MONITORING AND EVALUTION (M&E) MODEL OF
PROCUMENT OF GOODS AND SERVICES
CONTRUCTION BUILDING BASED ON DISASTER
MITIGATION IN CENTRAL SULAWESI
Tutang Muhtar*
Mary Selintung DjayaniNurdin Amar
Doctoral Student Civil Eng. Professor, Civil Eng. Professor,Managament . Asst. Professor of Civil Eng
Hasanuddin University Hasanuddin University Tadulako University Tadulako University
Abstract— Monitoring and evaluation (M&E) for emergency procurement project on natural disasters may become
more difficult for disaster-related projects in Central Sulawesi: project assessment and monitoring of the design
emergency procurement, quality standards are often not determined, and the necessary data may be difficult to be
collected. But good monitoring and evaluation not only improve project outcomes for stakeholders, but also very
beneficial to the public interest. His paper selects the group of controllers that can be achieved by using the methodology
in two major categories: the experimental design (randomized) and the design of quasi - experimental (not-encrypted);
estimation of counterfactual by using a random method to form a control group (experimental design), for controlling
pre- and post-program of procurement and development of its participants, and to establish the program impacts,
relevant data collected from the data base and its follow-up (including the time frame which is quite possible for the
program impacts the cost-benefit or cost-effectiveness analysis to measure the efficiency of the project; and qualitative
technique that makes it possible to use the method of triangulation. The results showed that there are differences
between districts in Central Sulawesi Province in terms of upholding the quality of procurement and services, relating to
the quality of each personnel, understanding of procurement regulations, systems training, correspondence between
procurement priorities, differences in data standards, rules and regulations as well as the inaccuracy of selecting
contractors
Keywords—Monitoring& evaluation(M&E), emergency ,procurement, disasters
I. INTRODUCTION
Procurement of goods and services during disaster risk understanding of the law by a lax standard procurement documents
from the emergency [1]. This occurs because of the large amount of funds to be spent quickly and to overcome the
problems of humanity. As a temporary shelter, clean water supply. Based on this risk, the expected service users and
service providers have the awareness to make efforts to understand the standards documents from the emergency
procurement by strengthening the distribution system by recruiting the help of a professional. Low quality of the
procurement that occurs during emergency situations is priorities of the management of aid also require proof of
transactions and other matters such as efficiency. Essentially, the risk of corruption can be reduced if the management
system is carried out correctly, accountable [1,2].
The problem with an “uncoordinated, hurried” approach to procurement, in an environment where “financial controls are
reduced, funding levels can soar, and staff change frequently,” is that it is a recipe for corruption and fraud [3].
Procurement officials may engage in corrupt practices because they feel they can get away with it, there is some value in
doing so, and they have an opportunity to personally influence the decision being made. In emergency procurement, all
three factors are potentially in play [3] . Provide examples of corrupt behaviors that include using emergency authority
when there is no real emergency or beyond the time of the emergency, misapplication of discretionary authority, matching
specifications against those of the firm desired, restricting bid invitations, and caving to political influences in award
decisions [2-5].
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -31
The purpose of this study can analyze the quality standard procedure selecting providers of goods and services based
construction disaster mitigation and create a model of monitoring and evaluation (M & E) procurement of construction
services-based mitigation. Therefore, the procurement of goods and services for construction is the starting point for the
creation of quality development outcomes. Users and providers of goods and services for construction need to understand
and share the same commitment in implementing regulations related to procurement and construction services.
Enforcement of standards of procurement of goods and services based construction buildings mitigation or in emergencies
begins with an understanding of the substance of the standards, so that the necessary access to get to know and get quality
information procurement are complete [6].
II. THEORY
Procurement is one form of government action that is critical to the economic recovery of communities. Disaster
procurement is also important since hazard events increase complexities and constraints to even well-functioning
procurement systems, highlighting the importance of transparency and effectiveness. Procurement systems which fail to
respond effectively during and after disasters may have long-term negative impacts on the recovery and resilience of
communities. Moreover, while disaster procurement at the federal level is important, the role played by local-level
procurement managers is critical. Despite the importance of this issue, there has been little to no scholarly investigation of
disaster procurement at the local level [2,5]. Procurement provisions under emergency declarations can give agencies the
authority to award a contract without public advertising for bids or make emergency purchases without prior approval.
Whether provisions involve waiving a bidding process or granting the ability to bypass routine forms, such provisions are
unique to each jurisdiction. Personnel from both the health department and the fiscal agency must know about the specific
provisions available to them during an emergency [7-8]. There is no statutory time limit for both request for quotation and
direct procurement and can be applied in times of emergencies also. As for direct procurement approvals have to be sought
from inspection and acceptance committee. These bureaucracies involved make this procedure unsuitable for corrective
maintenance [9].
Fig.1. Stages of Construction Project [10].
Procurement monitoring at the local government level can usually be done manually or using simple spreadsheets to record
and report data. However, at the program level it may be more convenient to monitor procurement through a database of
procurement actions. The database may be designed solely for procurement monitoring or it may support a broader
Management Information System (MIS).The evaluation studies should select a random sample of contracts from the
Procurement Database. In addition to verifying the information in the database, the studies should include an engineering
assessment of the quantity, quality and (if possible) value of work actually completed.
S ta g e s o f C o n s tr u c ti o n P r o je c t
i m p l e m e n ta ti o nc o n c e p t c o m p le t io n
d e v el o p m en t p ro d u cti o n
i n i ti a t io n C o n st ru ct io n C o m m i tm en tP l a n
CP C oIn
- B ri ef
- T O R - T en d e r D o cu m en t s
- C o n t ra ct D o cu m en t s
- P h y s i ca l p ro g r es s 1 0 0 %
- P ro j e ct C o nc ep t F o rm u l at i o n
- P ro j ec t S c o p e d e fi n it i o n
- C o n s tr u ct i o n I m p le m en t at i o n P ro ces s
P ro ces s E n g i ne er i n g a nd D e s i g n P r o ce ss M ai n t en a nc e P eri o d R e s u lt s
im p l em e nt a t io n o f C o n st r u ct io nN o t e:
T O R : T erm O f R e fer en c e
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -32
Comparisons should be made with similar types of work implemented using alternative modalities. Interviews with
stakeholders including contractors, officials and project beneficiaries should be used to gain a deeper understanding of the
process and to develop recommendations for improvements [11,13]. Monitoring and evaluation are important in ensuring
that the entire procurement process goes according to established standards. For those who do monitoring need to prepare
appropriate strategies to overcome the constraints that exist in the process of procurement of goods or public services. The
goods / services of government, involving government financial resources for capital expenditures is very great potential
for abuse is not uncommon cause significant losses mainly natural disaster relief funds made possible through the direct
appointment process.
Fig.2. Planing, monitoring and evaluation cycle [12]
Therefore, the parties conducting monitoring and evaluation of the procurement of government goods / services, expected to
be able to detect the risks that may arise in the supply, so it is able to identify any strategy needs related to the
implementation of the monitoring and evaluation program is reliable. [13-14].
Fig.3. Model monitoring and reporting systems [12].
III. METHODS AND ANALYSIS
RESEARCH DESIGN
This study reviews the performance of the application of quality standards of procurement of goods and services are based
on subjective reasons (subjective reasoning) and objective assessment to a complex problem. In this regard, data collection
techniques relevant to the nature and type of data that are qualitative interview (interview) or a written reply to a
questionnaire (survey forms) addressed to the expert (expert) .Instrument research the most appropriate forms for surveys
contains choice questions to be answered or selected by objective considerations and the experience and expertise of
respondents (experts) copies at every stage of the survey regarding the evaluation standard model of monitoring the
procurement of goods and services based construction buildings mitigation.
SORTING AND GROUPING VARIABLES INFLUENCE THE FACTOR ANALYSIS APPROACH
Mathematical formulation factor model can be described briefly as following. A factor model formulated by declaring
variables observed, in a set of linear function
X j to Xp..........................................................................................................................................................................(3.1)
Xi - Ul = I11F1 + I12F2 + ... + llmFm + Si...................................................................................................................(3.2)
X2- U2=/21F1 + /22F2 + ... + hmFm + S2 (3.1)
Xp-Up=/p1Fr +lpF2 +.*..+IpmFm +Sp .............................................................................................................................(3.3)
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -33
(X—u)px1 = LpxmFpxm + Spx1 (3.2) F are all factors that form and lj a weighting factor values. Tribe error associated
only with X,. a number ofa number of . p( random errors) and m weighting factors formed are not observed in the
