DELINEATION OF A REGION
A CASE STUDY ON
NCR
BY :-
KRISHNA DUTT ,131109025
ALOK KUMAR TRIPATHI
,131109037
ALOK SINGH , 131109042
LALIT KUMAWAT , 1311031
STRUCTURE OF THE PRESENTATION
• NCR constituents areas
• Population distribution
• Planning process
• Regional plan 2021 : Aims and objective
• Regional plan 2021 NCR
• Existing Landuse
• Landuse distribution
• Issues
• Proposals
NCR: CONSTITUENTS AREAS
(Area in Sq Kms)
NCT-Delhi 1,483
Haryana 13,413
Uttar Pradesh 10,853
Rajasthan 7,829
Total 33,578
▪ NCR area is
− 1.06% of the India’s area;
− 86% of the Kerala
− 75.9% of Haryana
− 66.67% of Punjab
 NCR area is almost 23 times that
of NCT-Delhi (1,483 sq. kms)
 NCR area is more than the
combined area of 3 States of
Tripura, Nagaland and Sikkim
(27,885 sq kms)
SUB-REGION WISE GROWTH / DISTRIBUTION OF
POPULATION (IN LAKHS)
0
50
100
150
200
250
300
350
400
1981 1991 2001
Delhi
Har
Raj
UP
NCR
NCR: POPULATION DISTRIBUTION
Urban-Rural Components of Population in NCR (1981-2001)
Urban-Rural Comp Percent share (%)
/Year 1981 1991 2001
Urban NCR 45.87 50.23 56.39
Rural NCR 54.13 49.77 43.61
Urban NCR* 24.53 29.39 34.47
Note: *Urban NCR excluding NCT-Delhi
Year
Sub-region (in Lakhs)
NCR Delhi Haryana Rajasthan U.P.
2001 371.00 138.50 86.87 29.92 115.70
2011 486.19 179.90 117.55 37.91 150.83
2021 641.38 234.87 160.16 48.06 198.29
Population Projection as per Regional Plan-2021 for NCR
Regional Plan
District Plans Sub-Regional Plans
Master/Development Plans
Functional Plans
Project Plans
To be prepared by the State Government or Local Body/Authority
To be prepared by the State Government
To be prepared by NCRPB
PLANNING PROCESS
REGIONAL PLAN-2021: AIM AND
OBJECTIVESTo promote growth and balanced development of the National Capital Region
through
• Providing suitable economic base for future growth in identified regional
settlements to absorb economic impulse of NCT-Delhi
• Promoting sustainable development
• Providing rational land use pattern
• Developing urban infrastructural facilities
• Providing efficient and cost effective rail and road based transport network
• Minimizing adverse environmental impact
• Innovative methods of resource mobilization and attracting private
investments
REGIONAL PLAN-2021 FOR NCR
• Regional Plan covers the policies and proposals
of the following sectors/ aspects:
-Shelter
-Social Infrastructure
-Heritage & Tourism
-Environment
-Disaster Management
-Rural Development
-Regional Landuse
-Counter Magnet
Areas
-Demographic Profile &
Settlement Pattern
-Economic Activities
-Transport
-Power
-Water
-Sewerage, SWM, Drainage &
Irrigation
-Telecommunication
REGIONAL PLAN-2021: EXISTING LANDUSE ANALYSIS
DEVELOPMENT OF LAND USE 1999 DATA BASE
Data Source : 1. NRSC : IRS 1C ( PAN+ LISS III) of March 1999
2.Survey of India :Topographical Sheets
3.State Governments Inputs
Scale : 1:50 000
Land Use Map - 1999 prepared using :
- Visual Interpretation
- Digital Mosaicing Techniques
- Application of Remote Sensing Techniques
Category Area (hectares) % to total
Built-up 263,500 8.71
Agriculture 24,04,964 79.52
Forest 1,21,435 4.02
Wastelands 2,00,535 6.63
