Notes on
Reinforcement Learning
Joo-Haeng Lee
GTA (GameTheory AOC), ETRI, 2017-09-21
Joo-Haeng Lee 2017 joohaeng@gmail.com
Goal of Today’s Talk
R 게sm 강화학습p vn하기 o해i
- 기본 개념p r해하t!
R Pr해했다W hT하는 f람의 rk기b 들let."
- 연구 동향p gw g펴et!
R 도대y .GGgDe -eeH2ind의 -eeH Q-NetNGIkr d데 ,T,60 2600p Xc u?Q
- 참Wta
R AttH://neuIG.cJ.ut.ee/demyJti?ying-deeH-Iein?GIcement-De:Ining/
R WikiHedi:, :IXiM, J:M: ,T,60, .it/ub, TNG 2inute P:HeI, …
Background & Motivation
Joo-Haeng Lee 2017 joohaeng@gmail.com
Various types of systems! Each requires different control policies.
Joo-Haeng Lee 2017 joohaeng@gmail.com
Many computer games belong to a dynamic system with discrete components. Not every!
Joo-Haeng Lee 2017 joohaeng@gmail.com
Joo-Haeng Lee 2017 joohaeng@gmail.com
Joo-Haeng Lee 2017 joohaeng@gmail.com
Joo-Haeng Lee 2017 joohaeng@gmail.com
S1S0
a0
S4
S2
a1
S3
a2
S7
S5
S6
S8
A state machine SM defined with 9 states, 3 actions, and 20 transitions.
Joo-Haeng Lee 2017 joohaeng@gmail.com
S1S0
a0
S4
S2
a1
S3
a2
S7
S5
S6
S8
For a given input at at time t, the state machine SM returns its state representation st and reward rt.
at
rt
st
Action
State
Reward
Joo-Haeng Lee 2017 joohaeng@gmail.com
S1S0
a0
S4
S2
a1
S3
a2
S7
S5
S6
S8
A human player.
at
rt
st
Action
State
Reward
PerceptionControl
Joo-Haeng Lee 2017 joohaeng@gmail.com
The system details and dynamics are unknown, or only partially known.
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
The system details and dynamics are unknown, or only partially known.
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
A human builds his cognitive model by learning.
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
How can a machine learn to perform?
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
A classic approach is Reinforcement Learning (RL)!
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
One of RL methods is Q-Learning (QL)!
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
A recent advancement in QL is Deep Q-Learning (DQL) by DeepMind!
at
rt
st
Action
State
Reward
PerceptionControl
?
Joo-Haeng Lee 2017 joohaeng@gmail.com
Can we build Alpha Ma using DQL or its variants?
at
rt
st
Action
State
Reward
PerceptionControl
?
Key Concepts
Joo-Haeng Lee 2017 joohaeng@gmail.com
Reinforcement Learning
• “Reinforcement learning (RL) is an area of machine learning inspired by behaviorist
psychology, concerned with how software agents ought to take actions in an
environment so as to maximize some notion of cumulative reward.“— Wikipedia
• “강화 학습은 기계 학습이 다루는 문제의 하나로, 어떤 환경 안에서 정의된 에이전트가
현재의 상태를 인식하여, 선택 가능한 행동들 중 보상을 최대화하는 행동 혹은 행동 순서
를 선택하는 방법이다.” — Wikipedia
Joo-Haeng Lee 2017 joohaeng@gmail.com
Main Challenges in RL
• Credit Assignment Problem
- “방금 얻은 점수는 어떤 액션 덕분이지?”
• Exploration-Exploitation Dilemma
- 탐사-채광:“더 큰 금맥을 찾아 갈까? 여기서 채굴할까?”
Joo-Haeng Lee 2017 joohaeng@gmail.com
Mathematical Formalism for RL
• Markov Decision Process (MDP)
- 액션에 따른 상태의 전이
- Action
- State
- Transition
S1S0
a0
S4
S2
a1
S3
a2
S7
S5
S6
S8
-10
-10
+100
+2
+20
+20
-50
Joo-Haeng Lee 2017 joohaeng@gmail.com
Key Concepts
• Encoding long term-strategies: discounted future reward
• Estimate the future reward: table-based Q-learning
• Huge state space: Q-table is replaced with neural network
• Implementation tip: experience replay for stability
• Exploration-exploitation dilemma: 𝜀-greedy exploration
Joo-Haeng Lee 2017 joohaeng@gmail.com
Reinforcement Learning — Breakout
Joo-Haeng Lee 2017 joohaeng@gmail.com
Reinforcement Learning — Breakout
• Problem description
- Input: game screen with scores
- Output: game controls = ( left || right || space )
- Training?
• Experts dataset for supervised learning — how to get them?
• Self practice with occasional rewards as humans do — reinforcement learning
Joo-Haeng Lee 2017 joohaeng@gmail.com
Markov Decision Process (MDP) — Formalism for RL
• Environment: game, system, simulator, …
• Agent: a human user, SW
• State: stochastic transition to another state for a action
• Action
• Reward
• Policy
EnvironmentsAgent
Action
State
Reward
S1S0
a0
S4
S2
a1
S3
a2
S7
S5
S6
S8
-10
-10
+100
+2
+20
+20
-50
Joo-Haeng Lee 2017 joohaeng@gmail.com
Markov Decision Process (MDP) — Formalism for RL
• Episode
- a sequence of states, actions, and rewards in a game
- so, ao, r1, s1, a1, r2, s2, a2, r3, s3, a3, …, rn-1, sn = game over = GG
• Markov assumption
- The probability of the next state si+1 depends only on current state si and
performed action ai, but not on preceding states or actions.
Joo-Haeng Lee 2017 joohaeng@gmail.com
• To play well in long-term, need to consider current and future rewards at once.
• Total reward for an episode: R = r1 + r2 + r3+…+ rn
• Total future reward at time t: Rt = rt + rt+1 + rt+2+…+ rn
• Considering the stochastic nature,
• Discounted future reward: Rt = rt +𝛾 rt+1 + 𝛾2 rt+2+…+ 𝛾n-t rn = rt +𝛾 Rt+1
• NOTE: A good strategy for an agent would be to always choose an action at at the
state st, that maximizes the discounted future reward Rt+1.
• BUT, how?
Discounted Future Reward (DFR)
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning
• Q-function: Q(s, a) — the discounted future reward from a sequence of optimal
actions
- Q(s, a) = max Rt+1
- Among myriads of possible episodes, the maximum DFR could be earned from a certain
sequence of actions after the current action a at the state s.
- The “quality” of the current action affects DFR.
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning
• Policy:
- π(s) = arg maxa’ Q(s, a’) = a
- The action a which results in the maximum DFR: Q(s, a)
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning
• Bellman equation for the transition < s1, a1, s2, r2 >
- Q(s1, a1) = r2 + 𝛾 maxai Q(s2, ai) S1 S2
a1
r2
S3
S4
r3
r4
a2
a3
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning
• Naïve algorithm for Q-table filling:
- Initialize Q-table arbitrarily with #state rows and #action columns.
- Observe initial state s
- Repeat
• Select an action a and input to the environment E
- Action a will be carried out in E.
• Observe reward r and new state s’
• Update the table: Q(s, a) = (1-α) Q(s, a) +α (r + γ maxa' Q(s’, a’))
- s = s'
- until terminated
Q-table a1 a2 a2 … an
s1 100 130 80 … 121
s2 200 99 99 … 2
s2 50 99 150 … 2
... … … … … …
sn 101 124 124 … 199
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning
• The estimations get more and more accurate with every iteration and it has been
shown that, if we perform this update enough times, then the Q-function will
converge and represent the true Q-value.
• OK. BUT, how to generalize a Q-function (or Q-table) to handle many similar
problems at once? — (ex) ATARI 2600.
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network
• Q-Learning + Deep Neural Network
• DQN
• Google DeepMind (NIPS 2013 Workshop, Nature 2015)
Joo-Haeng Lee 2017 joohaeng@gmail.com
ATARI 2600
Joo-Haeng Lee 2017 joohaeng@gmail.com
ATARI 2600
Joo-Haeng Lee 2017 joohaeng@gmail.com
ATARI 2600
Joo-Haeng Lee 2017 joohaeng@gmail.com
ATARI 2600
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning — Breakout
• Modeling for Breakout:
- State: description of all the game elements such as ball, bar, and bricks
- Reward: score
- Output: game controls = ( left || right || space )
• BUT, how to handle all the other ATARI 2600 games?
- The problem of generalization!
(# bricks) * (x, y, on) + (x)
for bar + (x, y) for ball
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning — All ATARI 2600 Games?
• Modeling for any Atari 2600 games:
- State: all the pixels in the game screens
- Reward: score
- Output: all the control actions in the joystick
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning — All ATARI 2600 Games?
• Modeling for any Atari 2600 games:
- State: 84x84 pixels * 4 frames * 256 gray
- Reward: score
- Output:18 actions
Convolution Convolution Fully connected Fully connected
No input
ation of the convolutional neural network. The
explained in the Methods. The input to the neural
843 4 image produced by the preprocessing
nvolutional layers (note: snaking blue line
symbolizes sliding of each filter across input image) and two fully connected
layers with a single output for each valid action. Each hidden layer is followed
by a rectifier nonlinearity (that is, max 0,xð Þ).
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning — All ATARI 2600 Games?
• Modeling for any Atari 2600 games:
- State: 84x84 pixels * 4 frames * 256 gray = 25684x84x4 ~ 1067970
- Reward: score
- Output:18 actions
Convolution Convolution Fully connected Fully connected
No input
ation of the convolutional neural network. The
explained in the Methods. The input to the neural
843 4 image produced by the preprocessing
nvolutional layers (note: snaking blue line
symbolizes sliding of each filter across input image) and two fully connected
layers with a single output for each valid action. Each hidden layer is followed
by a rectifier nonlinearity (that is, max 0,xð Þ).
Joo-Haeng Lee 2017 joohaeng@gmail.com
Q-Learning — All ATARI 2600 Games?
• Modeling for any Atari 2600 games:
- State: 84x84 pixels * 4 frames * 256 gray = 25684x84x4 ~ 1067970
- Reward: score
- Output:18 actions
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network — All ATARI 2600 Games!
• We can hardly implement a Q-function as a table: size and sparsity!
• Now, deep learning steps in!
- Deep convolutional neural network (CNN) is specially good at extracting small set of
features from a big data.
- We can replace Q-table with a deep neural network — DQN!
Q(s, an)
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network — All ATARI 2600 Games!
Layer Input Filter size Stride Num filters Activation Output
conv1 84x84x4 8×8 4 32 ReLU 20x20x32
conv2 20x20x32 4×4 2 64 ReLU 9x9x64
conv3 9x9x64 3×3 1 64 ReLU 7x7x64
fc4 7x7x64 512 ReLU 512
fc5 512 18 Linear 18
lt and engaging for human players. We used the same network
ecture, hyperparameter values (see Extended Data Table 1) and
ngprocedurethroughout—takinghigh-dimensionaldata(210|160
r video at 60 Hz) as input—to demonstrate that our approach
tly learns successful policies over a variety of games based solely
soryinputswithonlyveryminimalpriorknowledge(thatis,merely
put data were visual images, and the number of actions available
h game, but not their correspondences; see Methods). Notably,
ethod was able to train large neural networks using a reinforce-
earningsignalandstochasticgradientdescentinastablemanner—
ated by the temporal evolution of two indices of learning (the
s average score-per-episode and average predicted Q-values; see
and Supplementary Discussion for details).
We compared DQN with the best performing methods from the
reinforcement learning literature on the 49 games where results were
available12,15
. In addition to the learned agents, we alsoreport scores for
aprofessionalhumangamestesterplayingundercontrolledconditions
and a policy that selects actions uniformly at random (Extended Data
Table 2 and Fig. 3, denoted by 100% (human) and 0% (random) on y
axis; see Methods). Our DQN method outperforms the best existing
reinforcement learning methods on 43 of the games without incorpo-
rating any of the additional prior knowledge about Atari 2600 games
used by other approaches (for example, refs 12, 15). Furthermore, our
DQN agent performed at a level that was comparable to that of a pro-
fessionalhumangamestesteracrossthesetof49games,achievingmore
than75%ofthe humanscore onmorethanhalfofthegames(29 games;
Convolution Convolution Fully connected Fully connected
No input
1 | Schematic illustration of the convolutional neural network. The
of the architecture are explained in the Methods. The input to the neural
k consists of an 843 843 4 image produced by the preprocessing
followed by three convolutional layers (note: snaking blue line
symbolizes sliding of each filter across input image) and two fully connected
layers with a single output for each valid action. Each hidden layer is followed
by a rectifier nonlinearity (that is, max 0,xð Þ).
EARCH LETTER
Q(s, an)
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network
• Loss
- To measure how well a neural network is trained
- The less, the better.
- Current Q by prediction: Q(s, a) — forward evaluation of a neural network
- Target Q from new reward: r + γ maxa' Q(s’, a’) — forward evaluation
- L = 1/2 (current - target)2 = 1/2 ( Q(s, a) - ( r + γ maxa' Q(s’, a’) ) )2
- Weights of a neural network are updated to minimize the loss — back propagation
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network
• Experience Replay
- Training efficiency:“It takes a long time, almost a week on a single GPU.”
- Experience: <s, a, r, a’>
- Experience memory stores all the recent experiences.Actually, not all, but quite a few.
- Train on adjacent experiences?
- No! Random samples form experience memory to avoid local minimum.
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network
• So far, we mainly focused on “credit assignment problem,” specially in the context
of Q-learning.
• Exploration-Exploitation Dilemma?
- At first, Q-network gives a taste of randomness in selecting an optimal action due to
random initialization — greedy exploration to find the first (not the best) solution.
- However, it converges as the training continues — exploitation at the local minimum.
• ε-greedy exploration
- “Maybe, there could be a better action with the change of ε.”
- Choose between a random action and argmaxa' Q(s’, a’).
Joo-Haeng Lee 2017 joohaeng@gmail.com
n is
ility
deep
ons
rary
orks
bed
ke it
the
…,et},
mi-
hm,
nce,
oach
ence
ncy.
ong
ela-
on-
ters
Initialize action-value function Q with random weights h
Initialize target action-value function ^Q with weights h2
5 h
For episode 5 1, M do
Initialize sequence s1~ x1f g and preprocessed sequence w1~w s1ð Þ
For t 5 1,T do
With probability e select a random action at
otherwise select at~argmaxaQ w stð Þ,a; hð Þ
Execute action at in emulator and observe reward rt and image xt 1 1
Set stz1~st,at,xtz1 and preprocess wtz1~w stz1ð Þ
Store transition wt,at,rt,wtz1
À Á
in D
Sample random minibatch of transitions wj,aj,rj,wjz1
 
from D
Set yj~
rj if episode terminates at step jz1
rjzc maxa0 ^Q wjz1,a0
; h{
 
otherwise
(
Perform a gradient descent step on yj{Q wj,aj; h
  2
with respect to the
network parameters h
Every C steps reset ^Q~Q
End For
End For
31. Jarrett,K.,Kavukcuoglu,K.,Ranzato,M.A.LeCun,Y.Whatisthebestmulti-stage
Joo-Haeng Lee 2017 joohaeng@gmail.com
Deep Q Network
• DQN Algorithm:
- Initialize replay memory D.
- Initialize Q-network with random weights.
- Observe initial state s
- Repeat
• Select a random action a with probability ε. Otherwise a = argmaxa’ Q(s’, a’)
• Input a to the environment E for state transition
• Observe reward r and new state s’, and store them to replay memory D
• Sample random transitions sd, ad, rd, sd’ from replay memory D
• Calculate target t for each mini-batch transition
- If sd’ is terminal state then t = rd
- Otherwise t = rd + γ maxa’Q(sd’, a’)
• Train the Q network with the loss L = (t - Q(sd, ad))2 — Updating the Q-network
- s = s'
- until terminated
Examples Game
Joo-Haeng Lee 2017 joohaeng@gmail.com
Joo-Haeng Lee 2017 joohaeng@gmail.com
Examples Code
Joo-Haeng Lee 2017 joohaeng@gmail.com
Implementation Notes
Mathematica
S1S0
a0
S4
S2
a1
S3
a2
S7
S5
S6
S8
-10
-10
+100
+2
+20
+20
-50
References Paper
Joo-Haeng Lee 2017 joohaeng@gmail.com
B. Rider Breakout Enduro Pong Q*bert Seaquest S. Invaders
Random 354 1.2 0 20.4 157 110 179
Sarsa [3] 996 5.2 129 19 614 665 271
Contingency [4] 1743 6 159 17 960 723 268
DQN 4092 168 470 20 1952 1705 581
Human 7456 31 368 3 18900 28010 3690
HNeat Best [8] 3616 52 106 19 1800 920 1720
HNeat Pixel [8] 1332 4 91 16 1325 800 1145
DQN Best 5184 225 661 21 4500 1740 1075
Table 1: The upper table compares average total reward for various learning methods by running
an ✏-greedy policy with ✏ = 0.05 for a fixed number of steps. The lower table reports results of
the single best performing episode for HNeat and DQN. HNeat produces deterministic policies that
always get the same score while DQN used an ✏-greedy policy with ✏ = 0.05.
types of objects on the Atari screen. The HNeat Pixel score is obtained by using the special 8 color
channel representation of the Atari emulator that represents an object label map at each channel.
This method relies heavily on finding a deterministic sequence of states that represents a successful
exploit. It is unlikely that strategies learnt in this way will generalize to random perturbations;
therefore the algorithm was only evaluated on the highest scoring single episode. In contrast, our
algorithm is evaluated on ✏-greedy control sequences, and must therefore generalize across a wide
variety of possible situations. Nevertheless, we show that on all the games, except Space Invaders,
not only our max evaluation results (row 8), but also our average results (row 4) achieve better
performance.
Finally, we show that our method achieves better performance than an expert human player on
Breakout, Enduro and Pong and it achieves close to human performance on Beam Rider. The games
Q*bert, Seaquest, Space Invaders, on which we are far from human performance, are more chal-
lenging because they require the network to find a strategy that extends over long time scales.
6 Conclusion
This paper introduced a new deep learning model for reinforcement learning, and demonstrated its
ability to master difficult control policies for Atari 2600 computer games, using only raw pixels
as input. We also presented a variant of online Q-learning that combines stochastic minibatch up-
dates with experience replay memory to ease the training of deep networks for RL. Our approach
gave state-of-the-art results in six of the seven games it was tested on, with no adjustment of the
architecture or hyperparameters.
References
[1] Leemon Baird. Residual algorithms: Reinforcement learning with function approximation. In
Proceedings of the 12th International Conference on Machine Learning (ICML 1995), pages
30–37. Morgan Kaufmann, 1995.
[2] Marc Bellemare, Joel Veness, and Michael Bowling. Sketch-based linear value function ap-
proximation. In Advances in Neural Information Processing Systems 25, pages 2222–2230,
2012.
[3] Marc G Bellemare, Yavar Naddaf, Joel Veness, and Michael Bowling. The arcade learning
environment: An evaluation platform for general agents. Journal of Artificial Intelligence
Research, 47:253–279, 2013.
[4] Marc G Bellemare, Joel Veness, and Michael Bowling. Investigating contingency awareness
using atari 2600 games. In AAAI, 2012.
[5] Marc G. Bellemare, Joel Veness, and Michael Bowling. Bayesian learning of recursively fac-
tored environments. In Proceedings of the Thirtieth International Conference on Machine
Learning (ICML 2013), pages 1211–1219, 2013.
8
Playing Atari with Deep Reinforcement Learning
Volodymyr Mnih Koray Kavukcuoglu David Silver Alex Graves Ioannis Antonoglou
Daan Wierstra Martin Riedmiller
DeepMind Technologies
{vlad,koray,david,alex.graves,ioannis,daan,martin.riedmiller} @ deepmind.com
Abstract
We present the first deep learning model to successfully learn control policies di-
rectly from high-dimensional sensory input using reinforcement learning. The
model is a convolutional neural network, trained with a variant of Q-learning,
whose input is raw pixels and whose output is a value function estimating future
rewards. We apply our method to seven Atari 2600 games from the Arcade Learn-
ing Environment, with no adjustment of the architecture or learning algorithm. We
find that it outperforms all previous approaches on six of the games and surpasses
a human expert on three of them.
1 Introduction
Learning to control agents directly from high-dimensional sensory inputs like vision and speech is
one of the long-standing challenges of reinforcement learning (RL). Most successful RL applica-
tions that operate on these domains have relied on hand-crafted features combined with linear value
functions or policy representations. Clearly, the performance of such systems heavily relies on the
quality of the feature representation.
Recent advances in deep learning have made it possible to extract high-level features from raw sen-
sory data, leading to breakthroughs in computer vision [11, 22, 16] and speech recognition [6, 7].
These methods utilise a range of neural network architectures, including convolutional networks,
multilayer perceptrons, restricted Boltzmann machines and recurrent neural networks, and have ex-
ploited both supervised and unsupervised learning. It seems natural to ask whether similar tech-
niques could also be beneficial for RL with sensory data.
However reinforcement learning presents several challenges from a deep learning perspective.
Firstly, most successful deep learning applications to date have required large amounts of hand-
labelled training data. RL algorithms, on the other hand, must be able to learn from a scalar reward
signal that is frequently sparse, noisy and delayed. The delay between actions and resulting rewards,
which can be thousands of timesteps long, seems particularly daunting when compared to the direct
association between inputs and targets found in supervised learning. Another issue is that most deep
learning algorithms assume the data samples to be independent, while in reinforcement learning one
typically encounters sequences of highly correlated states. Furthermore, in RL the data distribu-
tion changes as the algorithm learns new behaviours, which can be problematic for deep learning
methods that assume a fixed underlying distribution.
This paper demonstrates that a convolutional neural network can overcome these challenges to learn
successful control policies from raw video data in complex RL environments. The network is
trained with a variant of the Q-learning [26] algorithm, with stochastic gradient descent to update
the weights. To alleviate the problems of correlated data and non-stationary distributions, we use
1
Figure 1: Screen shots from five Atari 2600 Games: (Left-to-right) Pong, Breakout, Space Invaders,
Seaquest, Beam Rider
an experience replay mechanism [13] which randomly samples previous transitions, and thereby
smooths the training distribution over many past behaviors.
We apply our approach to a range of Atari 2600 games implemented in The Arcade Learning Envi-
ronment (ALE) [3]. Atari 2600 is a challenging RL testbed that presents agents with a high dimen-
sional visual input (210 ⇥ 160 RGB video at 60Hz) and a diverse and interesting set of tasks that
were designed to be difficult for humans players. Our goal is to create a single neural network agent
that is able to successfully learn to play as many of the games as possible. The network was not pro-
vided with any game-specific information or hand-designed visual features, and was not privy to the
internal state of the emulator; it learned from nothing but the video input, the reward and terminal
signals, and the set of possible actions—just as a human player would. Furthermore the network ar-
chitecture and all hyperparameters used for training were kept constant across the games. So far the
network has outperformed all previous RL algorithms on six of the seven games we have attempted
and surpassed an expert human player on three of them. Figure 1 provides sample screenshots from
five of the games used for training.
2 Background
We consider tasks in which an agent interacts with an environment E, in this case the Atari emulator,
in a sequence of actions, observations and rewards. At each time-step the agent selects an action
at from the set of legal game actions, A = {1, . . . , K}. The action is passed to the emulator and
modifies its internal state and the game score. In general E may be stochastic. The emulator’s
internal state is not observed by the agent; instead it observes an image xt 2 Rd
from the emulator,
which is a vector of raw pixel values representing the current screen. In addition it receives a reward
rt representing the change in game score. Note that in general the game score may depend on the
whole prior sequence of actions and observations; feedback about an action may only be received
after many thousands of time-steps have elapsed.
Since the agent only observes images of the current screen, the task is partially observed and many
emulator states are perceptually aliased, i.e. it is impossible to fully understand the current situation
from only the current screen xt. We therefore consider sequences of actions and observations, st =
x1, a1, x2, ..., at 1, xt, and learn game strategies that depend upon these sequences. All sequences
in the emulator are assumed to terminate in a finite number of time-steps. This formalism gives
rise to a large but finite Markov decision process (MDP) in which each sequence is a distinct state.
