Journey of Narendra Modi Online
From #NaMo4PM to #PMOIndia
Knowledge	
  Partner	
  Social	
  Analy3cs	
  Partner	
  
Presented	
  By	
  
The journey was started
on February 28, 2005
when NarendraModi.in
domain was created.
Internet
was
emerging
Youth
Population
Increasing
(400M app.)
Narendra Modi
has foreseen
the importance
of digital
presence
With the emergence of
Social Media, he enhanced
his reach and joined
Twitter in January 2009 &
Facebook in May 2009
Present Stats:
Facebook Users: 100M+
Twitter Users: 18.1M+
Two-way
Communication
Fan Base
Formation
Subtle Image
Building
Dream of becoming a Prime
Minister of the world’s biggest
democracy started taking a shape
with the campaign
Narendra Modi for PM
on January 13, 2010
fb.com/NarendraModi4PM

The popularity of Narendra Modi became inevitable
3 years of campaigning to build an image of a perfect PM 
BJP was left with no other option than selecting him as
PM Candidate for General Elections 2014
Ousted senior leaders like L.K. Advani with a silent
strategy
How Narendra Modi
became popular?
3things that made 
Narendra Modi Popular online
 Establishing a
transparent image
by putting on-
ground activities
online	
  
Accurate
positioning
with
excessive
content
seeding	
  
Optimized
use of Social
Media	
  
• Narendra Modi has utilized all the social
platforms for creating the desired image.
Facebook, Twitter, Youtube, Slideshare,
Flickr, Pinterest, etc. were effectively
used during the campaign.
• Social platforms helped him in
connecting with masses and
establishing two-way communication.
• Social Media as an owned platform
definitely helped him in disseminating
information directly to the masses at any
point of time.
Optimized use of Social Media	
  
In last 3 years NaMo created lakhs
of Modi Brand Advocates via social
media who worked in mouth
publicity online and on-ground
during the campaigning.
This helped him in
suppressing the
negative content
be it about Godhra
Riots or his
marriage with
Jashodaben Modi.
Suppressed Content
• Narendra Modi has not left a room for negative content by stuffing all the search engines with excessive
positive content. 
• Campaigning included not just the official platforms & social channels of Modi but numerous pseudo
accounts and platforms.
• Forums, media platforms and websites are packed with the content which NaMo and BJP wanted to float.
• Platforms like www.quora.com/Narendra-Modi, www.narendramodiplans.com, www.isupportnamo.org/ are
content rich and have effectively helped in portraying the desired image. All the queries are tactically solved
on forums to remove negativity.
Accurate positioning with excessive
content seeding
• The way NaMo’s online promotional campaigns helped in creating brand ambassadors for on-ground
mouth publicity, representation of on-ground activities on online platforms supported in establishing a
transparent image of NaMo.
• Information of various developments in Gujarat and NaMo growth model is disseminated on daily basis.
• Blogs on various issues, occasions, events, situations and topics were published on regular basis to
create the desired image in minds of masses.
• At the time of campaigning information of rallies was conveniently disseminated.
Establishing a transparent image by
putting on-ground activities online
Narendra Modi
Narendra Modi
Official: 16M+ Likes
fb.com/narendramodi
fb.com/NarendraModi4PM:
1.7M+ Likes
fb.com/iSupportNamo: 
3.6M+ Likes
fb.com/IWantModi: 
99K+ Likes
fb.com/
NAMOBestPrimiMinisiterOfI
NDIA: 
83K+ Likes
On Facebook
• Narendra Modi official fan page to establish transparency and two-way
communication. This platform gives details of his schedule & portrays his
views on various occasions and incidents.

• There are various pages like NaMo4PM which are used to build his image
as a perfect candidate for PM.

• There are numerous fb open and closed groups discussing about NaMo.
They are usually created according to different places and his varied roles.

• Then there are several fb pages created and managed by his fans.

• Facebook Ads also played an important role and helped in targeting the
audience demographically. His campaign ‘Abki baar, Modi Sarkar’ was
launched in many languages to touch the nerves of people. 
• Millions of people are associated with NaMo on facebook and working as
his brand ambassadors.
Narendra Modi
On Facebook
and the list goes on…
Narendra Modi
Narendra Modi Official: 
4.64M+ Followers
twitter.com/narendramodi
twitter.com/NaMo4PM - 67.5K
twitter.com/wesuportmodi4PM - 37.6K
twitter.com/Narendramodi_PM - 56.5K
twitter.com/TigerNaMo - 16.1K
twitter.com/NaMo4PMI - 11.2K
twitter.com/NarendraModiPM - 9,515
twitter.com/i_narendramodi - 4883

On Twitter
• Narendra Modi official twitter handle gives instant updates and happenings
about NaMo. It also act as a platform where NaMo expresses his views and gives
special comments. 
• Almost 1.97K number of unique people talking about Narendra Modi every
month.

