREKA Cluster for Water
 
AH Council Meeting 11/9/15 - Item #9 - Water Meter
AH Council Meeting 11/9/15 - Item #9  - Water MeterAH Council Meeting 11/9/15 - Item #9  - Water Meter
AH Council Meeting 11/9/15 - Item #9 - Water Meter
Marian Vargas Mendoza
 
DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...
DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...
DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...
Deltares
 
NextGen Spernal United Kingdom
NextGen Spernal United KingdomNextGen Spernal United Kingdom
NextGen Spernal United Kingdom
NextGen Water Solutions
 
IAHR2015 - Characterization of hydraulic structures by means of numerical sim...
IAHR2015 - Characterization of hydraulic structures by means of numerical sim...IAHR2015 - Characterization of hydraulic structures by means of numerical sim...
IAHR2015 - Characterization of hydraulic structures by means of numerical sim...
Deltares
 
Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - Utilities
CityofEvanston2
 
Dr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemsDr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systems
promediakw
 
Water Master Plan Update
Water Master Plan UpdateWater Master Plan Update
Water Master Plan Update
City of College Station
 

What's hot (20)

Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
 
Estimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systemsEstimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systems
 
water mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx ggwater mapping SIP Nestle 15.ppsx gg
water mapping SIP Nestle 15.ppsx gg
 
ASCE/EWRI LID - Marcus Quigley
ASCE/EWRI LID - Marcus QuigleyASCE/EWRI LID - Marcus Quigley
ASCE/EWRI LID - Marcus Quigley
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
 
2008 hydroplogy project-feasibility-of_sapan_project
2008 hydroplogy project-feasibility-of_sapan_project2008 hydroplogy project-feasibility-of_sapan_project
2008 hydroplogy project-feasibility-of_sapan_project
 
DSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - WangDSD-NL 2021 WaterCoach, here and in Australia - Wang
DSD-NL 2021 WaterCoach, here and in Australia - Wang
 
Asset Management with GIS
Asset Management with GISAsset Management with GIS
Asset Management with GIS
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage discharge
 
Water sub metering @ nester raga
Water sub metering @ nester ragaWater sub metering @ nester raga
Water sub metering @ nester raga
 
Water management at Krishna Lilac
Water management at Krishna LilacWater management at Krishna Lilac
Water management at Krishna Lilac
 
cooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbertcooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbert
 
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazoneteAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
 
AH Council Meeting 11/9/15 - Item #9 - Water Meter
AH Council Meeting 11/9/15 - Item #9  - Water MeterAH Council Meeting 11/9/15 - Item #9  - Water Meter
AH Council Meeting 11/9/15 - Item #9 - Water Meter
 
DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...
DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...
DSD-INT 2018 Latest developments in Dutch river applications using the Delft3...
 
NextGen Spernal United Kingdom
NextGen Spernal United KingdomNextGen Spernal United Kingdom
NextGen Spernal United Kingdom
 
IAHR2015 - Characterization of hydraulic structures by means of numerical sim...
IAHR2015 - Characterization of hydraulic structures by means of numerical sim...IAHR2015 - Characterization of hydraulic structures by means of numerical sim...
IAHR2015 - Characterization of hydraulic structures by means of numerical sim...
 
Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - Utilities
 
Dr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemsDr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systems
 
Water Master Plan Update
Water Master Plan UpdateWater Master Plan Update
Water Master Plan Update
 

Similar to Nurudeens presentation at Innovtion Friday Night

SUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTION
SUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTIONSUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTION
SUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTION
iQHub
 
VFDFVFDV
VFDFVFDVVFDFVFDV
VFDFVFDV
dfdfdf7
 
Hydrology and Water resources software
Hydrology and Water resources softwareHydrology and Water resources software
Hydrology and Water resources software
Hariyali Pujara
 
Предимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиПредимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системи
Emil Hristov
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Fu Michael Justin
 
18.Urban Pressures
18.Urban Pressures18.Urban Pressures
Waternet utility presentation on innovation during AIWW 2021
Waternet utility presentation on innovation during AIWW 2021Waternet utility presentation on innovation during AIWW 2021
Waternet utility presentation on innovation during AIWW 2021
Alice Fermont
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
Iain McGregor
 