observation data collection or latent. With equations p and p + m fruit an unknown quantity, the value of these quantities
can be calculated directly without requiring any additional information. Examination of some of the variables that have a
high value on a weighting factor of factors done to examine the fundamental structure or commonality between these
variables. The fundamental structure owned by a high weighted variables that need to be searched is a logical interpretation
by an analyst based on the context of the research undertaken
RESEARCH INSTRUMENTS
Monitoring and evaluation (M&E) of disaster management procurement conducted by a systemic approach (input-
process-output-outcome-impact) that need to be specified factors, variables and parameters as the indicators in each of the
parts of the system (subsystem) enforcement. Factors in this study is intended circumstances or events that affect the
occurrence of something or anything that actively contribute to a settlement, the results and the process. The variable in this
study is intended as something that has a variation or something that can change that reflects the character of factors. The
indicators referred to in this research is something that can be used as a tool to measure, provide guidance and information
on the variables. The parameters defined in this study is a size limit or a variable performance benchmarks.
Results of monitoring and evaluation of the implementation of standard procurement of goods and services (SPBJ) can be
shown in the following equation:
n
nxaxxaxaxaaa 4321 .......................................................................................................................................(3.4)
With :
a = the average opinion of the respondents
1a = data opinions of respondents number 1
2a = data opinions of respondents 2nd
3a = data opinions of respondents the 3rd
4a = data opinions of respondents 4th
na = data opinions of respondents 5th
n = the amount of data from respondents
TABLE-1. EVALUATION CATEGORY ENTRY STANDARD PROCUREMENT DOCUMENTS BASED DISASTER MITIGATION.
Value (%)
Monitoring
Category
Evaluation Category
Portable Acceptable Applicable User Friendly
<25 Not Not Not Not Not
25 – 50 Less Less Less Less Less
50 – 75 Enough Enough Enough Enough Enough
>75 Good Good Good Good Good
IV. RESULTS AND DISCUSSION
Procurement of goods and services in the region of Central Sulawesi province are closely linked in efforts to bring about
development for the welfare of the people in that region. In the implementation of the procurement of goods and services
based on disaster mitigation specifically directed to be implemented, systematic, focused and integrated with the aspirations
and needs of the community in the region of Central Sulawesi province. Capital expenditures and spending on goods and
services in Central Sulawesi province from year to year has increased from the year 2009 up 5.6% of total expenditure
Rp533.403.100.000, - rose to Rp 563.350.540.000, - in 2011 rose by 15, 9% to Rp 652.707.420.000, -, the year 2012 has
increased very significantly jumped 43.6% to Rp.957.481.000.000, -, capital spending and price of goods to Central
Sulawesi Province to fund budget in 2013 to Rp 1.061 .820.910.000, up 13.3% and in 2014 only rose 6.4%, or total
expenditure Rp 1.130.150.825.000,
In general, direct spending districts / cities in Central Sulawesi from 2009-2013 year has increased from year to year, this
increase was offset an increase in regional revenue in nearly all districts / cities except Banggai islands and districts and
Morowali district. The decline in capital spending that occurred in the Banggai Islands and the District Morowali is caused
by the breakdown of the Banggai Islands into Banggai Banggai Islands and Sea and Morowali district became Morowali
and North Morowali Regency.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -34
TABLE-2. ACTUAL REGIONAL GOOD AND SERVICES EXPENDITURES OF DISTRICT/ CITY IN THE CENTRAL SULAWESI
PROVINCE YEAR 2009-2013 (MILLION RUPIAHS).
DISTRICT/CITY 2009 2010 2011 2012 2013
(1) (2) (3) (4) (5) (6)
Banggai Kepulauan 55.886.313 49.120.377 64.655.437 75.272.879 92.700.930
Banggai 96.497.361 89.211.514 130.002.474 133.617.808 206.398.915
Morowali 134.986.845 112.033.308 98.934.124 119.783.362 174.557.782
Poso 115.530.836 100.947.648 110.156.642 125.723.068 159.190.422
Donggala 78.579.335 85.134.218 134.567.427 128.985.195 149.502.282
Toli-Toli 76.533.021 62.683.317 93.660.491 100.537.893 132.431.515
Buol 74.748.296 59.826.832 84.344.300 63.970.383 96.874.615
Parigi Mautong 93.149.776 96.004.834 126.797.707 128.323.935 166.268.908
Tojo Una-una 92.265.622 95.837.984 97.298.711 90.876.843 140.983.723
Sigi 29.373.186 75.305.237 107.482.177 130.770.745 138.472.994
Palu 70.608.978 87.561.903 119.651.194 122.529.748 176.642.199
Source: Department of Revenue, Finance and Asset Management District
Fig.4. Realization Diagram Actual Regional Good and Services Expenditures of District/ City Year 2009-2013.
Based on the results of a study of 60 respondents about constraints on the implementation of the procurement quality
standards of maintenance found several problems that often occur in the field, are: (i) lack of accountability monitoring the
organizers of procurement (39.3% of respondents); (Ii) quality limitations of the methods of procurement (16.1% of
respondents); (Iii) limited human resources quality of service users (23.5% of respondents); (Iv) the lack of coordination
between service users and providers of quality procurement management services (12.7% of respondents); and (v)
difficulty understanding the substance of procurement quality standards (11.3% of respondents). If the observed
distribution of respondents every district, the results of the analysis showed nearly 75% of respondents in Toli-Toli declare
a major obstacle in achieving the quality of the procurement of goods and services procurement construction building-
based mitigation is the limited quality of human resources service users, the lack of coordination between service users and
service providers and difficulty understanding the substance of procurement quality standards as well as nearly 60% of
respondents respectively in Morowali District, Tojo Una-Una and Sigi stated the same thing with the respondent in Toli-
Toli. The phenomenon is quite different from the situation in Moutong Parigi district, Donggala which shows about 35% of
the respondents found the same thing with the other districts, as shown in Fig 5. From the description of this discussion can
be concluded that the implementation of procurement quality constraints dominant in the maintenance of procurement and
services is limited accountability monitoring, evaluation and procurement quality standards quality limitations procurement
documents used. The procurement of building construction quality based mitigation requires accountable procurement.
Terms are felt especially hard in the district outside Parigi Moutong and Donggala because of limited available resources.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -35
Aberration achievement of the quality of procurement of goods and services, ttechnical study ever conducted on the
performance quality of the goods and services mentioned that there are 6 (six) deviation implementation of procurement
quality achievement, namely: (i) Intervention by certain parties (ii) inadequate regulation (iii) Not all personal / unit want
on the monitor (iv) absence of further implications of the results of monitoring and evaluation (v) the performance appraisal
system is not adequate (vi) Low reward or punishment standards accepted obscurity compared to the achievement of the
results obtained. Implementation of the model is done to monitor and evaluate the implementation of quality standards of
goods and services based on disaster mitigation. Implementation of the model starts with the interview survey respondents
who have specific experience in the implementation of the procurement of goods / services based disaster mitigation, which
supported the minimum educational civil engineer with a background in career services are appropriate and adequate, and
comes from: BPPD office (Regional Natural Disaster Management Agency ), the Office of Public Works, the Office of
Human Settlements, the Office of Water Resources, and the Office of Procurement Services Unit. At every institution is
taken 1 to 2 respondents because the respondents will be divided equally follow a normal distribution according to the
selected study sites.
Fig .5.Constraints implementation of quality standards procurement.
TABLE-3. IDENTIFICATION OF CONSTRAINTS ON THE IMPLEMENTATION OF THE PROCUREMENT
QUALITY STANDARD DISASTER MITIGATION PROJECT.
IMPLEMENTATION OF QUALITY
STANDARDS PROCUREMENT
PERCEPTION OF RESPONDENTS (%)
SOURCES OF BASELINE MONITORING EVALUATION
 Limitations of Human Resource Quality
 limited funding
 limited time service users
 substance procurement quality standards
 Procurement priorities
 Risks and Challenges
15,7
37,6
12,0
13,4
15,1
6,4
35,5
29,6
8,1
11,4
9,3
6,1
13,2
39,3
16,1
11,3
12,7
7,4
Total 100,0 100,0 100,0
In this study, been some research location that is central Sulawesi and 6 (six) other places are districts in Central Sulawesi
(Sigi regency, Donggala, Parigi Moutong, TojoUna-Una, Toli-Toli, and Morowali). The choice of location is based on a
purposive sampling method, where the election because a particular purpose. So the number of respondents is 60 people
who have competence in the application of the procurement of goods / services.
TABLE-4. RESULTS OF MONITORING AND EVALUATION (M&E) STANDARDS ENFORCEMENT PROCUREMENT
DOCUMENT-BASED DISASTER MITIGATION.
NO. MONITORING AND EVALUATION BPPD CK BM SDA ULP MEAN
1. Have (M-1)
a. How to recognize
b. how to get
c. How to archive
6,00%
1,18%
2,50%
2,32%
3,60%
0,63%
1,63%
1,35%
4,80%
0,70%
3,13%
0,97%
4,90%
0,88%
2,00%
2,02%
5,63%
1,00%
3,13%
1,50%
4,91%
0,85%
2,40%
1,56%
2. Understanding (M-2)
a. understanding of the language
b. understanding of substance
15,00%
3,75%
11,25%
13,88%
3,75%
10,13%
14,00%
2,75%
11,25%
13,88%
2,25%
11,63%
11,63%
3,00%
8,63%
13,63%
3,04%
10,59%
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -36
3. Applying (M-3)
a. physical documents
b. executive competence
c. data management
d. utilization tool
e. utilization of materials
f. methods of implementation
42,81%
3,24%
10,31%
3,75%
8,88%
9,13%
7,50%
35,56%
3,75%
10,31%
2,50%
7,25%
5,00%
6,75%
31,94%
1,25%
4,68%
2,38%
6,88%
10,00%
6,75%
36,56%
2,49%
4,69%
4,12%
8,88%
9,13%
7,25%
31,56%
2,50%
8,43%
2,50%
5,63%
5,00%
7,50%
35,47%
2,49%
6,30%
2,97%
7,40%
7,31%
7,14%
4. Supervise (M-4)
a. achievement uniformity
b. Achievement of quality assurance
11,63%
4,13%
7,50%
11,25%
3,75%
7,50%
13,88%
4,38%
9,50%
7,63%
2,63%
5,00%
11,00%
4,00%
7,00%
10,88%
3,73%
7,15%
Value Monitoring 75,44% 64,29% 64,61% 62,96% 59,81% 65,22%
5. Evaluating (M-5)
a. Portable
b. Acceptable
c. Applicable
d. User Friendly
60,00%
