Subtitle
NATIONAL DISASTER RISK REDUCTION
CENTRE NEPAL NDRC Nepal
An Introduction
to
National Disaster Risk-reduction Center Nepal (NDRC Nepal)
October 2019
Contact Address:
National Disaster Risk Reduction Centre (NDRC Nepal)
New Baneshwor, Kathmandu, Radhamohan Marg- 162
GPO Box 9460 Kathmandu, Nepal
Phone: + 977 1 4482738
Email: ndrcnepal2007@gmail.com
Url: www.ndrcnepal.org
LinkedIn: https://www.linkedin.com/company/13257320/
Facebook: https://www.facebook.com/NDRCNpl/
Presentation content
3
1. Background
2. Geographical Coverage of NDRC Nepal
3. Key Engagement Areas of NDRC Nepal
4. Salient features of few projects
5. NDRC’s Key Strengths and Areas of Expertise
6. Publications
7. Development Partners
National Disaster Risk Reduction Center Nepal
Background
4
Inception 2003 and registered in 2007
Vision A resilient society
Mission Mainstreaming DRR, CCA and resilient livelihood into
development plans and policies
Goal Enhance the capacity of people and institutions towards
disaster resilience through social and economic
development of the communities, social mobilization,
and community empowerment
Objectives To implement project, contribute in social mobilization, conduct
research, case studies, lessons learned and goodNational Disaster Risk Reduction Center Nepal
Geographical Coverage of NDRC Nepal
National Disaster Risk Reduction Center Nepal5
Governance of
NDRC Nepal
Organization Information
Government Registrations
• Registration with DistrictAdministration Office: Registration Number: 992
• Registration with SocialWelfare Council: Affiliation Number: 30255
• Registration with Inland Revenue/PAN-VAT: VAT Number: 304240559
Annual Audit and Reporting
• Annual Progress Report 2019: Available
• Donor Project Audit 2018/19: Completed
• Annual InstitutionalAudit 2019: In progress
Board of Directors
• Executive Committee of 7 member board
• General Assembly of 31 members
• Advisory Members of 5 professionals.
Project Staff &Volunteers
• 14( Five female & 10 male)
Key Involvement
9 National Disaster Risk Reduction Center Nepal
Resilient
Society
Research &
Development
Capacity
Building
Knowledge
Management
Policy
Advocacy
Key Engagement Areas of NDRC Nepal
Project byThemes
•Disaster Risk Reduction (DRR)
•Urban DRR
•S/CBDRRM
•Comprehensive School Safety
•Climate Change Adaptation
•Natural Resource Management
•Resilient Livelihood
•Biodiversity Management
•Environment Protection
Salient features of few projects
Strengthening of DEOC and development of IM platform (2016
and 2017/18)/Danish Red Cross
Technical assistance to strengthening of DEOC and
development of IM platform in Dang, Banke,
Bardiya, (in 2016) Kailali and Darchula (added in
2017)
Capacity Building of DEOC staff and stakeholders
on disaster data collection and analysis focusing on
Use of GIS, Excel, Word, GPS and mobile data
collection procedure
Capacity Building of DDRC members on disaster
data collection and Management
Developed IM platform of DEOC of
Sindhupalchowk, Dolakha, Ramechhap and
Okhaldhunga- Mission East/CARE/Save The
Children National Disaster Risk Reduction Center Nepal11
Surakshit Sahar (Safer City)/ ADRA, DCA, LWF and
WVI/ 2017-2019
URBAN DRR pilot project in 2 wards of Lalitpur
Metropolitan City (LMC) and 2 wards of Kathmandu
Metropolitan City (KMC)
Based on Sendai Framework for DRR
Goal: Enhance urban resilience through strengthened
DRR in Kathmandu valley
Objectives
• Understanding disaster risk in the urban context
• Integrating disaster risk information at municipal planning and
actions for resilient development
• Strengthening institutional capacity to manage disaster risks
• Enhancing capacity of DRR institution and social
Collaborates with the government, non government,
private and local institutions to meet its objectives
National Disaster Risk Reduction Center Nepal12
Strengthening the Local Capacity for Reducing the