Water bodies 24,217 0.80
Others 9,549 0.32
Total NCR 30,24,200 100.00
REGIONAL PLAN-2021: EXISTING
LANDUSE-1999
Existing Landuse-1999 in NCR
Sales
BUILT-UP AREA AGRICLTURE
FORSET WASTELANDS
WATER BODIES
Regional Plan-2021: Existing Landuse 1999
REGIONAL PLAN-2021: EXISTING LANDUSE-1999
Category 1986 1999
Area %age Area %age
Built-up 98,794 3.26 2,63,500 8.71
Agriculture 26,50,585 87.64 24,04,964 79.52
Forests 77,512 2.56 1,21,435 4.02
Wastelands 1,85,886 6.14 2,00,535 6.63
Water bodies 3,235 0.10 24,217 0.80
Others 8,200 0.27 9,549 0.32
Total 30,24,200 100.00 30,24,200 100.00
Landuse Change Analysis in NCR: 1986-1999
LANDUSE DISTRIBUTION
LANDUSE 1986
87.64%
3.27%
2.56%
6.15%
0.28%0.11%
Built-up Agriculture Forests
Wasteland Waterbodies Others
LANDUSE 1993
86.18%
4.07%
3.63%
5.07%
0.06% 0.98%
Built-up Agriculture Forests
Wasteland Waterbodies Others
LAND-USE DISTRIBUTION IN NATIONAL CAPITAL REGION
LANDUSE 1999
79.53%
8.72%
4.02%
6.63%
0.32% 0.80%
Built-up Agriculture Forests
Wasteland Waterbodies Others
REGIONAL PLAN-2021: ISSUES
 LARGE SCALE CONVERSION OF AGRICULTURE LAND TO NON-
AGRICULTURE USE. AGRICULTURE AREA REDUCED FROM 88% IN 1986 TO 80%
IN 1999.
 UNAUTHORIZED CONVERSION OF LAND USES PARTICULARLY ALONG
THE TRANSPORT CORRIDORS.
UNPLANNED AND HAPHAZARD GROWTH IN ENVIRONMENTALLY SENSITIVE
AREAS LIKE RIVER BEDS, RIDGE AREAS, FOREST AREAS, ETC.
RURAL SETTLEMENTS CLOSE TO DELHI AND OTHER METROPOLITAN CITIES
IN NCR UNDER-GOING RAPID PHYSICAL AND SOCIO ECONOMIC CHANGES
AND SHORTAGE OF BASIC SERVICES.
EXISTING TOWN & COUNTRY PLANNING ACTS IN THE NCR PARTICIPATING
STATES DO NOT HAVE ANY CONTROL ON LOCATION OF URBAN ACTIVITIES
IN RURAL AREAS OUTSIDE THE NOTIFIED CONTROLLED/DEVELOPMENT
AREAS.
POLICIES AND PROPOSALS OF REGIONAL PLAN-
2021
FOR NCR
DEHRADUN
SHIB
I
ORSAHIBI
RIV
ER
NH1
NH58
NH24
NH10
NH71
NH8
NH2
NH91
NH71A
SH11
SH57
SH
47
SH
39
SH18
SH28
SH14
SH13
SH25
SH
25
SH24
SH22
SH20
SH16
SH16A
SH10
GANGA
RIVER
RIVERHINDAN
RIVER
KALI
RIVER
YAMUNA
GANGARIV
ER
RIVER
KALI
TOPANIPAT
TOSHAMLI
TOMUZAFFARNAGAR
TO MUZAFFARNAGAR
TOALIGARH
TO
M
ATHURA
TO
M
URADABAD
TO
M
URADABAD
TO JIND
TO
JIN
D
TO
JIND
TO
HANSI
TO BHIWANI
TOBHIW
ANI
TO
CHARKHI DADRI
TO
MAHENDRAGARH
TO NARNAUL
TO
N
A
RN
A
U
L
TO
JAIP
UR
TO JAIPUR
TOJAIPUR
TO
ALIG
ARH
TO
ALIG
ARH
TO
JAIP
UR
TO MURADABAD
TO
HANSI
UTTAR
PRADESH
RAJASTHAN
HARYANA
DELHI
NOIDA
MEERUT
SONEPAT-
KUNDLI
GHAZIABAD
G.NOIDA
FARIDABAD
GURGAON
BARAUT
BAGHPAT
BAHADURGARH
HAPUR
PALWAL
ALWAR
BEHROR
BHIWADI
REWARI
DHARUHERA
BAWAL
KHURJA
BULANDSHAHR
SHAHJAHANPUR
NEEMRANA
PANIPAT
ROHTAK
REGIONAL PLAN-2021: SETTLEMENT PATTERN 7 Metro Centres/Complexes
• Faridabad
• Ghaziabad-Loni Complex
• Meerut
• Sonepat - Kundli Complex
• Greater Noida
11 Regional Centres
• Bahadurgarh
• Panipat
• Rohtak
• Palwal
• Rewari-Dharuhera-Bawal
• Hapur
• Bulandshahr-Khurja
• Baghpat-Baraut Complex
• Alwar
• Greater Bhiwadi
• Shahjahanpur-Neemrana-Behror
Hierarchical Level Population Range
Metro Centre 10,00,000 and above
Regional Centre 3,00,001 – 10,00,000
Sub-regional Centre 50,001 – 3,00,000
Service Centre 10,001 – 50,000
Central Village 5,000 – 10,000
Basic Village Below 5,000