• Like fb there are various twitter handles like NaMo4PM which are used to build
his image as a perfect candidate for PM.

• There are numerous lists on twitter that are intended to spread positivity and
encourage discussions.

• There are several BJP & fan twitter handles that helps in promoting hashtags
and discussions about NaMo. He is the most discussed political personality on
twitter with maximum positive trends.

• Millions of people are associated with NaMo on twitter too and they work as his
brand ambassadors. It helps in suppressing the negative sentiments immediately.
• NaMo has more fan base than Superstar Rajinikanth.
Narendra Modi
On Twitter
• These are some of the hashtags which trended on
twitter almost throughout the campaigning for general
elections.
• They were flooded with positive sentiments.
• Every day Narendra Modi was in trend for his rallies at
various places.
• During the campaigning he met stars like Salman
Khan and Rajinikanth which became the topic of
discussion on twitter.
• Apart from his general video bites on newschannels,
his interview with Arnab Goswami and his appearance
on Aapki Adalat were nationally most discussed topics
on twitter.
Narendra Modi
Google +
+NarendraModi
1,378,877 followers
104,777,706 views
plus.google.com/+NarendraModi
Narendra Modi Official Website -
6188th most visited website in the World
& 296th most visited website in India.
www.narendramodi.in



Youtube
Narendra Modi Official Channel
-163,348 subscribers
19,293,207 views
youtube.com/user/narendramodi	
  
On Varied Platforms
A Campaign that started with ‘NaMo4PM’ took a new
shape after announcement of PM candidature. A
perfect plan was made to
Leverage the popularity of NaMo
+
Highlight all the negative aspects of UPA Government
+
Enlighten the hope & positivity among people
Abki Baar 
Modi Sarkaar
Janta maaf
nahi karegi
Achchhe din
aane wale hain

3 parallel campaigns that were carried on all the possible mediums
-
This campaign was created as an
expansion of ‘NaMo4PM’, with an aim
to target complete nation in mother
tongue. Main purpose is to leverage the
popularity of Narendra Modi.
‘Janta maaf nahi karegi’ line is used
to highlight all the negative aspects
and failures of UPA Govt.
This campaign was planned to
generate hope and positivity among
people. It helped in highlighting the
promises of BJP.
• Print Ads in varied languages were
published in all the newspapers.
• TV ads in between the programs.
• Whats App Messages and Ringtones.

• TV ads on prime time.
• Youtube videos were released.
• Memes were encouraged.
• Whats App messages &
Images.

• Song was created and released on Youtube.
• Same song was played on all the TV
channels.
• Ringtones were shared among masses on
whats app.
• TV Commercials were also created on the
same line.
3 Campaigns
1 Mission
‘result says it all’.
NaMo is the new PM of India. 
BJP recorded historic win with
undisputed majority.
As	
  we	
  say	
  	
  
	
  
PMOIndia
• 76k tweets congratulating Narendra Modi using #CongratsNamo 
• #CongratsNaMo trended Worldwide for almost 10 hours 
• ‘Congratulations Sir’ went trending Worldwide for almost 4 hours 
• 320 thousand Tweets using @narendraModi talking about Modi or talking to him [probably
the record number of mentions for one Twitter handle] 
• India’s most retweeted tweet in the history – the first tweet after victory by Narendra
Modi. 
64,919 RTs
40,246 Favorites
Result says it all
BJP won 282 seats
i.e. 31% of all votes

Total buzz on the
result day 2,26,552
for NaMo

64K+ RTs & 40K+
Favorites on NaMo’s
‘India has won’ tweet.
Sum Up
Online Journey
of NaMo
2005
NarendraModi.in
2009 Jan
Twitter
2009 May
Facebook
2010 Jan
NaMo for PM
2012
I Support
NaMo
2007 Oct
Youtube
2014 May
PMOIndia
2013
Nominated for
PM Candidature
2014
3 Historic
Campaigns
The strategy that struck 
the right chord with the people of India
Work on image building according to TG
and not your own perceptions and beliefs.
Do the research and understand the
nerve of your TG. 
-1: Congress tried creating an image as
per Congress ideology rather than
focusing on mindset of TG.
+1: Narendra Modi worked on image
building as per Indian youth ideology.
Either we talk about his look, his words,
his healthy lifestyle (yoga) or his tech-
savvy image, this is all planned and not
something that happened by chance.
	