Disaster Risks and Impact of Climate Change in
Banganga River Basin/Canadian Cooperation Office
Community DRR project implemented in
Banganga River Basin
6 VDCs of Kapilbastu district and 1 VDC in
Argakhanchi district
Community Mobilization for construction of
Bamboo Spurs
Community Contribution for Bamboo Spurs worth
three times the support provided by the project
Integration of community, school and local
authorities for sustainable outcome
National Disaster Risk Reduction Center Nepal13
BURDAN/ADRA Nepal/ March 2017- Sept 2018
Outcome 3
The government, policy
makers, civil society and
public in general will be
familiar with and act to
adopt SFDRR 2015-2030
priorities at the local level
planning adopting the
policy framework (NSDRM/
DM Act, policy and Action
Plan developed at national
level
National Disaster Risk Reduction Center Nepal14
• Consultation
workshops
• Conference
• Citizen
Engagement
• Policy
Dissemination
• Monitoring and
Evaluation
• KAP, Baseline and
Endline Survey
• Action Research
• IEC Materials
• Learning
Documentation
• Press Coverage
• Trainings/Workshops
• Material Distribution
• Awareness raising
• Exposure Visit
Capacity
Building
Knowledge
Management
Policy
And
Advocacy
Research
And
Development
PRAGATI/ DCA/ADRA/VSO- Aug 2017-Oct 2018
15 National Disaster Risk Reduction Center Nepal
“Strengthening National Climate Change Survey Process of
CBS/GoN and Practical Action”
CC impact survey conduct First time in Nepal by CCA.
Sample size 5000 HH from 28 districts
Provided technical support to prepare the questionnaire-
• Development of indicators for assessing the impact of
climate change at household level in communities
• 8 thematic leaders, statisticians from CBS, technical
committee of CBS, international experts and
representatives from Practical Action
• Project deliverable in collaboration with the national
stakeholders
National Disaster Risk Reduction Center Nepal16
National Initiative on Comprehensive School Safety
National Disaster Risk Reduction Center Nepal17
Duration June, 2018 – October, 2019
Geographi
cal
Coverage
National - Advocacy and
Dissemination,
Provinces - 7 Provinces
Districts - 14 most earthquake-
affected districts for
dissemination
Beneficiari
es
Direct reach at different level:
745 professionals (Federal,
Provincial and 131 local
government)
Indirect reach: 7,000 Schools,
800,000 Students, 35,000 SMC
PTA member of 14 earthquake
affected districts.
International Citizen Services Project
Geographical Coverage: Shankharapur
Municipality, wards 6,7,8,9
Outcomes:
• Enhanced understanding and capabilities of
target groups to use information in disaster
response and risk reduction.
• Increase in the percentage of people aware on
risk and hazard of disasters.
• Increase in the percentage of total population
prepared for timely response during emergency
in each Municipality
• Strengthened community based emergency
response teams
National Disaster Risk Reduction Center Nepal18
Waste management
Fire mock drill
Social
Transformation
through Community
engagement
Capacity Building
Community
Empowerment
Social Mobilization
Institutional
Development of
CBOs
Inclusive
Governance/ Gender
and Social
Policy Advocacy
Technical Support to
Government for
policy formulation
National Disaster Risk Reduction Center Nepal19
NDRC’s Key Strengths and Areas of Expertise
Publications
Publications
CSS IEC Package - 5 types (2019)
Safe School Self-Assessment
Checklist booklet (2017)
Safe School Kit for Practitioner (2013)
Safe school Policies and Practices:
good Initiative, Gaps, implications and
the way forward (2013)
Good practices: Community Based
Disaster Risk Reduction (2009)
Community Based Disaster Risk
Reduction: Contribution to HFA (2009)
Good Practices and Lessons learned:
DRR through School (2010)National Disaster Risk Reduction Center Nepal21
Development
Partners
Government Agencies