Hierarchy of settlements
PATIALA
AMBALA
DEHRADUN
BAREILLY
KANPUR
KOTA
HISSAR
8 Counter-magnet area
• Bareilly (UP)
• Gwalior (MP)
• Hissar (Haryana)
• Kota (Rajasthan)
• Patiala (Punjab)
• Ambala (Haryana)
• Dehradun (Uttrakhand)
• Kanpur (U.P.)
GWALIOR
Rural Settlements
Service Centre
Large village (10000-50000) to be developed as
agro-service centre, collection and distribution of
agriculture goods and services with processing,
marketing, warehousing and storage facilities.
Central Village
Central Village (5000-10000) to be developed with
relatively better services and facilities like education,
health, communication, accessibility and has a capacity to
serve group of basic villages.
Basic Village
All other census villages with population less than
5000. Basic facilities like link roads, water supply,
electricity, low-cost, common sanitary facilities with
minimum required social infrastructure as per planning
norms.
REGIONAL PLAN-2021 POLICIES FOR ENVIRONMENT
• Protection and conservation of good agricultural land
• Land suitability analysis in Master/ Development Plans for land use allocations
• Protection of identified natural and manmade heritage sites for the
protection of bio-diversity and culture
• Development Plan to be prepared for the protected areas
• To increase the area under forest from 4% to 10%
• Environmentally sensitive areas such as forests, wetlands, water bodies
etc. to be protected
• Regular monitoring of air, water, noise & land pollution by the respective
state pollution control boards
REGIONAL PLAN-2021: PROPOSED REGIONAL LAND USE
Regional Landuse Policies and Proposals
•Urbanisable Area
•Master plans of towns to be prepared within the
framework of RP2021.
•Population Densities be followed as per RP-2021
norms.
•Agricultural (rural) Zone within Controlled Area
•Activities as per Zoning Regulations of RP2021
• Green Buffers
•Green buffers along the ROW of the Transport
Network be maintained :
• Expressways/By Pass - 100 m.
National Highway - 60 m.
State Highway - 30 m.
Railway line - 30 m.
•Activities as per Zoning Regulations of RP-
2021 to be permitted
Contd..
1. Controlled/Development/Regulated Zone
Regional Landuse Policies and Proposals
2 Highway corridor zone
• To prevent ribbon development, a regulated zone to
be provided.
• Minimum width of 500 metres on either side of ROW
to be notified as Controlled/ Area
• Boundaries of the highway corridor zone to be
delineated based on revenue village boundary by the
State Governments.
• Master Plan to be prepared for
development/conservation based on development
potentialities.
3 Natural Conservation Zone
• Extension of Aravalli ridge to be developed in
accordance with notifications issued by MOEF.
• Water bodies, Ox-bow lakes and Paleo -channels and
other ground water recharging areas to be kept free
from encroachment/development.
• Detailed conservation Plans to be prepared for the
nature conservation zones.
Regional Landuse Policies and Proposals
• Existing cultivated land to be
conserved for agricultural use and
efforts be made to increase
production through intensive
cultivation.