As a result, we can apply standard reinforcement learning methods for MDPs, simply by using the
complete sequence st as the state representation at time t.
The goal of the agent is to interact with the emulator by selecting actions in a way that maximises
future rewards. We make the standard assumption that future rewards are discounted by a factor of
per time-step, and define the future discounted return at time t as Rt =
PT
t0=t
t0
t
rt0 , where T
is the time-step at which the game terminates. We define the optimal action-value function Q⇤
(s, a)
as the maximum expected return achievable by following any strategy, after seeing some sequence
s and then taking some action a, Q⇤
(s, a) = max⇡ E [Rt|st = s, at = a, ⇡], where ⇡ is a policy
mapping sequences to actions (or distributions over actions).
The optimal action-value function obeys an important identity known as the Bellman equation. This
is based on the following intuition: if the optimal value Q⇤
(s0
, a0
) of the sequence s0
at the next
time-step was known for all possible actions a0
, then the optimal strategy is to select the action a0
2
Mnih,V., Kavukcuoglu, K., Silver, D., Graves,A.,Antonoglou, I.,Wierstra, D.,  Riedmiller, M. (2013). Playing atari with deep reinforcement learning. arXiv preprint arXiv:1312.5602. — NIPS 2013 Deep Learning Workshop
Joo-Haeng Lee 2017 joohaeng@gmail.com
LETTER doi:10.1038/nature14236
Human-level control through deep reinforcement
learning
Volodymyr Mnih1
*, Koray Kavukcuoglu1
*, David Silver1
*, Andrei A. Rusu1
, Joel Veness1
, Marc G. Bellemare1
, Alex Graves1
,
Martin Riedmiller1
, Andreas K. Fidjeland1
, Georg Ostrovski1
, Stig Petersen1
, Charles Beattie1
, Amir Sadik1
, Ioannis Antonoglou1
,
Helen King1
, Dharshan Kumaran1
, Daan Wierstra1
, Shane Legg1
 Demis Hassabis1
Thetheoryofreinforcementlearningprovidesanormativeaccount1
,
deeply rooted in psychological2
and neuroscientific3
perspectives on
animal behaviour, of how agents may optimize their control of an
environment.Tousereinforcementlearningsuccessfullyinsituations
approaching real-worldcomplexity, however, agentsareconfronted
with a difficulttask: theymust deriveefficientrepresentations ofthe
environment from high-dimensional sensory inputs, and use these
togeneralizepastexperiencetonewsituations.Remarkably,humans
andotheranimals seemtosolvethisproblemthrougha harmonious
combinationofreinforcementlearningandhierarchicalsensorypro-
cessing systems4,5
, the former evidenced by a wealth of neural data
revealingnotableparallelsbetweenthephasicsignalsemittedbydopa-
minergic neurons and temporal difference reinforcement learning
algorithms3
.Whilereinforcementlearningagentshaveachievedsome
successesinavarietyofdomains6–8
,theirapplicabilityhaspreviously
beenlimitedtodomainsinwhichusefulfeaturescanbehandcrafted,
or to domains with fully observed, low-dimensional state spaces.
Here we use recent advances in training deep neural networks9–11
to
develop a novel artificial agent, termed a deep Q-network, that can
learnsuccessfulpoliciesdirectlyfromhigh-dimensionalsensoryinputs
using end-to-end reinforcement learning. We tested this agent on
the challenging domain of classic Atari 2600 games12
. We demon-
strate that the deep Q-network agent, receiving only the pixels and
the game score as inputs, was able to surpass the performance of all
previous algorithms and achieve a level comparable to that of a pro-
fessionalhumangamestesteracrossasetof49games,usingthesame
algorithm, network architecture and hyperparameters. This work
bridges the divide between high-dimensional sensory inputs and
actions, resulting in the first artificial agent that is capable of learn-
ing to excel at a diverse array of challenging tasks.
We set out to create a single algorithm that would be able to develop
a wide range of competencies on a varied range of challenging tasks—a
central goal of general artificial intelligence13
that has eluded previous
efforts8,14,15
.Toachievethis,wedevelopedanovelagent,adeepQ-network
(DQN), which is able to combine reinforcement learning with a class
of artificial neural network16
known as deep neural networks. Notably,
recent advances in deep neural networks9–11
, in which several layers of
nodes are used to build up progressively more abstract representations
of the data, have made it possible for artificial neural networks to learn
concepts such as object categories directly from raw sensory data. We
use one particularly successful architecture, the deep convolutional
network17
, which uses hierarchical layers of tiled convolutional filters
to mimic the effects of receptive fields—inspired byHubel and Wiesel’s
seminalworkonfeedforwardprocessinginearlyvisualcortex18
—thereby
exploitingthe localspatial correlations present in images, and building
in robustness to natural transformations such as changes of viewpoint
or scale.
We consider tasks in which the agent interacts with an environment
throughasequenceofobservations,actionsandrewards.Thegoalofthe
agent is to select actions in a fashion that maximizes cumulative future
reward. More formally, we use a deep convolutional neural network to
approximate the optimal action-value function
QÃ
s,að Þ~ max
p
rtzcrtz1zc2
rtz2z . . . jst~s, at~a, p
 Ã
,
which is the maximum sum of rewards rt discounted by c at each time-
step t, achievable by a behaviour policy p 5 P(ajs), after making an
observation (s) and taking an action (a) (see Methods)19
.
Reinforcement learning is known to be unstable or even to diverge
when a nonlinear function approximator such as a neural network is
used to represent the action-value (also known as Q) function20
. This
instability has several causes: the correlations present in the sequence
ofobservations,thefactthatsmallupdatestoQ maysignificantlychange
thepolicyandthereforechangethedatadistribution,andthecorrelations
betweentheaction-values(Q)andthe target valuesrzc max
a0
Q s0
, a0
ð Þ.
We address these instabilities with a novel variantof Q-learning, which
uses two key ideas. First, we used a biologically inspired mechanism
termed experience replay21–23
that randomizes over the data, thereby
removing correlationsintheobservationsequenceandsmoothing over
changes in the data distribution(see below for details). Second, we used
an iterative update that adjusts the action-values (Q) towards target
valuesthatareonlyperiodicallyupdated,therebyreducingcorrelations
with the target.
While other stable methods exist for training neural networks in the
reinforcement learning setting, such as neural fitted Q-iteration24
, these
methodsinvolvetherepeatedtrainingofnetworksdenovoonhundreds
of iterations. Consequently, these methods, unlike our algorithm, are
too inefficient to be used successfully with large neural networks. We
parameterize an approximate value function Q(s,a;hi) using the deep
convolutionalneuralnetworkshowninFig.1,inwhichhi aretheparam-
eters (that is, weights) of the Q-network at iteration i. To perform
experience replay we store the agent’s experiences et 5 (st,at,rt,st 1 1)
at each time-step t in a data set Dt 5 {e1,…,et}. During learning, we
apply Q-learning updates, on samples (or minibatches) of experience
(s,a,r,s9) , U(D), drawn uniformly at random from the pool of stored
samples. The Q-learning update at iteration i uses the following loss
function:
Li hið Þ~ s,a,r,s0ð Þ*U Dð Þ rzc max
a0
Q(s0
,a0
; h{
i ){Q s,a; hið Þ
 2
 #
in which c is the discountfactordetermining the agent’s horizon, hi are
the parameters of the Q-network at iteration i and h{
i are the network
parameters used to compute the target at iteration i. The target net-
work parameters h{
i are only updated with the Q-network parameters
(hi) every C steps and are held fixed between individual updates (see
Methods).
To evaluate our DQN agent, we took advantage of the Atari 2600
platform, which offers a diverse array of tasks (n 5 49) designed to be
*These authors contributed equally to this work.
1
Google DeepMind, 5 New Street Square, London EC4A 3TW, UK.
2 6 F E B R U A R Y 2 0 1 5 | V O L 5 1 8 | N A T U R E | 5 2 9
Macmillan Publishers Limited. All rights reserved©2015
difficult and engaging for human players. We used the same network
architecture, hyperparameter values (see Extended Data Table 1) and
learningprocedurethroughout—takinghigh-dimensionaldata(210|160
colour video at 60 Hz) as input—to demonstrate that our approach
robustly learns successful policies over a variety of games based solely
onsensoryinputswithonlyveryminimalpriorknowledge(thatis,merely
the input data were visual images, and the number of actions available
in each game, but not their correspondences; see Methods). Notably,
our method was able to train large neural networks using a reinforce-
mentlearningsignalandstochasticgradientdescentinastablemanner—
illustrated by the temporal evolution of two indices of learning (the
agent’s average score-per-episode and average predicted Q-values; see
Fig. 2 and Supplementary Discussion for details).
We compared DQN with the best performing methods from the
reinforcement learning literature on the 49 games where results were
available12,15
. In addition to the learned agents, we also report scores for
aprofessionalhumangamestesterplayingundercontrolledconditions
and a policy that selects actions uniformly at random (Extended Data
Table 2 and Fig. 3, denoted by 100% (human) and 0% (random) on y
axis; see Methods). Our DQN method outperforms the best existing
reinforcement learning methods on 43 of the games without incorpo-
rating any of the additional prior knowledge about Atari 2600 games
used by other approaches (for example, refs 12, 15). Furthermore, our
DQN agent performed at a level that was comparable to that of a pro-
fessionalhumangamestesteracrossthesetof49games,achievingmore
than75%ofthe human score onmorethanhalfofthegames(29 games;
Convolution Convolution Fully connected Fully connected
No input
Figure 1 | Schematic illustration of the convolutional neural network. The
details of the architecture are explained in the Methods. The input to the neural
network consists of an 843 843 4 image produced by the preprocessing
map w, followed by three convolutional layers (note: snaking blue line
symbolizes sliding of each filter across input image) and two fully connected
layers with a single output for each valid action. Each hidden layer is followed
by a rectifier nonlinearity (that is, max 0,xð Þ).
a b
c d
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
0 20 40 60 80 100 120 140 160 180 200
Averagescoreperepisode
Training epochs
0
1
2
3
4
5
6
7
8
9
10
11
0 20 40 60 80 100 120 140 160 180 200
Averageactionvalue(Q)
Training epochs
0
1,000
2,000
3,000
4,000
5,000
6,000
0 20 40 60 80 100 120 140 160 180 200
Averagescoreperepisode
Training epochs
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100 120 140 160 180 200
Averageactionvalue(Q)
Training epochs
Figure 2 | Training curves tracking the agent’s average score and average
predicted action-value. a, Each point is the average score achieved per episode
after the agent is run with e-greedy policy (e 5 0.05) for 520k frames on Space
Invaders. b, Average score achieved per episode for Seaquest. c, Average
predicted action-value on a held-out set of states on Space Invaders. Each point
on the curve is the average of the action-value Q computed over the held-out
set of states. Note that Q-values are scaled due to clipping of rewards (see
Methods). d, Average predicted action-value on Seaquest. See Supplementary
Discussion for details.
RESEARCH LETTER
5 3 0 | N A T U R E | V O L 5 1 8 | 2 6 F E B R U A R Y 2 0 1 5
Macmillan Publishers Limited. All rights reserved©2015
see Fig. 3, Supplementary Discussion and Extended Data Table 2). In
additional simulations (see Supplementary Discussion and Extended
Data Tables 3 and 4), we demonstrate the importance of the individual
corecomponentsoftheDQNagent—thereplaymemory,separatetarget
Q-network and deepconvolutionalnetwork architecture—bydisabling
them and demonstrating the detrimental effects on performance.
We next examined the representations learned by DQN that under-
pinnedthesuccessfulperformanceoftheagentinthecontextofthegame
Space Invaders (see Supplementary Video 1 for a demonstration of the
performance of DQN), by using a technique developed for the visual-
ization of high-dimensional data called ‘t-SNE’25
(Fig. 4). As expected,
the t-SNE algorithm tends to map the DQN representation of percep-
tuallysimilarstatestonearbypoints.Interestingly,wealsofoundinstances
in which the t-SNE algorithm generated similar embeddings for DQN
representations of states that are close in terms of expected reward but
perceptually dissimilar (Fig. 4, bottom right, top left and middle), con-
sistent with the notion that the network is able to learn representations
thatsupportadaptivebehaviourfromhigh-dimensionalsensoryinputs.
Furthermore, we also show that the representations learned by DQN
are able to generalize to data generated from policies other than its
own—in simulations where we presented as input to the networkgame
states experienced during human and agent play, recorded the repre-
sentations of the last hidden layer, and visualized the embeddings gen-
eratedbythet-SNEalgorithm(ExtendedDataFig.1andSupplementary
Discussion). Extended Data Fig. 2 provides an additional illustrationof
how the representations learned by DQN allow it to accurately predict
state and action values.
It is worth noting that the games in which DQN excels are extremely
varied in their nature, from side-scrolling shooters (River Raid) to box-
inggames(Boxing)andthree-dimensionalcar-racinggames(Enduro).
Montezuma's Revenge
Private Eye
Gravitar
Frostbite
Asteroids
Ms. Pac-Man
Bowling
Double Dunk
Seaquest
Venture
Alien
Amidar
River Raid
Bank Heist
Zaxxon
Centipede
Chopper Command
Wizard of Wor
Battle Zone
Asterix
H.E.R.O.
Q*bert
Ice Hockey
Up and Down
Fishing Derby
Enduro
Time Pilot
Freeway
Kung-Fu Master
Tutankham
Beam Rider
Space Invaders
Pong
James Bond
Tennis
Kangaroo
Road Runner
Assault
Krull
Name This Game
Demon Attack
Gopher
Crazy Climber
Atlantis
Robotank
Star Gunner
Breakout
Boxing
Video Pinball
At human-level or above
Below human-level
0 100 200 300 400 4,500%500 1,000600
Best linear learner
DQN
Figure 3 | Comparison of the DQN agent with the best reinforcement
learning methods15
in the literature. The performance of DQN is normalized
with respect to a professional human games tester (that is, 100% level) and
random play (that is, 0% level). Note that the normalized performance of DQN,
expressed as a percentage, is calculated as: 1003 (DQN score 2 random play
score)/(human score 2 random play score). It can be seen that DQN
outperforms competing methods (also see Extended Data Table 2) in almost all
the games, and performs at a level that is broadly comparable with or superior
to a professional human games tester (that is, operationalized as a level of
75% or above) in the majority of games. Audio output was disabled for both
human players and agents. Error bars indicate s.d. across the 30 evaluation
episodes, starting with different initial conditions.
LETTER RESEARCH
2 6 F E B R U A R Y 2 0 1 5 | V O L 5 1 8 | N A T U R E | 5 3 1
Macmillan Publishers Limited. All rights reserved©2015
Joo-Haeng Lee 2017 joohaeng@gmail.com
Indeed, in certain games DQN is able to discover a relatively long-term
strategy (for example, Breakout: the agent learns the optimal strategy,
which is to first dig a tunnel around the side of the wall allowing the ball
to be sent around the back to destroy a large number of blocks; see Sup-
plementary Video 2 for illustration of development of DQN’s perfor-
manceoverthecourseoftraining).Nevertheless,gamesdemandingmore
temporally extended planning strategies still constitute a major chal-
lengeforallexistingagentsincludingDQN(forexample,Montezuma’s
Revenge).
In this work, we demonstrate that a single architecture can success-
fullylearncontrolpoliciesinarangeofdifferentenvironmentswithonly
very minimal prior knowledge, receiving only the pixels and the game
scoreasinputs,andusingthesamealgorithm,networkarchitectureand
hyperparametersoneachgame,privyonlytotheinputsahumanplayer
would have. In contrast to previous work24,26
, our approach incorpo-
rates ‘end-to-end’ reinforcement learning that uses reward to continu-
ously shape representations within the convolutional network towards
salient featuresof the environmentthat facilitate value estimation.This
principledrawsonneurobiological evidencethatreward signalsduring
perceptuallearningmayinfluencethecharacteristicsofrepresentations
within primate visual cortex27,28
. Notably, the successful integration of
reinforcement learning with deep network architectures was critically
dependentonourincorporationofareplayalgorithm21–23
involvingthe
storageand representationofrecently experienced transitions.Conver-
gentevidencesuggeststhatthe hippocampusmay supportthe physical
realization of such a process in the mammalian brain, with the time-
compressed reactivation of recently experienced trajectories during
offline periods21,22
(for example, waking rest) providing a putative mech-
anism by which value functions may be efficiently updated through
interactions with the basal ganglia22
. In the future, it will be important
to explore the potential use of biasing the content of experience replay
towards salient events, a phenomenon that characterizes empirically
observed hippocampal replay29
, and relates to the notion of ‘prioritized
sweeping’30
in reinforcement learning. Taken together, our work illus-
trates the power of harnessing state-of-the-art machine learning tech-
niques with biologically inspired mechanisms to create agents that are
capable of learning to master a diverse array of challenging tasks.
Online Content Methods, along with any additional Extended Data display items
andSource Data, are available in the onlineversion ofthe paper; references unique
to these sections appear only in the online paper.
Received 10 July 2014; accepted 16 January 2015.
1. Sutton, R.  Barto, A. Reinforcement Learning: An Introduction (MIT Press, 1998).
2. Thorndike, E. L. Animal Intelligence: Experimental studies (Macmillan, 1911).
3. Schultz, W., Dayan, P.  Montague, P. R. A neural substrate of prediction and
reward. Science 275, 1593–1599 (1997).
4. Serre, T., Wolf, L.  Poggio, T. Object recognition with features inspired by visual
cortex. Proc. IEEE. Comput. Soc. Conf. Comput. Vis. Pattern. Recognit. 994–1000
(2005).
5. Fukushima, K. Neocognitron: A self-organizing neural network model for a
mechanism of pattern recognition unaffected by shift in position. Biol. Cybern. 36,
193–202 (1980).
V
Figure 4 | Two-dimensional t-SNE embedding of the representations in the
last hidden layer assigned by DQN to game states experienced while playing
Space Invaders. The plot was generated by letting the DQN agent play for
2 h ofreal game time andrunningthet-SNEalgorithm25
on the lasthiddenlayer
representations assigned by DQN to each experienced game state. The
pointsare coloured according to the state values (V, maximum expected reward
of a state) predicted by DQN for the corresponding game states (ranging
from dark red (highest V) to dark blue (lowest V)). The screenshots
corresponding to a selected number of points are shown. The DQN agent
predicts high state values for both full (top right screenshots) and nearly
complete screens (bottom left screenshots) because it has learned that
completing a screen leads to a new screen full of enemy ships. Partially
completed screens (bottom screenshots) are assigned lower state values because
less immediate reward is available. The screens shown on the bottom right
andtopleft andmiddleareless perceptually similar than theother examples but
are still mapped to nearby representations and similar values because the
orange bunkers do not carry great significance near the end of a level. With
permission from Square Enix Limited.
RESEARCH LETTER
5 3 2 | N A T U R E | V O L 5 1 8 | 2 6 F E B R U A R Y 2 0 1 5
Macmillan Publishers Limited. All rights reserved©2015
METHODS
Preprocessing. Workingdirectlywith rawAtari2600 frames, whichare2103 160
pixel images with a 128-colour palette, can be demanding in terms of computation
and memory requirements. We apply a basic preprocessing step aimed at reducing
the input dimensionality and dealing with some artefacts of the Atari 2600 emu-
lator.First,toencodeasingleframewetakethemaximumvalueforeachpixelcolour
value over the frame being encoded and the previous frame. This was necessary to
remove flickering that is present in games where some objects appear only in even
frames while other objects appear only in odd frames, an artefact caused by the
limited number of sprites Atari 2600 can display at once. Second, we then extract
the Y channel, also known as luminance, from the RGB frame and rescale it to
84 3 84.The functionw fromalgorithm1 described belowappliesthis preprocess-
ing to the m most recent frames and stacks them to produce the input to the
Q-function, in which m 5 4, although the algorithm is robust to different values of
m (for example, 3 or 5).
Code availability. The source code can be accessed at https://sites.google.com/a/
deepmind.com/dqn for non-commercial uses only.
Model architecture. There are several possible ways of parameterizing Q using a
neural network. Because Q maps history–action pairs to scalar estimates of their
Q-value, the history and the action have been used as inputs to the neural network
by some previous approaches24,26
. The main drawback of this type of architecture
is that a separate forward pass is required to compute the Q-value of each action,
resulting in a cost that scales linearly with thenumber ofactions. We instead usean
architecture in which there is a separate output unit for each possible action, and
only the state representation is an input to the neural network. The outputs cor-
respond to the predicted Q-values of the individual actions for the input state. The
main advantageof this type of architecture is the ability tocompute Q-valuesforall
possibleactionsinagivenstatewithonlyasingleforwardpassthroughthenetwork.
The exact architecture, shown schematically in Fig. 1, is as follows. The input to
the neural network consists of an 843 843 4 image produced by the preprocess-
ing map w. The first hidden layer convolves 32 filters of 83 8 with stride 4 with the
input image and applies a rectifier nonlinearity31,32
. The second hidden layer con-
volves 64 filters of 43 4 with stride 2, again followed by a rectifier nonlinearity.
Thisisfollowedbyathirdconvolutionallayerthatconvolves64filtersof33 3with
stride 1 followed by a rectifier. The final hidden layer is fully-connected and con-
sists of 512 rectifier units. The output layer is a fully-connected linear layer with a
single output for each valid action. The number of valid actions varied between 4
and 18 on the games we considered.
Training details.Weperformedexperimentson49Atari2600gameswhereresults
were available for all other comparable methods12,15
. A different network was trained
on each game: the same network architecture, learning algorithm and hyperpara-
metersettings(seeExtended Data Table1)wereusedacross allgames, showing that
our approach is robust enough to work on a variety of games while incorporating
onlyminimalpriorknowledge(seebelow).Whileweevaluatedouragentsonunmodi-
fied games, we made one change to the reward structure of the games during training
only. As the scale of scores varies greatly from game to game, we clipped all posi-
tive rewards at 1 and all negative rewards at 21, leaving 0 rewards unchanged.
Clipping the rewards in this manner limits the scale of the error derivatives and
makesiteasierto use thesamelearningrateacrossmultiplegames. At the same time,
it could affect the performance of our agent since it cannot differentiate between
rewards of different magnitude. For games where there is a life counter, the Atari
2600 emulator alsosends the number of lives left in the game, which is then used to
mark the end of an episode during training.
In these experiments, we used the RMSProp (see http://www.cs.toronto.edu/
,tijmen/csc321/slides/lecture_slides_lec6.pdf ) algorithmwith minibatches ofsize
32. The behaviour policy during training was e-greedy with e annealed linearly
from 1.0 to 0.1 over the first million frames, and fixed at 0.1 thereafter. We trained
for a total of 50 million frames (that is, around 38 days of game experience in total)
and used a replay memory of 1 million most recent frames.
FollowingpreviousapproachestoplayingAtari2600games,wealsouseasimple
frame-skipping technique15
. More precisely, the agent sees and selects actions on
every kth frame instead of every frame, and its last action is repeated on skipped
frames. Because running the emulator forward for one step requires much less
computation than having the agent select an action, this technique allows the agent
to play roughly k times more games without significantly increasing the runtime.
We use k 5 4 for all games.
Thevaluesofallthehyperparametersandoptimizationparameterswereselected
by performing an informal search on the games Pong, Breakout, Seaquest, Space
Invaders and Beam Rider. We did not perform a systematic grid search owing to
the highcomputationalcost.Theseparameterswere thenheldfixedacrossallother
games.ThevaluesanddescriptionsofallhyperparametersareprovidedinExtended
Data Table 1.
Our experimental setup amounts to using the following minimal prior know-
ledge: that the input data consisted of visual images (motivating our use of a con-
volutional deep network), the game-specific score (with no modification), number
of actions, although not their correspondences (for example, specification of the
up ‘button’) and the life count.
