IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 436
EVALUATION OF PUBLIC PROCUREMENT MECHANISM FOR
SUSTAINABLE DEVELOPMENT IN BANGLADESH
Mohammad Abdul Mannan1
, Zahidul Islam2
1
Department of Electrical & Electronic Engineering, Dhaka University of Engineering & Technology, Gazipur,
mannan489@yahoo.com
2
Department of Anthropology, University of Dhaka
Abstract
Transparency, accountability and efficiency in PPM is the vital requirement for sustainable development of all sectors of a developing
country like Bangladesh. Developing countries utilize huge amount of their national budget in development projects through
procurement of goods, works and services. For sustainable development, proper utilization of this huge amount of national budget
must be ensured through establishing sound (PPM). This paper presents a study in PPM of Bangladesh and corresponding empirical
outcomes with object oriented suggestions for sustainable development. Participant Observation Method, Case Study Method and
Questionnaire techniques are used to collect primary data. Questionnaire comprising of 29 queries is administered among 60
respondents involved in public procurement. Author has been involved in public procurement mechanism, as member (TEC/PEC) and
consultant for the last ten years to study the system as a participant & case study observer. Secondary data is collected from related
books, journals and documents of GoB. Empirical outcomes and object oriented suggestions are obtained through analysis of data.
Final outcomes are evaluated lacks, gaps, problems etc of existing PPM and specific suggestions for sustainable development in
Bangladesh.
Keywords:
Sound PPM: A public procurement mechanism which ensures transparent procurement process, best value for money,
quality and standard of procured goods / works / services, accountability and strongly resist corruptions and misuse of
national budget.
Poor PPM: A PPM which includes opaque procurement process, corruption favoring rules and procedures, fails to
ensure best value for money, transparency and accountability, quality and standard of procured goods/works/services.
--------------------------------------------------------------------***-----------------------------------------------------------------------
1. INTRODUCTION
As a developing country, Bangladesh utilizes approximately
75% of national budget in development projects. This huge
amount of national budget has been used for procurement of
goods, works and services. For sustainable development of
Bangladesh, we should ensure proper utilization of this major
portion of our national budget ie ensure best value for money
through establishing sound PPM. But due to systemic
deficiencies including opaque procurement practices, outdated
procurement rules and procedures, inadequate management
capacity, lack of transparency and accountability mechanisms,
pervasive rent-seeking, corruption, fraudulent/collusive/
coercive practices, dishonesty, lack of morality and ethics etc,
a large sum of money is wasted[2]. This leads not only to
misuse of scarce public resources, domestic & foreign aids,
but also leads to acquisition of poor quality of goods, works
and services [2]. At a more fundamental level, it causes
erosion of public confidence and deterioration of investment
climate i.e. poor PPM is the main barrier in our national
development.
On the other hand, sound SPPM promises significant benefits
for sustainable development in Bangladesh. These include
economy, efficiency and transparency in public procurement
leading to timely and cost effective implementation of
development projects[2]. It has the potential for enhancing
Bangladesh’s aid utilization capacity, creating opportunities
for increasing foreign aids, reducing cost of doing business in
Bangladesh and improving investment climate, for the better
interest of the state as well as the people or mankind. It offers
a promise for developing the capacity of domestic contracting
and consulting industries/firms for entry into the regional and
global markets [2]. To achieve sound PPM, GoB, as a part of
Public Procurement reform activities, developed and
implemented PPR-03 in 2003, PPA-06, PPR-08 and PPR-11.
But expected goal is not yet achieved. Present research was
aimed to conduct a systematic study and evaluation of existing
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 437
public procurement mechanism of GoB and to develop
significant suggestions for sustainable development in
Bangladesh.
2. METHODOLOGY
Participant Observation Method, Case Study Method and
Questionnaire techniques of Survey Method are used to collect
primary data from public bodies like Rural Electrification
Board, Bangladesh Bank, Bangladesh Rice Research Institute,
Dhaka University of Engineering & Technology, Bangladesh
Power Development Board, Security Printing Corporation Ltd,
Telephone Shilpa Songstha etc. As a member of TEC/PEC
and consultant to many engineering projects. Participant
observation and case study methods had been used to know
activities, involvement, and professionalism of prevailing
PPM for the last ten years. Qualitative outcomes, from this
long study are incorporated in construction of questionnaire.
Following steps are followed in construction of questionnaire
[4].
(i) As per definition of the problem to be investigated, data
requirement is fixed. And qualitative outcomes from
case study and participant observation are incorporated.
(ii) Type of questionnaire (closed/open ended) is decided.
(iii) Topics of questionnaire are outlined and questions are
written on three areas; general queries on PPR,
drawbacks of PPM, suggestions for Sustainable
Development in Bangladesh[5].