• Measures to be initiated for protection
of prime agricultural land and ensure
its needless conservation into non-
agricultural/urban use.
• Use of less valuable land for urban
expansion / new urban centres /
development purposes
4 Agricultural (rural) zone outside notified controlled/ development areas
THANK YOU …….. 

Ncr

  • 1.
    DELINEATION OF AREGION A CASE STUDY ON NCR BY :- KRISHNA DUTT ,131109025 ALOK KUMAR TRIPATHI ,131109037 ALOK SINGH , 131109042 LALIT KUMAWAT , 1311031
  • 2.
    STRUCTURE OF THEPRESENTATION • NCR constituents areas • Population distribution • Planning process • Regional plan 2021 : Aims and objective • Regional plan 2021 NCR • Existing Landuse • Landuse distribution • Issues • Proposals
  • 3.
    NCR: CONSTITUENTS AREAS (Areain Sq Kms) NCT-Delhi 1,483 Haryana 13,413 Uttar Pradesh 10,853 Rajasthan 7,829 Total 33,578 ▪ NCR area is − 1.06% of the India’s area; − 86% of the Kerala − 75.9% of Haryana − 66.67% of Punjab  NCR area is almost 23 times that of NCT-Delhi (1,483 sq. kms)  NCR area is more than the combined area of 3 States of Tripura, Nagaland and Sikkim (27,885 sq kms)
  • 4.
    SUB-REGION WISE GROWTH/ DISTRIBUTION OF POPULATION (IN LAKHS) 0 50 100 150 200 250 300 350 400 1981 1991 2001 Delhi Har Raj UP NCR
  • 5.
    NCR: POPULATION DISTRIBUTION Urban-RuralComponents of Population in NCR (1981-2001) Urban-Rural Comp Percent share (%) /Year 1981 1991 2001 Urban NCR 45.87 50.23 56.39 Rural NCR 54.13 49.77 43.61 Urban NCR* 24.53 29.39 34.47 Note: *Urban NCR excluding NCT-Delhi Year Sub-region (in Lakhs) NCR Delhi Haryana Rajasthan U.P. 2001 371.00 138.50 86.87 29.92 115.70 2011 486.19 179.90 117.55 37.91 150.83 2021 641.38 234.87 160.16 48.06 198.29 Population Projection as per Regional Plan-2021 for NCR
  • 6.
    Regional Plan District PlansSub-Regional Plans Master/Development Plans Functional Plans Project Plans To be prepared by the State Government or Local Body/Authority To be prepared by the State Government To be prepared by NCRPB PLANNING PROCESS
  • 7.
    REGIONAL PLAN-2021: AIMAND OBJECTIVESTo promote growth and balanced development of the National Capital Region through • Providing suitable economic base for future growth in identified regional settlements to absorb economic impulse of NCT-Delhi • Promoting sustainable development • Providing rational land use pattern • Developing urban infrastructural facilities • Providing efficient and cost effective rail and road based transport network • Minimizing adverse environmental impact • Innovative methods of resource mobilization and attracting private investments
  • 8.
    REGIONAL PLAN-2021 FORNCR • Regional Plan covers the policies and proposals of the following sectors/ aspects: -Shelter -Social Infrastructure -Heritage & Tourism -Environment -Disaster Management -Rural Development -Regional Landuse -Counter Magnet Areas -Demographic Profile & Settlement Pattern -Economic Activities -Transport -Power -Water -Sewerage, SWM, Drainage & Irrigation -Telecommunication
  • 9.
    REGIONAL PLAN-2021: EXISTINGLANDUSE ANALYSIS DEVELOPMENT OF LAND USE 1999 DATA BASE Data Source : 1. NRSC : IRS 1C ( PAN+ LISS III) of March 1999 2.Survey of India :Topographical Sheets 3.State Governments Inputs Scale : 1:50 000 Land Use Map - 1999 prepared using : - Visual Interpretation - Digital Mosaicing Techniques - Application of Remote Sensing Techniques
  • 10.