Evaluation procedure. The trained agents were evaluated by playing each game
30 times for up to 5 min each time with different initial random conditions (‘no-
op’; see Extended Data Table 1) and an e-greedy policy with e 5 0.05. This pro-
cedure is adopted to minimize the possibility of overfitting during evaluation. The
random agent served as a baseline comparison and chose a random action at 10 Hz
which is every sixth frame, repeating its last action on intervening frames. 10 Hz is
about the fastest that a human player can select the ‘fire’ button, and setting the
random agent to this frequency avoids spurious baseline scores in a handful of the
games.Wedidalsoassesstheperformanceofarandomagentthatselectedanaction
at 60 Hz (that is, every frame). This had a minimal effect: changing the normalized
DQN performance by more than 5% in only six games (Boxing, Breakout, Crazy
Climber, Demon Attack, Krull and Robotank), and in all these games DQN out-
performed the expert human by a considerable margin.
The professional human tester used the sameemulator engine as the agents, and
played under controlled conditions. The human tester was not allowed to pause,
save or reload games. As in the original Atari 2600 environment, the emulator was
run at 60 Hz and the audio output was disabled: as such, the sensory input was
equated between humanplayer andagents. The human performance is theaverage
rewardachievedfromaround20episodesofeachgamelastingamaximumof5 min
each, following around 2 h of practice playing each game.
Algorithm. We consider tasks in which an agent interacts with an environment,
in this case the Atari emulator, in a sequence of actions, observations and rewards.
At each time-step the agent selects an action at from the set of legal game actions,
A~ 1, . . . ,Kf g. The action is passed to the emulator and modifies its internal state
and the game score. In general the environment may be stochastic. The emulator’s
internal state is not observed by the agent; instead the agent observes an image
xt[Rd
from the emulator, which is a vector of pixel values representing the current
screen. In addition it receives a reward rt representing the change in game score.
Note that in general thegame score maydependon the whole previoussequence of
actions andobservations;feedbackabout anactionmayonlybereceivedaftermany
thousands of time-steps have elapsed.
Becausetheagentonlyobservesthecurrentscreen,thetask ispartiallyobserved33
and many emulator states are perceptually aliased (that is, it is impossible to fully
understand the current situation from only the current screen xt). Therefore,
sequences of actions and observations, st~x1,a1,x2,:::,at{1,xt, are input to the
algorithm, which then learnsgame strategies depending uponthese sequences. All
sequences in the emulator are assumed to terminate in a finite number of time-
steps.ThisformalismgivesrisetoalargebutfiniteMarkovdecisionprocess(MDP)
in which each sequence is a distinct state. As a result, we can apply standard rein-
forcement learning methods for MDPs, simply by using the complete sequence st
as the state representation at time t.
The goal ofthe agent isto interact with the emulatorby selectingactionsin a way
thatmaximizesfuturerewards.Wemakethestandardassumptionthatfuturerewards
are discounted by a factor of c per time-step (c was set to 0.99 throughout), and
define the future discounted return at time t as Rt~
XT
t0~t
ct0
{t
rt0 , in which T is the
time-step at which the game terminates. We define the optimal action-value
function QÃ
s,að Þ as the maximum expected return achievable by following any
policy, after seeing some sequence s and then taking some action a, QÃ
s,að Þ~
maxp RtDst~s,at~a,p½ Š in which p is a policy mapping sequences to actions (or
distributions over actions).
The optimal action-value function obeys an important identity known as the
Bellman equation. This is based on the following intuition: if the optimal value
QÃ
s0
,a0
ð Þ of the sequence s9 at the next time-step was known for all possible actions
a9, thentheoptimalstrategy istoselecttheaction a9 maximizingtheexpectedvalue
of rzcQÃ
s0
,a0
ð Þ:
QÃ
s,að Þ ~ s0 rzc max
a0
QÃ
s0
,a0
ð ÞDs,a
!
The basic idea behind many reinforcement learning algorithms is to estimate
the action-value function by using the Bellman equation as an iterative update,
Qiz1 s,að Þ~ s0 rzc maxa0 Qi s0
,a0
ð ÞDs,a½ Š. Such value iteration algorithms converge
totheoptimalaction-valuefunction,Qi?QÃ
asi??.Inpractice,thisbasicapproach
is impractical, because the action-value function is estimated separately for each
sequence,withoutanygeneralization.Instead,itiscommontouseafunctionapprox-
imator to estimate the action-value function, Q s,a; hð ÞQÃ
s,að Þ. In the reinforce-
ment learning community this is typically a linear function approximator, but
RESEARCH LETTER
Macmillan Publishers Limited. All rights reserved©2015
sometimes a nonlinear function approximator is used instead, such as a neural
network. We refer to a neural network function approximator with weights h as a
Q-network.AQ-network canbe trainedby adjusting theparameters hi atiteration
i to reduce the mean-squared error in the Bellman equation, where the optimal
target values rzc maxa0 QÃ
s0
,a0
ð Þ are substituted with approximate target values
y~rzc maxa0 Q s0
,a0
; h{
i
À Á
, using parameters h{
i from some previous iteration.
This leads to a sequence of loss functions Li(hi) that changes at each iteration i,
Li hið Þ~ s,a,r Es0 yDs,a½ Š{Q s,a; hið Þð Þ2Â Ã
~ s,a,r,s0 y{Q s,a; hið Þð Þ2Â Ã
zEs,a,r Vs0 y½ н Š:
Note that the targets depend on the network weights; this is in contrast with the
targets used for supervised learning, which are fixed before learning begins. At
each stage of optimization, we hold the parameters from the previous iteration hi
2
fixed when optimizing the ith loss function Li(hi), resulting in a sequence of well-
defined optimization problems. The final term is the variance of the targets, which
does not depend on the parameters hi that we are currently optimizing, and may
therefore be ignored. Differentiating the loss function with respect to the weights
we arrive at the following gradient:
+hi
L hið Þ ~ s,a,r,s0 rzc max
a0
Q s0
,a0
; h{
i
À Á
{Q s,a; hið Þ
 
+hi
Q s,a; hið Þ
!
:
Rather than computing the full expectations in the above gradient, it is often
computationally expedient to optimize the loss function by stochastic gradient
descent. The familiar Q-learning algorithm19
can be recovered in this framework
by updating the weights after every time step, replacing the expectations using
single samples, and setting h{
i ~hi{1.
Note that this algorithm is model-free: it solves the reinforcement learning task
directly using samples from the emulator, without explicitly estimating the reward
and transition dynamics P r,s0
Ds,að Þ. It is also off-policy: it learns about the greedy
policya~argmaxa0 Q s,a0
; hð Þ,whilefollowingabehaviourdistributionthatensures
adequate exploration of the state space. In practice, the behaviour distribution is
often selected by an e-greedy policy that follows the greedy policy with probability
1 2 e and selects a random action with probability e.
Training algorithm for deep Q-networks. The full algorithm for training deep
Q-networks is presented in Algorithm 1. The agent selects and executes actions
according to an e-greedy policy based on Q. Because using histories of arbitrary
length as inputs to a neural network can be difficult, our Q-function instead works
on a fixed length representation of histories produced by the function w described
above. The algorithm modifies standard online Q-learning in two ways to make it
suitable for training large neural networks without diverging.
First, we use a technique known as experience replay23
in which we store the
agent’sexperiences at each time-step, et 5(st,at, rt,st 1 1), in a data set Dt 5{e1,…,et},
pooled over many episodes (where the end of an episode occurs when a termi-
nal state is reached) into a replay memory. During the inner loop of the algorithm,
we apply Q-learning updates, or minibatch updates, to samples of experience,
(s, a, r, s9) ,U(D), drawn atrandom from the pool of stored samples. This approach
hasseveraladvantagesoverstandardonlineQ-learning.First,eachstepofexperience
is potentiallyused inmany weight updates, whichallowsforgreater data efficiency.
Second, learning directly from consecutive samplesis inefficient, owing to the strong
correlations between the samples; randomizing the samples breaks these correla-
tions and therefore reduces the variance of the updates. Third, when learning on-
policy the current parameters determine the next data sample that the parameters
are trainedon. For example, if the maximizing actionis to moveleft then the train-
ing samples will be dominated by samples from the left-hand side; if the maximiz-
ing action then switches to the right then the training distribution will also switch.
Itiseasytoseehowunwantedfeedbackloopsmayariseandtheparameterscouldget
stuckinapoorlocalminimum,orevendivergecatastrophically20
.Byusingexperience
replay the behaviour distribution is averaged over many of its previous states,
smoothing out learning and avoiding oscillations or divergence in the parameters.
Note that when learning by experience replay, it is necessary to learn off-policy
(because our current parameters are different to those used to generate the sam-
ple), which motivates the choice of Q-learning.
In practice, our algorithm only stores the last N experience tuples in the replay
memory,andsamplesuniformlyat randomfrom Dwhenperforming updates. This
approach is in some respects limited because the memory buffer does not differ-
entiate important transitions and always overwrites with recent transitions owing
to the finite memory size N. Similarly, the uniform sampling gives equal impor-
tanceto all transitions in the replaymemory. A moresophisticatedsampling strat-
egy might emphasize transitions from which we can learn the most, similar to
prioritized sweeping30
.
The second modification to online Q-learning aimed at further improving the
stability of our method with neural networks is to use a separate network for gen-
erating the targets yj in the Q-learning update. More precisely, every C updates we
clone the network Q to obtain a target network ^Q and use ^Q for generating the
Q-learning targets yj forthe followingC updates to Q. This modificationmakes the
algorithm more stable compared to standard online Q-learning, where an update
thatincreasesQ(st,at)oftenalsoincreasesQ(st 1 1,a)forallaandhencealsoincreases
the target yj, possibly leading to oscillations or divergence of the policy. Generating
the targetsusinganoldersetofparametersaddsadelay betweenthe timeanupdate
to Q is made and the time the update affects the targets yj, making divergence or
oscillations much more unlikely.
We also found it helpful to clip the error term from the update rzc maxa0 Q
s0
,a0
; h{
i
À Á
{Q s,a; hið Þ to be between 21 and 1. Because the absolute value loss
function jxj has a derivative of 21 for all negative values of x and a derivative of 1
for all positive values of x, clipping the squared error to be between 21 and 1 cor-
responds to using an absolute value loss function for errors outside of the (21,1)
interval.This formoferrorclippingfurtherimproved the stability ofthe algorithm.
Algorithm 1: deep Q-learning with experience replay.
Initialize replay memory D to capacity N
Initialize action-value function Q with random weights h
Initialize target action-value function ^Q with weights h2
5 h
For episode 5 1, M do
Initialize sequence s1~ x1f g and preprocessed sequence w1~w s1ð Þ
For t 5 1,T do
With probability e select a random action at
otherwise select at~argmaxaQ w stð Þ,a; hð Þ
Execute action at in emulator and observe reward rt and image xt 1 1
Set stz1~st,at,xtz1 and preprocess wtz1~w stz1ð Þ
Store transition wt,at,rt,wtz1
À Á
in D
Sample random minibatch of transitions wj,aj,rj,wjz1
 
from D
Set yj~
rj if episode terminates at step jz1
rjzc maxa0 ^Q wjz1,a0
; h{
 
otherwise
(
Perform a gradient descent step on yj{Q wj,aj; h
  2
with respect to the
network parameters h
Every C steps reset ^Q~Q
End For
End For
31. Jarrett,K.,Kavukcuoglu,K.,Ranzato,M.A.LeCun,Y.Whatisthebestmulti-stage
architecture for object recognition? Proc. IEEE. Int. Conf. Comput. Vis. 2146–2153
(2009).
32. Nair, V.  Hinton, G. E. Rectified linear units improve restricted Boltzmann
machines. Proc. Int. Conf. Mach. Learn. 807–814 (2010).
33. Kaelbling, L. P., Littman, M. L.  Cassandra, A. R. Planning and acting in partially
observable stochastic domains. Artificial Intelligence 101, 99–134 (1994).
LETTER RESEARCH
Macmillan Publishers Limited. All rights reserved©2015
Joo-Haeng Lee 2017 joohaeng@gmail.com
n is
ility
deep
ons
rary
orks
bed
ke it
the
…,et},
mi-
hm,
nce,
oach
ence
ncy.
ong
ela-
on-
ters
Initialize action-value function Q with random weights h
Initialize target action-value function ^Q with weights h2
5 h
For episode 5 1, M do
Initialize sequence s1~ x1f g and preprocessed sequence w1~w s1ð Þ
For t 5 1,T do
With probability e select a random action at
otherwise select at~argmaxaQ w stð Þ,a; hð Þ
Execute action at in emulator and observe reward rt and image xt 1 1
Set stz1~st,at,xtz1 and preprocess wtz1~w stz1ð Þ
Store transition wt,at,rt,wtz1
À Á
in D
Sample random minibatch of transitions wj,aj,rj,wjz1
 
from D
Set yj~
rj if episode terminates at step jz1
rjzc maxa0 ^Q wjz1,a0
; h{
 
otherwise
(
Perform a gradient descent step on yj{Q wj,aj; h
  2
with respect to the
network parameters h
Every C steps reset ^Q~Q
End For
End For
31. Jarrett,K.,Kavukcuoglu,K.,Ranzato,M.A.LeCun,Y.Whatisthebestmulti-stage
Joo-Haeng Lee 2017 joohaeng@gmail.com
Joo-Haeng Lee 2017 joohaeng@gmail.com
Extended Data Figure 1 | Two-dimensional t-SNE embedding of the
representations in the last hidden layer assigned by DQN to game states
experienced during a combination of human and agent play in Space
Invaders. The plot was generated by running the t-SNE algorithm25
on the last
hidden layer representation assigned by DQN to game states experienced
during a combination of human (30 min) and agent (2 h) play. The fact that
there is similar structure in the two-dimensional embeddings corresponding to
the DQN representation of states experienced during human play (orange
points) and DQN play (blue points) suggests that the representations learned
by DQN do indeed generalize to data generated from policies other than its
own. The presence in the t-SNE embedding of overlapping clusters of points
corresponding to the network representation of states experienced during
human and agent play shows that the DQN agent also follows sequences of
states similar to those found in human play. Screenshots corresponding to
selected states are shown (human: orange border; DQN: blue border).
RESEARCH LETTER
Macmillan Publishers Limited. All rights reserved©2015
Extended Data Figure 2 | Visualization of learned value functions on two
games, Breakout and Pong. a, A visualization of the learned value function on
the game Breakout.At time points 1 and 2, the state value is predicted to be ,17
and the agent is clearing the bricks at the lowest level. Each of the peaks in
the value function curve corresponds to a reward obtained by clearing a brick.
At time point 3, the agent is about to break through to the top level of bricks and
the value increases to ,21 in anticipation of breaking out and clearing a
large set of bricks. At point 4, the value is above 23 and the agent has broken
through. After this point, the ball will bounce at the upper part of the bricks
clearing many of them by itself. b, A visualization of the learned action-value
function on the game Pong. At time point 1, the ball is moving towards the
paddle controlled by the agent on the right side of the screen and the values of
all actions are around 0.7, reflecting the expected value of this state based on
previous experience. At time point 2, the agent starts moving the paddle
towards the ball and the value of the ‘up’ action stays high while the value of the
‘down’ action falls to 20.9. This reflects the fact that pressing ‘down’ would lead
to the agent losing the ball and incurring a reward of 21. At time point 3,
the agent hits the ball by pressing ‘up’ and the expected reward keeps increasing
until time point 4, when the ball reaches the left edge of the screen and the value
of all actions reflects that the agent is about to receive a reward of 1. Note,
the dashed line shows the past trajectory of the ball purely for illustrative
purposes (that is, not shown during the game). With permission from Atari
Interactive, Inc.
LETTER RESEARCH
Macmillan Publishers Limited. All rights reserved©2015
Extended Data Table 1 | List of hyperparameters and their values
The values of all the hyperparameters were selected by performing an informal search on the games Pong, Breakout, Seaquest, Space Invaders and Beam Rider. We did not perform a systematic grid search owing
to the high computational cost, although it is conceivable that even better results could be obtained by systematically tuning the hyperparameter values.
RESEARCH LETTER
Macmillan Publishers Limited. All rights reserved©2015
Joo-Haeng Lee 2017 joohaeng@gmail.com
Extended Data Table 2 | Comparison of games scores obtained by DQN agents with methods from the literature12,15
and a professional
human games tester
Best Linear Learner is the best result obtained by a linear function approximator on different types of hand designed features12
. Contingency (SARSA) agent figures are the results obtained in ref. 15. Note the
figures in the last column indicate the performance of DQN relative to the human games tester, expressed as a percentage, that is, 100 3 (DQN score 2 random play score)/(human score 2 random play score).
LETTER RESEARCH
Macmillan Publishers Limited. All rights reserved©2015
Extended Data Table 3 | The effects of replay and separating the target Q-network
DQN agents were trained for 10 million frames using standard hyperparameters for all possible combinations of turning replay on or off, using or not using a separate target Q-network, and three different learning
rates. Each agent was evaluated every 250,000 training frames for 135,000 validation frames and the highest average episode score is reported. Note that these evaluation episodes were not truncated at 5 min
leading to higher scores on Enduro than the ones reported in Extended Data Table 2. Note also that the number of training frames was shorter (10 million frames) as compared to the main results presented in
Extended Data Table 2 (50 million frames).
RESEARCH LETTER
Macmillan Publishers Limited. All rights reserved©2015
Extended Data Table 3 | The effects of replay and separating the target Q-network
DQN agents were trained for 10 million frames using standard hyperparameters for all possible combinations of turning replay on or off, using or not using a separate target Q-network, and three different learning
rates. Each agent was evaluated every 250,000 training frames for 135,000 validation frames and the highest average episode score is reported. Note that these evaluation episodes were not truncated at 5 min
leading to higher scores on Enduro than the ones reported in Extended Data Table 2. Note also that the number of training frames was shorter (10 million frames) as compared to the main results presented in
Extended Data Table 2 (50 million frames).
RESEARCH LETTER
Macmillan Publishers Limited. All rights reserved©2015
Extended Data Table 4 | Comparison of DQN performance with lin-
ear function approximator
The performance of the DQN agent is compared with the performance of a linear function approximator
on the 5 validation games (that is, where a single linear layer was used instead of the convolutional
network, in combination with replay and separate target network). Agents were trained for 10 million
frames using standard hyperparameters, and three different learning rates. Each agent was evaluated
every 250,000 training frames for 135,000 validation frames and the highest average episode score is
reported. Note that these evaluation episodes were not truncated at 5 min leading to higher scores on
Enduro than the ones reported in Extended Data Table 2. Note also that the number of training frames
was shorter (10 million frames) as compared to the main results presented in Extended Data Table 2
(50 million frames).
LETTER RESEARCH
Macmillan Publishers Limited. All rights reserved©2015
Joo-Haeng Lee 2017 joohaeng@gmail.com
Asynchronous Methods for Deep Reinforcement Learning
Volodymyr Mnih1
VMNIH@GOOGLE.COM
Adrià Puigdomènech Badia1
ADRIAP@GOOGLE.COM
Mehdi Mirza1,2
MIRZAMOM@IRO.UMONTREAL.CA
Alex Graves1
GRAVESA@GOOGLE.COM
Tim Harley1
THARLEY@GOOGLE.COM
Timothy P. Lillicrap1
COUNTZERO@GOOGLE.COM
David Silver1
DAVIDSILVER@GOOGLE.COM
Koray Kavukcuoglu 1
KORAYK@GOOGLE.COM
1
Google DeepMind
2
Montreal Institute for Learning Algorithms (MILA), University of Montreal
Abstract
We propose a conceptually simple and
lightweight framework for deep reinforce-
ment learning that uses asynchronous gradient
descent for optimization of deep neural network
controllers. We present asynchronous variants of
four standard reinforcement learning algorithms
and show that parallel actor-learners have a
stabilizing effect on training allowing all four
methods to successfully train neural network
controllers. The best performing method, an
asynchronous variant of actor-critic, surpasses
the current state-of-the-art on the Atari domain
while training for half the time on a single
multi-core CPU instead of a GPU. Furthermore,
we show that asynchronous actor-critic succeeds
on a wide variety of continuous motor control
problems as well as on a new task of navigating
random 3D mazes using a visual input.
1. Introduction
Deep neural networks provide rich representations that can
enable reinforcement learning (RL) algorithms to perform
effectively. However, it was previously thought that the
combination of simple online RL algorithms with deep
neural networks was fundamentally unstable. Instead, a va-
riety of solutions have been proposed to stabilize the algo-
rithm (Riedmiller, 2005; Mnih et al., 2013; 2015; Van Has-
selt et al., 2015; Schulman et al., 2015a). These approaches
share a common idea: the sequence of observed data en-
countered by an online RL agent is non-stationary, and on-
Proceedings of the 33rd
International Conference on Machine
Learning, New York, NY, USA, 2016. JMLR: WCP volume
48. Copyright 2016 by the author(s).
line RL updates are strongly correlated. By storing the
agent’s data in an experience replay memory, the data can
be batched (Riedmiller, 2005; Schulman et al., 2015a) or
randomly sampled (Mnih et al., 2013; 2015; Van Hasselt
et al., 2015) from different time-steps. Aggregating over
memory in this way reduces non-stationarity and decorre-
lates updates, but at the same time limits the methods to
off-policy reinforcement learning algorithms.
Deep RL algorithms based on experience replay have
achieved unprecedented success in challenging domains
such as Atari 2600. However, experience replay has several
drawbacks: it uses more memory and computation per real
interaction; and it requires off-policy learning algorithms
that can update from data generated by an older policy.
In this paper we provide a very different paradigm for deep
reinforcement learning. Instead of experience replay, we
asynchronously execute multiple agents in parallel, on mul-
tiple instances of the environment. This parallelism also
decorrelates the agents’ data into a more stationary process,
since at any given time-step the parallel agents will be ex-
periencing a variety of different states. This simple idea
enables a much larger spectrum of fundamental on-policy
RL algorithms, such as Sarsa, n-step methods, and actor-
critic methods, as well as off-policy RL algorithms such
as Q-learning, to be applied robustly and effectively using
deep neural networks.
Our parallel reinforcement learning paradigm also offers
practical benefits. Whereas previous approaches to deep re-
inforcement learning rely heavily on specialized hardware
such as GPUs (Mnih et al., 2015; Van Hasselt et al., 2015;
Schaul et al., 2015) or massively distributed architectures
(Nair et al., 2015), our experiments run on a single machine
with a standard multi-core CPU. When applied to a vari-
ety of Atari 2600 domains, on many games asynchronous
reinforcement learning achieves better results, in far less
arXiv:1602.01783v2[cs.LG]16Jun2016
Asynchronous Methods for Deep Reinforcement Learning
One way of propagating rewards faster is by using n-
step returns (Watkins, 1989; Peng  Williams, 1996).
In n-step Q-learning, Q(s, a) is updated toward the n-
step return defined as rt + rt+1 + · · · + n 1
rt+n 1 +
maxa
n
Q(st+n, a). This results in a single reward r di-
rectly affecting the values of n preceding state action pairs.
This makes the process of propagating rewards to relevant
state-action pairs potentially much more efficient.
In contrast to value-based methods, policy-based model-
free methods directly parameterize the policy ⇡(a|s; ✓) and
update the parameters ✓ by performing, typically approx-
imate, gradient ascent on E[Rt]. One example of such
a method is the REINFORCE family of algorithms due
to Williams (1992). Standard REINFORCE updates the
policy parameters ✓ in the direction r✓ log ⇡(at|st; ✓)Rt,
which is an unbiased estimate of r✓E[Rt]. It is possible to
reduce the variance of this estimate while keeping it unbi-
ased by subtracting a learned function of the state bt(st),
known as a baseline (Williams, 1992), from the return. The
resulting gradient is r✓ log ⇡(at|st; ✓) (Rt bt(st)).
A learned estimate of the value function is commonly used
as the baseline bt(st) ⇡ V ⇡
(st) leading to a much lower
variance estimate of the policy gradient. When an approx-
imate value function is used as the baseline, the quantity
Rt bt used to scale the policy gradient can be seen as
an estimate of the advantage of action at in state st, or
A(at, st) = Q(at, st) V (st), because Rt is an estimate of
Q⇡
(at, st) and bt is an estimate of V ⇡
(st). This approach
can be viewed as an actor-critic architecture where the pol-
icy ⇡ is the actor and the baseline bt is the critic (Sutton 
Barto, 1998; Degris et al., 2012).