 Ministry of Federal Affairs and
Administration
Ministry of Education, Science and
Technology
Department of Disaster Management,
Ministry of Home Affairs
 Environment Department, Central
Bureau of Statistics
Local Partners
• Institute for Frontier Studies
• Maitri Management and Development
Pvt Limited
• Save the Banganga
NGOs/ National Agencies
DPNet Nepal
ECO Nepal
National Society for Earthquake
Technologies (NSET)
DIPECHO Project Partners Nepal
Nepal Red Cross Society (NRCS)
Community Energy and
Environment Development Fund
(CEEDF)
Hospital and Rehabilitation Centre
for children with Disability (HRDC)
National Disaster Risk Reduction Center Nepal23
Canadian Cooperation Office Nepal
Help Age International
Action Aid Nepal and IDS at Sussex, UK
Association of INGOs in Nepal
CBM International
Save the Children
World Vision International
Canadian Cooperation Office Nepal
Handicap International Nepal
Mission East Nepal
Practical Action
UN agencies
Care Nepal
Oxfam
Lutheran World Federation
Lutheran World Relief
Islamic Relief Worldwide
Plan International Nepal
ICIMOD
FAO
Habitat for Humanity
World Health Organization
Danish Red Cross
Action Contre La Faim
Yale University USA
National Disaster Risk Reduction Center Nepal24
INGOs/International Agencies
National Disaster Risk Reduction Center Nepal25

Ndrc nepal general introduction 2019

  • 1.
    Subtitle NATIONAL DISASTER RISKREDUCTION CENTRE NEPAL NDRC Nepal
  • 2.
    An Introduction to National DisasterRisk-reduction Center Nepal (NDRC Nepal) October 2019 Contact Address: National Disaster Risk Reduction Centre (NDRC Nepal) New Baneshwor, Kathmandu, Radhamohan Marg- 162 GPO Box 9460 Kathmandu, Nepal Phone: + 977 1 4482738 Email: ndrcnepal2007@gmail.com Url: www.ndrcnepal.org LinkedIn: https://www.linkedin.com/company/13257320/ Facebook: https://www.facebook.com/NDRCNpl/
  • 3.
    Presentation content 3 1. Background 2.Geographical Coverage of NDRC Nepal 3. Key Engagement Areas of NDRC Nepal 4. Salient features of few projects 5. NDRC’s Key Strengths and Areas of Expertise 6. Publications 7. Development Partners National Disaster Risk Reduction Center Nepal
  • 4.
    Background 4 Inception 2003 andregistered in 2007 Vision A resilient society Mission Mainstreaming DRR, CCA and resilient livelihood into development plans and policies Goal Enhance the capacity of people and institutions towards disaster resilience through social and economic development of the communities, social mobilization, and community empowerment Objectives To implement project, contribute in social mobilization, conduct research, case studies, lessons learned and goodNational Disaster Risk Reduction Center Nepal
  • 5.
    Geographical Coverage ofNDRC Nepal National Disaster Risk Reduction Center Nepal5
  • 6.
  • 7.
    Organization Information Government Registrations •Registration with DistrictAdministration Office: Registration Number: 992 • Registration with SocialWelfare Council: Affiliation Number: 30255 • Registration with Inland Revenue/PAN-VAT: VAT Number: 304240559 Annual Audit and Reporting • Annual Progress Report 2019: Available • Donor Project Audit 2018/19: Completed • Annual InstitutionalAudit 2019: In progress Board of Directors • Executive Committee of 7 member board • General Assembly of 31 members • Advisory Members of 5 professionals. Project Staff &Volunteers • 14( Five female & 10 male)
  • 8.
  • 9.
    9 National DisasterRisk Reduction Center Nepal Resilient Society Research & Development Capacity Building Knowledge Management Policy Advocacy Key Engagement Areas of NDRC Nepal Project byThemes •Disaster Risk Reduction (DRR) •Urban DRR •S/CBDRRM •Comprehensive School Safety •Climate Change Adaptation •Natural Resource Management •Resilient Livelihood •Biodiversity Management •Environment Protection
  • 10.
    Salient features offew projects
  • 11.
