CURRICULAM VITAE
NAVEEN KUMAR
Vill.- Aurangabad P.o.-Jakhauli
Distt.-Sonepat Haryana- 131001
Mobile No. +91-9050199001
+91-9999808942
Kautish828@gmail.com
Kautish039@yahoo.com
Career Objective
To associate myself with an organization which allows me to prove the best of my abilities in the industry, where
there is ample scope of individual development.
Professional Synopsis
 More than Five year experience in Product / Process Engineering & new product design & development
activities in the Manufacturing Industry.
 Proven abilities in enhancing production process operations, optimizing resource and capacity utilization,
escalating productivity & operational efficiencies as per the quality standards.
 Conversant with the problem Solving Tools , SPC, FMEA,PPAP
Career Highlight
1. APRIL 2012 with JAYASHREE POLYMERS PVT. LTD. MANESAR (HARYANA)
As Sr. Engineer (New Product Design & Development)
Company Brief:
It is an ISO/TS-16949, ISO-14001 and OSHAS-18001 certified company from UL India. The Jayashree
Group traces its roots back to 1984 when it began operations as a Rubber manufacturing company. Jayashree,
realizing the immense opportunities in the global rubber components industry has been successful in expanding
its operations into multiple locations & multi-products over a period of time. It has established itself as one of
the leading automotive rubber components supplier in the country. Its most valuable customer is GENERAL
MOTOR, SUZUKI MOTORCYCLE, PIAGGIO, TATA MOTORS, HERO MOTO CORP., SONALIKA TRACTOR,
MAHINDRA, YAMAHA MOTORS & DELPHI etc.
Work Profile:
 Preparing the project development plan.
 Part Modeling, Product Design & Feasibility Check.
 Follow all cycle of APQP activity for development of the product & making all necessary documents as per
APQP manual & customer specific requirements.
 Reduce customer complaints by analyzing the problem finding root cause (using tools like 5 why fish bone
etc).
 Make the prototype as per customer requirement for modification in existing product as well as for new
product.
 Follow up with the Tool manufacturer for making the tool or die for the new product.
 Taking Care of mould trial activity & resolve out the problem during the trial.
 Setup the new line, Gauges & Fixtures for new developing product.
 Submission of samples to the customer and getting feedback about samples from customer.
 Review the BOP Part development activity with the supplier.
 PPAP submission to the customer at the time of development & running product.
 Implement the changes in design and drawings as per customer requirement.
 Co-ordinate with customer for problem solving during the development of new product
 Conducting design trial, production trial, mass production trial as per the APQP.
 Customer audit during the development of the product & close the non conformity of audit, if any.
 To taking care of all testing requirement on the product as per customer requirements.
 Maintaining initial supply control and initial product control during the development phase of the
component.
 Adaptable and a quick learner; possess skills to work under pressure.
Project In Work:
 PROJECTS:-
1) KWPG, K14A, K23A, K43A, KWPK MODEL FOR HMSI.
2) 014, 1GC, 2FB, 34C, 2SX, B97, B70, B44 MODEL FOR YAMAHA.
3) K06A, AAWA, AATA, AANC, AACD, KZAA, AABA FOR HEROMOTO CORP.
Previous Employee:
2. Since AUGUST 2010 to MARCH 12 with FIEM INDUSTRIES LTD. RAI SONIPAT
(HARYANA)
As Engineer (New product development)
Company Brief:
It is an ISO/TS-16949 certified company and the most competitive manufacturer of automotive lighting, rear view
mirror and signaling equipments FIEM INDUSTRIES LTD caters to automotive giants like TVS motorcycle, HMSI
SUZUKI MOTORCYCLE, PIAGGIO, CHRYSLER LLC, KUBOTA, ROYAL ENFIELD, JCB, SKODA, HUNDAI etc. The
company is having joint venture with ICHIKO ELECTRIC co. JAPAN. The company exporting to various Korean and
American leading automobile industries.
Work Profile:
 Preparing the project development plan.