4. Asynchronous RL Framework
We now present multi-threaded asynchronous variants of
one-step Sarsa, one-step Q-learning, n-step Q-learning, and
advantage actor-critic. The aim in designing these methods
was to find RL algorithms that can train deep neural net-
work policies reliably and without large resource require-
ments. While the underlying RL methods are quite dif-
ferent, with actor-critic being an on-policy policy search
method and Q-learning being an off-policy value-based
method, we use two main ideas to make all four algorithms
practical given our design goal.
First, we use asynchronous actor-learners, similarly to the
Gorila framework (Nair et al., 2015), but instead of using
separate machines and a parameter server, we use multi-
ple CPU threads on a single machine. Keeping the learn-
ers on a single machine removes the communication costs
of sending gradients and parameters and enables us to use
Hogwild! (Recht et al., 2011) style updates for training.
Second, we make the observation that multiple actors-
Algorithm 1 Asynchronous one-step Q-learning - pseu-
docode for each actor-learner thread.
// Assume global shared ✓, ✓ , and counter T = 0.
Initialize thread step counter t 0
Initialize target network weights ✓ ✓
Initialize network gradients d✓ 0
Get initial state s
repeat
Take action a with ✏-greedy policy based on Q(s, a; ✓)
Receive new state s0
and reward r
y =
⇢
r for terminal s0
r + maxa0 Q(s0
, a0
; ✓ ) for non-terminal s0
Accumulate gradients wrt ✓: d✓ d✓ + @(y Q(s,a;✓))2
@✓
s = s0
T T + 1 and t t + 1
if T mod Itarget == 0 then
Update the target network ✓ ✓
end if
if t mod IAsyncUpdate == 0 or s is terminal then
Perform asynchronous update of ✓ using d✓.
Clear gradients d✓ 0.
end if
until T  Tmax
learners running in parallel are likely to be exploring dif-
ferent parts of the environment. Moreover, one can explic-
itly use different exploration policies in each actor-learner
to maximize this diversity. By running different explo-
ration policies in different threads, the overall changes be-
ing made to the parameters by multiple actor-learners ap-
plying online updates in parallel are likely to be less corre-
lated in time than a single agent applying online updates.
Hence, we do not use a replay memory and rely on parallel
actors employing different exploration policies to perform
the stabilizing role undertaken by experience replay in the
DQN training algorithm.
In addition to stabilizing learning, using multiple parallel
actor-learners has multiple practical benefits. First, we ob-
tain a reduction in training time that is roughly linear in
the number of parallel actor-learners. Second, since we no
longer rely on experience replay for stabilizing learning we
are able to use on-policy reinforcement learning methods
such as Sarsa and actor-critic to train neural networks in a
stable way. We now describe our variants of one-step Q-
learning, one-step Sarsa, n-step Q-learning and advantage
actor-critic.
Asynchronous one-step Q-learning: Pseudocode for our
variant of Q-learning, which we call Asynchronous one-
step Q-learning, is shown in Algorithm 1. Each thread in-
teracts with its own copy of the environment and at each
step computes a gradient of the Q-learning loss. We use
a shared and slowly changing target network in comput-
ing the Q-learning loss, as was proposed in the DQN train-
ing method. We also accumulate gradients over multiple
timesteps before they are applied, which is similar to us-
Asynchronous Methods for Deep Reinforcement Learning
Figure 1. Learning speed comparison for DQN and the new asynchronous algorithms on five Atari 2600 games. DQN was trained on
a single Nvidia K40 GPU while the asynchronous methods were trained using 16 CPU cores. The plots are averaged over 5 runs. In
the case of DQN the runs were for different seeds with fixed hyperparameters. For asynchronous methods we average over the best 5
models from 50 experiments with learning rates sampled from LogUniform(10 4
, 10 2
) and all other hyperparameters fixed.
two additional domains to evaluate only the A3C algorithm
– Mujoco and Labyrinth. MuJoCo (Todorov, 2015) is a
physics simulator for evaluating agents on continuous mo-
tor control tasks with contact dynamics. Labyrinth is a new
3D environment where the agent must learn to find rewards
in randomly generated mazes from a visual input. The pre-
cise details of our experimental setup can be found in Sup-
plementary Section 8.
5.1. Atari 2600 Games
We first present results on a subset of Atari 2600 games to
demonstrate the training speed of the new methods. Fig-
ure 1 compares the learning speed of the DQN algorithm
trained on an Nvidia K40 GPU with the asynchronous
methods trained using 16 CPU cores on five Atari 2600
games. The results show that all four asynchronous meth-
ods we presented can successfully train neural network
controllers on the Atari domain. The asynchronous meth-
ods tend to learn faster than DQN, with significantly faster
learning on some games, while training on only 16 CPU
cores. Additionally, the results suggest that n-step methods
learn faster than one-step methods on some games. Over-
all, the policy-based advantage actor-critic method signifi-
cantly outperforms all three value-based methods.
We then evaluated asynchronous advantage actor-critic on
57 Atari games. In order to compare with the state of the
art in Atari game playing, we largely followed the train-
ing and evaluation protocol of (Van Hasselt et al., 2015).
Specifically, we tuned hyperparameters (learning rate and
amount of gradient norm clipping) using a search on six
Atari games (Beamrider, Breakout, Pong, Q*bert, Seaquest
and Space Invaders) and then fixed all hyperparameters for
all 57 games. We trained both a feedforward agent with the
same architecture as (Mnih et al., 2015; Nair et al., 2015;
Van Hasselt et al., 2015) as well as a recurrent agent with an
additional 256 LSTM cells after the final hidden layer. We
additionally used the final network weights for evaluation
to make the results more comparable to the original results
Method Training Time Mean Median
DQN 8 days on GPU 121.9% 47.5%
Gorila 4 days, 100 machines 215.2% 71.3%
D-DQN 8 days on GPU 332.9% 110.9%
Dueling D-DQN 8 days on GPU 343.8% 117.1%
Prioritized DQN 8 days on GPU 463.6% 127.6%
A3C, FF 1 day on CPU 344.1% 68.2%
A3C, FF 4 days on CPU 496.8% 116.6%
A3C, LSTM 4 days on CPU 623.0% 112.6%
Table 1. Mean and median human-normalized scores on 57 Atari
games using the human starts evaluation metric. Supplementary
Table SS3 shows the raw scores for all games.
from (Bellemare et al., 2012). We trained our agents for
four days using 16 CPU cores, while the other agents were
trained for 8 to 10 days on Nvidia K40 GPUs. Table 1
shows the average and median human-normalized scores
obtained by our agents trained by asynchronous advantage
actor-critic (A3C) as well as the current state-of-the art.
Supplementary Table S3 shows the scores on all games.
A3C significantly improves on state-of-the-art the average
score over 57 games in half the training time of the other
methods while using only 16 CPU cores and no GPU. Fur-
thermore, after just one day of training, A3C matches the
average human normalized score of Dueling Double DQN
and almost reaches the median human normalized score of
Gorila. We note that many of the improvements that are
presented in Double DQN (Van Hasselt et al., 2015) and
Dueling Double DQN (Wang et al., 2015) can be incorpo-
rated to 1-step Q and n-step Q methods presented in this
work with similar potential improvements.
5.2. TORCS Car Racing Simulator
We also compared the four asynchronous methods on
the TORCS 3D car racing game (Wymann et al., 2013).
TORCS not only has more realistic graphics than Atari
2600 games, but also requires the agent to learn the dy-
namics of the car it is controlling. At each step, an agent
received only a visual input in the form of an RGB image
Joo-Haeng Lee 2017 joohaeng@gmail.com
Schema Networks: Zero-shot Transfer with a Generative Causal Model of
Intuitive Physics
Ken Kansky Tom Silver David A. M´ely Mohamed Eldawy Miguel L´azaro-Gredilla Xinghua Lou
Nimrod Dorfman Szymon Sidor Scott Phoenix Dileep George
Abstract
The recent adaptation of deep neural network-
based methods to reinforcement learning and
planning domains has yielded remarkable
progress on individual tasks. Nonetheless,
progress on task-to-task transfer remains limited.
In pursuit of efficient and robust generalization,
we introduce the Schema Network, an object-
oriented generative physics simulator capable
of disentangling multiple causes of events and
reasoning backward through causes to achieve
goals. The richly structured architecture of the
Schema Network can learn the dynamics of an
environment directly from data. We compare
Schema Networks with Asynchronous Advan-
tage Actor-Critic and Progressive Networks on a
suite of Breakout variations, reporting results on
training efficiency and zero-shot generalization,
consistently demonstrating faster, more robust
learning and better transfer. We argue that
generalizing from limited data and learning
causal relationships are essential abilities on the
path toward generally intelligent systems.
1. Introduction
A longstanding ambition of research in artificial intelli-
gence is to efficiently generalize experience in one scenario
to other similar scenarios. Such generalization is essential
for an embodied agent working to accomplish a variety of
goals in a changing world. Despite remarkable progress on
individual tasks like Atari 2600 games (Mnih et al., 2015;
Van Hasselt et al., 2016; Mnih et al., 2016) and Go (Silver
et al., 2016a), the ability of state-of-the-art models to trans-
fer learning from one environment to the next remains lim-
All authors affiliated with Vicarious AI, California, USA. Cor-
respondence to: Ken Kansky ken@vicarious.com, Tom Silver
tom@vicarious.com.
Copyright 2017 by the author(s).
Figure 1. Variations of Breakout. From top left: standard version,
middle wall, half negative bricks, offset paddle, random target,
and juggling. After training on the standard version, Schema Net-
works are able to generalize to the other variations without any
additional training.
ited. For instance, consider the variations of Breakout illus-
trated in Fig. 1. In these environments the positions of ob-
jects are perturbed, but the object movements and sources
of reward remain the same. While humans have no trouble
generalizing experience from the basic Breakout to its vari-
ations, deep neural network-based models are easily fooled
(Taylor  Stone, 2009; Rusu et al., 2016).
The model-free approach of deep reinforcement learning
(Deep RL) such as the Deep-Q Network and its descen-
dants is inherently hindered by the same feature that makes
it desirable for single-scenario tasks: it makes no assump-
tions about the structure of the domain. Recent work has
suggested how to overcome this deficiency by utilizing
object-based representations (Diuk et al., 2008; Usunier
et al., 2016). Such a representation is motivated by the
Schema Networks: Zero-shot Transfer with a Generative Causal Model of Intuitive Physics
still be unable to generalize from biased training data with-
out continuing to learn on the test environment. In contrast,
Schema Networks exhibit zero-shot transfer.
Schema Networks are implemented as probabilistic graph-
ical models (PGMs), which provide practical inference and
structure learning techniques. Additionally, inference with
uncertainty and explaining away are naturally supported by
PGMs. We direct the readers to (Koller  Friedman, 2009)
and (Jordan, 1998) for a thorough overview of PGMs. In
particular, early work on factored MDPs has demonstrated
how PGMs can be applied in RL and planning settings
(Guestrin et al., 2003b).
3. Schema Networks
3.1. MDPs and Notation
The traditional formalism for the Reinforcement Learning
problem is the Markov Decision Process (MDP). An MDP
M is a five-tuple (S, A, T, R, ), where S is a set of states,
A is a set of actions, T(s(t+1)
|s(t)
, a(t)
) is the probabil-
ity of transitioning from state s(t)
2 S to s(t+1)
2 S af-
ter action a(t)
2 A, R(r(t+1)
|s(t)
, a(t)
) is the probability
of receiving reward r(t+1)
2 R after executing action a(t)
while in state s(t)
, and 2 [0, 1] is the rate at which future
rewards are exponentially discounted.
3.2. Model Definition
A Schema Network is a structured generative model of an
MDP. We first describe the architecture of the model infor-
mally. An image input is parsed into a list of entities, which
may be thought of as instances of objects in the sense of
OO-MDPs (Diuk et al., 2008). All entities share the same
collection of attributes. We refer to a specific attribute of
a specific entity as an entity-attribute, which is represented
as a binary variable to indicate the presence of that attribute
for an entity. An entity state is an assignment of states to
all attributes of the entity, and the complete model state is
the set of all entity states.
A grounded schema is a binary variable associated with
a particular entity-attribute in the next timestep, whose
value depends on the present values of a set of binary
entity-attributes. The event that one of these present entity-
attributes assumes the value 1 is called a precondition of the
grounded schema. When all preconditions of a grounded
schema are satisfied, we say that the schema is active, and
it predicts the activation of its associated entity-attribute.
Grounded schemas may also predict rewards and may be
conditioned on actions, both of which are represented as
binary variables. For instance, a grounded schema might
define a distribution over Entity 1’s “position” attribute at
time 5, conditioned on Entity 2’s “position” attribute at
time 4 and the action “UP” at time 4. Grounded schemas
Figure 2. Architecture of a Schema Network. An ungrounded
schema is a template for a factor that predicts either the value
of an entity-attribute (A) or a future reward (B) based on entity
states and actions taken in the present. Self-transitions (C) predict
that entity-attributes remain in the same state when no schema is
active to predict a change. Self-transitions allow continuous or
categorical variables to be represented by a set of binary variables
(depicted as smaller nodes). The grounded schema factors, instan-
tiated from ungrounded schemas at all positions, times, and entity
bindings, are combined with self-transitions to create a Schema
Network (D).
are instantiated from ungrounded schemas, which behave
like templates for grounded schemas to be instantiated at
different times and in different combinations of entities.
For example, an ungrounded schema could predict the “po-
sition” attribute of Entity x at time t + 1 conditioned on
the “position” of Entity y at time t and the action “UP”
at time t; this ungrounded schema could be instantiated at
time t = 4 with x = 1 and y = 2 to create the grounded
schema described above. In the case of attributes like “po-
sition” that are inherently continuous or categorical, several
binary variables may be used to discretely approximate the
distribution (see the smaller nodes in Figure 2). A Schema
Network is a factor graph that contains all grounded instan-
tiations of a set of ungrounded schemas over some window
of time, illustrated in Figure 2.
We now formalize the Schema Network factor graph. For
simplicity, suppose the number of entities and the num-
ber of attributes are fixed at N and M respectively. Let
Ei refer to the ith
entity and let ↵
(t)
i,j refer to the jth
at-
tribute value of the ith
entity at time t. We use the notation
E
(t)
i = (↵
(t)
i,1, ..., ↵
(t)
i,M ) to refer to the state of the ith
en-
Schema Networks: Zero-shot Transfer with a Generative Causal Model of Intuitive Physics
(a) Mini Breakout Learning Rate (b) Middle Wall Learning Rate
Figure 3. Comparison of learning rates. (a) Schema Networks and A3C were trained for 100k frames in Mini Breakout. Plot shows the
average of 5 training attempts for Schema Networks and the best of 5 training attempts for A3C, which did not converge as reliably. (b)
PNs and Schema Networks were pretrained on 100K frames of Standard Breakout, and then training continued on 45K additional frames
of the Middle Wall variation. We show performance as a function of training frames for both models. Note that Schema Networks are
ignoring all the additional training data, since all the required schemas were learned during pretraining. For Schema Networks, zero-shot
transfer learning is happening.
the input to Schema Networks did not treat any object dif-
ferently. Schema Networks were provided separate entities
for each part (pixel) of each object, and each entity con-
tained 53 attributes corresponding to the available part la-
bels (21 for bricks, 30 for the paddle, 1 for walls, and 1 for
the ball). Only one of these part attributes was active per
entity. Schema Networks had to learn that some attributes,
like parts of bricks, were irrelevant for prediction.
5.1. Transfer Learning
This experiment examines how effectively Schema Net-
works and PNs are able to learn a new Breakout variation
after pretraining, which examines how well the two mod-
els can transfer existing knowledge to a new task. Fig. 3a
shows the learning rates during 100k frames of training on
Mini Breakout. In a second experiment, we pretrained on
Large Breakout for 100k frames and continued training on
the Middle Wall variation, shown in Fig. 1b. Fig. 3b shows
that PNs require significant time to learn in this new en-
vironment, while Schema Networks do not learn anything
new because the dynamics are the same.
5.2. Zero-Shot Generalization
Many Breakout variations can be constructed that all in-
volve the same dynamics. If a model correctly learns the
dynamics from one variation, in theory the others could
be played perfectly by planning using the learned model.
Rather than comparing transfer with additional training us-
ing PNs, in these variations we can compare zero-shot gen-
eralization by training A3C only on Standard Breakout.
Fig. 1b-e shows some of these variations with the following
modifications from the training environment:
• Offset Paddle (Fig. 1d): The paddle is shifted upward
by a few pixels.
• Middle Wall (Fig. 1b): A wall is placed in the middle
of the screen, requiring the agent to aim around it to
hit the bricks.
• Random Target (Fig. 1e): A group of bricks is
destoyed when the ball hits any of them and then reap-
pears in a new random position, requiring the agent to
delibarately aim at the group.
• Juggling (Fig. 1f, enlarged from actual environment
to see the balls): Without any bricks, three balls are
launched in such a way that a perfect policy could jug-
gle them without dropping any.
Table 1 shows the average scores per episode in each
Breakout variation. These results show that A3C has failed
to recognize the common dynamics and adapt its policy ac-
cordingly. This comes as no surprise, as the policy it has
learned for Standard Breakout is no longer applicable in
these variations. Simply adding an offset to the paddle is
Joo-Haeng Lee 2017 joohaeng@gmail.com
Playing FlappyBird with Deep Reinforcement Learning
Naveen Appiah
Mechanical Engineering
nappiahb@stanford.edu
Sagar Vare
Stanford ICME
svare@stanford.edu
Abstract
Learning to play games has been one among of the pop-
ular topics researched in AI today. Solving such problems
using game theory/ search algorithms require careful do-
main specific feature definitions, making them averse to
scalability. The goal here is to develop a more general
framework to learn game specific features and solve the
problem. The game we are considering for this project is
the popular mobile game - Flappy Bird. It involves navi-
gating a bird through a bunch of obstacles. Though, this
problem can be solved using naive RL implementation, it
requires good feature definitions to set up the problem. Our
goal is to develop a CNN model to learn features from just
snapshots of the game and train the agent to take the right
actions at each game instance.
1 INTRODUCTION- PROBLEM
DEFINITION
Flappy bird (Figure 1) is a game in which the player
guides the bird, which is the hero of the game through
the space between pairs of pipes. At each instant there
are two actions that the player can take: to press the ’up’
key, which makes the bird jump upward or not pressing
any key, which makes it descend at a constant rate.
Today, the recent advances in deep neural networks,
in which several layers of nodes are used to build up
progressively more abstract representations of the data,
have made it possible for machine learning models to
learn concepts such as object categories directly from
raw sensory data. It is has also been observed that deep
convolutional networks, which use hierarchical layers of
tiled convolutional filters to mimic the effects of receptive
fields produce promising results in solving computer
vision problems such as classification and detection.
The goal here is to develop a deep neural network to
learn game specific features just from the raw pixels and
decide on what actions to take. Inspired by [1] and [2],
we propose a reinforcement learning set-up to learn and
play this game..
Reinforcement learning is essential when it is not suf-
ficient to tackle problems by programming the agent with
just a few predetermined behaviors. It is a way to teach
the agent to make the right decisions under uncertainty
and with very high dimensional input (such as a cam-
era) by making it experiencing scenarios. In this way, the
learning can happen online and the agent can learn to re-
act to even the rarest of scenarios which the brutal pro-
gramming would never consider.
Figure 1: Flappybird Game - Schematics
2 RELATED WORK
Google Deepmind’s efforts to use Deep learning tech-
niques to play games have paved way to looking at ar-
tificial Intelligence problems with a completely different
lens. Their recent success, AlphaGo [4], the Go agent that
has been giving a stiff competition to the experts in the
game show clearly the potential of what Deep learning is
1
Figure 2: Schematic Architecture of the Convolutional Neural Network.
capable of. Deepmind’s previous venture was to learn and
play the Atari 2600 games just from the raw pixel data.
Mnih et al. are able to successfully train agents to play
these games using reinforcement learning, surpassing
human expert-level on multiple games [1],[2]. Here, they
have developed a novel agent, a deep Q-network (DQN)
combining reinforcement learning with deep neural net-
works. The deep Neural Networks acts as the approximate
function to represent the Q-value (action-value) in Q-
learning. They also discuss a few techniques to improve
the efficiency of training and better the stability. They use
a experience replay of previous experiences from which
mini-batches are randomly sampled to update the net-
work so as to de-correlate experiences and delayed up-
dates for the cloned model from which target values are
obtained (explained in detail later) to better the stability.
Another advantage of this pipeline is the complete ab-
sence of labeled data. The model learns by playing with
the game emulator and learns to make good decisions
over time. It is this simple learning framework and their
stupendous results in playing the Atari games, inspired us
to implement a similar algorithm for this project.
3 METHODS
In the following section, we describe how the model is pa-
rameterized and the Q-learning algorithm. The task of
the AI agent when the model gets deployed is to extract
images of game instances and output the necessary ac-
tion to be taken from the set of feasible actions that can
be taken. This is similar to a classification problem. Un-
like the common classification problem, we don’t have la-
beled data to train the model on. Instead, a reinforcement
learning setting tries to evaluate the actions at a given
state based on the reward it observes by executing it.
3.1 MODEL FORMULATION
The actions the bird can take are to flap (a = 1) or do noth-
ing (a = 0). The state at time (frame) t is derived by pre-
processing the raw image of the current frame (xt ) with
a finite number of previous frames (xt°1,xt°2,...). This
way, each state will uniquely recognize the trajectory the
bird had followed to reach that position and thus provide
temporal information to the agent. The number of previ-
ous frames stored becomes a hyper-parameter. Ideally, st
should be a function of all frames from t = 1 but to reduce
the state-space, only a finite number of frames are used.
As we know, that the bird dies when it hits the pipe or
the edges of the screen, we can associate a negative re-
ward for bird crashing and a positive reward if it passes
through the gap. This will be close to what a human
player tries to do, i.e try to avoid dying and score as many
points as possible. Therefore, there are two rewards,
rewardPass and rewardDie. A discount factor (∞) of
0.9 is used to discount the rewards propagated from the
future action-values
4 Q-LEARNING
The goal of reinforcement learning is to maximize the to-
tal pay-off (reward). In Q-learning, which is off-policy, we
use the bellman equation as an iterative update
section, the experiences are stored in a replay memory
and at regular intervals, a random mini-batch of experi-
ences are sampled from the memory and used to perform
a gradient descent on the DQN parameters. Then we up-
date the exploration probability as well as the target net-
work parameters µ°
if necessary.
Algorithm 1 Deep Reinforcement learning
1: Initialize replay memory D to certain capacity
2: Initialize the Q-value function with random weights µ
3: Initialize µ° = µ
4: for games = 1 ! maxGames do
5: for snapShots = 1 ! T do
6: With probability ≤ select a random action at
7: otherwise select at = ar gmaxaQ(st ,a;µ)
8: Execute at and observe rt and next sate st+1
9: Store transition st ,at ,rt ,st+1 in D
10: Sample mini-batch of transitions from D
11: for j = 1 ! size of minibatch do
12: if game terminates at next state then
13: yj = rf
14: else
15: yj = rj +∞maxa0 Q(s0,a0;µ°))
16: end if
17: end for
18: Perform gradient descent on the loss w.r.t µ
19: Every C steps reset µ° = µ
20: end for
21: end for
The score of the output game is the sole evaluation
metric. To make the results robust, we take an average
score over a few games rather than a single one. The ≤ fac-
tor is set to zero during test and while training, we use a
decaying value. This is to model the surety of our deci-
sions as we train and learn more.
5 EXPERIMENTS AND RESULTS
5.1 TRAINING PARAMETERS
Model Parameters: The Flappy bird is played at 10 frames
per second, 3 recent frames are processed to generate a
state, the discount factor ∞ is set to 0.9 and the rewards are
as follows: rewardPass = +1.0 and rewardDie = °1.0.