International Water Summit 2016
International Water Summit 2016International Water Summit 2016
International Water Summit 2016
Dori Álvarez Romero
 
01. nalco tsl sustainability expo
01. nalco   tsl sustainability expo01. nalco   tsl sustainability expo
01. nalco tsl sustainability expo
EEGRAB
 
WaterInnovationMeyAriel
WaterInnovationMeyArielWaterInnovationMeyAriel
WaterInnovationMeyAriel
Zeev Somer
 
The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...
Ecological Sequestration Trust
 
resilience.io WASH prototype Debut Workshop - GAMA
resilience.io WASH prototype Debut Workshop - GAMAresilience.io WASH prototype Debut Workshop - GAMA
resilience.io WASH prototype Debut Workshop - GAMA
Ecological Sequestration Trust
 
Embedding integrated asset investment planning dunea and seams iam
Embedding integrated asset investment planning   dunea and seams iamEmbedding integrated asset investment planning   dunea and seams iam
Embedding integrated asset investment planning dunea and seams iam
Nikki Peacock
 
Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...
seamsltd
 
Rainwater drainage
Rainwater drainageRainwater drainage
Rainwater drainage
Morten Høgsdorf
 
IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016 IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016
India-EU Water Partnership
 
Kevin Fitzgibbon
Kevin FitzgibbonKevin Fitzgibbon
Kevin Fitzgibbon
Trinity College Dublin
 
Teamnet Engineering - Company Profile
Teamnet Engineering - Company ProfileTeamnet Engineering - Company Profile
Teamnet Engineering - Company Profile
Teamnet International
 
Water conservation in building systems design
Water conservation in building systems designWater conservation in building systems design
Water conservation in building systems design
ASHRAE Rajasthan Chapter
 

Similar to Nurudeens presentation at Innovtion Friday Night (20)

SUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTION
SUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTIONSUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTION
SUSTAINABLE PRACTICES IN WATER LOSS MANAGEMENT AND NRW REDUCTION
 
VFDFVFDV
VFDFVFDVVFDFVFDV
VFDFVFDV
 
Hydrology and Water resources software
Hydrology and Water resources softwareHydrology and Water resources software
Hydrology and Water resources software
 
Предимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системиПредимствата на вакуумни канализационни системи
Предимствата на вакуумни канализационни системи
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
18.Urban Pressures
18.Urban Pressures18.Urban Pressures
18.Urban Pressures
 
Waternet utility presentation on innovation during AIWW 2021
Waternet utility presentation on innovation during AIWW 2021Waternet utility presentation on innovation during AIWW 2021
Waternet utility presentation on innovation during AIWW 2021
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
International Water Summit 2016
International Water Summit 2016International Water Summit 2016
International Water Summit 2016
 
01. nalco tsl sustainability expo
01. nalco   tsl sustainability expo01. nalco   tsl sustainability expo
01. nalco tsl sustainability expo
 
WaterInnovationMeyAriel
WaterInnovationMeyArielWaterInnovationMeyAriel
WaterInnovationMeyAriel
 
The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...The development of WASH use case studies to simulate in the model – GTG Webin...
The development of WASH use case studies to simulate in the model – GTG Webin...
 
resilience.io WASH prototype Debut Workshop - GAMA
resilience.io WASH prototype Debut Workshop - GAMAresilience.io WASH prototype Debut Workshop - GAMA
resilience.io WASH prototype Debut Workshop - GAMA
 
Embedding integrated asset investment planning dunea and seams iam
Embedding integrated asset investment planning   dunea and seams iamEmbedding integrated asset investment planning   dunea and seams iam
Embedding integrated asset investment planning dunea and seams iam
 
Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...
 
Rainwater drainage
Rainwater drainageRainwater drainage
Rainwater drainage
 
IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016 IEWP @ Business meeting 7 March 2016
IEWP @ Business meeting 7 March 2016
 
Kevin Fitzgibbon
Kevin FitzgibbonKevin Fitzgibbon
Kevin Fitzgibbon
 
Teamnet Engineering - Company Profile
Teamnet Engineering - Company ProfileTeamnet Engineering - Company Profile
Teamnet Engineering - Company Profile
 
Water conservation in building systems design
Water conservation in building systems designWater conservation in building systems design
Water conservation in building systems design
 