    Strengthening of DEOCand development of IM platform (2016 and 2017/18)/Danish Red Cross Technical assistance to strengthening of DEOC and development of IM platform in Dang, Banke, Bardiya, (in 2016) Kailali and Darchula (added in 2017) Capacity Building of DEOC staff and stakeholders on disaster data collection and analysis focusing on Use of GIS, Excel, Word, GPS and mobile data collection procedure Capacity Building of DDRC members on disaster data collection and Management Developed IM platform of DEOC of Sindhupalchowk, Dolakha, Ramechhap and Okhaldhunga- Mission East/CARE/Save The Children National Disaster Risk Reduction Center Nepal11
  • 12.
    Surakshit Sahar (SaferCity)/ ADRA, DCA, LWF and WVI/ 2017-2019 URBAN DRR pilot project in 2 wards of Lalitpur Metropolitan City (LMC) and 2 wards of Kathmandu Metropolitan City (KMC) Based on Sendai Framework for DRR Goal: Enhance urban resilience through strengthened DRR in Kathmandu valley Objectives • Understanding disaster risk in the urban context • Integrating disaster risk information at municipal planning and actions for resilient development • Strengthening institutional capacity to manage disaster risks • Enhancing capacity of DRR institution and social Collaborates with the government, non government, private and local institutions to meet its objectives National Disaster Risk Reduction Center Nepal12
  • 13.
    Strengthening the LocalCapacity for Reducing the Disaster Risks and Impact of Climate Change in Banganga River Basin/Canadian Cooperation Office Community DRR project implemented in Banganga River Basin 6 VDCs of Kapilbastu district and 1 VDC in Argakhanchi district Community Mobilization for construction of Bamboo Spurs Community Contribution for Bamboo Spurs worth three times the support provided by the project Integration of community, school and local authorities for sustainable outcome National Disaster Risk Reduction Center Nepal13
  • 14.
    BURDAN/ADRA Nepal/ March2017- Sept 2018 Outcome 3 The government, policy makers, civil society and public in general will be familiar with and act to adopt SFDRR 2015-2030 priorities at the local level planning adopting the policy framework (NSDRM/ DM Act, policy and Action Plan developed at national level National Disaster Risk Reduction Center Nepal14 • Consultation workshops • Conference • Citizen Engagement • Policy Dissemination • Monitoring and Evaluation • KAP, Baseline and Endline Survey • Action Research • IEC Materials • Learning Documentation • Press Coverage • Trainings/Workshops • Material Distribution • Awareness raising • Exposure Visit Capacity Building Knowledge Management Policy And Advocacy Research And Development
  • 15.
    PRAGATI/ DCA/ADRA/VSO- Aug2017-Oct 2018 15 National Disaster Risk Reduction Center Nepal
  • 16.
    “Strengthening National ClimateChange Survey Process of CBS/GoN and Practical Action” CC impact survey conduct First time in Nepal by CCA. Sample size 5000 HH from 28 districts Provided technical support to prepare the questionnaire- • Development of indicators for assessing the impact of climate change at household level in communities • 8 thematic leaders, statisticians from CBS, technical committee of CBS, international experts and representatives from Practical Action • Project deliverable in collaboration with the national stakeholders National Disaster Risk Reduction Center Nepal16
  • 17.
    National Initiative onComprehensive School Safety National Disaster Risk Reduction Center Nepal17 Duration June, 2018 – October, 2019 Geographi cal Coverage National - Advocacy and Dissemination, Provinces - 7 Provinces Districts - 14 most earthquake- affected districts for dissemination Beneficiari es Direct reach at different level: 745 professionals (Federal, Provincial and 131 local government) Indirect reach: 7,000 Schools, 800,000 Students, 35,000 SMC PTA member of 14 earthquake affected districts.
  • 18.
    International Citizen ServicesProject Geographical Coverage: Shankharapur Municipality, wards 6,7,8,9 Outcomes: • Enhanced understanding and capabilities of target groups to use information in disaster response and risk reduction. • Increase in the percentage of people aware on risk and hazard of disasters. • Increase in the percentage of total population prepared for timely response during emergency in each Municipality • Strengthened community based emergency response teams National Disaster Risk Reduction Center Nepal18 Waste management Fire mock drill
  • 19.