  
India is the nation of youth with 450M+
youngsters and they are the biggest
influencer. Win their trust and keep them
informed about every decision. It helps in
creating diehard party followers.
-1: Congress concentrated on grass-root
level and interacted more with followers.
+1: Narendra Modi interacted personally
with influencers and connected with
followers through rallies and mass
communication.
Social Media spreads everything at the speed
of light be it positive or negative. So it is
important to remove all the image damaging
news and information from search engines. As
we say ‘Positivity overcomes Negativity’, stuff
search engines & social networking sites with
positive content.
-1: Congress does not have impressions of the
work they have done online and has never
concentrated on removing the negativity online.
+1: Narendra Modi managed to handle the
marriage and godhra riots with content
management.
As a leader one is expected to be unbiased. This
helps in creating a crystal clear image of a person.
Use blogging efficiently and portray the desired
image.
-1: Congress missed to give detailed views on
everything going in country and world this leaves a
room for perception. Don’t give a chance and allow
perceptions to ruin the image. PM was expected
to speak on inflation, foreign intrusion, increasing
rape cases, etc but the silence spoiled everything.
+1: Narendra Modi’s blog portrays what he exactly
want to convey on every big and small issue.
Availability is very important. Everyone expects the
leader to be available for them. Social networking
helps in being there and listening the problems,
views, suggestion and everything that nation
wants to convey. It also helps in understanding the
views of citizen on particular issue and thus, it
gives direction in showcasing one’s views.
-1: Sonia Gandhi, Rahul Gandhi and Manmohan
Singh, nobody has official verified social profiles
on any of the channel.
+1: Narendra Modi has presence on every online
platform.
Arnab Mitra
Mayur Sethi
Barkha Jain
Credits – Team Behind
Kamlesh Sawal
Zubin Nalawalla
Thank you
arnab.mitra@liqvd.asia
Knowledge	
  Partner	
  Social	
  Analy3cs	
  Partner	
  