 Follow all cycle of APQP activity for development of the product & making all necessary documents as per
APQP manual & customer specific requirements.
 Setup the new line, Gauges & Fixtures for new developing product.
 Follow up with the Tool manufacturer for making the tool or die for the new product.
 Taking Care of mould trial activity & resolve out the problem during the trial.
 Submission of samples to the customer and getting feedback about samples from customer.
 Review the BOP Part development activity with the supplier.
 PPAP submission to the customer at the time of development & running product.
 Interact with the design dept. For resolve the design issue.
 Analysis the rejection & reduce by using the 7 Q.C tools.
 Implement the changes in design and drawings as per customer requirement.
Project In Work:
 Presently working on three projects.
1) MGSA, KZZA for HONDA EXPORT MODEL (Head lamp Assy., Tail Lamp Assy. & Side indicator Assy.)
2) KZKA, K14A, KTEL for HONDA (Head lamp Assy., Tail Lamp Assy. & Side indicator Assy.)
3) XD-801, XB-251 for SUZUKI (Head lamp Assy., Tail Lamp Assy. & Side indicator Assy.)
Technical Qualifications
 B.TECH in MECHANICAL ENGG. from N.C.College of Engineering, ISRANA, PANIPAT (KURUKSHETRA
UNIVERSITY).
 Diploma in MECHANICAL ENGG. (TOOL & DIE) from GOVT. POLY. SONIPAT (SBTE).
Technical Skills
 Language : Auto Cad , Unigraphic 7.5
IT Skills
Language : Well conversant with Operating Systems {Windows 98) & MS Office, MS project. Internet
etc.
Hobbies
Cricket, Listening Music, Travelling
Personal Profile
Name Naveen Kumar
Father’s Name Sh. Narender Singh
Date of Birth 10th
Jan 1990
Nationality Indian
Sex Male
Marital Status Unmarried
Language known English, Hindi
Strengths Decision making capacity, Go get attitude
Declaration
I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility
for the correctness of the above mentioned particulars.
Date:
Place: SONIPAT
(HARYANA)
(NAVEEN KUMAR)

new product development cv

  • 1.
    CURRICULAM VITAE NAVEEN KUMAR Vill.-Aurangabad P.o.-Jakhauli Distt.-Sonepat Haryana- 131001 Mobile No. +91-9050199001 +91-9999808942 Kautish828@gmail.com Kautish039@yahoo.com Career Objective To associate myself with an organization which allows me to prove the best of my abilities in the industry, where there is ample scope of individual development. Professional Synopsis  More than Five year experience in Product / Process Engineering & new product design & development activities in the Manufacturing Industry.  Proven abilities in enhancing production process operations, optimizing resource and capacity utilization, escalating productivity & operational efficiencies as per the quality standards.  Conversant with the problem Solving Tools , SPC, FMEA,PPAP Career Highlight 1. APRIL 2012 with JAYASHREE POLYMERS PVT. LTD. MANESAR (HARYANA) As Sr. Engineer (New Product Design & Development) Company Brief: It is an ISO/TS-16949, ISO-14001 and OSHAS-18001 certified company from UL India. The Jayashree Group traces its roots back to 1984 when it began operations as a Rubber manufacturing company. Jayashree, realizing the immense opportunities in the global rubber components industry has been successful in expanding its operations into multiple locations & multi-products over a period of time. It has established itself as one of the leading automotive rubber components supplier in the country. Its most valuable customer is GENERAL MOTOR, SUZUKI MOTORCYCLE, PIAGGIO, TATA MOTORS, HERO MOTO CORP., SONALIKA TRACTOR, MAHINDRA, YAMAHA MOTORS & DELPHI etc. Work Profile:  Preparing the project development plan.  Part Modeling, Product Design & Feasibility Check.  Follow all cycle of APQP activity for development of the product & making all necessary documents as per APQP manual & customer specific requirements.  Reduce customer complaints by analyzing the problem finding root cause (using tools like 5 why fish bone etc).