    Social Transformation through Community engagement Capacity Building Community Empowerment SocialMobilization Institutional Development of CBOs Inclusive Governance/ Gender and Social Policy Advocacy Technical Support to Government for policy formulation National Disaster Risk Reduction Center Nepal19 NDRC’s Key Strengths and Areas of Expertise
  • 20.
  • 21.
    Publications CSS IEC Package- 5 types (2019) Safe School Self-Assessment Checklist booklet (2017) Safe School Kit for Practitioner (2013) Safe school Policies and Practices: good Initiative, Gaps, implications and the way forward (2013) Good practices: Community Based Disaster Risk Reduction (2009) Community Based Disaster Risk Reduction: Contribution to HFA (2009) Good Practices and Lessons learned: DRR through School (2010)National Disaster Risk Reduction Center Nepal21
  • 22.
  • 23.
    Government Agencies  Ministryof Federal Affairs and Administration Ministry of Education, Science and Technology Department of Disaster Management, Ministry of Home Affairs  Environment Department, Central Bureau of Statistics Local Partners • Institute for Frontier Studies • Maitri Management and Development Pvt Limited • Save the Banganga NGOs/ National Agencies DPNet Nepal ECO Nepal National Society for Earthquake Technologies (NSET) DIPECHO Project Partners Nepal Nepal Red Cross Society (NRCS) Community Energy and Environment Development Fund (CEEDF) Hospital and Rehabilitation Centre for children with Disability (HRDC) National Disaster Risk Reduction Center Nepal23
  • 24.
    Canadian Cooperation OfficeNepal Help Age International Action Aid Nepal and IDS at Sussex, UK Association of INGOs in Nepal CBM International Save the Children World Vision International Canadian Cooperation Office Nepal Handicap International Nepal Mission East Nepal Practical Action UN agencies Care Nepal Oxfam Lutheran World Federation Lutheran World Relief Islamic Relief Worldwide Plan International Nepal ICIMOD FAO Habitat for Humanity World Health Organization Danish Red Cross Action Contre La Faim Yale University USA National Disaster Risk Reduction Center Nepal24 INGOs/International Agencies
  • 25.
    National Disaster RiskReduction Center Nepal25

Editor's Notes

  • #4 Estd date: 2003 registered in DAO in 2007 Objectives: 1) To aware and sensitize people at risks to prepare and cope with impending disaster 2) To reduce the vulnerability caused by different hazards and promote sustainable mitigation measures 3) To contribute in seismic risk assessment, particularly in the earthquake context 4) To advocate for favorable and supportive policy environment for effective implementation of DRR and CCA initiatives in both rural and urban areas 5) To increase the effectiveness of civil society and promote the role of civilians to contribute towards building resilient communities 6) To implement project, conduct research, case studies, lessons learned and good practices for wider dissemination
  • #5 Estd date: 2003 registered in DAO in 2007 Objectives: 1) To aware and sensitize people at risks to prepare and cope with impending disaster 2) To reduce the vulnerability caused by different hazards and promote sustainable mitigation measures 3) To contribute in seismic risk assessment, particularly in the earthquake context 4) To advocate for favorable and supportive policy environment for effective implementation of DRR and CCA initiatives in both rural and urban areas 5) To increase the effectiveness of civil society and promote the role of civilians to contribute towards building resilient communities 6) To implement project, conduct research, case studies, lessons learned and good practices for wider dissemination
  • #10  We believe the resilient society can be achieved from research and development, identifying the gaps and building capacity of the communities. It is also necessary to document the knowledge that the community already possess and the knowledge gained from implementation of various activities for community development and disaster risk reduction in the community. It in turn will help to lobby in policies which will lead to a sustainable change in the society. And further demanding research and development in a cycl;ic form. R&D Technical feasibility, need assessment for DRR and CCA and humanitarian response Baseline survey; KAP (knowledge, attitude and practice) survey; gap and phasing out study Participatory Vulnerability Analysis and protection related assessment - DRR and CCA related Monitoring and Evaluation - Specialized study on seismic assessment, WASH, SPHERE, inclusive development Knowledge Management Good Practices and Lesson Learnt Studies Case studies Publications Capacity Building DRR and CCA capacity building initiatives Participatory project planning Prepare manual on DRR and CCA Policy Advocacy
  • #11  These projects exhibit the ability of NDRC to deliver support for the pioneer activities in DRR and CCA in larger scale as well as independently implement the projects in community.