75,00%
77,84%
77,50%
36,00%
69,38%
64,66%
75,00%
48,00%
70,00%
58,07%
92,50%
49,00%
69,38%
66,48%
50,83%
56,25%
58,13%
57,39%
73,33%
49,11%
68,14%
64,49%
72,51%
In general, monitoring results in the category of "good enough" with 59.81% which is the lowest in the Procurement
Services Unit (ULP) and the highest on the Regional Disaster Management Agency (BPPD) by monitoring the value of
75.44%, followed by the Department of Resources Water Resources (SDA) (62.96%), the Department of Highways (BM)
(64.61%), and the Department of Human Settlements (CK) (64.26%). This suggests that the Regional Disaster
Management Agency (BPPD) and the Department of Human Settlements (CK) as the central unit in charge of managing
the procurement of goods and services had been monitoring the implementation of the procurement documents properly in
accordance duties and functions, while the Procurement Services Unit (ULP) better position ourselves as a procurement
official controls the extent of the procurement documents may be owned, understood, and applied by field practitioners in
the field of consultancy and the procurement of goods / services. Results if the data derived from the logic models show
that the level of fairness of the analysis is quite good because it is not much different from the results of the monitoring
assessment among stakeholders. Thus it can be said that the level of achievement of the reach of uniformity in the quality
assurance of goods / services procurement of emergency in the region of Central Sulawesi and the surrounding areas in
both categories
Evaluation of the implementation of the procurement documents reviewed in 4 (four) aspects of assessment, namely: (1)
portable (2) acceptable (3) applicable and (4) user friendly. Regional Disaster Management Agency (BPPD) and
Procurement Services Unit (ULP) assess fairly portable document procurement (respectively above 50.0%, ie 60.0% and
56.25%) due to first get the book printed documents procurement than Department of Human Settlements, Department of
Highways and Department of Water Resources. The third unit is more dominant in the technical manuals rather than the
procurement documents. In general, the fifth unit is working well enough to understand the language and the technical
substance of the procurement documents as acceptable average value is 68.14%, which means that means that the content
of the discussion document management easy to learn and understand. Similarly applicable aspects and user friendly.
Results of evaluation of these two aspects that are in good enough category, with each average is 64.49% and 72.51%. In
general, the results of an evaluation of any aspect of being in good enough category (50.0% - 75.0%) except for portable
aspect, which is located in the unfavorable category (25.0% - 50.0%). This indicates that the socialization of the
procurement documents (how to identify, acquire, and archive) further improved in all units of the relevant stakeholders
management procurement of goods and services based on mitigation, including universities, so that in the future the
community created a standard minded procurement of goods and services based mitigation. In addition it should be
considered a book procurement uniform documents so as not to give rise to many interpretations that make a gap for abuse
of authority. Procurement Monitoring and Evaluation Program system of disaster management. Monitoring and evaluation
(M&E) is one activity in one cycle of procurement, management is important to look at the performance of the parties
involved in the process of procurement of public goods and services. Monitoring can also be defined as a process of
information gathering and analysis (based on the indicators set) basis systematic and continuous program of activities, so
that corrective action can be done to further refinement of the program. The process of evaluation of the quality of the
procurement of government goods / services if implemented properly can generate useful recommendations to the parties
conducting monitoring and evaluation. Monitoring and evaluation (M&E) system procurement disaster countermeasures
covering all areas of the county and city in the province of Central Sulawesi, provide feedback for the Consultancy's
performance, strategic decision making, and help provide a solution. "This system will create tangible benefits for
supporting decision makers. In detail the purpose of e-monitoring and evaluation is:
- Make admin agency
- View the procurement process plans and disaster management
- Update the plan and procurement process for disaster management
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -37
From the analysis of information systems in Table 4 we can conclude the necessity of a system program monitoring and
evaluation that deal specifically procurement of natural disaster (emergency procurement) by increasing (upgrade) IT
facilities that exist in the respective districts, implements warehouse in data integration, implementation of Service
Oriented Arcitecture (SOA ) in the process of the integration of existing information systems.
TABLE-5. GAP ANALYSIS E-(M & E) AND TARGET ARCHITECTURE (M & E) EMERGENCY PROCUREMENT.
E-(M & E) TARGET ARCHITECTURE
Not to All Use Standard
Database Not Integrated
All data have not been in Backup
Separate data between central and local
Not to use the mobile system
Not to Support Service
All standardized
Integrated Data Base
Data Backup Fulfilled
Data Warehouse
Using a mobile system
SOA
Fig.5. Information Systems Architecture [15-16].
From Fig 5, the future plans for the process of data sharing is all the data that is stored in a distributed or centralized to be
multi-user, the data of each center into a data mart, admin in the respective district or unit of work data is input the data
directly as a map of the disaster, budget plans, procurement plans that are integrated with LKPP, LPSE, LPJK, and IBRA.
This is to facilitate the development of a data warehouse as a replica of the data that is scattered.
V. CONCLUSIONS
Monitoring and evaluation (M&E) system and a breakthrough is the development of the manual monitoring system that
already exists. Through this system, the expected performance of the goods / services of the government will increase. In
particular, monitoring and evaluation system procurement countermeasures disaster in Central Sulawesi, the system was
developed to meet the objectives of monitoring and evaluation, such as providing feedback on their performance
consultancy, strategic decision-making, and help provide a solution. This system will create tangible benefits for supporting
decision makers. e-M & E not only contain information on the implementation of procurement of goods / services of the
government alone, but includes the unity of business process.
REFERENCES
[1]. Abhas K Jha, “Safer Homes, Stronger Communities: A Handbook for Reconstructing after Natural
Disasters,Guiding Principles for Monitoring and Evaluation”,As with asThe International Bank for Reconstruction and
Development/ The World Bank Washington DC 20433, 2010
[2]. Atkinson C.Land Sapat, AK, After Katrina: ”Comparisons of Post-Disaster Public Procurement Approaches And
Outcomes in the New Orleans Area”,Journal of Public Procurement, Volume 12, issue 3, 356-385, 2012
[3]. Schultz. J And Søreide T, ”Corruption In Emergency Procurement”, U4 Anti Corruption Resource
Center CHR Michelen Institute. 2006
A dm in S p a ti al
LK P P
L P S E S ult en g
L PJ K
B P B N
Em on ev
R eg ula tio n
P ro cur em e nt
S er v ice
p ro v id er
c er tif icat ion s
E x p ert s
C om p any
DataCleaningandIntegration
L o ca l M ap
D isa ste r D a ta B as e
Be n ca n a
D o c.P ro cu re m e nt
D isa ste r B ud ge t
U nit P ric e
Applicatons
M o ne v D ata
W a re H o use
D at a M a rtD a ta S o urc es
W a re H o us e
P ro cum e nt
Pua s at d a ta E m erg e nc y
P ro cum ent
U ser s
P u b lic
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763
Issue 08, Volume 3 (August 2016) www.ijirae.com
___________________________________________________________________________________________________
IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 |
Index Copernicus 2014 = 6.57
© 2014- 16, IJIRAE- All Rights Reserved Page -38
[4]. Kalibala S, ”Monitoring and Evaluation of the Emergency Plan Progress (MEEPP”), End-of-Project
Evaluation,United States Agency for International Development (USAID)/Uganda under the terms of Contract No. GHH-I-
02-07-00034-00,2010
[5]. Kiage J.O, ”Factors Affecting Procurement Performance: A Case of Ministry of Energy”, International Journal of
Business andCommerce Vol. 3, No.1,2013
[6]. Morgan J, G.Bowles and K.Carter, ”Procurement Efficiencies: Monitoring and Evaluation of Devanha Phase
2”,Scottish Government Social Research, 2012
[7]. Morgan S, Fisher S and J.Herrmann, ”Administrative Preparedness: Emergency Procurement Strategies for Health
Departments”, the National Association of County and City Health Officials (NACCHO)Washington, DC
20036,2013
[8]. WHO, ” Harmonized monitoring and evaluation indicators for procurement and supply management systems”,World
Health Organization Department of HIV/AIDS Avenue Appia 201211Geneva 27 Switzerland, 2011
[9]. Mutava C, ”Impact of Public Procurement Procedures on Delivery of Maintenance Work”s,FIG Congress ,Engaging
the Challenges –Enhancing the Relevance Kuala Lumpur, Malaysia,2014
[10]. Mangitung,D.M, ”Taxonomy of Construction Procurement”,Yamiba, Palu,2010
[11]. Querol A.A and Schaefer B, (2013),SEAD ”Guide for Monitoring and Evaluating Green Public Procurement
Programs”, eco Institut, Barcelona, 2013
[12]. Nannei C,(2011), ”Monitoring and evaluation framework for the Global Strategy and Plan of Action” ,WHO
Department of Public Health, Innovation and Intellectual Property,2011
[13]. UNCDF, (2013), ”Procuremet For Local Development, A Guide to Best Practice in Local Government Procurement
in Least developed countries”, UN Capital Development Fund, New York, NY 19917.2013
[14].CPPR,”Monitoring dan Evaluasi Pengadaan Barang dan Jasa”, Universitas Gajah Mada,
Yogyakarta,2012
[15]. Zachman JA, 2000, ” Enterprise Architecture: Issues,inhibitors and Incentives”, Data To Knowlodge Newletter,
27(1):11-1,2000
[16]. Supriana Iyan, ”Model Arsitektur Bisnis, Sistem Informasi dan Teknologi di Bakorsustanal Berbasis TOGAF”,
Telkomnika, Vol 8 No.1 : 17-24, 2010
[17]. Li Xand Zhang X, ”Emergency Procurement Based on Supply Disruptions: Single-Sourcing or Dual-Sourcing,”The
Open Cybernetics & Systemics Journal, 8, 618-622,2014
[18]. Erniati,M.Wihadi Tjaronge, Zulharnah,Ulfa Ria Irfan, ”,Porosity, Pore Size and Compressive Strength of Self
Compacting Concrete Using Sea Water”, Volume125,page, 832-837,Procedia Engginering, 2015
[19]. Li Xand Zhang X, ”Manufacturers’Emergency Procurement Strategies under Supply Disruption and Competition
Based on Scenario Analysis”,International Journal of uand e Service, Science and Technology Vol.8, No.2, 2015