    Category Area (hectares)% to total Built-up 263,500 8.71 Agriculture 24,04,964 79.52 Forest 1,21,435 4.02 Wastelands 2,00,535 6.63 Water bodies 24,217 0.80 Others 9,549 0.32 Total NCR 30,24,200 100.00 REGIONAL PLAN-2021: EXISTING LANDUSE-1999 Existing Landuse-1999 in NCR Sales BUILT-UP AREA AGRICLTURE FORSET WASTELANDS WATER BODIES
  • 11.
  • 12.
    REGIONAL PLAN-2021: EXISTINGLANDUSE-1999 Category 1986 1999 Area %age Area %age Built-up 98,794 3.26 2,63,500 8.71 Agriculture 26,50,585 87.64 24,04,964 79.52 Forests 77,512 2.56 1,21,435 4.02 Wastelands 1,85,886 6.14 2,00,535 6.63 Water bodies 3,235 0.10 24,217 0.80 Others 8,200 0.27 9,549 0.32 Total 30,24,200 100.00 30,24,200 100.00 Landuse Change Analysis in NCR: 1986-1999
  • 13.
    LANDUSE DISTRIBUTION LANDUSE 1986 87.64% 3.27% 2.56% 6.15% 0.28%0.11% Built-upAgriculture Forests Wasteland Waterbodies Others LANDUSE 1993 86.18% 4.07% 3.63% 5.07% 0.06% 0.98% Built-up Agriculture Forests Wasteland Waterbodies Others LAND-USE DISTRIBUTION IN NATIONAL CAPITAL REGION LANDUSE 1999 79.53% 8.72% 4.02% 6.63% 0.32% 0.80% Built-up Agriculture Forests Wasteland Waterbodies Others
  • 14.
    REGIONAL PLAN-2021: ISSUES LARGE SCALE CONVERSION OF AGRICULTURE LAND TO NON- AGRICULTURE USE. AGRICULTURE AREA REDUCED FROM 88% IN 1986 TO 80% IN 1999.  UNAUTHORIZED CONVERSION OF LAND USES PARTICULARLY ALONG THE TRANSPORT CORRIDORS. UNPLANNED AND HAPHAZARD GROWTH IN ENVIRONMENTALLY SENSITIVE AREAS LIKE RIVER BEDS, RIDGE AREAS, FOREST AREAS, ETC. RURAL SETTLEMENTS CLOSE TO DELHI AND OTHER METROPOLITAN CITIES IN NCR UNDER-GOING RAPID PHYSICAL AND SOCIO ECONOMIC CHANGES AND SHORTAGE OF BASIC SERVICES. EXISTING TOWN & COUNTRY PLANNING ACTS IN THE NCR PARTICIPATING STATES DO NOT HAVE ANY CONTROL ON LOCATION OF URBAN ACTIVITIES IN RURAL AREAS OUTSIDE THE NOTIFIED CONTROLLED/DEVELOPMENT AREAS.
  • 15.
    POLICIES AND PROPOSALSOF REGIONAL PLAN- 2021 FOR NCR
  • 16.
    DEHRADUN SHIB I ORSAHIBI RIV ER NH1 NH58 NH24 NH10 NH71 NH8 NH2 NH91 NH71A SH11 SH57 SH 47 SH 39 SH18 SH28 SH14 SH13 SH25 SH 25 SH24 SH22 SH20 SH16 SH16A SH10 GANGA RIVER RIVERHINDAN RIVER KALI RIVER YAMUNA GANGARIV ER RIVER KALI TOPANIPAT TOSHAMLI TOMUZAFFARNAGAR TO MUZAFFARNAGAR TOALIGARH TO M ATHURA TO M URADABAD TO M URADABAD TO JIND TO JIN D TO JIND TO HANSI TOBHIWANI TOBHIW ANI TO CHARKHI DADRI TO MAHENDRAGARH TO NARNAUL TO N A RN A U L TO JAIP UR TO JAIPUR TOJAIPUR TO ALIG ARH TO ALIG ARH TO JAIP UR TO MURADABAD TO HANSI UTTAR PRADESH RAJASTHAN HARYANA DELHI NOIDA MEERUT SONEPAT- KUNDLI GHAZIABAD G.NOIDA FARIDABAD GURGAON BARAUT BAGHPAT BAHADURGARH HAPUR PALWAL ALWAR BEHROR BHIWADI REWARI DHARUHERA BAWAL KHURJA BULANDSHAHR SHAHJAHANPUR NEEMRANA PANIPAT ROHTAK REGIONAL PLAN-2021: SETTLEMENT PATTERN 7 Metro Centres/Complexes • Faridabad • Ghaziabad-Loni Complex • Meerut • Sonepat - Kundli Complex • Greater Noida 11 Regional Centres • Bahadurgarh • Panipat • Rohtak • Palwal • Rewari-Dharuhera-Bawal • Hapur • Bulandshahr-Khurja • Baghpat-Baraut Complex • Alwar • Greater Bhiwadi • Shahjahanpur-Neemrana-Behror Hierarchical Level Population Range Metro Centre 10,00,000 and above Regional Centre 3,00,001 – 10,00,000 Sub-regional Centre 50,001 – 3,00,000 Service Centre 10,001 – 50,000 Central Village 5,000 – 10,000 Basic Village Below 5,000 Hierarchy of settlements PATIALA AMBALA DEHRADUN BAREILLY KANPUR KOTA HISSAR 8 Counter-magnet area • Bareilly (UP) • Gwalior (MP) • Hissar (Haryana) • Kota (Rajasthan) • Patiala (Punjab) • Ambala (Haryana) • Dehradun (Uttrakhand) • Kanpur (U.P.) GWALIOR