DQN parameters: The exploration probability (≤)
linearly decreased from 0.6 to 0 in 1000 updates. The size
of the replay memory is set to 1000 and the mini-batches
are sampled once it has 500 experiences. The parameters
of the target model µ°
are updated every C=100 updates.
A mini-batch of 32 is randomly sampled every 5 frames
to update the DQN parameters.
Training parameters: The Gradient descent update
rule used to update the DQN parameters is Adam with
a learning rate 1e ° 6, Ø1 = 0.9 and Ø2 = 0.999. These
parameters were chosen on a trial and error basis observ-
ing the convergence of the loss value. Our convolution
weights are initialized to have a normal distribution with
mean 0 and variance 1e °2.
The whole DQN architecture and the Q-learning
setup was developed in python using numpy
and matplotlib libraries. The game emulator is
also a python-pygame implementation found at
https://github.com/TimoWilken/flappy-bird-pygame.git
5.2 RESULTS AND ANALYSIS
After training, a few snapshots of the game were tested
with the model to see if results made sense. Figure
3 shows some example snaps and their corresponding
scores which make perfect sense.
(a) Score: UP = 1.870, DOWN = -1.830
(b) Score: UP = -1.999, DOWN = 1.983
Figure 3: Example snapshots with their corresponding
scores. 3a is scenario where the bird has to jump up and
3b is a scenario where the bird has to go down
To understand more about the working of the trained
CNN model, test image 3b was visualized after the con-
volution layers to notice the activation. It could be seen
that most activation show clear patches on the edges of
References Web
Joo-Haeng Lee 2017 joohaeng@gmail.com

Notes on Reinforcement Learning - v0.1

  • 1.
    Notes on Reinforcement Learning Joo-HaengLee GTA (GameTheory AOC), ETRI, 2017-09-21
  • 2.
    Joo-Haeng Lee 2017joohaeng@gmail.com Goal of Today’s Talk R 게sm 강화학습p vn하기 o해i - 기본 개념p r해하t! R Pr해했다W hT하는 f람의 rk기b 들let." - 연구 동향p gw g펴et! R 도대y .GGgDe -eeH2ind의 -eeH Q-NetNGIkr d데 ,T,60 2600p Xc u?Q - 참Wta R AttH://neuIG.cJ.ut.ee/demyJti?ying-deeH-Iein?GIcement-De:Ining/ R WikiHedi:, :IXiM, J:M: ,T,60, .it/ub, TNG 2inute P:HeI, …
  • 3.
  • 4.
    Joo-Haeng Lee 2017joohaeng@gmail.com Various types of systems! Each requires different control policies.
  • 5.
    Joo-Haeng Lee 2017joohaeng@gmail.com Many computer games belong to a dynamic system with discrete components. Not every!
  • 6.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 7.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 8.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 9.
    Joo-Haeng Lee 2017joohaeng@gmail.com S1S0 a0 S4 S2 a1 S3 a2 S7 S5 S6 S8 A state machine SM defined with 9 states, 3 actions, and 20 transitions.
  • 10.
    Joo-Haeng Lee 2017joohaeng@gmail.com S1S0 a0 S4 S2 a1 S3 a2 S7 S5 S6 S8 For a given input at at time t, the state machine SM returns its state representation st and reward rt. at rt st Action State Reward
  • 11.
    Joo-Haeng Lee 2017joohaeng@gmail.com S1S0 a0 S4 S2 a1 S3 a2 S7 S5 S6 S8 A human player. at rt st Action State Reward PerceptionControl
  • 12.
    Joo-Haeng Lee 2017joohaeng@gmail.com The system details and dynamics are unknown, or only partially known. at rt st Action State Reward PerceptionControl ?
  • 13.
    Joo-Haeng Lee 2017joohaeng@gmail.com The system details and dynamics are unknown, or only partially known. at rt st Action State Reward PerceptionControl ?
  • 14.
    Joo-Haeng Lee 2017joohaeng@gmail.com A human builds his cognitive model by learning. at rt st Action State Reward PerceptionControl ?
  • 15.
    Joo-Haeng Lee 2017joohaeng@gmail.com How can a machine learn to perform? at rt st Action State Reward PerceptionControl ?
  • 16.
    Joo-Haeng Lee 2017joohaeng@gmail.com A classic approach is Reinforcement Learning (RL)! at rt st Action State Reward PerceptionControl ?
  • 17.
    Joo-Haeng Lee 2017joohaeng@gmail.com One of RL methods is Q-Learning (QL)! at rt st Action State Reward PerceptionControl ?
  • 18.
    Joo-Haeng Lee 2017joohaeng@gmail.com A recent advancement in QL is Deep Q-Learning (DQL) by DeepMind! at rt st Action State Reward PerceptionControl ?
  • 19.
    Joo-Haeng Lee 2017joohaeng@gmail.com Can we build Alpha Ma using DQL or its variants? at rt st Action State Reward PerceptionControl ?
  • 20.
  • 21.
    Joo-Haeng Lee 2017joohaeng@gmail.com Reinforcement Learning • “Reinforcement learning (RL) is an area of machine learning inspired by behaviorist psychology, concerned with how software agents ought to take actions in an environment so as to maximize some notion of cumulative reward.“— Wikipedia • “강화 학습은 기계 학습이 다루는 문제의 하나로, 어떤 환경 안에서 정의된 에이전트가 현재의 상태를 인식하여, 선택 가능한 행동들 중 보상을 최대화하는 행동 혹은 행동 순서 를 선택하는 방법이다.” — Wikipedia
  • 22.
    Joo-Haeng Lee 2017joohaeng@gmail.com Main Challenges in RL • Credit Assignment Problem - “방금 얻은 점수는 어떤 액션 덕분이지?” • Exploration-Exploitation Dilemma - 탐사-채광:“더 큰 금맥을 찾아 갈까? 여기서 채굴할까?”
  • 23.
    Joo-Haeng Lee 2017joohaeng@gmail.com Mathematical Formalism for RL • Markov Decision Process (MDP) - 액션에 따른 상태의 전이 - Action - State - Transition S1S0 a0 S4 S2 a1 S3 a2 S7 S5 S6 S8 -10 -10 +100 +2 +20 +20 -50
  • 24.
    Joo-Haeng Lee 2017joohaeng@gmail.com Key Concepts • Encoding long term-strategies: discounted future reward • Estimate the future reward: table-based Q-learning • Huge state space: Q-table is replaced with neural network • Implementation tip: experience replay for stability • Exploration-exploitation dilemma: 𝜀-greedy exploration
  • 25.
    Joo-Haeng Lee 2017joohaeng@gmail.com Reinforcement Learning — Breakout
  • 26.
    Joo-Haeng Lee 2017joohaeng@gmail.com Reinforcement Learning — Breakout • Problem description - Input: game screen with scores - Output: game controls = ( left || right || space ) - Training? • Experts dataset for supervised learning — how to get them? • Self practice with occasional rewards as humans do — reinforcement learning
  • 27.
    Joo-Haeng Lee 2017joohaeng@gmail.com Markov Decision Process (MDP) — Formalism for RL • Environment: game, system, simulator, … • Agent: a human user, SW • State: stochastic transition to another state for a action • Action • Reward • Policy EnvironmentsAgent Action State Reward S1S0 a0 S4 S2 a1 S3 a2 S7 S5 S6 S8 -10 -10 +100 +2 +20 +20 -50
  • 28.
    Joo-Haeng Lee 2017joohaeng@gmail.com Markov Decision Process (MDP) — Formalism for RL • Episode - a sequence of states, actions, and rewards in a game - so, ao, r1, s1, a1, r2, s2, a2, r3, s3, a3, …, rn-1, sn = game over = GG • Markov assumption - The probability of the next state si+1 depends only on current state si and performed action ai, but not on preceding states or actions.
  • 29.
    Joo-Haeng Lee 2017joohaeng@gmail.com • To play well in long-term, need to consider current and future rewards at once. • Total reward for an episode: R = r1 + r2 + r3+…+ rn • Total future reward at time t: Rt = rt + rt+1 + rt+2+…+ rn • Considering the stochastic nature, • Discounted future reward: Rt = rt +𝛾 rt+1 + 𝛾2 rt+2+…+ 𝛾n-t rn = rt +𝛾 Rt+1 • NOTE: A good strategy for an agent would be to always choose an action at at the state st, that maximizes the discounted future reward Rt+1. • BUT, how? Discounted Future Reward (DFR)
  • 30.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning • Q-function: Q(s, a) — the discounted future reward from a sequence of optimal actions - Q(s, a) = max Rt+1 - Among myriads of possible episodes, the maximum DFR could be earned from a certain sequence of actions after the current action a at the state s. - The “quality” of the current action affects DFR.
  • 31.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning • Policy: - π(s) = arg maxa’ Q(s, a’) = a - The action a which results in the maximum DFR: Q(s, a)
  • 32.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning • Bellman equation for the transition < s1, a1, s2, r2 > - Q(s1, a1) = r2 + 𝛾 maxai Q(s2, ai) S1 S2 a1 r2 S3 S4 r3 r4 a2 a3
  • 33.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning • Naïve algorithm for Q-table filling: - Initialize Q-table arbitrarily with #state rows and #action columns. - Observe initial state s - Repeat • Select an action a and input to the environment E - Action a will be carried out in E. • Observe reward r and new state s’ • Update the table: Q(s, a) = (1-α) Q(s, a) +α (r + γ maxa' Q(s’, a’)) - s = s' - until terminated Q-table a1 a2 a2 … an s1 100 130 80 … 121 s2 200 99 99 … 2 s2 50 99 150 … 2 ... … … … … … sn 101 124 124 … 199
  • 34.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning • The estimations get more and more accurate with every iteration and it has been shown that, if we perform this update enough times, then the Q-function will converge and represent the true Q-value. • OK. BUT, how to generalize a Q-function (or Q-table) to handle many similar problems at once? — (ex) ATARI 2600.
  • 35.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network • Q-Learning + Deep Neural Network • DQN • Google DeepMind (NIPS 2013 Workshop, Nature 2015)
  • 36.
    Joo-Haeng Lee 2017joohaeng@gmail.com ATARI 2600
  • 37.
    Joo-Haeng Lee 2017joohaeng@gmail.com ATARI 2600
  • 38.
    Joo-Haeng Lee 2017joohaeng@gmail.com ATARI 2600
  • 39.
    Joo-Haeng Lee 2017joohaeng@gmail.com ATARI 2600
  • 40.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning — Breakout • Modeling for Breakout: - State: description of all the game elements such as ball, bar, and bricks - Reward: score - Output: game controls = ( left || right || space ) • BUT, how to handle all the other ATARI 2600 games? - The problem of generalization! (# bricks) * (x, y, on) + (x) for bar + (x, y) for ball
  • 41.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning — All ATARI 2600 Games? • Modeling for any Atari 2600 games: - State: all the pixels in the game screens - Reward: score - Output: all the control actions in the joystick
  • 42.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning — All ATARI 2600 Games? • Modeling for any Atari 2600 games: - State: 84x84 pixels * 4 frames * 256 gray - Reward: score - Output:18 actions Convolution Convolution Fully connected Fully connected No input ation of the convolutional neural network. The explained in the Methods. The input to the neural 843 4 image produced by the preprocessing nvolutional layers (note: snaking blue line symbolizes sliding of each filter across input image) and two fully connected layers with a single output for each valid action. Each hidden layer is followed by a rectifier nonlinearity (that is, max 0,xð Þ).
  • 43.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning — All ATARI 2600 Games? • Modeling for any Atari 2600 games: - State: 84x84 pixels * 4 frames * 256 gray = 25684x84x4 ~ 1067970 - Reward: score - Output:18 actions Convolution Convolution Fully connected Fully connected No input ation of the convolutional neural network. The explained in the Methods. The input to the neural 843 4 image produced by the preprocessing nvolutional layers (note: snaking blue line symbolizes sliding of each filter across input image) and two fully connected layers with a single output for each valid action. Each hidden layer is followed by a rectifier nonlinearity (that is, max 0,xð Þ).
  • 44.
    Joo-Haeng Lee 2017joohaeng@gmail.com Q-Learning — All ATARI 2600 Games? • Modeling for any Atari 2600 games: - State: 84x84 pixels * 4 frames * 256 gray = 25684x84x4 ~ 1067970 - Reward: score - Output:18 actions
  • 45.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network — All ATARI 2600 Games! • We can hardly implement a Q-function as a table: size and sparsity! • Now, deep learning steps in! - Deep convolutional neural network (CNN) is specially good at extracting small set of features from a big data. - We can replace Q-table with a deep neural network — DQN! Q(s, an)
  • 46.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network — All ATARI 2600 Games! Layer Input Filter size Stride Num filters Activation Output conv1 84x84x4 8×8 4 32 ReLU 20x20x32 conv2 20x20x32 4×4 2 64 ReLU 9x9x64 conv3 9x9x64 3×3 1 64 ReLU 7x7x64 fc4 7x7x64 512 ReLU 512 fc5 512 18 Linear 18 lt and engaging for human players. We used the same network ecture, hyperparameter values (see Extended Data Table 1) and ngprocedurethroughout—takinghigh-dimensionaldata(210|160 r video at 60 Hz) as input—to demonstrate that our approach tly learns successful policies over a variety of games based solely soryinputswithonlyveryminimalpriorknowledge(thatis,merely put data were visual images, and the number of actions available h game, but not their correspondences; see Methods). Notably, ethod was able to train large neural networks using a reinforce- earningsignalandstochasticgradientdescentinastablemanner— ated by the temporal evolution of two indices of learning (the s average score-per-episode and average predicted Q-values; see and Supplementary Discussion for details). We compared DQN with the best performing methods from the reinforcement learning literature on the 49 games where results were available12,15 . In addition to the learned agents, we alsoreport scores for aprofessionalhumangamestesterplayingundercontrolledconditions and a policy that selects actions uniformly at random (Extended Data Table 2 and Fig. 3, denoted by 100% (human) and 0% (random) on y axis; see Methods). Our DQN method outperforms the best existing reinforcement learning methods on 43 of the games without incorpo- rating any of the additional prior knowledge about Atari 2600 games used by other approaches (for example, refs 12, 15). Furthermore, our DQN agent performed at a level that was comparable to that of a pro- fessionalhumangamestesteracrossthesetof49games,achievingmore than75%ofthe humanscore onmorethanhalfofthegames(29 games; Convolution Convolution Fully connected Fully connected No input 1 | Schematic illustration of the convolutional neural network. The of the architecture are explained in the Methods. The input to the neural k consists of an 843 843 4 image produced by the preprocessing followed by three convolutional layers (note: snaking blue line symbolizes sliding of each filter across input image) and two fully connected layers with a single output for each valid action. Each hidden layer is followed by a rectifier nonlinearity (that is, max 0,xð Þ). EARCH LETTER Q(s, an)
  • 47.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network • Loss - To measure how well a neural network is trained - The less, the better. - Current Q by prediction: Q(s, a) — forward evaluation of a neural network - Target Q from new reward: r + γ maxa' Q(s’, a’) — forward evaluation - L = 1/2 (current - target)2 = 1/2 ( Q(s, a) - ( r + γ maxa' Q(s’, a’) ) )2 - Weights of a neural network are updated to minimize the loss — back propagation
  • 48.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network • Experience Replay - Training efficiency:“It takes a long time, almost a week on a single GPU.” - Experience: <s, a, r, a’> - Experience memory stores all the recent experiences.Actually, not all, but quite a few. - Train on adjacent experiences? - No! Random samples form experience memory to avoid local minimum.
  • 49.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network • So far, we mainly focused on “credit assignment problem,” specially in the context of Q-learning. • Exploration-Exploitation Dilemma? - At first, Q-network gives a taste of randomness in selecting an optimal action due to random initialization — greedy exploration to find the first (not the best) solution. - However, it converges as the training continues — exploitation at the local minimum. • ε-greedy exploration - “Maybe, there could be a better action with the change of ε.” - Choose between a random action and argmaxa' Q(s’, a’).
  • 50.
    Joo-Haeng Lee 2017joohaeng@gmail.com n is ility deep ons rary orks bed ke it the …,et}, mi- hm, nce, oach ence ncy. ong ela- on- ters Initialize action-value function Q with random weights h Initialize target action-value function ^Q with weights h2 5 h For episode 5 1, M do Initialize sequence s1~ x1f g and preprocessed sequence w1~w s1ð Þ For t 5 1,T do With probability e select a random action at otherwise select at~argmaxaQ w stð Þ,a; hð Þ Execute action at in emulator and observe reward rt and image xt 1 1 Set stz1~st,at,xtz1 and preprocess wtz1~w stz1ð Þ Store transition wt,at,rt,wtz1 À Á in D Sample random minibatch of transitions wj,aj,rj,wjz1 from D Set yj~ rj if episode terminates at step jz1 rjzc maxa0 ^Q wjz1,a0 ; h{ otherwise ( Perform a gradient descent step on yj{Q wj,aj; h 2 with respect to the network parameters h Every C steps reset ^Q~Q End For End For 31. Jarrett,K.,Kavukcuoglu,K.,Ranzato,M.A.LeCun,Y.Whatisthebestmulti-stage
  • 51.
    Joo-Haeng Lee 2017joohaeng@gmail.com Deep Q Network • DQN Algorithm: - Initialize replay memory D. - Initialize Q-network with random weights. - Observe initial state s - Repeat • Select a random action a with probability ε. Otherwise a = argmaxa’ Q(s’, a’) • Input a to the environment E for state transition • Observe reward r and new state s’, and store them to replay memory D • Sample random transitions sd, ad, rd, sd’ from replay memory D • Calculate target t for each mini-batch transition - If sd’ is terminal state then t = rd - Otherwise t = rd + γ maxa’Q(sd’, a’) • Train the Q network with the loss L = (t - Q(sd, ad))2 — Updating the Q-network - s = s' - until terminated
  • 52.
  • 53.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 54.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 55.
  • 56.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 57.
  • 58.
  • 59.
  • 60.
    Joo-Haeng Lee 2017joohaeng@gmail.com B. Rider Breakout Enduro Pong Q*bert Seaquest S. Invaders Random 354 1.2 0 20.4 157 110 179 Sarsa [3] 996 5.2 129 19 614 665 271 Contingency [4] 1743 6 159 17 960 723 268 DQN 4092 168 470 20 1952 1705 581 Human 7456 31 368 3 18900 28010 3690 HNeat Best [8] 3616 52 106 19 1800 920 1720 HNeat Pixel [8] 1332 4 91 16 1325 800 1145 DQN Best 5184 225 661 21 4500 1740 1075 Table 1: The upper table compares average total reward for various learning methods by running an ✏-greedy policy with ✏ = 0.05 for a fixed number of steps. The lower table reports results of the single best performing episode for HNeat and DQN. HNeat produces deterministic policies that always get the same score while DQN used an ✏-greedy policy with ✏ = 0.05. types of objects on the Atari screen. The HNeat Pixel score is obtained by using the special 8 color channel representation of the Atari emulator that represents an object label map at each channel. This method relies heavily on finding a deterministic sequence of states that represents a successful exploit. It is unlikely that strategies learnt in this way will generalize to random perturbations; therefore the algorithm was only evaluated on the highest scoring single episode. In contrast, our algorithm is evaluated on ✏-greedy control sequences, and must therefore generalize across a wide variety of possible situations. Nevertheless, we show that on all the games, except Space Invaders, not only our max evaluation results (row 8), but also our average results (row 4) achieve better performance. Finally, we show that our method achieves better performance than an expert human player on Breakout, Enduro and Pong and it achieves close to human performance on Beam Rider. The games Q*bert, Seaquest, Space Invaders, on which we are far from human performance, are more chal- lenging because they require the network to find a strategy that extends over long time scales. 6 Conclusion This paper introduced a new deep learning model for reinforcement learning, and demonstrated its ability to master difficult control policies for Atari 2600 computer games, using only raw pixels as input. We also presented a variant of online Q-learning that combines stochastic minibatch up- dates with experience replay memory to ease the training of deep networks for RL. Our approach gave state-of-the-art results in six of the seven games it was tested on, with no adjustment of the architecture or hyperparameters. References [1] Leemon Baird. Residual algorithms: Reinforcement learning with function approximation. In Proceedings of the 12th International Conference on Machine Learning (ICML 1995), pages 30–37. Morgan Kaufmann, 1995. [2] Marc Bellemare, Joel Veness, and Michael Bowling. Sketch-based linear value function ap- proximation. In Advances in Neural Information Processing Systems 25, pages 2222–2230, 2012. [3] Marc G Bellemare, Yavar Naddaf, Joel Veness, and Michael Bowling. The arcade learning environment: An evaluation platform for general agents. Journal of Artificial Intelligence Research, 47:253–279, 2013. [4] Marc G Bellemare, Joel Veness, and Michael Bowling. Investigating contingency awareness using atari 2600 games. In AAAI, 2012. [5] Marc G. Bellemare, Joel Veness, and Michael Bowling. Bayesian learning of recursively fac- tored environments. In Proceedings of the Thirtieth International Conference on Machine Learning (ICML 2013), pages 1211–1219, 2013. 8 Playing Atari with Deep Reinforcement Learning Volodymyr Mnih Koray Kavukcuoglu David Silver Alex Graves Ioannis Antonoglou Daan Wierstra Martin Riedmiller DeepMind Technologies {vlad,koray,david,alex.graves,ioannis,daan,martin.riedmiller} @ deepmind.com Abstract We present the first deep learning model to successfully learn control policies di- rectly from high-dimensional sensory input using reinforcement learning. The model is a convolutional neural network, trained with a variant of Q-learning, whose input is raw pixels and whose output is a value function estimating future rewards. We apply our method to seven Atari 2600 games from the Arcade Learn- ing Environment, with no adjustment of the architecture or learning algorithm. We find that it outperforms all previous approaches on six of the games and surpasses a human expert on three of them. 1 Introduction Learning to control agents directly from high-dimensional sensory inputs like vision and speech is one of the long-standing challenges of reinforcement learning (RL). Most successful RL applica- tions that operate on these domains have relied on hand-crafted features combined with linear value functions or policy representations. Clearly, the performance of such systems heavily relies on the quality of the feature representation. Recent advances in deep learning have made it possible to extract high-level features from raw sen- sory data, leading to breakthroughs in computer vision [11, 22, 16] and speech recognition [6, 7]. These methods utilise a range of neural network architectures, including convolutional networks, multilayer perceptrons, restricted Boltzmann machines and recurrent neural networks, and have ex- ploited both supervised and unsupervised learning. It seems natural to ask whether similar tech- niques could also be beneficial for RL with sensory data. However reinforcement learning presents several challenges from a deep learning perspective. Firstly, most successful deep learning applications to date have required large amounts of hand- labelled training data. RL algorithms, on the other hand, must be able to learn from a scalar reward signal that is frequently sparse, noisy and delayed. The delay between actions and resulting rewards, which can be thousands of timesteps long, seems particularly daunting when compared to the direct association between inputs and targets found in supervised learning. Another issue is that most deep learning algorithms assume the data samples to be independent, while in reinforcement learning one typically encounters sequences of highly correlated states. Furthermore, in RL the data distribu- tion changes as the algorithm learns new behaviours, which can be problematic for deep learning methods that assume a fixed underlying distribution. This paper demonstrates that a convolutional neural network can overcome these challenges to learn successful control policies from raw video data in complex RL environments. The network is trained with a variant of the Q-learning [26] algorithm, with stochastic gradient descent to update the weights. To alleviate the problems of correlated data and non-stationary distributions, we use 1 Figure 1: Screen shots from five Atari 2600 Games: (Left-to-right) Pong, Breakout, Space Invaders, Seaquest, Beam Rider an experience replay mechanism [13] which randomly samples previous transitions, and thereby smooths the training distribution over many past behaviors. We apply our approach to a range of Atari 2600 games implemented in The Arcade Learning Envi- ronment (ALE) [3]. Atari 2600 is a challenging RL testbed that presents agents with a high dimen- sional visual input (210 ⇥ 160 RGB video at 60Hz) and a diverse and interesting set of tasks that were designed to be difficult for humans players. Our goal is to create a single neural network agent that is able to successfully learn to play as many of the games as possible. The network was not pro- vided with any game-specific information or hand-designed visual features, and was not privy to the internal state of the emulator; it learned from nothing but the video input, the reward and terminal signals, and the set of possible actions—just as a human player would. Furthermore the network ar- chitecture and all hyperparameters used for training were kept constant across the games. So far the network has outperformed all previous RL algorithms on six of the seven games we have attempted and surpassed an expert human player on three of them. Figure 1 provides sample screenshots from five of the games used for training. 2 Background We consider tasks in which an agent interacts with an environment E, in this case the Atari emulator, in a sequence of actions, observations and rewards. At each time-step the agent selects an action at from the set of legal game actions, A = {1, . . . , K}. The action is passed to the emulator and modifies its internal state and the game score. In general E may be stochastic. The emulator’s internal state is not observed by the agent; instead it observes an image xt 2 Rd from the emulator, which is a vector of raw pixel values representing the current screen. In addition it receives a reward rt representing the change in game score. Note that in general the game score may depend on the whole prior sequence of actions and observations; feedback about an action may only be received after many thousands of time-steps have elapsed. Since the agent only observes images of the current screen, the task is partially observed and many emulator states are perceptually aliased, i.e. it is impossible to fully understand the current situation from only the current screen xt. We therefore consider sequences of actions and observations, st = x1, a1, x2, ..., at 1, xt, and learn game strategies that depend upon these sequences. All sequences in the emulator are assumed to terminate in a finite number of time-steps. This formalism gives rise to a large but finite Markov decision process (MDP) in which each sequence is a distinct state. As a result, we can apply standard reinforcement learning methods for MDPs, simply by using the complete sequence st as the state representation at time t. The goal of the agent is to interact with the emulator by selecting actions in a way that maximises future rewards. We make the standard assumption that future rewards are discounted by a factor of per time-step, and define the future discounted return at time t as Rt = PT t0=t t0 t rt0 , where T is the time-step at which the game terminates. We define the optimal action-value function Q⇤ (s, a) as the maximum expected return achievable by following any strategy, after seeing some sequence s and then taking some action a, Q⇤ (s, a) = max⇡ E [Rt|st = s, at = a, ⇡], where ⇡ is a policy mapping sequences to actions (or distributions over actions). The optimal action-value function obeys an important identity known as the Bellman equation. This is based on the following intuition: if the optimal value Q⇤ (s0 , a0 ) of the sequence s0 at the next time-step was known for all possible actions a0 , then the optimal strategy is to select the action a0 2 Mnih,V., Kavukcuoglu, K., Silver, D., Graves,A.,Antonoglou, I.,Wierstra, D., Riedmiller, M. (2013). Playing atari with deep reinforcement learning. arXiv preprint arXiv:1312.5602. — NIPS 2013 Deep Learning Workshop
  • 61.