More Related Content

Similar to MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTRUCTION BUILDING BASED ON DISASTER MITIGATION IN CENTRAL SULAWESI

IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET Journal
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...
eSAT Journals
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management system
eSAT Publishing House
 
IRJET- Valuation of Real Estate in Karad City
IRJET- Valuation of Real Estate in Karad CityIRJET- Valuation of Real Estate in Karad City
IRJET- Valuation of Real Estate in Karad City
IRJET Journal
 
Hierarchical Forecasting and Reconciliation in The Context of Temporal Hierarchy
Hierarchical Forecasting and Reconciliation in The Context of Temporal HierarchyHierarchical Forecasting and Reconciliation in The Context of Temporal Hierarchy
Hierarchical Forecasting and Reconciliation in The Context of Temporal Hierarchy
IRJET Journal
 
Factors affecting effective
Factors affecting effectiveFactors affecting effective
Factors affecting effective
World-Academic Journal
 
IRJET- Substance Abuse by Employees At Construction Industry
IRJET-  	  Substance Abuse by Employees At Construction IndustryIRJET-  	  Substance Abuse by Employees At Construction Industry
IRJET- Substance Abuse by Employees At Construction Industry
IRJET Journal
 
AVOIDING AN ARBITRATION DISPUTE
AVOIDING AN ARBITRATION DISPUTEAVOIDING AN ARBITRATION DISPUTE
AVOIDING AN ARBITRATION DISPUTE
AM Publications
 
IRJET- Accident Information Mining and Insurance Dispute Resolution
IRJET- Accident Information Mining and Insurance Dispute ResolutionIRJET- Accident Information Mining and Insurance Dispute Resolution
IRJET- Accident Information Mining and Insurance Dispute Resolution
IRJET Journal
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
IRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
IRJET Journal
 
Controlling Anti Ragging System using Android
Controlling Anti Ragging System using AndroidControlling Anti Ragging System using Android
Controlling Anti Ragging System using Android
IRJET Journal
 
J03405077089
J03405077089J03405077089
J03405077089
theijes
 
10-1111-evaluation-of-skills-account-trials
10-1111-evaluation-of-skills-account-trials10-1111-evaluation-of-skills-account-trials
10-1111-evaluation-of-skills-account-trials
David Sands
 
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET Journal
 
A fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safetyA fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safety
eSAT Journals
 
A fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safetyA fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safety
eSAT Journals
 
Stock Price Prediction Using Sentiment Analysis and Historic Data of Stock
Stock Price Prediction Using Sentiment Analysis and Historic Data of StockStock Price Prediction Using Sentiment Analysis and Historic Data of Stock
Stock Price Prediction Using Sentiment Analysis and Historic Data of Stock
IRJET Journal
 
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
eSAT Journals
 
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by theEnhancement of the performance of an industry by the
Enhancement of the performance of an industry by the
eSAT Publishing House
 

Similar to MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTRUCTION BUILDING BASED ON DISASTER MITIGATION IN CENTRAL SULAWESI (20)

IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management system
 
IRJET- Valuation of Real Estate in Karad City
IRJET- Valuation of Real Estate in Karad CityIRJET- Valuation of Real Estate in Karad City
IRJET- Valuation of Real Estate in Karad City
 
Hierarchical Forecasting and Reconciliation in The Context of Temporal Hierarchy
Hierarchical Forecasting and Reconciliation in The Context of Temporal HierarchyHierarchical Forecasting and Reconciliation in The Context of Temporal Hierarchy
Hierarchical Forecasting and Reconciliation in The Context of Temporal Hierarchy
 
Factors affecting effective
Factors affecting effectiveFactors affecting effective
Factors affecting effective
 
IRJET- Substance Abuse by Employees At Construction Industry
IRJET-  	  Substance Abuse by Employees At Construction IndustryIRJET-  	  Substance Abuse by Employees At Construction Industry
IRJET- Substance Abuse by Employees At Construction Industry
 
AVOIDING AN ARBITRATION DISPUTE
AVOIDING AN ARBITRATION DISPUTEAVOIDING AN ARBITRATION DISPUTE
AVOIDING AN ARBITRATION DISPUTE
 
IRJET- Accident Information Mining and Insurance Dispute Resolution
IRJET- Accident Information Mining and Insurance Dispute ResolutionIRJET- Accident Information Mining and Insurance Dispute Resolution
IRJET- Accident Information Mining and Insurance Dispute Resolution
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
Controlling Anti Ragging System using Android
Controlling Anti Ragging System using AndroidControlling Anti Ragging System using Android
Controlling Anti Ragging System using Android
 
J03405077089
J03405077089J03405077089
J03405077089
 
10-1111-evaluation-of-skills-account-trials
10-1111-evaluation-of-skills-account-trials10-1111-evaluation-of-skills-account-trials
10-1111-evaluation-of-skills-account-trials
 
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of Windshield
 
A fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safetyA fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safety
 
A fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safetyA fuzzy approach to evaluate suitability of infrastructure projects with safety
A fuzzy approach to evaluate suitability of infrastructure projects with safety
 
Stock Price Prediction Using Sentiment Analysis and Historic Data of Stock
Stock Price Prediction Using Sentiment Analysis and Historic Data of StockStock Price Prediction Using Sentiment Analysis and Historic Data of Stock
Stock Price Prediction Using Sentiment Analysis and Historic Data of Stock
 
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
 
Enhancement of the performance of an industry by the
Enhancement of the performance of an industry by theEnhancement of the performance of an industry by the
Enhancement of the performance of an industry by the
 

More from AM Publications

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
AM Publications
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
AM Publications
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
AM Publications
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
AM Publications
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
AM Publications
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
AM Publications
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
AM Publications
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
AM Publications
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
AM Publications
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
AM Publications
 
INTELLIGENT BLIND STICK
INTELLIGENT BLIND STICKINTELLIGENT BLIND STICK
INTELLIGENT BLIND STICK
AM Publications
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
AM Publications
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
AM Publications
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
AM Publications
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNN
AM Publications
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECT
AM Publications
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
AM Publications
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
AM Publications
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
AM Publications
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
AM Publications
 

More from AM Publications (20)

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
 
INTELLIGENT BLIND STICK
INTELLIGENT BLIND STICKINTELLIGENT BLIND STICK
INTELLIGENT BLIND STICK
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNN
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECT
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
 

Recently uploaded

Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 

Recently uploaded (20)

Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 

MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTRUCTION BUILDING BASED ON DISASTER MITIGATION IN CENTRAL SULAWESI

  • 1. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -30 MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTRUCTION BUILDING BASED ON DISASTER MITIGATION IN CENTRAL SULAWESI Tutang Muhtar* Mary Selintung DjayaniNurdin Amar Doctoral Student Civil Eng. Professor, Civil Eng. Professor,Managament . Asst. Professor of Civil Eng Hasanuddin University Hasanuddin University Tadulako University Tadulako University Abstract— Monitoring and evaluation (M&E) for emergency procurement project on natural disasters may become more difficult for disaster-related projects in Central Sulawesi: project assessment and monitoring of the design emergency procurement, quality standards are often not determined, and the necessary data may be difficult to be collected. But good monitoring and evaluation not only improve project outcomes for stakeholders, but also very beneficial to the public interest. His paper selects the group of controllers that can be achieved by using the methodology in two major categories: the experimental design (randomized) and the design of quasi - experimental (not-encrypted); estimation of counterfactual by using a random method to form a control group (experimental design), for controlling pre- and post-program of procurement and development of its participants, and to establish the program impacts, relevant data collected from the data base and its follow-up (including the time frame which is quite possible for the program impacts the cost-benefit or cost-effectiveness analysis to measure the efficiency of the project; and qualitative technique that makes it possible to use the method of triangulation. The results showed that there are differences between districts in Central Sulawesi Province in terms of upholding the quality of procurement and services, relating to the quality of each personnel, understanding of procurement regulations, systems training, correspondence between procurement priorities, differences in data standards, rules and regulations as well as the inaccuracy of selecting contractors Keywords—Monitoring& evaluation(M&E), emergency ,procurement, disasters I. INTRODUCTION Procurement of goods and services during disaster risk understanding of the law by a lax standard procurement documents from the emergency [1]. This occurs because of the large amount of funds to be spent quickly and to overcome the problems of humanity. As a temporary shelter, clean water supply. Based on this risk, the expected service users and service providers have the awareness to make efforts to understand the standards documents from the emergency procurement by strengthening the distribution system by recruiting the help of a professional. Low quality of the procurement that occurs during emergency situations is priorities of the management of aid also require proof of transactions and other matters such as efficiency. Essentially, the risk of corruption can be reduced if the management system is carried out correctly, accountable [1,2]. The problem with an “uncoordinated, hurried” approach to procurement, in an environment where “financial controls are reduced, funding levels can soar, and staff change frequently,” is that it is a recipe for corruption and fraud [3]. Procurement officials may engage in corrupt practices because they feel they can get away with it, there is some value in doing so, and they have an opportunity to personally influence the decision being made. In emergency procurement, all three factors are potentially in play [3] . Provide examples of corrupt behaviors that include using emergency authority when there is no real emergency or beyond the time of the emergency, misapplication of discretionary authority, matching specifications against those of the firm desired, restricting bid invitations, and caving to political influences in award decisions [2-5].
  • 2. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -31 The purpose of this study can analyze the quality standard procedure selecting providers of goods and services based construction disaster mitigation and create a model of monitoring and evaluation (M & E) procurement of construction services-based mitigation. Therefore, the procurement of goods and services for construction is the starting point for the creation of quality development outcomes. Users and providers of goods and services for construction need to understand and share the same commitment in implementing regulations related to procurement and construction services. Enforcement of standards of procurement of goods and services based construction buildings mitigation or in emergencies begins with an understanding of the substance of the standards, so that the necessary access to get to know and get quality information procurement are complete [6]. II. THEORY Procurement is one form of government action that is critical to the economic recovery of communities. Disaster procurement is also important since hazard events increase complexities and constraints to even well-functioning procurement systems, highlighting the importance of transparency and effectiveness. Procurement systems which fail to respond effectively during and after disasters may have long-term negative impacts on the recovery and resilience of communities. Moreover, while disaster procurement at the federal level is important, the role played by local-level procurement managers is critical. Despite the importance of this issue, there has been little to no scholarly investigation of disaster procurement at the local level [2,5]. Procurement provisions under emergency declarations can give agencies the authority to award a contract without public advertising for bids or make emergency purchases without prior approval. Whether provisions involve waiving a bidding process or granting the ability to bypass routine forms, such provisions are unique to each jurisdiction. Personnel from both the health department and the fiscal agency must know about the specific provisions available to them during an emergency [7-8]. There is no statutory time limit for both request for quotation and direct procurement and can be applied in times of emergencies also. As for direct procurement approvals have to be sought from inspection and acceptance committee. These bureaucracies involved make this procedure unsuitable for corrective maintenance [9]. Fig.1. Stages of Construction Project [10]. Procurement monitoring at the local government level can usually be done manually or using simple spreadsheets to record and report data. However, at the program level it may be more convenient to monitor procurement through a database of procurement actions. The database may be designed solely for procurement monitoring or it may support a broader Management Information System (MIS).The evaluation studies should select a random sample of contracts from the Procurement Database. In addition to verifying the information in the database, the studies should include an engineering assessment of the quantity, quality and (if possible) value of work actually completed. S ta g e s o f C o n s tr u c ti o n P r o je c t i m p l e m e n ta ti o nc o n c e p t c o m p le t io n d e v el o p m en t p ro d u cti o n i n i ti a t io n C o n st ru ct io n C o m m i tm en tP l a n CP C oIn - B ri ef - T O R - T en d e r D o cu m en t s - C o n t ra ct D o cu m en t s - P h y s i ca l p ro g r es s 1 0 0 % - P ro j e ct C o nc ep t F o rm u l at i o n - P ro j ec t S c o p e d e fi n it i o n - C o n s tr u ct i o n I m p le m en t at i o n P ro ces s P ro ces s E n g i ne er i n g a nd D e s i g n P r o ce ss M ai n t en a nc e P eri o d R e s u lt s im p l em e nt a t io n o f C o n st r u ct io nN o t e: T O R : T erm O f R e fer en c e
  • 3. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -32 Comparisons should be made with similar types of work implemented using alternative modalities. Interviews with stakeholders including contractors, officials and project beneficiaries should be used to gain a deeper understanding of the process and to develop recommendations for improvements [11,13]. Monitoring and evaluation are important in ensuring that the entire procurement process goes according to established standards. For those who do monitoring need to prepare appropriate strategies to overcome the constraints that exist in the process of procurement of goods or public services. The goods / services of government, involving government financial resources for capital expenditures is very great potential for abuse is not uncommon cause significant losses mainly natural disaster relief funds made possible through the direct appointment process. Fig.2. Planing, monitoring and evaluation cycle [12] Therefore, the parties conducting monitoring and evaluation of the procurement of government goods / services, expected to be able to detect the risks that may arise in the supply, so it is able to identify any strategy needs related to the implementation of the monitoring and evaluation program is reliable. [13-14]. Fig.3. Model monitoring and reporting systems [12]. III. METHODS AND ANALYSIS RESEARCH DESIGN This study reviews the performance of the application of quality standards of procurement of goods and services are based on subjective reasons (subjective reasoning) and objective assessment to a complex problem. In this regard, data collection techniques relevant to the nature and type of data that are qualitative interview (interview) or a written reply to a questionnaire (survey forms) addressed to the expert (expert) .Instrument research the most appropriate forms for surveys contains choice questions to be answered or selected by objective considerations and the experience and expertise of respondents (experts) copies at every stage of the survey regarding the evaluation standard model of monitoring the procurement of goods and services based construction buildings mitigation. SORTING AND GROUPING VARIABLES INFLUENCE THE FACTOR ANALYSIS APPROACH Mathematical formulation factor model can be described briefly as following. A factor model formulated by declaring variables observed, in a set of linear function X j to Xp..........................................................................................................................................................................(3.1) Xi - Ul = I11F1 + I12F2 + ... + llmFm + Si...................................................................................................................(3.2) X2- U2=/21F1 + /22F2 + ... + hmFm + S2 (3.1) Xp-Up=/p1Fr +lpF2 +.*..+IpmFm +Sp .............................................................................................................................(3.3)