Narendra Modi Election 2014 - Case Study

  • 1.
    Journey of NarendraModi Online From #NaMo4PM to #PMOIndia Knowledge  Partner  Social  Analy3cs  Partner   Presented  By  
  • 2.
    The journey wasstarted on February 28, 2005 when NarendraModi.in domain was created. Internet was emerging Youth Population Increasing (400M app.) Narendra Modi has foreseen the importance of digital presence
  • 3.
    With the emergenceof Social Media, he enhanced his reach and joined Twitter in January 2009 & Facebook in May 2009 Present Stats: Facebook Users: 100M+ Twitter Users: 18.1M+ Two-way Communication Fan Base Formation Subtle Image Building
  • 4.
    Dream of becominga Prime Minister of the world’s biggest democracy started taking a shape with the campaign Narendra Modi for PM on January 13, 2010 fb.com/NarendraModi4PM The popularity of Narendra Modi became inevitable 3 years of campaigning to build an image of a perfect PM BJP was left with no other option than selecting him as PM Candidate for General Elections 2014 Ousted senior leaders like L.K. Advani with a silent strategy
  • 5.
    How Narendra Modi becamepopular? 3things that made Narendra Modi Popular online Establishing a transparent image by putting on- ground activities online   Accurate positioning with excessive content seeding   Optimized use of Social Media  
  • 6.
    • Narendra Modi hasutilized all the social platforms for creating the desired image. Facebook, Twitter, Youtube, Slideshare, Flickr, Pinterest, etc. were effectively used during the campaign. • Social platforms helped him in connecting with masses and establishing two-way communication. • Social Media as an owned platform definitely helped him in disseminating information directly to the masses at any point of time. Optimized use of Social Media   In last 3 years NaMo created lakhs of Modi Brand Advocates via social media who worked in mouth publicity online and on-ground during the campaigning.
  • 7.
    This helped himin suppressing the negative content be it about Godhra Riots or his marriage with Jashodaben Modi. Suppressed Content • Narendra Modi has not left a room for negative content by stuffing all the search engines with excessive positive content. • Campaigning included not just the official platforms & social channels of Modi but numerous pseudo accounts and platforms. • Forums, media platforms and websites are packed with the content which NaMo and BJP wanted to float. • Platforms like www.quora.com/Narendra-Modi, www.narendramodiplans.com, www.isupportnamo.org/ are content rich and have effectively helped in portraying the desired image. All the queries are tactically solved on forums to remove negativity. Accurate positioning with excessive content seeding
  • 8.
    • The way NaMo’sonline promotional campaigns helped in creating brand ambassadors for on-ground mouth publicity, representation of on-ground activities on online platforms supported in establishing a transparent image of NaMo. • Information of various developments in Gujarat and NaMo growth model is disseminated on daily basis. • Blogs on various issues, occasions, events, situations and topics were published on regular basis to create the desired image in minds of masses. • At the time of campaigning information of rallies was conveniently disseminated. Establishing a transparent image by putting on-ground activities online
  • 9.
    Narendra Modi Narendra Modi Official:16M+ Likes fb.com/narendramodi fb.com/NarendraModi4PM: 1.7M+ Likes fb.com/iSupportNamo: 3.6M+ Likes fb.com/IWantModi: 99K+ Likes fb.com/ NAMOBestPrimiMinisiterOfI NDIA: 83K+ Likes On Facebook • Narendra Modi official fan page to establish transparency and two-way communication. This platform gives details of his schedule & portrays his views on various occasions and incidents. • There are various pages like NaMo4PM which are used to build his image as a perfect candidate for PM. • There are numerous fb open and closed groups discussing about NaMo. They are usually created according to different places and his varied roles. • Then there are several fb pages created and managed by his fans. • Facebook Ads also played an important role and helped in targeting the audience demographically. His campaign ‘Abki baar, Modi Sarkar’ was launched in many languages to touch the nerves of people. • Millions of people are associated with NaMo on facebook and working as his brand ambassadors.
  • 10.
    Narendra Modi On Facebook andthe list goes on…
  • 11.
    Narendra Modi Narendra ModiOfficial: 4.64M+ Followers twitter.com/narendramodi twitter.com/NaMo4PM - 67.5K twitter.com/wesuportmodi4PM - 37.6K twitter.com/Narendramodi_PM - 56.5K twitter.com/TigerNaMo - 16.1K twitter.com/NaMo4PMI - 11.2K twitter.com/NarendraModiPM - 9,515 twitter.com/i_narendramodi - 4883 On Twitter • Narendra Modi official twitter handle gives instant updates and happenings about NaMo. It also act as a platform where NaMo expresses his views and gives special comments. • Almost 1.97K number of unique people talking about Narendra Modi every month. • Like fb there are various twitter handles like NaMo4PM which are used to build his image as a perfect candidate for PM. • There are numerous lists on twitter that are intended to spread positivity and encourage discussions. • There are several BJP & fan twitter handles that helps in promoting hashtags and discussions about NaMo. He is the most discussed political personality on twitter with maximum positive trends. • Millions of people are associated with NaMo on twitter too and they work as his brand ambassadors. It helps in suppressing the negative sentiments immediately. • NaMo has more fan base than Superstar Rajinikanth.
  • 12.