    Joo-Haeng Lee 2017joohaeng@gmail.com LETTER doi:10.1038/nature14236 Human-level control through deep reinforcement learning Volodymyr Mnih1 *, Koray Kavukcuoglu1 *, David Silver1 *, Andrei A. Rusu1 , Joel Veness1 , Marc G. Bellemare1 , Alex Graves1 , Martin Riedmiller1 , Andreas K. Fidjeland1 , Georg Ostrovski1 , Stig Petersen1 , Charles Beattie1 , Amir Sadik1 , Ioannis Antonoglou1 , Helen King1 , Dharshan Kumaran1 , Daan Wierstra1 , Shane Legg1 Demis Hassabis1 Thetheoryofreinforcementlearningprovidesanormativeaccount1 , deeply rooted in psychological2 and neuroscientific3 perspectives on animal behaviour, of how agents may optimize their control of an environment.Tousereinforcementlearningsuccessfullyinsituations approaching real-worldcomplexity, however, agentsareconfronted with a difficulttask: theymust deriveefficientrepresentations ofthe environment from high-dimensional sensory inputs, and use these togeneralizepastexperiencetonewsituations.Remarkably,humans andotheranimals seemtosolvethisproblemthrougha harmonious combinationofreinforcementlearningandhierarchicalsensorypro- cessing systems4,5 , the former evidenced by a wealth of neural data revealingnotableparallelsbetweenthephasicsignalsemittedbydopa- minergic neurons and temporal difference reinforcement learning algorithms3 .Whilereinforcementlearningagentshaveachievedsome successesinavarietyofdomains6–8 ,theirapplicabilityhaspreviously beenlimitedtodomainsinwhichusefulfeaturescanbehandcrafted, or to domains with fully observed, low-dimensional state spaces. Here we use recent advances in training deep neural networks9–11 to develop a novel artificial agent, termed a deep Q-network, that can learnsuccessfulpoliciesdirectlyfromhigh-dimensionalsensoryinputs using end-to-end reinforcement learning. We tested this agent on the challenging domain of classic Atari 2600 games12 . We demon- strate that the deep Q-network agent, receiving only the pixels and the game score as inputs, was able to surpass the performance of all previous algorithms and achieve a level comparable to that of a pro- fessionalhumangamestesteracrossasetof49games,usingthesame algorithm, network architecture and hyperparameters. This work bridges the divide between high-dimensional sensory inputs and actions, resulting in the first artificial agent that is capable of learn- ing to excel at a diverse array of challenging tasks. We set out to create a single algorithm that would be able to develop a wide range of competencies on a varied range of challenging tasks—a central goal of general artificial intelligence13 that has eluded previous efforts8,14,15 .Toachievethis,wedevelopedanovelagent,adeepQ-network (DQN), which is able to combine reinforcement learning with a class of artificial neural network16 known as deep neural networks. Notably, recent advances in deep neural networks9–11 , in which several layers of nodes are used to build up progressively more abstract representations of the data, have made it possible for artificial neural networks to learn concepts such as object categories directly from raw sensory data. We use one particularly successful architecture, the deep convolutional network17 , which uses hierarchical layers of tiled convolutional filters to mimic the effects of receptive fields—inspired byHubel and Wiesel’s seminalworkonfeedforwardprocessinginearlyvisualcortex18 —thereby exploitingthe localspatial correlations present in images, and building in robustness to natural transformations such as changes of viewpoint or scale. We consider tasks in which the agent interacts with an environment throughasequenceofobservations,actionsandrewards.Thegoalofthe agent is to select actions in a fashion that maximizes cumulative future reward. More formally, we use a deep convolutional neural network to approximate the optimal action-value function Qà s,að Þ~ max p rtzcrtz1zc2 rtz2z . . . jst~s, at~a, p  à , which is the maximum sum of rewards rt discounted by c at each time- step t, achievable by a behaviour policy p 5 P(ajs), after making an observation (s) and taking an action (a) (see Methods)19 . Reinforcement learning is known to be unstable or even to diverge when a nonlinear function approximator such as a neural network is used to represent the action-value (also known as Q) function20 . This instability has several causes: the correlations present in the sequence ofobservations,thefactthatsmallupdatestoQ maysignificantlychange thepolicyandthereforechangethedatadistribution,andthecorrelations betweentheaction-values(Q)andthe target valuesrzc max a0 Q s0 , a0 ð Þ. We address these instabilities with a novel variantof Q-learning, which uses two key ideas. First, we used a biologically inspired mechanism termed experience replay21–23 that randomizes over the data, thereby removing correlationsintheobservationsequenceandsmoothing over changes in the data distribution(see below for details). Second, we used an iterative update that adjusts the action-values (Q) towards target valuesthatareonlyperiodicallyupdated,therebyreducingcorrelations with the target. While other stable methods exist for training neural networks in the reinforcement learning setting, such as neural fitted Q-iteration24 , these methodsinvolvetherepeatedtrainingofnetworksdenovoonhundreds of iterations. Consequently, these methods, unlike our algorithm, are too inefficient to be used successfully with large neural networks. We parameterize an approximate value function Q(s,a;hi) using the deep convolutionalneuralnetworkshowninFig.1,inwhichhi aretheparam- eters (that is, weights) of the Q-network at iteration i. To perform experience replay we store the agent’s experiences et 5 (st,at,rt,st 1 1) at each time-step t in a data set Dt 5 {e1,…,et}. During learning, we apply Q-learning updates, on samples (or minibatches) of experience (s,a,r,s9) , U(D), drawn uniformly at random from the pool of stored samples. The Q-learning update at iteration i uses the following loss function: Li hið Þ~ s,a,r,s0ð Þ*U Dð Þ rzc max a0 Q(s0 ,a0 ; h{ i ){Q s,a; hið Þ 2 # in which c is the discountfactordetermining the agent’s horizon, hi are the parameters of the Q-network at iteration i and h{ i are the network parameters used to compute the target at iteration i. The target net- work parameters h{ i are only updated with the Q-network parameters (hi) every C steps and are held fixed between individual updates (see Methods). To evaluate our DQN agent, we took advantage of the Atari 2600 platform, which offers a diverse array of tasks (n 5 49) designed to be *These authors contributed equally to this work. 1 Google DeepMind, 5 New Street Square, London EC4A 3TW, UK. 2 6 F E B R U A R Y 2 0 1 5 | V O L 5 1 8 | N A T U R E | 5 2 9 Macmillan Publishers Limited. All rights reserved©2015 difficult and engaging for human players. We used the same network architecture, hyperparameter values (see Extended Data Table 1) and learningprocedurethroughout—takinghigh-dimensionaldata(210|160 colour video at 60 Hz) as input—to demonstrate that our approach robustly learns successful policies over a variety of games based solely onsensoryinputswithonlyveryminimalpriorknowledge(thatis,merely the input data were visual images, and the number of actions available in each game, but not their correspondences; see Methods). Notably, our method was able to train large neural networks using a reinforce- mentlearningsignalandstochasticgradientdescentinastablemanner— illustrated by the temporal evolution of two indices of learning (the agent’s average score-per-episode and average predicted Q-values; see Fig. 2 and Supplementary Discussion for details). We compared DQN with the best performing methods from the reinforcement learning literature on the 49 games where results were available12,15 . In addition to the learned agents, we also report scores for aprofessionalhumangamestesterplayingundercontrolledconditions and a policy that selects actions uniformly at random (Extended Data Table 2 and Fig. 3, denoted by 100% (human) and 0% (random) on y axis; see Methods). Our DQN method outperforms the best existing reinforcement learning methods on 43 of the games without incorpo- rating any of the additional prior knowledge about Atari 2600 games used by other approaches (for example, refs 12, 15). Furthermore, our DQN agent performed at a level that was comparable to that of a pro- fessionalhumangamestesteracrossthesetof49games,achievingmore than75%ofthe human score onmorethanhalfofthegames(29 games; Convolution Convolution Fully connected Fully connected No input Figure 1 | Schematic illustration of the convolutional neural network. The details of the architecture are explained in the Methods. The input to the neural network consists of an 843 843 4 image produced by the preprocessing map w, followed by three convolutional layers (note: snaking blue line symbolizes sliding of each filter across input image) and two fully connected layers with a single output for each valid action. Each hidden layer is followed by a rectifier nonlinearity (that is, max 0,xð Þ). a b c d 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 0 20 40 60 80 100 120 140 160 180 200 Averagescoreperepisode Training epochs 0 1 2 3 4 5 6 7 8 9 10 11 0 20 40 60 80 100 120 140 160 180 200 Averageactionvalue(Q) Training epochs 0 1,000 2,000 3,000 4,000 5,000 6,000 0 20 40 60 80 100 120 140 160 180 200 Averagescoreperepisode Training epochs 0 1 2 3 4 5 6 7 8 9 10 0 20 40 60 80 100 120 140 160 180 200 Averageactionvalue(Q) Training epochs Figure 2 | Training curves tracking the agent’s average score and average predicted action-value. a, Each point is the average score achieved per episode after the agent is run with e-greedy policy (e 5 0.05) for 520k frames on Space Invaders. b, Average score achieved per episode for Seaquest. c, Average predicted action-value on a held-out set of states on Space Invaders. Each point on the curve is the average of the action-value Q computed over the held-out set of states. Note that Q-values are scaled due to clipping of rewards (see Methods). d, Average predicted action-value on Seaquest. See Supplementary Discussion for details. RESEARCH LETTER 5 3 0 | N A T U R E | V O L 5 1 8 | 2 6 F E B R U A R Y 2 0 1 5 Macmillan Publishers Limited. All rights reserved©2015 see Fig. 3, Supplementary Discussion and Extended Data Table 2). In additional simulations (see Supplementary Discussion and Extended Data Tables 3 and 4), we demonstrate the importance of the individual corecomponentsoftheDQNagent—thereplaymemory,separatetarget Q-network and deepconvolutionalnetwork architecture—bydisabling them and demonstrating the detrimental effects on performance. We next examined the representations learned by DQN that under- pinnedthesuccessfulperformanceoftheagentinthecontextofthegame Space Invaders (see Supplementary Video 1 for a demonstration of the performance of DQN), by using a technique developed for the visual- ization of high-dimensional data called ‘t-SNE’25 (Fig. 4). As expected, the t-SNE algorithm tends to map the DQN representation of percep- tuallysimilarstatestonearbypoints.Interestingly,wealsofoundinstances in which the t-SNE algorithm generated similar embeddings for DQN representations of states that are close in terms of expected reward but perceptually dissimilar (Fig. 4, bottom right, top left and middle), con- sistent with the notion that the network is able to learn representations thatsupportadaptivebehaviourfromhigh-dimensionalsensoryinputs. Furthermore, we also show that the representations learned by DQN are able to generalize to data generated from policies other than its own—in simulations where we presented as input to the networkgame states experienced during human and agent play, recorded the repre- sentations of the last hidden layer, and visualized the embeddings gen- eratedbythet-SNEalgorithm(ExtendedDataFig.1andSupplementary Discussion). Extended Data Fig. 2 provides an additional illustrationof how the representations learned by DQN allow it to accurately predict state and action values. It is worth noting that the games in which DQN excels are extremely varied in their nature, from side-scrolling shooters (River Raid) to box- inggames(Boxing)andthree-dimensionalcar-racinggames(Enduro). Montezuma's Revenge Private Eye Gravitar Frostbite Asteroids Ms. Pac-Man Bowling Double Dunk Seaquest Venture Alien Amidar River Raid Bank Heist Zaxxon Centipede Chopper Command Wizard of Wor Battle Zone Asterix H.E.R.O. Q*bert Ice Hockey Up and Down Fishing Derby Enduro Time Pilot Freeway Kung-Fu Master Tutankham Beam Rider Space Invaders Pong James Bond Tennis Kangaroo Road Runner Assault Krull Name This Game Demon Attack Gopher Crazy Climber Atlantis Robotank Star Gunner Breakout Boxing Video Pinball At human-level or above Below human-level 0 100 200 300 400 4,500%500 1,000600 Best linear learner DQN Figure 3 | Comparison of the DQN agent with the best reinforcement learning methods15 in the literature. The performance of DQN is normalized with respect to a professional human games tester (that is, 100% level) and random play (that is, 0% level). Note that the normalized performance of DQN, expressed as a percentage, is calculated as: 1003 (DQN score 2 random play score)/(human score 2 random play score). It can be seen that DQN outperforms competing methods (also see Extended Data Table 2) in almost all the games, and performs at a level that is broadly comparable with or superior to a professional human games tester (that is, operationalized as a level of 75% or above) in the majority of games. Audio output was disabled for both human players and agents. Error bars indicate s.d. across the 30 evaluation episodes, starting with different initial conditions. LETTER RESEARCH 2 6 F E B R U A R Y 2 0 1 5 | V O L 5 1 8 | N A T U R E | 5 3 1 Macmillan Publishers Limited. All rights reserved©2015
  • 62.
    Joo-Haeng Lee 2017joohaeng@gmail.com Indeed, in certain games DQN is able to discover a relatively long-term strategy (for example, Breakout: the agent learns the optimal strategy, which is to first dig a tunnel around the side of the wall allowing the ball to be sent around the back to destroy a large number of blocks; see Sup- plementary Video 2 for illustration of development of DQN’s perfor- manceoverthecourseoftraining).Nevertheless,gamesdemandingmore temporally extended planning strategies still constitute a major chal- lengeforallexistingagentsincludingDQN(forexample,Montezuma’s Revenge). In this work, we demonstrate that a single architecture can success- fullylearncontrolpoliciesinarangeofdifferentenvironmentswithonly very minimal prior knowledge, receiving only the pixels and the game scoreasinputs,andusingthesamealgorithm,networkarchitectureand hyperparametersoneachgame,privyonlytotheinputsahumanplayer would have. In contrast to previous work24,26 , our approach incorpo- rates ‘end-to-end’ reinforcement learning that uses reward to continu- ously shape representations within the convolutional network towards salient featuresof the environmentthat facilitate value estimation.This principledrawsonneurobiological evidencethatreward signalsduring perceptuallearningmayinfluencethecharacteristicsofrepresentations within primate visual cortex27,28 . Notably, the successful integration of reinforcement learning with deep network architectures was critically dependentonourincorporationofareplayalgorithm21–23 involvingthe storageand representationofrecently experienced transitions.Conver- gentevidencesuggeststhatthe hippocampusmay supportthe physical realization of such a process in the mammalian brain, with the time- compressed reactivation of recently experienced trajectories during offline periods21,22 (for example, waking rest) providing a putative mech- anism by which value functions may be efficiently updated through interactions with the basal ganglia22 . In the future, it will be important to explore the potential use of biasing the content of experience replay towards salient events, a phenomenon that characterizes empirically observed hippocampal replay29 , and relates to the notion of ‘prioritized sweeping’30 in reinforcement learning. Taken together, our work illus- trates the power of harnessing state-of-the-art machine learning tech- niques with biologically inspired mechanisms to create agents that are capable of learning to master a diverse array of challenging tasks. Online Content Methods, along with any additional Extended Data display items andSource Data, are available in the onlineversion ofthe paper; references unique to these sections appear only in the online paper. Received 10 July 2014; accepted 16 January 2015. 1. Sutton, R. Barto, A. Reinforcement Learning: An Introduction (MIT Press, 1998). 2. Thorndike, E. L. Animal Intelligence: Experimental studies (Macmillan, 1911). 3. Schultz, W., Dayan, P. Montague, P. R. A neural substrate of prediction and reward. Science 275, 1593–1599 (1997). 4. Serre, T., Wolf, L. Poggio, T. Object recognition with features inspired by visual cortex. Proc. IEEE. Comput. Soc. Conf. Comput. Vis. Pattern. Recognit. 994–1000 (2005). 5. Fukushima, K. Neocognitron: A self-organizing neural network model for a mechanism of pattern recognition unaffected by shift in position. Biol. Cybern. 36, 193–202 (1980). V Figure 4 | Two-dimensional t-SNE embedding of the representations in the last hidden layer assigned by DQN to game states experienced while playing Space Invaders. The plot was generated by letting the DQN agent play for 2 h ofreal game time andrunningthet-SNEalgorithm25 on the lasthiddenlayer representations assigned by DQN to each experienced game state. The pointsare coloured according to the state values (V, maximum expected reward of a state) predicted by DQN for the corresponding game states (ranging from dark red (highest V) to dark blue (lowest V)). The screenshots corresponding to a selected number of points are shown. The DQN agent predicts high state values for both full (top right screenshots) and nearly complete screens (bottom left screenshots) because it has learned that completing a screen leads to a new screen full of enemy ships. Partially completed screens (bottom screenshots) are assigned lower state values because less immediate reward is available. The screens shown on the bottom right andtopleft andmiddleareless perceptually similar than theother examples but are still mapped to nearby representations and similar values because the orange bunkers do not carry great significance near the end of a level. With permission from Square Enix Limited. RESEARCH LETTER 5 3 2 | N A T U R E | V O L 5 1 8 | 2 6 F E B R U A R Y 2 0 1 5 Macmillan Publishers Limited. All rights reserved©2015 METHODS Preprocessing. Workingdirectlywith rawAtari2600 frames, whichare2103 160 pixel images with a 128-colour palette, can be demanding in terms of computation and memory requirements. We apply a basic preprocessing step aimed at reducing the input dimensionality and dealing with some artefacts of the Atari 2600 emu- lator.First,toencodeasingleframewetakethemaximumvalueforeachpixelcolour value over the frame being encoded and the previous frame. This was necessary to remove flickering that is present in games where some objects appear only in even frames while other objects appear only in odd frames, an artefact caused by the limited number of sprites Atari 2600 can display at once. Second, we then extract the Y channel, also known as luminance, from the RGB frame and rescale it to 84 3 84.The functionw fromalgorithm1 described belowappliesthis preprocess- ing to the m most recent frames and stacks them to produce the input to the Q-function, in which m 5 4, although the algorithm is robust to different values of m (for example, 3 or 5). Code availability. The source code can be accessed at https://sites.google.com/a/ deepmind.com/dqn for non-commercial uses only. Model architecture. There are several possible ways of parameterizing Q using a neural network. Because Q maps history–action pairs to scalar estimates of their Q-value, the history and the action have been used as inputs to the neural network by some previous approaches24,26 . The main drawback of this type of architecture is that a separate forward pass is required to compute the Q-value of each action, resulting in a cost that scales linearly with thenumber ofactions. We instead usean architecture in which there is a separate output unit for each possible action, and only the state representation is an input to the neural network. The outputs cor- respond to the predicted Q-values of the individual actions for the input state. The main advantageof this type of architecture is the ability tocompute Q-valuesforall possibleactionsinagivenstatewithonlyasingleforwardpassthroughthenetwork. The exact architecture, shown schematically in Fig. 1, is as follows. The input to the neural network consists of an 843 843 4 image produced by the preprocess- ing map w. The first hidden layer convolves 32 filters of 83 8 with stride 4 with the input image and applies a rectifier nonlinearity31,32 . The second hidden layer con- volves 64 filters of 43 4 with stride 2, again followed by a rectifier nonlinearity. Thisisfollowedbyathirdconvolutionallayerthatconvolves64filtersof33 3with stride 1 followed by a rectifier. The final hidden layer is fully-connected and con- sists of 512 rectifier units. The output layer is a fully-connected linear layer with a single output for each valid action. The number of valid actions varied between 4 and 18 on the games we considered. Training details.Weperformedexperimentson49Atari2600gameswhereresults were available for all other comparable methods12,15 . A different network was trained on each game: the same network architecture, learning algorithm and hyperpara- metersettings(seeExtended Data Table1)wereusedacross allgames, showing that our approach is robust enough to work on a variety of games while incorporating onlyminimalpriorknowledge(seebelow).Whileweevaluatedouragentsonunmodi- fied games, we made one change to the reward structure of the games during training only. As the scale of scores varies greatly from game to game, we clipped all posi- tive rewards at 1 and all negative rewards at 21, leaving 0 rewards unchanged. Clipping the rewards in this manner limits the scale of the error derivatives and makesiteasierto use thesamelearningrateacrossmultiplegames. At the same time, it could affect the performance of our agent since it cannot differentiate between rewards of different magnitude. For games where there is a life counter, the Atari 2600 emulator alsosends the number of lives left in the game, which is then used to mark the end of an episode during training. In these experiments, we used the RMSProp (see http://www.cs.toronto.edu/ ,tijmen/csc321/slides/lecture_slides_lec6.pdf ) algorithmwith minibatches ofsize 32. The behaviour policy during training was e-greedy with e annealed linearly from 1.0 to 0.1 over the first million frames, and fixed at 0.1 thereafter. We trained for a total of 50 million frames (that is, around 38 days of game experience in total) and used a replay memory of 1 million most recent frames. FollowingpreviousapproachestoplayingAtari2600games,wealsouseasimple frame-skipping technique15 . More precisely, the agent sees and selects actions on every kth frame instead of every frame, and its last action is repeated on skipped frames. Because running the emulator forward for one step requires much less computation than having the agent select an action, this technique allows the agent to play roughly k times more games without significantly increasing the runtime. We use k 5 4 for all games. Thevaluesofallthehyperparametersandoptimizationparameterswereselected by performing an informal search on the games Pong, Breakout, Seaquest, Space Invaders and Beam Rider. We did not perform a systematic grid search owing to the highcomputationalcost.Theseparameterswere thenheldfixedacrossallother games.ThevaluesanddescriptionsofallhyperparametersareprovidedinExtended Data Table 1. Our experimental setup amounts to using the following minimal prior know- ledge: that the input data consisted of visual images (motivating our use of a con- volutional deep network), the game-specific score (with no modification), number of actions, although not their correspondences (for example, specification of the up ‘button’) and the life count. Evaluation procedure. The trained agents were evaluated by playing each game 30 times for up to 5 min each time with different initial random conditions (‘no- op’; see Extended Data Table 1) and an e-greedy policy with e 5 0.05. This pro- cedure is adopted to minimize the possibility of overfitting during evaluation. The random agent served as a baseline comparison and chose a random action at 10 Hz which is every sixth frame, repeating its last action on intervening frames. 