  • 4. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -33 (X—u)px1 = LpxmFpxm + Spx1 (3.2) F are all factors that form and lj a weighting factor values. Tribe error associated only with X,. a number ofa number of . p( random errors) and m weighting factors formed are not observed in the observation data collection or latent. With equations p and p + m fruit an unknown quantity, the value of these quantities can be calculated directly without requiring any additional information. Examination of some of the variables that have a high value on a weighting factor of factors done to examine the fundamental structure or commonality between these variables. The fundamental structure owned by a high weighted variables that need to be searched is a logical interpretation by an analyst based on the context of the research undertaken RESEARCH INSTRUMENTS Monitoring and evaluation (M&E) of disaster management procurement conducted by a systemic approach (input- process-output-outcome-impact) that need to be specified factors, variables and parameters as the indicators in each of the parts of the system (subsystem) enforcement. Factors in this study is intended circumstances or events that affect the occurrence of something or anything that actively contribute to a settlement, the results and the process. The variable in this study is intended as something that has a variation or something that can change that reflects the character of factors. The indicators referred to in this research is something that can be used as a tool to measure, provide guidance and information on the variables. The parameters defined in this study is a size limit or a variable performance benchmarks. Results of monitoring and evaluation of the implementation of standard procurement of goods and services (SPBJ) can be shown in the following equation: n nxaxxaxaxaaa 4321 .......................................................................................................................................(3.4) With : a = the average opinion of the respondents 1a = data opinions of respondents number 1 2a = data opinions of respondents 2nd 3a = data opinions of respondents the 3rd 4a = data opinions of respondents 4th na = data opinions of respondents 5th n = the amount of data from respondents TABLE-1. EVALUATION CATEGORY ENTRY STANDARD PROCUREMENT DOCUMENTS BASED DISASTER MITIGATION. Value (%) Monitoring Category Evaluation Category Portable Acceptable Applicable User Friendly <25 Not Not Not Not Not 25 – 50 Less Less Less Less Less 50 – 75 Enough Enough Enough Enough Enough >75 Good Good Good Good Good IV. RESULTS AND DISCUSSION Procurement of goods and services in the region of Central Sulawesi province are closely linked in efforts to bring about development for the welfare of the people in that region. In the implementation of the procurement of goods and services based on disaster mitigation specifically directed to be implemented, systematic, focused and integrated with the aspirations and needs of the community in the region of Central Sulawesi province. Capital expenditures and spending on goods and services in Central Sulawesi province from year to year has increased from the year 2009 up 5.6% of total expenditure Rp533.403.100.000, - rose to Rp 563.350.540.000, - in 2011 rose by 15, 9% to Rp 652.707.420.000, -, the year 2012 has increased very significantly jumped 43.6% to Rp.957.481.000.000, -, capital spending and price of goods to Central Sulawesi Province to fund budget in 2013 to Rp 1.061 .820.910.000, up 13.3% and in 2014 only rose 6.4%, or total expenditure Rp 1.130.150.825.000, In general, direct spending districts / cities in Central Sulawesi from 2009-2013 year has increased from year to year, this increase was offset an increase in regional revenue in nearly all districts / cities except Banggai islands and districts and Morowali district. The decline in capital spending that occurred in the Banggai Islands and the District Morowali is caused by the breakdown of the Banggai Islands into Banggai Banggai Islands and Sea and Morowali district became Morowali and North Morowali Regency.
  • 5. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -34 TABLE-2. ACTUAL REGIONAL GOOD AND SERVICES EXPENDITURES OF DISTRICT/ CITY IN THE CENTRAL SULAWESI PROVINCE YEAR 2009-2013 (MILLION RUPIAHS). DISTRICT/CITY 2009 2010 2011 2012 2013 (1) (2) (3) (4) (5) (6) Banggai Kepulauan 55.886.313 49.120.377 64.655.437 75.272.879 92.700.930 Banggai 96.497.361 89.211.514 130.002.474 133.617.808 206.398.915 Morowali 134.986.845 112.033.308 98.934.124 119.783.362 174.557.782 Poso 115.530.836 100.947.648 110.156.642 125.723.068 159.190.422 Donggala 78.579.335 85.134.218 134.567.427 128.985.195 149.502.282 Toli-Toli 76.533.021 62.683.317 93.660.491 100.537.893 132.431.515 Buol 74.748.296 59.826.832 84.344.300 63.970.383 96.874.615 Parigi Mautong 93.149.776 96.004.834 126.797.707 128.323.935 166.268.908 Tojo Una-una 92.265.622 95.837.984 97.298.711 90.876.843 140.983.723 Sigi 29.373.186 75.305.237 107.482.177 130.770.745 138.472.994 Palu 70.608.978 87.561.903 119.651.194 122.529.748 176.642.199 Source: Department of Revenue, Finance and Asset Management District Fig.4. Realization Diagram Actual Regional Good and Services Expenditures of District/ City Year 2009-2013. Based on the results of a study of 60 respondents about constraints on the implementation of the procurement quality standards of maintenance found several problems that often occur in the field, are: (i) lack of accountability monitoring the organizers of procurement (39.3% of respondents); (Ii) quality limitations of the methods of procurement (16.1% of respondents); (Iii) limited human resources quality of service users (23.5% of respondents); (Iv) the lack of coordination between service users and providers of quality procurement management services (12.7% of respondents); and (v) difficulty understanding the substance of procurement quality standards (11.3% of respondents). If the observed distribution of respondents every district, the results of the analysis showed nearly 75% of respondents in Toli-Toli declare a major obstacle in achieving the quality of the procurement of goods and services procurement construction building- based mitigation is the limited quality of human resources service users, the lack of coordination between service users and service providers and difficulty understanding the substance of procurement quality standards as well as nearly 60% of respondents respectively in Morowali District, Tojo Una-Una and Sigi stated the same thing with the respondent in Toli- Toli. The phenomenon is quite different from the situation in Moutong Parigi district, Donggala which shows about 35% of the respondents found the same thing with the other districts, as shown in Fig 5. From the description of this discussion can be concluded that the implementation of procurement quality constraints dominant in the maintenance of procurement and services is limited accountability monitoring, evaluation and procurement quality standards quality limitations procurement documents used. The procurement of building construction quality based mitigation requires accountable procurement. Terms are felt especially hard in the district outside Parigi Moutong and Donggala because of limited available resources.
  • 6. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -35 Aberration achievement of the quality of procurement of goods and services, ttechnical study ever conducted on the performance quality of the goods and services mentioned that there are 6 (six) deviation implementation of procurement quality achievement, namely: (i) Intervention by certain parties (ii) inadequate regulation (iii) Not all personal / unit want on the monitor (iv) absence of further implications of the results of monitoring and evaluation (v) the performance appraisal system is not adequate (vi) Low reward or punishment standards accepted obscurity compared to the achievement of the results obtained. Implementation of the model is done to monitor and evaluate the implementation of quality standards of goods and services based on disaster mitigation. Implementation of the model starts with the interview survey respondents who have specific experience in the implementation of the procurement of goods / services based disaster mitigation, which supported the minimum educational civil engineer with a background in career services are appropriate and adequate, and comes from: BPPD office (Regional Natural Disaster Management Agency ), the Office of Public Works, the Office of Human Settlements, the Office of Water Resources, and the Office of Procurement Services Unit. At every institution is taken 1 to 2 respondents because the respondents will be divided equally follow a normal distribution according to the selected study sites. Fig .5.Constraints implementation of quality standards procurement. TABLE-3. IDENTIFICATION OF CONSTRAINTS ON THE IMPLEMENTATION OF THE PROCUREMENT QUALITY STANDARD DISASTER MITIGATION PROJECT. IMPLEMENTATION OF QUALITY STANDARDS PROCUREMENT PERCEPTION OF RESPONDENTS (%) SOURCES OF BASELINE MONITORING EVALUATION  Limitations of Human Resource Quality  limited funding  limited time service users  substance procurement quality standards  Procurement priorities  Risks and Challenges 15,7 37,6 12,0 13,4 15,1 6,4 35,5 29,6 8,1 11,4 9,3 6,1 13,2 39,3 16,1 11,3 12,7 7,4 Total 100,0 100,0 100,0 In this study, been some research location that is central Sulawesi and 6 (six) other places are districts in Central Sulawesi (Sigi regency, Donggala, Parigi Moutong, TojoUna-Una, Toli-Toli, and Morowali). The choice of location is based on a purposive sampling method, where the election because a particular purpose. So the number of respondents is 60 people who have competence in the application of the procurement of goods / services. TABLE-4. RESULTS OF MONITORING AND EVALUATION (M&E) STANDARDS ENFORCEMENT PROCUREMENT DOCUMENT-BASED DISASTER MITIGATION. NO. MONITORING AND EVALUATION BPPD CK BM SDA ULP MEAN 1. Have (M-1) a. How to recognize b. how to get c. How to archive 6,00% 1,18% 2,50% 2,32% 3,60% 0,63% 1,63% 1,35% 4,80% 0,70% 3,13% 0,97% 4,90% 0,88% 2,00% 2,02% 5,63% 1,00% 3,13% 1,50% 4,91% 0,85% 2,40% 1,56% 2. Understanding (M-2) a. understanding of the language b. understanding of substance 15,00% 3,75% 11,25% 13,88% 3,75% 10,13% 14,00% 2,75% 11,25% 13,88% 2,25% 11,63% 11,63% 3,00% 8,63% 13,63% 3,04% 10,59%