  • #14 Formation of DMC in 7 VDCs Orientation and training on DRR and CCA in 6 VDCs Construction of Bamboo Spurs (Bio engineering) in river banks Establishment of meteorological station in 2 schools Flood measurement gauge stations in upstream and downstream DRR activities through school—incorporation of DRR and CCA issues in ECA activities of 7 schools
  • #18 Formation of DMC in 7 VDCs Orientation and training on DRR and CCA in 6 VDCs Construction of Bamboo Spurs (Bio engineering) in river banks Establishment of meteorological station in 2 schools Flood measurement gauge stations in upstream and downstream DRR activities through school—incorporation of DRR and CCA issues in ECA activities of 7 schools
  • #20 Development of Baseline Indicators/status - Assisted agencies to develop baseline indicators in line with the project objectives - These indicators guide agencies for monitoring and evaluation of projects The baseline status derived from qualitative and quantitative assessments allows comparison during end line review and evaluation For instance- Nepal India transboundary Flood Resilience Project, Impact of Earthquake on OP and PwDs, name of Project (s) Instrument/tools design - Develop the appropriate tools for the research, monitoring and evaluation of the projects - Focus on mixed approach of research for precise and authentic information from the field - Include theoretical perspective in the research as far as possible such as “livelihood approach”, XXXXXX - Seek alignment with the national and international policy - Provide support to local partners to develop instruments/tools For e.g. : Supported IFS for Baseline study of Children with Disability and KAP survey of Disaster Preparedness schools in Makwanpur and Sindhuli; Supported Maitri Management Pvt Ltd for Assessment of Livelihood Opportunities for Poor and Vulnerable HH in Eastern Terai Region. Capacity Builiding - Production of materials such toolkits, training manuals and guidelines for training - Delivery of trainings to the target audience ranging from school children to government officials - Availability of human resources experienced in training delivery in DRR, using statistical packages, CCA and GIS - For eg: Safe School Tool Kit (2013) ; Two phases of Training on Disaster Data Collection and Analysis (Focusing on GIS, excel, Microsoft word) delivered to DEOC staff and other stakeholders Policy Review An inseparable ingredient of evaluations and knowledge documentation and review exercises Reviewed policies of DRR, CCA and Livelihood in course of relevant exercises 2 policy review specific exercises For instance: Safe School Policies and Practices: Good Practices, Gaps, Implications and The Way Forward (2013), Formulation of Standard Operating Procedures for Disaster Response (2007) Knowledge Management Experience of conducting 6 Lessons learnt, Good practices and Gap analysis Knowledge documentation of the project activities and achievements for eg: Payment For Environmental Services in Chitwan Annapurna Landscape (2016) Publications of the case studies and learning of the projects Eg: Broadening the Scope of School Curricula : Extracurricular activities and drills increase children’s confidence regarding DRR and CCA) (insert hyperlink). Needs and constraints of Early Warning System Practices in Nepal, good practices on DRR in Central and Mid western Development regions, Good Practices generated by FAO on DR, Good Practices of CCA and DRR in Nepal etc. Monitoring an evaluation 15 projects of Monitoring, evaluation and endline review exercises Guided the projects to make necessary changes for successful achievement of project objective Provided strategic recommendation for the scale up of the project Provided programmatic recommendation for filling the existing gaps of the project Eg: Evaluation of 'Community Preparedness for Disaster Risk Reduction in Central and Eastern Nepal.' (2008), Joint evaluation of DIPECHO Projects V in Nepal (DRR) (2010), Evaluation of EOCs (Emergency Operation Centres) (2015) Mobile based data Collection ???