10 Hz is about the fastest that a human player can select the ‘fire’ button, and setting the random agent to this frequency avoids spurious baseline scores in a handful of the games.Wedidalsoassesstheperformanceofarandomagentthatselectedanaction at 60 Hz (that is, every frame). This had a minimal effect: changing the normalized DQN performance by more than 5% in only six games (Boxing, Breakout, Crazy Climber, Demon Attack, Krull and Robotank), and in all these games DQN out- performed the expert human by a considerable margin. The professional human tester used the sameemulator engine as the agents, and played under controlled conditions. The human tester was not allowed to pause, save or reload games. As in the original Atari 2600 environment, the emulator was run at 60 Hz and the audio output was disabled: as such, the sensory input was equated between humanplayer andagents. The human performance is theaverage rewardachievedfromaround20episodesofeachgamelastingamaximumof5 min each, following around 2 h of practice playing each game. Algorithm. We consider tasks in which an agent interacts with an environment, in this case the Atari emulator, in a sequence of actions, observations and rewards. At each time-step the agent selects an action at from the set of legal game actions, A~ 1, . . . ,Kf g. The action is passed to the emulator and modifies its internal state and the game score. In general the environment may be stochastic. The emulator’s internal state is not observed by the agent; instead the agent observes an image xt[Rd from the emulator, which is a vector of pixel values representing the current screen. In addition it receives a reward rt representing the change in game score. Note that in general thegame score maydependon the whole previoussequence of actions andobservations;feedbackabout anactionmayonlybereceivedaftermany thousands of time-steps have elapsed. Becausetheagentonlyobservesthecurrentscreen,thetask ispartiallyobserved33 and many emulator states are perceptually aliased (that is, it is impossible to fully understand the current situation from only the current screen xt). Therefore, sequences of actions and observations, st~x1,a1,x2,:::,at{1,xt, are input to the algorithm, which then learnsgame strategies depending uponthese sequences. All sequences in the emulator are assumed to terminate in a finite number of time- steps.ThisformalismgivesrisetoalargebutfiniteMarkovdecisionprocess(MDP) in which each sequence is a distinct state. As a result, we can apply standard rein- forcement learning methods for MDPs, simply by using the complete sequence st as the state representation at time t. The goal ofthe agent isto interact with the emulatorby selectingactionsin a way thatmaximizesfuturerewards.Wemakethestandardassumptionthatfuturerewards are discounted by a factor of c per time-step (c was set to 0.99 throughout), and define the future discounted return at time t as Rt~ XT t0~t ct0 {t rt0 , in which T is the time-step at which the game terminates. We define the optimal action-value function Qà s,að Þ as the maximum expected return achievable by following any policy, after seeing some sequence s and then taking some action a, Qà s,að Þ~ maxp RtDst~s,at~a,p½ Š in which p is a policy mapping sequences to actions (or distributions over actions). The optimal action-value function obeys an important identity known as the Bellman equation. This is based on the following intuition: if the optimal value Qà s0 ,a0 ð Þ of the sequence s9 at the next time-step was known for all possible actions a9, thentheoptimalstrategy istoselecttheaction a9 maximizingtheexpectedvalue of rzcQà s0 ,a0 ð Þ: Qà s,að Þ ~ s0 rzc max a0 Qà s0 ,a0 ð ÞDs,a ! The basic idea behind many reinforcement learning algorithms is to estimate the action-value function by using the Bellman equation as an iterative update, Qiz1 s,að Þ~ s0 rzc maxa0 Qi s0 ,a0 ð ÞDs,a½ Š. Such value iteration algorithms converge totheoptimalaction-valuefunction,Qi?Qà asi??.Inpractice,thisbasicapproach is impractical, because the action-value function is estimated separately for each sequence,withoutanygeneralization.Instead,itiscommontouseafunctionapprox- imator to estimate the action-value function, Q s,a; hð ÞQà s,að Þ. In the reinforce- ment learning community this is typically a linear function approximator, but RESEARCH LETTER Macmillan Publishers Limited. All rights reserved©2015 sometimes a nonlinear function approximator is used instead, such as a neural network. We refer to a neural network function approximator with weights h as a Q-network.AQ-network canbe trainedby adjusting theparameters hi atiteration i to reduce the mean-squared error in the Bellman equation, where the optimal target values rzc maxa0 Qà s0 ,a0 ð Þ are substituted with approximate target values y~rzc maxa0 Q s0 ,a0 ; h{ i À Á , using parameters h{ i from some previous iteration. This leads to a sequence of loss functions Li(hi) that changes at each iteration i, Li hið Þ~ s,a,r Es0 yDs,a½ Š{Q s,a; hið Þð Þ2 à ~ s,a,r,s0 y{Q s,a; hið Þð Þ2 à zEs,a,r Vs0 y½ н Š: Note that the targets depend on the network weights; this is in contrast with the targets used for supervised learning, which are fixed before learning begins. At each stage of optimization, we hold the parameters from the previous iteration hi 2 fixed when optimizing the ith loss function Li(hi), resulting in a sequence of well- defined optimization problems. The final term is the variance of the targets, which does not depend on the parameters hi that we are currently optimizing, and may therefore be ignored. Differentiating the loss function with respect to the weights we arrive at the following gradient: +hi L hið Þ ~ s,a,r,s0 rzc max a0 Q s0 ,a0 ; h{ i À Á {Q s,a; hið Þ +hi Q s,a; hið Þ ! : Rather than computing the full expectations in the above gradient, it is often computationally expedient to optimize the loss function by stochastic gradient descent. The familiar Q-learning algorithm19 can be recovered in this framework by updating the weights after every time step, replacing the expectations using single samples, and setting h{ i ~hi{1. Note that this algorithm is model-free: it solves the reinforcement learning task directly using samples from the emulator, without explicitly estimating the reward and transition dynamics P r,s0 Ds,að Þ. It is also off-policy: it learns about the greedy policya~argmaxa0 Q s,a0 ; hð Þ,whilefollowingabehaviourdistributionthatensures adequate exploration of the state space. In practice, the behaviour distribution is often selected by an e-greedy policy that follows the greedy policy with probability 1 2 e and selects a random action with probability e. Training algorithm for deep Q-networks. The full algorithm for training deep Q-networks is presented in Algorithm 1. The agent selects and executes actions according to an e-greedy policy based on Q. Because using histories of arbitrary length as inputs to a neural network can be difficult, our Q-function instead works on a fixed length representation of histories produced by the function w described above. The algorithm modifies standard online Q-learning in two ways to make it suitable for training large neural networks without diverging. First, we use a technique known as experience replay23 in which we store the agent’sexperiences at each time-step, et 5(st,at, rt,st 1 1), in a data set Dt 5{e1,…,et}, pooled over many episodes (where the end of an episode occurs when a termi- nal state is reached) into a replay memory. During the inner loop of the algorithm, we apply Q-learning updates, or minibatch updates, to samples of experience, (s, a, r, s9) ,U(D), drawn atrandom from the pool of stored samples. This approach hasseveraladvantagesoverstandardonlineQ-learning.First,eachstepofexperience is potentiallyused inmany weight updates, whichallowsforgreater data efficiency. Second, learning directly from consecutive samplesis inefficient, owing to the strong correlations between the samples; randomizing the samples breaks these correla- tions and therefore reduces the variance of the updates. Third, when learning on- policy the current parameters determine the next data sample that the parameters are trainedon. For example, if the maximizing actionis to moveleft then the train- ing samples will be dominated by samples from the left-hand side; if the maximiz- ing action then switches to the right then the training distribution will also switch. Itiseasytoseehowunwantedfeedbackloopsmayariseandtheparameterscouldget stuckinapoorlocalminimum,orevendivergecatastrophically20 .Byusingexperience replay the behaviour distribution is averaged over many of its previous states, smoothing out learning and avoiding oscillations or divergence in the parameters. Note that when learning by experience replay, it is necessary to learn off-policy (because our current parameters are different to those used to generate the sam- ple), which motivates the choice of Q-learning. In practice, our algorithm only stores the last N experience tuples in the replay memory,andsamplesuniformlyat randomfrom Dwhenperforming updates. This approach is in some respects limited because the memory buffer does not differ- entiate important transitions and always overwrites with recent transitions owing to the finite memory size N. Similarly, the uniform sampling gives equal impor- tanceto all transitions in the replaymemory. A moresophisticatedsampling strat- egy might emphasize transitions from which we can learn the most, similar to prioritized sweeping30 . The second modification to online Q-learning aimed at further improving the stability of our method with neural networks is to use a separate network for gen- erating the targets yj in the Q-learning update. More precisely, every C updates we clone the network Q to obtain a target network ^Q and use ^Q for generating the Q-learning targets yj forthe followingC updates to Q. This modificationmakes the algorithm more stable compared to standard online Q-learning, where an update thatincreasesQ(st,at)oftenalsoincreasesQ(st 1 1,a)forallaandhencealsoincreases the target yj, possibly leading to oscillations or divergence of the policy. Generating the targetsusinganoldersetofparametersaddsadelay betweenthe timeanupdate to Q is made and the time the update affects the targets yj, making divergence or oscillations much more unlikely. We also found it helpful to clip the error term from the update rzc maxa0 Q s0 ,a0 ; h{ i À Á {Q s,a; hið Þ to be between 21 and 1. Because the absolute value loss function jxj has a derivative of 21 for all negative values of x and a derivative of 1 for all positive values of x, clipping the squared error to be between 21 and 1 cor- responds to using an absolute value loss function for errors outside of the (21,1) interval.This formoferrorclippingfurtherimproved the stability ofthe algorithm. Algorithm 1: deep Q-learning with experience replay. Initialize replay memory D to capacity N Initialize action-value function Q with random weights h Initialize target action-value function ^Q with weights h2 5 h For episode 5 1, M do Initialize sequence s1~ x1f g and preprocessed sequence w1~w s1ð Þ For t 5 1,T do With probability e select a random action at otherwise select at~argmaxaQ w stð Þ,a; hð Þ Execute action at in emulator and observe reward rt and image xt 1 1 Set stz1~st,at,xtz1 and preprocess wtz1~w stz1ð Þ Store transition wt,at,rt,wtz1 À Á in D Sample random minibatch of transitions wj,aj,rj,wjz1 from D Set yj~ rj if episode terminates at step jz1 rjzc maxa0 ^Q wjz1,a0 ; h{ otherwise ( Perform a gradient descent step on yj{Q wj,aj; h 2 with respect to the network parameters h Every C steps reset ^Q~Q End For End For 31. Jarrett,K.,Kavukcuoglu,K.,Ranzato,M.A.LeCun,Y.Whatisthebestmulti-stage architecture for object recognition? Proc. IEEE. Int. Conf. Comput. Vis. 2146–2153 (2009). 32. Nair, V. Hinton, G. E. Rectified linear units improve restricted Boltzmann machines. Proc. Int. Conf. Mach. Learn. 807–814 (2010). 33. Kaelbling, L. P., Littman, M. L. Cassandra, A. R. Planning and acting in partially observable stochastic domains. Artificial Intelligence 101, 99–134 (1994). LETTER RESEARCH Macmillan Publishers Limited. All rights reserved©2015
  • 63.
    Joo-Haeng Lee 2017joohaeng@gmail.com n is ility deep ons rary orks bed ke it the …,et}, mi- hm, nce, oach ence ncy. ong ela- on- ters Initialize action-value function Q with random weights h Initialize target action-value function ^Q with weights h2 5 h For episode 5 1, M do Initialize sequence s1~ x1f g and preprocessed sequence w1~w s1ð Þ For t 5 1,T do With probability e select a random action at otherwise select at~argmaxaQ w stð Þ,a; hð Þ Execute action at in emulator and observe reward rt and image xt 1 1 Set stz1~st,at,xtz1 and preprocess wtz1~w stz1ð Þ Store transition wt,at,rt,wtz1 À Á in D Sample random minibatch of transitions wj,aj,rj,wjz1 from D Set yj~ rj if episode terminates at step jz1 rjzc maxa0 ^Q wjz1,a0 ; h{ otherwise ( Perform a gradient descent step on yj{Q wj,aj; h 2 with respect to the network parameters h Every C steps reset ^Q~Q End For End For 31. Jarrett,K.,Kavukcuoglu,K.,Ranzato,M.A.LeCun,Y.Whatisthebestmulti-stage
  • 64.
    Joo-Haeng Lee 2017joohaeng@gmail.com
  • 65.
    Joo-Haeng Lee 2017joohaeng@gmail.com Extended Data Figure 1 | Two-dimensional t-SNE embedding of the representations in the last hidden layer assigned by DQN to game states experienced during a combination of human and agent play in Space Invaders. The plot was generated by running the t-SNE algorithm25 on the last hidden layer representation assigned by DQN to game states experienced during a combination of human (30 min) and agent (2 h) play. The fact that there is similar structure in the two-dimensional embeddings corresponding to the DQN representation of states experienced during human play (orange points) and DQN play (blue points) suggests that the representations learned by DQN do indeed generalize to data generated from policies other than its own. The presence in the t-SNE embedding of overlapping clusters of points corresponding to the network representation of states experienced during human and agent play shows that the DQN agent also follows sequences of states similar to those found in human play. Screenshots corresponding to selected states are shown (human: orange border; DQN: blue border). RESEARCH LETTER Macmillan Publishers Limited. All rights reserved©2015 Extended Data Figure 2 | Visualization of learned value functions on two games, Breakout and Pong. a, A visualization of the learned value function on the game Breakout.At time points 1 and 2, the state value is predicted to be ,17 and the agent is clearing the bricks at the lowest level. Each of the peaks in the value function curve corresponds to a reward obtained by clearing a brick. At time point 3, the agent is about to break through to the top level of bricks and the value increases to ,21 in anticipation of breaking out and clearing a large set of bricks. At point 4, the value is above 23 and the agent has broken through. After this point, the ball will bounce at the upper part of the bricks clearing many of them by itself. b, A visualization of the learned action-value function on the game Pong. At time point 1, the ball is moving towards the paddle controlled by the agent on the right side of the screen and the values of all actions are around 0.7, reflecting the expected value of this state based on previous experience. At time point 2, the agent starts moving the paddle towards the ball and the value of the ‘up’ action stays high while the value of the ‘down’ action falls to 20.9. This reflects the fact that pressing ‘down’ would lead to the agent losing the ball and incurring a reward of 21. At time point 3, the agent hits the ball by pressing ‘up’ and the expected reward keeps increasing until time point 4, when the ball reaches the left edge of the screen and the value of all actions reflects that the agent is about to receive a reward of 1. Note, the dashed line shows the past trajectory of the ball purely for illustrative purposes (that is, not shown during the game). With permission from Atari Interactive, Inc. LETTER RESEARCH Macmillan Publishers Limited. All rights reserved©2015 Extended Data Table 1 | List of hyperparameters and their values The values of all the hyperparameters were selected by performing an informal search on the games Pong, Breakout, Seaquest, Space Invaders and Beam Rider. We did not perform a systematic grid search owing to the high computational cost, although it is conceivable that even better results could be obtained by systematically tuning the hyperparameter values. RESEARCH LETTER Macmillan Publishers Limited. All rights reserved©2015
  • 66.
    Joo-Haeng Lee 2017joohaeng@gmail.com Extended Data Table 2 | Comparison of games scores obtained by DQN agents with methods from the literature12,15 and a professional human games tester Best Linear Learner is the best result obtained by a linear function approximator on different types of hand designed features12 . Contingency (SARSA) agent figures are the results obtained in ref. 15. Note the figures in the last column indicate the performance of DQN relative to the human games tester, expressed as a percentage, that is, 100 3 (DQN score 2 random play score)/(human score 2 random play score). LETTER RESEARCH Macmillan Publishers Limited. All rights reserved©2015 Extended Data Table 3 | The effects of replay and separating the target Q-network DQN agents were trained for 10 million frames using standard hyperparameters for all possible combinations of turning replay on or off, using or not using a separate target Q-network, and three different learning rates. Each agent was evaluated every 250,000 training frames for 135,000 validation frames and the highest average episode score is reported. Note that these evaluation episodes were not truncated at 5 min leading to higher scores on Enduro than the ones reported in Extended Data Table 2. Note also that the number of training frames was shorter (10 million frames) as compared to the main results presented in Extended Data Table 2 (50 million frames). RESEARCH LETTER Macmillan Publishers Limited. All rights reserved©2015 Extended Data Table 3 | The effects of replay and separating the target Q-network DQN agents were trained for 10 million frames using standard hyperparameters for all possible combinations of turning replay on or off, using or not using a separate target Q-network, and three different learning rates. Each agent was evaluated every 250,000 training frames for 135,000 validation frames and the highest average episode score is reported. Note that these evaluation episodes were not truncated at 5 min leading to higher scores on Enduro than the ones reported in Extended Data Table 2. Note also that the number of training frames was shorter (10 million frames) as compared to the main results presented in Extended Data Table 2 (50 million frames). RESEARCH LETTER Macmillan Publishers Limited. All rights reserved©2015 Extended Data Table 4 | Comparison of DQN performance with lin- ear function approximator The performance of the DQN agent is compared with the performance of a linear function approximator on the 5 validation games (that is, where a single linear layer was used instead of the convolutional network, in combination with replay and separate target network). Agents were trained for 10 million frames using standard hyperparameters, and three different learning rates. Each agent was evaluated every 250,000 training frames for 135,000 validation frames and the highest average episode score is reported. Note that these evaluation episodes were not truncated at 5 min leading to higher scores on Enduro than the ones reported in Extended Data Table 2. Note also that the number of training frames was shorter (10 million frames) as compared to the main results presented in Extended Data Table 2 (50 million frames). LETTER RESEARCH Macmillan Publishers Limited. All rights reserved©2015
  • 67.