    Narendra Modi On Twitter • Theseare some of the hashtags which trended on twitter almost throughout the campaigning for general elections. • They were flooded with positive sentiments. • Every day Narendra Modi was in trend for his rallies at various places. • During the campaigning he met stars like Salman Khan and Rajinikanth which became the topic of discussion on twitter. • Apart from his general video bites on newschannels, his interview with Arnab Goswami and his appearance on Aapki Adalat were nationally most discussed topics on twitter.
  • 13.
    Narendra Modi Google + +NarendraModi 1,378,877 followers 104,777,706views plus.google.com/+NarendraModi Narendra Modi Official Website - 6188th most visited website in the World & 296th most visited website in India. www.narendramodi.in Youtube Narendra Modi Official Channel -163,348 subscribers 19,293,207 views youtube.com/user/narendramodi   On Varied Platforms
  • 14.
    A Campaign thatstarted with ‘NaMo4PM’ took a new shape after announcement of PM candidature. A perfect plan was made to Leverage the popularity of NaMo + Highlight all the negative aspects of UPA Government + Enlighten the hope & positivity among people
  • 15.
    Abki Baar ModiSarkaar Janta maaf nahi karegi Achchhe din aane wale hain 3 parallel campaigns that were carried on all the possible mediums - This campaign was created as an expansion of ‘NaMo4PM’, with an aim to target complete nation in mother tongue. Main purpose is to leverage the popularity of Narendra Modi. ‘Janta maaf nahi karegi’ line is used to highlight all the negative aspects and failures of UPA Govt. This campaign was planned to generate hope and positivity among people. It helped in highlighting the promises of BJP. • Print Ads in varied languages were published in all the newspapers. • TV ads in between the programs. • Whats App Messages and Ringtones. • TV ads on prime time. • Youtube videos were released. • Memes were encouraged. • Whats App messages & Images. • Song was created and released on Youtube. • Same song was played on all the TV channels. • Ringtones were shared among masses on whats app. • TV Commercials were also created on the same line.
  • 16.
  • 17.
    ‘result says itall’. NaMo is the new PM of India. BJP recorded historic win with undisputed majority. As  we  say      
  • 18.
  • 19.
    • 76k tweetscongratulating Narendra Modi using #CongratsNamo • #CongratsNaMo trended Worldwide for almost 10 hours • ‘Congratulations Sir’ went trending Worldwide for almost 4 hours • 320 thousand Tweets using @narendraModi talking about Modi or talking to him [probably the record number of mentions for one Twitter handle] • India’s most retweeted tweet in the history – the first tweet after victory by Narendra Modi. 64,919 RTs 40,246 Favorites
  • 20.
    Result says itall BJP won 282 seats i.e. 31% of all votes Total buzz on the result day 2,26,552 for NaMo 64K+ RTs & 40K+ Favorites on NaMo’s ‘India has won’ tweet.
  • 21.
    Sum Up Online Journey ofNaMo 2005 NarendraModi.in 2009 Jan Twitter 2009 May Facebook 2010 Jan NaMo for PM 2012 I Support NaMo 2007 Oct Youtube 2014 May PMOIndia 2013 Nominated for PM Candidature 2014 3 Historic Campaigns
  • 22.
    The strategy thatstruck the right chord with the people of India
  • 23.
    Work on imagebuilding according to TG and not your own perceptions and beliefs. Do the research and understand the nerve of your TG. -1: Congress tried creating an image as per Congress ideology rather than focusing on mindset of TG. +1: Narendra Modi worked on image building as per Indian youth ideology. Either we talk about his look, his words, his healthy lifestyle (yoga) or his tech- savvy image, this is all planned and not something that happened by chance.  
  • 24.
    India is thenation of youth with 450M+ youngsters and they are the biggest influencer. Win their trust and keep them informed about every decision. It helps in creating diehard party followers. -1: Congress concentrated on grass-root level and interacted more with followers. +1: Narendra Modi interacted personally with influencers and connected with followers through rallies and mass communication.
  • 25.
    Social Media spreadseverything at the speed of light be it positive or negative. So it is important to remove all the image damaging news and information from search engines. As we say ‘Positivity overcomes Negativity’, stuff search engines & social networking sites with positive content. -1: Congress does not have impressions of the work they have done online and has never concentrated on removing the negativity online. +1: Narendra Modi managed to handle the marriage and godhra riots with content management.
  • 26.
    As a leaderone is expected to be unbiased. This helps in creating a crystal clear image of a person. Use blogging efficiently and portray the desired image. -1: Congress missed to give detailed views on everything going in country and world this leaves a room for perception. Don’t give a chance and allow perceptions to ruin the image. PM was expected to speak on inflation, foreign intrusion, increasing rape cases, etc but the silence spoiled everything. +1: Narendra Modi’s blog portrays what he exactly want to convey on every big and small issue.
  • 27.
    Availability is veryimportant. Everyone expects the leader to be available for them. Social networking helps in being there and listening the problems, views, suggestion and everything that nation wants to convey. It also helps in understanding the views of citizen on particular issue and thus, it gives direction in showcasing one’s views. -1: Sonia Gandhi, Rahul Gandhi and Manmohan Singh, nobody has official verified social profiles on any of the channel. +1: Narendra Modi has presence on every online platform.
  • 28.
    Arnab Mitra Mayur Sethi BarkhaJain Credits – Team Behind Kamlesh Sawal Zubin Nalawalla
  • 29.