Recently uploaded

一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
ahzuo
 
The Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series DatabaseThe Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series Database
javier ramirez
 
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
ahzuo
 
Influence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business PlanInfluence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business Plan
jerlynmaetalle
 
Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
Sachin Paul
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
vikram sood
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
mzpolocfi
 
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
nuttdpt
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
g4dpvqap0
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
Bill641377
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
Lars Albertsson
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
Walaa Eldin Moustafa
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
dwreak4tg
 
State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023
kuntobimo2016
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
nyfuhyz
 
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
v3tuleee
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
g4dpvqap0
 
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
v7oacc3l
 
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
74nqk8xf
 
Natural Language Processing (NLP), RAG and its applications .pptx
Natural Language Processing (NLP), RAG and its applications .pptxNatural Language Processing (NLP), RAG and its applications .pptx
Natural Language Processing (NLP), RAG and its applications .pptx
fkyes25
 

Recently uploaded (20)

一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
 
The Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series DatabaseThe Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series Database
 
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
 
Influence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business PlanInfluence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business Plan
 
Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
 
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
 
State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
 
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
 
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
 
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
 
Natural Language Processing (NLP), RAG and its applications .pptx
Natural Language Processing (NLP), RAG and its applications .pptxNatural Language Processing (NLP), RAG and its applications .pptx
Natural Language Processing (NLP), RAG and its applications .pptx
 

Nurudeens presentation at Innovtion Friday Night

  • 3. www.kalfor.dk Kalundborg Forsyning supplies sewer system to the 48469 inhabitants in the municipality of Kalundborg and 5 other nearby villages With 817km of sewer pipe system, 328.3km of wastewater network, 244.7km rain water and 244.1km of combined sewer network
  • 4. www.kalfor.dk During heavy storms, the combined storm and wastewater flow is a challenge, as it can only handle a limited amount of rain Solution in such circumstance is to provide structures in the sewer diverting untreated flow above a certain volume in the combined sewer system into water bodies These structures(weirs) are commonly used to prevent flooding and to control the untreated volume discharge to water bodies. The untreated discharge volume called combined sewer overflows are a major pollution concern in urban drainage management Calibrated Model is well suited to understand and control CSOs
  • 5. www.kalfor.dk Initial Modelling set-up before Calibration Model Result does not fit reasonably well with measured field data A reason why it is important to Calibrate the model
  • 6. www.kalfor.dk Data Requirement for Calibration Flow sensors and rain guage are installed for Calibration e.g Byens Mose Kalundborg as a case study It is crucial for calculating model reduction factor and initial loss
  • 7. www.kalfor.dk Data are stored with a data logger and transmitted via GPRS to the Blue North Server And thereafter they are exported to Excel
  • 8. www.kalfor.dk Analyses are done on the measured flow and the raingauge to ensure good quality of data for calibration
  • 9. www.kalfor.dk A systematic method to avoid over/under estimation of water in the Model Reduction factor calibration is an approach that is based on a water balance principle
  • 10. www.kalfor.dk What is Model Calibration?? Making adjustment to the model with the Calibrated reduction factor and initial loss
  • 11. www.kalfor.dk How is calibration accomplished?? Run simulation and compare Model result to measured flow data
  • 12. www.kalfor.dk Model is Calibrated…what next - undersized pipes Locate areas with poor turnover - Flooded areas - Combined sewer overflows
  • 13. www.kalfor.dk Computed CSOs?? Results compared to legislational requirement such as: - Flooding on terrain (must not happen more than once every n years). - Flooding of basements (must not happen more than once every n years). - Discharge from CSO weirs to receiving waters (must not happen more than n times per year -Total volume from CSOs (must not exceed a certain threshold amount per year).
  • 14. www.kalfor.dk Calibrated model afterwards for capital Improvement planning , e.g - Storage capacities for basins - Pipe Dimensioning - Green Infrastructure planning - Process optimization and control of pumps and treatment facilities
  • 15. Conclusion Calibrated models in utilities can create large value as a decision support tool Based on models for Byens mose we have learned that  Calibrated models can support operational strategies  Provides understanding to support capital improvement planning  Useful now and in the future and needs to be maintained and updated  All planned activities at Kalundborg Forsyning can be tested with calibrated models before implementation CSOs and flood management strategies without a calibrated models might result in a considerable waste of energy and resources