  • 7. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -36 3. Applying (M-3) a. physical documents b. executive competence c. data management d. utilization tool e. utilization of materials f. methods of implementation 42,81% 3,24% 10,31% 3,75% 8,88% 9,13% 7,50% 35,56% 3,75% 10,31% 2,50% 7,25% 5,00% 6,75% 31,94% 1,25% 4,68% 2,38% 6,88% 10,00% 6,75% 36,56% 2,49% 4,69% 4,12% 8,88% 9,13% 7,25% 31,56% 2,50% 8,43% 2,50% 5,63% 5,00% 7,50% 35,47% 2,49% 6,30% 2,97% 7,40% 7,31% 7,14% 4. Supervise (M-4) a. achievement uniformity b. Achievement of quality assurance 11,63% 4,13% 7,50% 11,25% 3,75% 7,50% 13,88% 4,38% 9,50% 7,63% 2,63% 5,00% 11,00% 4,00% 7,00% 10,88% 3,73% 7,15% Value Monitoring 75,44% 64,29% 64,61% 62,96% 59,81% 65,22% 5. Evaluating (M-5) a. Portable b. Acceptable c. Applicable d. User Friendly 60,00% 75,00% 77,84% 77,50% 36,00% 69,38% 64,66% 75,00% 48,00% 70,00% 58,07% 92,50% 49,00% 69,38% 66,48% 50,83% 56,25% 58,13% 57,39% 73,33% 49,11% 68,14% 64,49% 72,51% In general, monitoring results in the category of "good enough" with 59.81% which is the lowest in the Procurement Services Unit (ULP) and the highest on the Regional Disaster Management Agency (BPPD) by monitoring the value of 75.44%, followed by the Department of Resources Water Resources (SDA) (62.96%), the Department of Highways (BM) (64.61%), and the Department of Human Settlements (CK) (64.26%). This suggests that the Regional Disaster Management Agency (BPPD) and the Department of Human Settlements (CK) as the central unit in charge of managing the procurement of goods and services had been monitoring the implementation of the procurement documents properly in accordance duties and functions, while the Procurement Services Unit (ULP) better position ourselves as a procurement official controls the extent of the procurement documents may be owned, understood, and applied by field practitioners in the field of consultancy and the procurement of goods / services. Results if the data derived from the logic models show that the level of fairness of the analysis is quite good because it is not much different from the results of the monitoring assessment among stakeholders. Thus it can be said that the level of achievement of the reach of uniformity in the quality assurance of goods / services procurement of emergency in the region of Central Sulawesi and the surrounding areas in both categories Evaluation of the implementation of the procurement documents reviewed in 4 (four) aspects of assessment, namely: (1) portable (2) acceptable (3) applicable and (4) user friendly. Regional Disaster Management Agency (BPPD) and Procurement Services Unit (ULP) assess fairly portable document procurement (respectively above 50.0%, ie 60.0% and 56.25%) due to first get the book printed documents procurement than Department of Human Settlements, Department of Highways and Department of Water Resources. The third unit is more dominant in the technical manuals rather than the procurement documents. In general, the fifth unit is working well enough to understand the language and the technical substance of the procurement documents as acceptable average value is 68.14%, which means that means that the content of the discussion document management easy to learn and understand. Similarly applicable aspects and user friendly. Results of evaluation of these two aspects that are in good enough category, with each average is 64.49% and 72.51%. In general, the results of an evaluation of any aspect of being in good enough category (50.0% - 75.0%) except for portable aspect, which is located in the unfavorable category (25.0% - 50.0%). This indicates that the socialization of the procurement documents (how to identify, acquire, and archive) further improved in all units of the relevant stakeholders management procurement of goods and services based on mitigation, including universities, so that in the future the community created a standard minded procurement of goods and services based mitigation. In addition it should be considered a book procurement uniform documents so as not to give rise to many interpretations that make a gap for abuse of authority. Procurement Monitoring and Evaluation Program system of disaster management. Monitoring and evaluation (M&E) is one activity in one cycle of procurement, management is important to look at the performance of the parties involved in the process of procurement of public goods and services. Monitoring can also be defined as a process of information gathering and analysis (based on the indicators set) basis systematic and continuous program of activities, so that corrective action can be done to further refinement of the program. The process of evaluation of the quality of the procurement of government goods / services if implemented properly can generate useful recommendations to the parties conducting monitoring and evaluation. Monitoring and evaluation (M&E) system procurement disaster countermeasures covering all areas of the county and city in the province of Central Sulawesi, provide feedback for the Consultancy's performance, strategic decision making, and help provide a solution. "This system will create tangible benefits for supporting decision makers. In detail the purpose of e-monitoring and evaluation is: - Make admin agency - View the procurement process plans and disaster management - Update the plan and procurement process for disaster management
  • 8. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -37 From the analysis of information systems in Table 4 we can conclude the necessity of a system program monitoring and evaluation that deal specifically procurement of natural disaster (emergency procurement) by increasing (upgrade) IT facilities that exist in the respective districts, implements warehouse in data integration, implementation of Service Oriented Arcitecture (SOA ) in the process of the integration of existing information systems. TABLE-5. GAP ANALYSIS E-(M & E) AND TARGET ARCHITECTURE (M & E) EMERGENCY PROCUREMENT. E-(M & E) TARGET ARCHITECTURE Not to All Use Standard Database Not Integrated All data have not been in Backup Separate data between central and local Not to use the mobile system Not to Support Service All standardized Integrated Data Base Data Backup Fulfilled Data Warehouse Using a mobile system SOA Fig.5. Information Systems Architecture [15-16]. From Fig 5, the future plans for the process of data sharing is all the data that is stored in a distributed or centralized to be multi-user, the data of each center into a data mart, admin in the respective district or unit of work data is input the data directly as a map of the disaster, budget plans, procurement plans that are integrated with LKPP, LPSE, LPJK, and IBRA. This is to facilitate the development of a data warehouse as a replica of the data that is scattered. V. CONCLUSIONS Monitoring and evaluation (M&E) system and a breakthrough is the development of the manual monitoring system that already exists. Through this system, the expected performance of the goods / services of the government will increase. In particular, monitoring and evaluation system procurement countermeasures disaster in Central Sulawesi, the system was developed to meet the objectives of monitoring and evaluation, such as providing feedback on their performance consultancy, strategic decision-making, and help provide a solution. This system will create tangible benefits for supporting decision makers. e-M & E not only contain information on the implementation of procurement of goods / services of the government alone, but includes the unity of business process. REFERENCES [1]. Abhas K Jha, “Safer Homes, Stronger Communities: A Handbook for Reconstructing after Natural Disasters,Guiding Principles for Monitoring and Evaluation”,As with asThe International Bank for Reconstruction and Development/ The World Bank Washington DC 20433, 2010 [2]. Atkinson C.Land Sapat, AK, After Katrina: ”Comparisons of Post-Disaster Public Procurement Approaches And Outcomes in the New Orleans Area”,Journal of Public Procurement, Volume 12, issue 3, 356-385, 2012 [3]. Schultz. J And Søreide T, ”Corruption In Emergency Procurement”, U4 Anti Corruption Resource Center CHR Michelen Institute. 2006 A dm in S p a ti al LK P P L P S E S ult en g L PJ K B P B N Em on ev R eg ula tio n P ro cur em e nt S er v ice p ro v id er c er tif icat ion s E x p ert s C om p any DataCleaningandIntegration L o ca l M ap D isa ste r D a ta B as e Be n ca n a D o c.P ro cu re m e nt D isa ste r B ud ge t U nit P ric e Applicatons M o ne v D ata W a re H o use D at a M a rtD a ta S o urc es W a re H o us e P ro cum e nt Pua s at d a ta E m erg e nc y P ro cum ent U ser s P u b lic
  • 9. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2763 Issue 08, Volume 3 (August 2016) www.ijirae.com ___________________________________________________________________________________________________ IJIRAE: Impact Factor Value – SJIF: Innospace, Morocco (2015): 3.361 | PIF: 2.469 | Jour Info: 4.085 | Index Copernicus 2014 = 6.57 © 2014- 16, IJIRAE- All Rights Reserved Page -38 [4]. Kalibala S, ”Monitoring and Evaluation of the Emergency Plan Progress (MEEPP”), End-of-Project Evaluation,United States Agency for International Development (USAID)/Uganda under the terms of Contract No. GHH-I- 02-07-00034-00,2010 [5]. Kiage J.O, ”Factors Affecting Procurement Performance: A Case of Ministry of Energy”, International Journal of Business andCommerce Vol. 3, No.1,2013 [6]. Morgan J, G.Bowles and K.Carter, ”Procurement Efficiencies: Monitoring and Evaluation of Devanha Phase 2”,Scottish Government Social Research, 2012 [7]. Morgan S, Fisher S and J.Herrmann, ”Administrative Preparedness: Emergency Procurement Strategies for Health Departments”, the National Association of County and City Health Officials (NACCHO)Washington, DC 20036,2013 [8]. WHO, ” Harmonized monitoring and evaluation indicators for procurement and supply management systems”,World Health Organization Department of HIV/AIDS Avenue Appia 201211Geneva 27 Switzerland, 2011 [9]. Mutava C, ”Impact of Public Procurement Procedures on Delivery of Maintenance Work”s,FIG Congress ,Engaging the Challenges –Enhancing the Relevance Kuala Lumpur, Malaysia,2014 [10]. Mangitung,D.M, ”Taxonomy of Construction Procurement”,Yamiba, Palu,2010 [11]. Querol A.A and Schaefer B, (2013),SEAD ”Guide for Monitoring and Evaluating Green Public Procurement Programs”, eco Institut, Barcelona, 2013 [12]. Nannei C,(2011), ”Monitoring and evaluation framework for the Global Strategy and Plan of Action” ,WHO Department of Public Health, Innovation and Intellectual Property,2011 [13]. UNCDF, (2013), ”Procuremet For Local Development, A Guide to Best Practice in Local Government Procurement in Least developed countries”, UN Capital Development Fund, New York, NY 19917.2013 [14].CPPR,”Monitoring dan Evaluasi Pengadaan Barang dan Jasa”, Universitas Gajah Mada, Yogyakarta,2012 [15]. Zachman JA, 2000, ” Enterprise Architecture: Issues,inhibitors and Incentives”, Data To Knowlodge Newletter, 27(1):11-1,2000 [16]. Supriana Iyan, ”Model Arsitektur Bisnis, Sistem Informasi dan Teknologi di Bakorsustanal Berbasis TOGAF”, Telkomnika, Vol 8 No.1 : 17-24, 2010 [17]. Li Xand Zhang X, ”Emergency Procurement Based on Supply Disruptions: Single-Sourcing or Dual-Sourcing,”The Open Cybernetics & Systemics Journal, 8, 618-622,2014 [18]. Erniati,M.Wihadi Tjaronge, Zulharnah,Ulfa Ria Irfan, ”,Porosity, Pore Size and Compressive Strength of Self Compacting Concrete Using Sea Water”, Volume125,page, 832-837,Procedia Engginering, 2015 [19]. Li Xand Zhang X, ”Manufacturers’Emergency Procurement Strategies under Supply Disruption and Competition Based on Scenario Analysis”,International Journal of uand e Service, Science and Technology Vol.8, No.2, 2015