  • 2.
     Make theprototype as per customer requirement for modification in existing product as well as for new product.  Follow up with the Tool manufacturer for making the tool or die for the new product.  Taking Care of mould trial activity & resolve out the problem during the trial.  Setup the new line, Gauges & Fixtures for new developing product.  Submission of samples to the customer and getting feedback about samples from customer.  Review the BOP Part development activity with the supplier.  PPAP submission to the customer at the time of development & running product.  Implement the changes in design and drawings as per customer requirement.  Co-ordinate with customer for problem solving during the development of new product  Conducting design trial, production trial, mass production trial as per the APQP.  Customer audit during the development of the product & close the non conformity of audit, if any.  To taking care of all testing requirement on the product as per customer requirements.  Maintaining initial supply control and initial product control during the development phase of the component.  Adaptable and a quick learner; possess skills to work under pressure. Project In Work:  PROJECTS:- 1) KWPG, K14A, K23A, K43A, KWPK MODEL FOR HMSI. 2) 014, 1GC, 2FB, 34C, 2SX, B97, B70, B44 MODEL FOR YAMAHA. 3) K06A, AAWA, AATA, AANC, AACD, KZAA, AABA FOR HEROMOTO CORP. Previous Employee: 2. Since AUGUST 2010 to MARCH 12 with FIEM INDUSTRIES LTD. RAI SONIPAT (HARYANA) As Engineer (New product development) Company Brief: It is an ISO/TS-16949 certified company and the most competitive manufacturer of automotive lighting, rear view mirror and signaling equipments FIEM INDUSTRIES LTD caters to automotive giants like TVS motorcycle, HMSI SUZUKI MOTORCYCLE, PIAGGIO, CHRYSLER LLC, KUBOTA, ROYAL ENFIELD, JCB, SKODA, HUNDAI etc. The company is having joint venture with ICHIKO ELECTRIC co. JAPAN. The company exporting to various Korean and American leading automobile industries. Work Profile:  Preparing the project development plan.  Follow all cycle of APQP activity for development of the product & making all necessary documents as per APQP manual & customer specific requirements.  Setup the new line, Gauges & Fixtures for new developing product.  Follow up with the Tool manufacturer for making the tool or die for the new product.  Taking Care of mould trial activity & resolve out the problem during the trial.  Submission of samples to the customer and getting feedback about samples from customer.  Review the BOP Part development activity with the supplier.  PPAP submission to the customer at the time of development & running product.  Interact with the design dept. For resolve the design issue.  Analysis the rejection & reduce by using the 7 Q.C tools.  Implement the changes in design and drawings as per customer requirement. Project In Work:  Presently working on three projects.
  • 3.
    1) MGSA, KZZAfor HONDA EXPORT MODEL (Head lamp Assy., Tail Lamp Assy. & Side indicator Assy.) 2) KZKA, K14A, KTEL for HONDA (Head lamp Assy., Tail Lamp Assy. & Side indicator Assy.) 3) XD-801, XB-251 for SUZUKI (Head lamp Assy., Tail Lamp Assy. & Side indicator Assy.) Technical Qualifications  B.TECH in MECHANICAL ENGG. from N.C.College of Engineering, ISRANA, PANIPAT (KURUKSHETRA UNIVERSITY).  Diploma in MECHANICAL ENGG. (TOOL & DIE) from GOVT. POLY. SONIPAT (SBTE). Technical Skills  Language : Auto Cad , Unigraphic 7.5 IT Skills Language : Well conversant with Operating Systems {Windows 98) & MS Office, MS project. Internet etc. Hobbies Cricket, Listening Music, Travelling Personal Profile Name Naveen Kumar Father’s Name Sh. Narender Singh Date of Birth 10th Jan 1990 Nationality Indian Sex Male Marital Status Unmarried Language known English, Hindi Strengths Decision making capacity, Go get attitude Declaration I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars. Date: Place: SONIPAT (HARYANA) (NAVEEN KUMAR)