    Joo-Haeng Lee 2017joohaeng@gmail.com Asynchronous Methods for Deep Reinforcement Learning Volodymyr Mnih1 VMNIH@GOOGLE.COM Adrià Puigdomènech Badia1 ADRIAP@GOOGLE.COM Mehdi Mirza1,2 MIRZAMOM@IRO.UMONTREAL.CA Alex Graves1 GRAVESA@GOOGLE.COM Tim Harley1 THARLEY@GOOGLE.COM Timothy P. Lillicrap1 COUNTZERO@GOOGLE.COM David Silver1 DAVIDSILVER@GOOGLE.COM Koray Kavukcuoglu 1 KORAYK@GOOGLE.COM 1 Google DeepMind 2 Montreal Institute for Learning Algorithms (MILA), University of Montreal Abstract We propose a conceptually simple and lightweight framework for deep reinforce- ment learning that uses asynchronous gradient descent for optimization of deep neural network controllers. We present asynchronous variants of four standard reinforcement learning algorithms and show that parallel actor-learners have a stabilizing effect on training allowing all four methods to successfully train neural network controllers. The best performing method, an asynchronous variant of actor-critic, surpasses the current state-of-the-art on the Atari domain while training for half the time on a single multi-core CPU instead of a GPU. Furthermore, we show that asynchronous actor-critic succeeds on a wide variety of continuous motor control problems as well as on a new task of navigating random 3D mazes using a visual input. 1. Introduction Deep neural networks provide rich representations that can enable reinforcement learning (RL) algorithms to perform effectively. However, it was previously thought that the combination of simple online RL algorithms with deep neural networks was fundamentally unstable. Instead, a va- riety of solutions have been proposed to stabilize the algo- rithm (Riedmiller, 2005; Mnih et al., 2013; 2015; Van Has- selt et al., 2015; Schulman et al., 2015a). These approaches share a common idea: the sequence of observed data en- countered by an online RL agent is non-stationary, and on- Proceedings of the 33rd International Conference on Machine Learning, New York, NY, USA, 2016. JMLR: WCP volume 48. Copyright 2016 by the author(s). line RL updates are strongly correlated. By storing the agent’s data in an experience replay memory, the data can be batched (Riedmiller, 2005; Schulman et al., 2015a) or randomly sampled (Mnih et al., 2013; 2015; Van Hasselt et al., 2015) from different time-steps. Aggregating over memory in this way reduces non-stationarity and decorre- lates updates, but at the same time limits the methods to off-policy reinforcement learning algorithms. Deep RL algorithms based on experience replay have achieved unprecedented success in challenging domains such as Atari 2600. However, experience replay has several drawbacks: it uses more memory and computation per real interaction; and it requires off-policy learning algorithms that can update from data generated by an older policy. In this paper we provide a very different paradigm for deep reinforcement learning. Instead of experience replay, we asynchronously execute multiple agents in parallel, on mul- tiple instances of the environment. This parallelism also decorrelates the agents’ data into a more stationary process, since at any given time-step the parallel agents will be ex- periencing a variety of different states. This simple idea enables a much larger spectrum of fundamental on-policy RL algorithms, such as Sarsa, n-step methods, and actor- critic methods, as well as off-policy RL algorithms such as Q-learning, to be applied robustly and effectively using deep neural networks. Our parallel reinforcement learning paradigm also offers practical benefits. Whereas previous approaches to deep re- inforcement learning rely heavily on specialized hardware such as GPUs (Mnih et al., 2015; Van Hasselt et al., 2015; Schaul et al., 2015) or massively distributed architectures (Nair et al., 2015), our experiments run on a single machine with a standard multi-core CPU. When applied to a vari- ety of Atari 2600 domains, on many games asynchronous reinforcement learning achieves better results, in far less arXiv:1602.01783v2[cs.LG]16Jun2016 Asynchronous Methods for Deep Reinforcement Learning One way of propagating rewards faster is by using n- step returns (Watkins, 1989; Peng Williams, 1996). In n-step Q-learning, Q(s, a) is updated toward the n- step return defined as rt + rt+1 + · · · + n 1 rt+n 1 + maxa n Q(st+n, a). This results in a single reward r di- rectly affecting the values of n preceding state action pairs. This makes the process of propagating rewards to relevant state-action pairs potentially much more efficient. In contrast to value-based methods, policy-based model- free methods directly parameterize the policy ⇡(a|s; ✓) and update the parameters ✓ by performing, typically approx- imate, gradient ascent on E[Rt]. One example of such a method is the REINFORCE family of algorithms due to Williams (1992). Standard REINFORCE updates the policy parameters ✓ in the direction r✓ log ⇡(at|st; ✓)Rt, which is an unbiased estimate of r✓E[Rt]. It is possible to reduce the variance of this estimate while keeping it unbi- ased by subtracting a learned function of the state bt(st), known as a baseline (Williams, 1992), from the return. The resulting gradient is r✓ log ⇡(at|st; ✓) (Rt bt(st)). A learned estimate of the value function is commonly used as the baseline bt(st) ⇡ V ⇡ (st) leading to a much lower variance estimate of the policy gradient. When an approx- imate value function is used as the baseline, the quantity Rt bt used to scale the policy gradient can be seen as an estimate of the advantage of action at in state st, or A(at, st) = Q(at, st) V (st), because Rt is an estimate of Q⇡ (at, st) and bt is an estimate of V ⇡ (st). This approach can be viewed as an actor-critic architecture where the pol- icy ⇡ is the actor and the baseline bt is the critic (Sutton Barto, 1998; Degris et al., 2012). 4. Asynchronous RL Framework We now present multi-threaded asynchronous variants of one-step Sarsa, one-step Q-learning, n-step Q-learning, and advantage actor-critic. The aim in designing these methods was to find RL algorithms that can train deep neural net- work policies reliably and without large resource require- ments. While the underlying RL methods are quite dif- ferent, with actor-critic being an on-policy policy search method and Q-learning being an off-policy value-based method, we use two main ideas to make all four algorithms practical given our design goal. First, we use asynchronous actor-learners, similarly to the Gorila framework (Nair et al., 2015), but instead of using separate machines and a parameter server, we use multi- ple CPU threads on a single machine. Keeping the learn- ers on a single machine removes the communication costs of sending gradients and parameters and enables us to use Hogwild! (Recht et al., 2011) style updates for training. Second, we make the observation that multiple actors- Algorithm 1 Asynchronous one-step Q-learning - pseu- docode for each actor-learner thread. // Assume global shared ✓, ✓ , and counter T = 0. Initialize thread step counter t 0 Initialize target network weights ✓ ✓ Initialize network gradients d✓ 0 Get initial state s repeat Take action a with ✏-greedy policy based on Q(s, a; ✓) Receive new state s0 and reward r y = ⇢ r for terminal s0 r + maxa0 Q(s0 , a0 ; ✓ ) for non-terminal s0 Accumulate gradients wrt ✓: d✓ d✓ + @(y Q(s,a;✓))2 @✓ s = s0 T T + 1 and t t + 1 if T mod Itarget == 0 then Update the target network ✓ ✓ end if if t mod IAsyncUpdate == 0 or s is terminal then Perform asynchronous update of ✓ using d✓. Clear gradients d✓ 0. end if until T Tmax learners running in parallel are likely to be exploring dif- ferent parts of the environment. Moreover, one can explic- itly use different exploration policies in each actor-learner to maximize this diversity. By running different explo- ration policies in different threads, the overall changes be- ing made to the parameters by multiple actor-learners ap- plying online updates in parallel are likely to be less corre- lated in time than a single agent applying online updates. Hence, we do not use a replay memory and rely on parallel actors employing different exploration policies to perform the stabilizing role undertaken by experience replay in the DQN training algorithm. In addition to stabilizing learning, using multiple parallel actor-learners has multiple practical benefits. First, we ob- tain a reduction in training time that is roughly linear in the number of parallel actor-learners. Second, since we no longer rely on experience replay for stabilizing learning we are able to use on-policy reinforcement learning methods such as Sarsa and actor-critic to train neural networks in a stable way. We now describe our variants of one-step Q- learning, one-step Sarsa, n-step Q-learning and advantage actor-critic. Asynchronous one-step Q-learning: Pseudocode for our variant of Q-learning, which we call Asynchronous one- step Q-learning, is shown in Algorithm 1. Each thread in- teracts with its own copy of the environment and at each step computes a gradient of the Q-learning loss. We use a shared and slowly changing target network in comput- ing the Q-learning loss, as was proposed in the DQN train- ing method. We also accumulate gradients over multiple timesteps before they are applied, which is similar to us- Asynchronous Methods for Deep Reinforcement Learning Figure 1. Learning speed comparison for DQN and the new asynchronous algorithms on five Atari 2600 games. DQN was trained on a single Nvidia K40 GPU while the asynchronous methods were trained using 16 CPU cores. The plots are averaged over 5 runs. In the case of DQN the runs were for different seeds with fixed hyperparameters. For asynchronous methods we average over the best 5 models from 50 experiments with learning rates sampled from LogUniform(10 4 , 10 2 ) and all other hyperparameters fixed. two additional domains to evaluate only the A3C algorithm – Mujoco and Labyrinth. MuJoCo (Todorov, 2015) is a physics simulator for evaluating agents on continuous mo- tor control tasks with contact dynamics. Labyrinth is a new 3D environment where the agent must learn to find rewards in randomly generated mazes from a visual input. The pre- cise details of our experimental setup can be found in Sup- plementary Section 8. 5.1. Atari 2600 Games We first present results on a subset of Atari 2600 games to demonstrate the training speed of the new methods. Fig- ure 1 compares the learning speed of the DQN algorithm trained on an Nvidia K40 GPU with the asynchronous methods trained using 16 CPU cores on five Atari 2600 games. The results show that all four asynchronous meth- ods we presented can successfully train neural network controllers on the Atari domain. The asynchronous meth- ods tend to learn faster than DQN, with significantly faster learning on some games, while training on only 16 CPU cores. Additionally, the results suggest that n-step methods learn faster than one-step methods on some games. Over- all, the policy-based advantage actor-critic method signifi- cantly outperforms all three value-based methods. We then evaluated asynchronous advantage actor-critic on 57 Atari games. In order to compare with the state of the art in Atari game playing, we largely followed the train- ing and evaluation protocol of (Van Hasselt et al., 2015). Specifically, we tuned hyperparameters (learning rate and amount of gradient norm clipping) using a search on six Atari games (Beamrider, Breakout, Pong, Q*bert, Seaquest and Space Invaders) and then fixed all hyperparameters for all 57 games. We trained both a feedforward agent with the same architecture as (Mnih et al., 2015; Nair et al., 2015; Van Hasselt et al., 2015) as well as a recurrent agent with an additional 256 LSTM cells after the final hidden layer. We additionally used the final network weights for evaluation to make the results more comparable to the original results Method Training Time Mean Median DQN 8 days on GPU 121.9% 47.5% Gorila 4 days, 100 machines 215.2% 71.3% D-DQN 8 days on GPU 332.9% 110.9% Dueling D-DQN 8 days on GPU 343.8% 117.1% Prioritized DQN 8 days on GPU 463.6% 127.6% A3C, FF 1 day on CPU 344.1% 68.2% A3C, FF 4 days on CPU 496.8% 116.6% A3C, LSTM 4 days on CPU 623.0% 112.6% Table 1. Mean and median human-normalized scores on 57 Atari games using the human starts evaluation metric. Supplementary Table SS3 shows the raw scores for all games. from (Bellemare et al., 2012). We trained our agents for four days using 16 CPU cores, while the other agents were trained for 8 to 10 days on Nvidia K40 GPUs. Table 1 shows the average and median human-normalized scores obtained by our agents trained by asynchronous advantage actor-critic (A3C) as well as the current state-of-the art. Supplementary Table S3 shows the scores on all games. A3C significantly improves on state-of-the-art the average score over 57 games in half the training time of the other methods while using only 16 CPU cores and no GPU. Fur- thermore, after just one day of training, A3C matches the average human normalized score of Dueling Double DQN and almost reaches the median human normalized score of Gorila. We note that many of the improvements that are presented in Double DQN (Van Hasselt et al., 2015) and Dueling Double DQN (Wang et al., 2015) can be incorpo- rated to 1-step Q and n-step Q methods presented in this work with similar potential improvements. 5.2. TORCS Car Racing Simulator We also compared the four asynchronous methods on the TORCS 3D car racing game (Wymann et al., 2013). TORCS not only has more realistic graphics than Atari 2600 games, but also requires the agent to learn the dy- namics of the car it is controlling. At each step, an agent received only a visual input in the form of an RGB image
  • 68.
    Joo-Haeng Lee 2017joohaeng@gmail.com Schema Networks: Zero-shot Transfer with a Generative Causal Model of Intuitive Physics Ken Kansky Tom Silver David A. M´ely Mohamed Eldawy Miguel L´azaro-Gredilla Xinghua Lou Nimrod Dorfman Szymon Sidor Scott Phoenix Dileep George Abstract The recent adaptation of deep neural network- based methods to reinforcement learning and planning domains has yielded remarkable progress on individual tasks. Nonetheless, progress on task-to-task transfer remains limited. In pursuit of efficient and robust generalization, we introduce the Schema Network, an object- oriented generative physics simulator capable of disentangling multiple causes of events and reasoning backward through causes to achieve goals. The richly structured architecture of the Schema Network can learn the dynamics of an environment directly from data. We compare Schema Networks with Asynchronous Advan- tage Actor-Critic and Progressive Networks on a suite of Breakout variations, reporting results on training efficiency and zero-shot generalization, consistently demonstrating faster, more robust learning and better transfer. We argue that generalizing from limited data and learning causal relationships are essential abilities on the path toward generally intelligent systems. 1. Introduction A longstanding ambition of research in artificial intelli- gence is to efficiently generalize experience in one scenario to other similar scenarios. Such generalization is essential for an embodied agent working to accomplish a variety of goals in a changing world. Despite remarkable progress on individual tasks like Atari 2600 games (Mnih et al., 2015; Van Hasselt et al., 2016; Mnih et al., 2016) and Go (Silver et al., 2016a), the ability of state-of-the-art models to trans- fer learning from one environment to the next remains lim- All authors affiliated with Vicarious AI, California, USA. Cor- respondence to: Ken Kansky ken@vicarious.com, Tom Silver tom@vicarious.com. Copyright 2017 by the author(s). Figure 1. Variations of Breakout. From top left: standard version, middle wall, half negative bricks, offset paddle, random target, and juggling. After training on the standard version, Schema Net- works are able to generalize to the other variations without any additional training. ited. For instance, consider the variations of Breakout illus- trated in Fig. 1. In these environments the positions of ob- jects are perturbed, but the object movements and sources of reward remain the same. While humans have no trouble generalizing experience from the basic Breakout to its vari- ations, deep neural network-based models are easily fooled (Taylor Stone, 2009; Rusu et al., 2016). The model-free approach of deep reinforcement learning (Deep RL) such as the Deep-Q Network and its descen- dants is inherently hindered by the same feature that makes it desirable for single-scenario tasks: it makes no assump- tions about the structure of the domain. Recent work has suggested how to overcome this deficiency by utilizing object-based representations (Diuk et al., 2008; Usunier et al., 2016). Such a representation is motivated by the Schema Networks: Zero-shot Transfer with a Generative Causal Model of Intuitive Physics still be unable to generalize from biased training data with- out continuing to learn on the test environment. In contrast, Schema Networks exhibit zero-shot transfer. Schema Networks are implemented as probabilistic graph- ical models (PGMs), which provide practical inference and structure learning techniques. Additionally, inference with uncertainty and explaining away are naturally supported by PGMs. We direct the readers to (Koller Friedman, 2009) and (Jordan, 1998) for a thorough overview of PGMs. In particular, early work on factored MDPs has demonstrated how PGMs can be applied in RL and planning settings (Guestrin et al., 2003b). 3. Schema Networks 3.1. MDPs and Notation The traditional formalism for the Reinforcement Learning problem is the Markov Decision Process (MDP). An MDP M is a five-tuple (S, A, T, R, ), where S is a set of states, A is a set of actions, T(s(t+1) |s(t) , a(t) ) is the probabil- ity of transitioning from state s(t) 2 S to s(t+1) 2 S af- ter action a(t) 2 A, R(r(t+1) |s(t) , a(t) ) is the probability of receiving reward r(t+1) 2 R after executing action a(t) while in state s(t) , and 2 [0, 1] is the rate at which future rewards are exponentially discounted. 3.2. Model Definition A Schema Network is a structured generative model of an MDP. We first describe the architecture of the model infor- mally. An image input is parsed into a list of entities, which may be thought of as instances of objects in the sense of OO-MDPs (Diuk et al., 2008). All entities share the same collection of attributes. We refer to a specific attribute of a specific entity as an entity-attribute, which is represented as a binary variable to indicate the presence of that attribute for an entity. An entity state is an assignment of states to all attributes of the entity, and the complete model state is the set of all entity states. A grounded schema is a binary variable associated with a particular entity-attribute in the next timestep, whose value depends on the present values of a set of binary entity-attributes. The event that one of these present entity- attributes assumes the value 1 is called a precondition of the grounded schema. When all preconditions of a grounded schema are satisfied, we say that the schema is active, and it predicts the activation of its associated entity-attribute. Grounded schemas may also predict rewards and may be conditioned on actions, both of which are represented as binary variables. For instance, a grounded schema might define a distribution over Entity 1’s “position” attribute at time 5, conditioned on Entity 2’s “position” attribute at time 4 and the action “UP” at time 4. Grounded schemas Figure 2. Architecture of a Schema Network. An ungrounded schema is a template for a factor that predicts either the value of an entity-attribute (A) or a future reward (B) based on entity states and actions taken in the present. Self-transitions (C) predict that entity-attributes remain in the same state when no schema is active to predict a change. Self-transitions allow continuous or categorical variables to be represented by a set of binary variables (depicted as smaller nodes). The grounded schema factors, instan- tiated from ungrounded schemas at all positions, times, and entity bindings, are combined with self-transitions to create a Schema Network (D). are instantiated from ungrounded schemas, which behave like templates for grounded schemas to be instantiated at different times and in different combinations of entities. For example, an ungrounded schema could predict the “po- sition” attribute of Entity x at time t + 1 conditioned on the “position” of Entity y at time t and the action “UP” at time t; this ungrounded schema could be instantiated at time t = 4 with x = 1 and y = 2 to create the grounded schema described above. In the case of attributes like “po- sition” that are inherently continuous or categorical, several binary variables may be used to discretely approximate the distribution (see the smaller nodes in Figure 2). A Schema Network is a factor graph that contains all grounded instan- tiations of a set of ungrounded schemas over some window of time, illustrated in Figure 2. We now formalize the Schema Network factor graph. For simplicity, suppose the number of entities and the num- ber of attributes are fixed at N and M respectively. Let Ei refer to the ith entity and let ↵ (t) i,j refer to the jth at- tribute value of the ith entity at time t. We use the notation E (t) i = (↵ (t) i,1, ..., ↵ (t) i,M ) to refer to the state of the ith en- Schema Networks: Zero-shot Transfer with a Generative Causal Model of Intuitive Physics (a) Mini Breakout Learning Rate (b) Middle Wall Learning Rate Figure 3. Comparison of learning rates. (a) Schema Networks and A3C were trained for 100k frames in Mini Breakout. Plot shows the average of 5 training attempts for Schema Networks and the best of 5 training attempts for A3C, which did not converge as reliably. (b) PNs and Schema Networks were pretrained on 100K frames of Standard Breakout, and then training continued on 45K additional frames of the Middle Wall variation. We show performance as a function of training frames for both models. Note that Schema Networks are ignoring all the additional training data, since all the required schemas were learned during pretraining. For Schema Networks, zero-shot transfer learning is happening. the input to Schema Networks did not treat any object dif- ferently. Schema Networks were provided separate entities for each part (pixel) of each object, and each entity con- tained 53 attributes corresponding to the available part la- bels (21 for bricks, 30 for the paddle, 1 for walls, and 1 for the ball). Only one of these part attributes was active per entity. Schema Networks had to learn that some attributes, like parts of bricks, were irrelevant for prediction. 5.1. Transfer Learning This experiment examines how effectively Schema Net- works and PNs are able to learn a new Breakout variation after pretraining, which examines how well the two mod- els can transfer existing knowledge to a new task. Fig. 3a shows the learning rates during 100k frames of training on Mini Breakout. In a second experiment, we pretrained on Large Breakout for 100k frames and continued training on the Middle Wall variation, shown in Fig. 1b. Fig. 3b shows that PNs require significant time to learn in this new en- vironment, while Schema Networks do not learn anything new because the dynamics are the same. 5.2. Zero-Shot Generalization Many Breakout variations can be constructed that all in- volve the same dynamics. If a model correctly learns the dynamics from one variation, in theory the others could be played perfectly by planning using the learned model. Rather than comparing transfer with additional training us- ing PNs, in these variations we can compare zero-shot gen- eralization by training A3C only on Standard Breakout. Fig. 1b-e shows some of these variations with the following modifications from the training environment: • Offset Paddle (Fig. 1d): The paddle is shifted upward by a few pixels. • Middle Wall (Fig. 1b): A wall is placed in the middle of the screen, requiring the agent to aim around it to hit the bricks. • Random Target (Fig. 1e): A group of bricks is destoyed when the ball hits any of them and then reap- pears in a new random position, requiring the agent to delibarately aim at the group. • Juggling (Fig. 1f, enlarged from actual environment to see the balls): Without any bricks, three balls are launched in such a way that a perfect policy could jug- gle them without dropping any. Table 1 shows the average scores per episode in each Breakout variation. These results show that A3C has failed to recognize the common dynamics and adapt its policy ac- cordingly. This comes as no surprise, as the policy it has learned for Standard Breakout is no longer applicable in these variations. Simply adding an offset to the paddle is
  • 69.
    Joo-Haeng Lee 2017joohaeng@gmail.com Playing FlappyBird with Deep Reinforcement Learning Naveen Appiah Mechanical Engineering nappiahb@stanford.edu Sagar Vare Stanford ICME svare@stanford.edu Abstract Learning to play games has been one among of the pop- ular topics researched in AI today. Solving such problems using game theory/ search algorithms require careful do- main specific feature definitions, making them averse to scalability. The goal here is to develop a more general framework to learn game specific features and solve the problem. The game we are considering for this project is the popular mobile game - Flappy Bird. It involves navi- gating a bird through a bunch of obstacles. Though, this problem can be solved using naive RL implementation, it requires good feature definitions to set up the problem. Our goal is to develop a CNN model to learn features from just snapshots of the game and train the agent to take the right actions at each game instance. 1 INTRODUCTION- PROBLEM DEFINITION Flappy bird (Figure 1) is a game in which the player guides the bird, which is the hero of the game through the space between pairs of pipes. At each instant there are two actions that the player can take: to press the ’up’ key, which makes the bird jump upward or not pressing any key, which makes it descend at a constant rate. Today, the recent advances in deep neural networks, in which several layers of nodes are used to build up progressively more abstract representations of the data, have made it possible for machine learning models to learn concepts such as object categories directly from raw sensory data. It is has also been observed that deep convolutional networks, which use hierarchical layers of tiled convolutional filters to mimic the effects of receptive fields produce promising results in solving computer vision problems such as classification and detection. The goal here is to develop a deep neural network to learn game specific features just from the raw pixels and decide on what actions to take. Inspired by [1] and [2], we propose a reinforcement learning set-up to learn and play this game.. Reinforcement learning is essential when it is not suf- ficient to tackle problems by programming the agent with just a few predetermined behaviors. It is a way to teach the agent to make the right decisions under uncertainty and with very high dimensional input (such as a cam- era) by making it experiencing scenarios. In this way, the learning can happen online and the agent can learn to re- act to even the rarest of scenarios which the brutal pro- gramming would never consider. Figure 1: Flappybird Game - Schematics 2 RELATED WORK Google Deepmind’s efforts to use Deep learning tech- niques to play games have paved way to looking at ar- tificial Intelligence problems with a completely different lens. Their recent success, AlphaGo [4], the Go agent that has been giving a stiff competition to the experts in the game show clearly the potential of what Deep learning is 1 Figure 2: Schematic Architecture of the Convolutional Neural Network. capable of. Deepmind’s previous venture was to learn and play the Atari 2600 games just from the raw pixel data. Mnih et al. are able to successfully train agents to play these games using reinforcement learning, surpassing human expert-level on multiple games [1],[2]. Here, they have developed a novel agent, a deep Q-network (DQN) combining reinforcement learning with deep neural net- works. The deep Neural Networks acts as the approximate function to represent the Q-value (action-value) in Q- learning. They also discuss a few techniques to improve the efficiency of training and better the stability. They use a experience replay of previous experiences from which mini-batches are randomly sampled to update the net- work so as to de-correlate experiences and delayed up- dates for the cloned model from which target values are obtained (explained in detail later) to better the stability. Another advantage of this pipeline is the complete ab- sence of labeled data. The model learns by playing with the game emulator and learns to make good decisions over time. It is this simple learning framework and their stupendous results in playing the Atari games, inspired us to implement a similar algorithm for this project. 3 METHODS In the following section, we describe how the model is pa- rameterized and the Q-learning algorithm. The task of the AI agent when the model gets deployed is to extract images of game instances and output the necessary ac- tion to be taken from the set of feasible actions that can be taken. This is similar to a classification problem. Un- like the common classification problem, we don’t have la- beled data to train the model on. Instead, a reinforcement learning setting tries to evaluate the actions at a given state based on the reward it observes by executing it. 3.1 MODEL FORMULATION The actions the bird can take are to flap (a = 1) or do noth- ing (a = 0). The state at time (frame) t is derived by pre- processing the raw image of the current frame (xt ) with a finite number of previous frames (xt°1,xt°2,...). This way, each state will uniquely recognize the trajectory the bird had followed to reach that position and thus provide temporal information to the agent. The number of previ- ous frames stored becomes a hyper-parameter. Ideally, st should be a function of all frames from t = 1 but to reduce the state-space, only a finite number of frames are used. As we know, that the bird dies when it hits the pipe or the edges of the screen, we can associate a negative re- ward for bird crashing and a positive reward if it passes through the gap. This will be close to what a human player tries to do, i.e try to avoid dying and score as many points as possible. Therefore, there are two rewards, rewardPass and rewardDie. A discount factor (∞) of 0.9 is used to discount the rewards propagated from the future action-values 4 Q-LEARNING The goal of reinforcement learning is to maximize the to- tal pay-off (reward). In Q-learning, which is off-policy, we use the bellman equation as an iterative update section, the experiences are stored in a replay memory and at regular intervals, a random mini-batch of experi- ences are sampled from the memory and used to perform a gradient descent on the DQN parameters. Then we up- date the exploration probability as well as the target net- work parameters µ° if necessary. Algorithm 1 Deep Reinforcement learning 1: Initialize replay memory D to certain capacity 2: Initialize the Q-value function with random weights µ 3: Initialize µ° = µ 4: for games = 1 ! maxGames do 5: for snapShots = 1 ! T do 6: With probability ≤ select a random action at 7: otherwise select at = ar gmaxaQ(st ,a;µ) 8: Execute at and observe rt and next sate st+1 9: Store transition st ,at ,rt ,st+1 in D 10: Sample mini-batch of transitions from D 11: for j = 1 ! size of minibatch do 12: if game terminates at next state then 13: yj = rf 14: else 15: yj = rj +∞maxa0 Q(s0,a0;µ°)) 16: end if 17: end for 18: Perform gradient descent on the loss w.r.t µ 19: Every C steps reset µ° = µ 20: end for 21: end for The score of the output game is the sole evaluation metric. To make the results robust, we take an average score over a few games rather than a single one. The ≤ fac- tor is set to zero during test and while training, we use a decaying value. This is to model the surety of our deci- sions as we train and learn more. 5 EXPERIMENTS AND RESULTS 5.1 TRAINING PARAMETERS Model Parameters: The Flappy bird is played at 10 frames per second, 3 recent frames are processed to generate a state, the discount factor ∞ is set to 0.9 and the rewards are as follows: rewardPass = +1.0 and rewardDie = °1.0. DQN parameters: The exploration probability (≤) linearly decreased from 0.6 to 0 in 1000 updates. The size of the replay memory is set to 1000 and the mini-batches are sampled once it has 500 experiences. The parameters of the target model µ° are updated every C=100 updates. A mini-batch of 32 is randomly sampled every 5 frames to update the DQN parameters. Training parameters: The Gradient descent update rule used to update the DQN parameters is Adam with a learning rate 1e ° 6, Ø1 = 0.9 and Ø2 = 0.999. These parameters were chosen on a trial and error basis observ- ing the convergence of the loss value. Our convolution weights are initialized to have a normal distribution with mean 0 and variance 1e °2. The whole DQN architecture and the Q-learning setup was developed in python using numpy and matplotlib libraries. The game emulator is also a python-pygame implementation found at https://github.com/TimoWilken/flappy-bird-pygame.git 5.2 RESULTS AND ANALYSIS After training, a few snapshots of the game were tested with the model to see if results made sense. Figure 3 shows some example snaps and their corresponding scores which make perfect sense. (a) Score: UP = 1.870, DOWN = -1.830 (b) Score: UP = -1.999, DOWN = 1.983 Figure 3: Example snapshots with their corresponding scores. 3a is scenario where the bird has to jump up and 3b is a scenario where the bird has to go down To understand more about the working of the trained CNN model, test image 3b was visualized after the con- volution layers to notice the activation. It could be seen that most activation show clear patches on the edges of
  • 70.
  • 72.
    Joo-Haeng Lee 2017joohaeng@gmail.com