  • 17.
    Rural Settlements Service Centre Largevillage (10000-50000) to be developed as agro-service centre, collection and distribution of agriculture goods and services with processing, marketing, warehousing and storage facilities. Central Village Central Village (5000-10000) to be developed with relatively better services and facilities like education, health, communication, accessibility and has a capacity to serve group of basic villages. Basic Village All other census villages with population less than 5000. Basic facilities like link roads, water supply, electricity, low-cost, common sanitary facilities with minimum required social infrastructure as per planning norms.
  • 18.
    REGIONAL PLAN-2021 POLICIESFOR ENVIRONMENT • Protection and conservation of good agricultural land • Land suitability analysis in Master/ Development Plans for land use allocations • Protection of identified natural and manmade heritage sites for the protection of bio-diversity and culture • Development Plan to be prepared for the protected areas • To increase the area under forest from 4% to 10% • Environmentally sensitive areas such as forests, wetlands, water bodies etc. to be protected • Regular monitoring of air, water, noise & land pollution by the respective state pollution control boards
  • 19.
  • 20.
    Regional Landuse Policiesand Proposals •Urbanisable Area •Master plans of towns to be prepared within the framework of RP2021. •Population Densities be followed as per RP-2021 norms. •Agricultural (rural) Zone within Controlled Area •Activities as per Zoning Regulations of RP2021 • Green Buffers •Green buffers along the ROW of the Transport Network be maintained : • Expressways/By Pass - 100 m. National Highway - 60 m. State Highway - 30 m. Railway line - 30 m. •Activities as per Zoning Regulations of RP- 2021 to be permitted Contd.. 1. Controlled/Development/Regulated Zone
  • 21.
    Regional Landuse Policiesand Proposals 2 Highway corridor zone • To prevent ribbon development, a regulated zone to be provided. • Minimum width of 500 metres on either side of ROW to be notified as Controlled/ Area • Boundaries of the highway corridor zone to be delineated based on revenue village boundary by the State Governments. • Master Plan to be prepared for development/conservation based on development potentialities. 3 Natural Conservation Zone • Extension of Aravalli ridge to be developed in accordance with notifications issued by MOEF. • Water bodies, Ox-bow lakes and Paleo -channels and other ground water recharging areas to be kept free from encroachment/development. • Detailed conservation Plans to be prepared for the nature conservation zones.
  • 22.
    Regional Landuse Policiesand Proposals • Existing cultivated land to be conserved for agricultural use and efforts be made to increase production through intensive cultivation. • Measures to be initiated for protection of prime agricultural land and ensure its needless conservation into non- agricultural/urban use. • Use of less valuable land for urban expansion / new urban centres / development purposes 4 Agricultural (rural) zone outside notified controlled/ development areas
  • 23.