(iv) Questionnaire are edited for technical defects or bases
that reflect personal values.
(v) Questions are pre-tested to know how well to work.
(vi) After pretest, final edition is made of ensure that the
questionnaire is ready for administration. This includes
a close look at the content, sequence of questions,
appearance and clarity of the procedure for using the
questionnaire.
(vii) Finally the questionnaire is formulated to made it
reliable and valid. To do a satisfactory formulation job,
procedural check lists are considered.
3. QUESTIONNAIRE
Questionnaire technique of survey method is used to collect
primary data from GoB’s procurement sector. Sample random
sampling method is used to select 60 respondents; 40 from
procuring entity and 20 from suppliers/contractors/consultants
engaged in development projects. For limitation of paper size,
questionnaire format comprising of 27 queries; 9 for
assessment of PPR, 9 to find out drawbacks of PPR and 9 for
development of suggestions to establish sound PPM that was
administered on 6 respondents is not presented(available in
ref-1).
4. STATISTICS OF RESPONDENTS
Demographic information and statistics of respondents are
shown below:
1. Code No
2. Category
3. Age
4. Education
5. Religion
6. Marital status
7. Sex
8. Occupation (position)
Table – 1: Age of Respondents
Age structure No of
respondent
Percentage (%)
Age up to 30 years
Age 30 to 35 years
Age 36 to 40 years
Age 41 to 45 years
Age 46 to 50 years
Above 50
5
10
10
15
15
5
8.33
16.67
16.67
25
25
8.33
N 60
Table 1 shows that age group of 41 to 50 predominating public
procurement process.
Table – 2: Education of Respondents
Level of education No of
respondent
Percentage (%)
01
02
03
04
B.Sc. Engg.
degree
M.Sc.
Engg./Ph.D.
Masters
degree
Diploma
Engg./Pass
course
40
10
6
4
66.67
16.67
10
6.66
N 60 100
Table 2 shows that B.Sc. Engineers are major resources
(66.67%) involved in existing PPM.
Table – 3: Religion, Marital status and Sex of Respondents
Religion, Marital status
and Sex
No of
respondent
Percentage (%)
Islam
Others
Married
Unmarried
Male
Female
58
2
59
1
59
1
96.67
3.33
98.33
1.67
98.33
1.67
N 60 100
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 438
Table 3 shows that Muslims, Married & Male officers are
predominating in existing PPM. Number female officer is very
low.
Table – 4: Position of Respondents
Table 4 shows that officers of national grade no 3 have highest
position and grades 2, 4 & 5 have second position.
5. EMPIRICAL OUTCOMES
Empirical outcomes from the questionnaire administered on
selected respondents are presented below: for limitation of
paper size, only outcomes on queries of special importance are
presented below (interested readers on requested read ref 1).
Q-1 Tendering process is influenced by coercive/
collusive /fraudulent practices.
Ans.: yes / no / frequently / rarely
Graphical Representation
So tendering process should be free from coercive/ collusive
/fraudulent practices.
Q.-2 All universities should have sufficient courses (likely
at least 3 courses, each having 3 credits in graduation level) on
education and practices on honesty, morality and professional
ethics. Course contents should be taken from religions and
from life history of famous personnel of the history.
Ans.: Yes / No / Partially
Graphical Representation
Which show that 95% of respondents are completely agreed
with the suggestion of “All university should have sufficient
courses (likely at least 3 courses, each having 3 credits in
graduation level) on education and practices on honesty,
morality and professional ethics. Course contents should be
taken from religions and from life history of famous personnel
of the history”.
Q.-3 As approximately 75% of national budget is utilized
in development projects, and engineers are mainly involved in
development project, all engineering graduation courses
should include a course on Public Procurement Management.
Ans.: Yes / No/ Partially
Graphical Representation
Which show that 95% of respondents are agreed with the
suggestion of “All engineering graduation courses should
include a course on Public Procurement Management”.
Q.-4 All universities, providing engineering graduation,
must ensure educational quality and standard up to
professional level. To achieve such level of standard,
Universities must have co-operation with industries, so that
students can conduct UG/PG research on industry’s need
based projects, that is on real time project not only on
academic projects.
Ans.: Yes / No/ Partially
Graphical Representation
Position Structure No of respondent Percentage (%)
1
2
3
4
5
6
7
8
national scale No. 2
national scale No. 3
national scale No. 4
national scale No. 5
national scale No. 6
national scale No. 7
national scale No. 8
national scale No. 9
10
20
10
10
3
3
2
2
16.67
33.33
16.67
16.67
5.00
5.00
3.33
3.33
N 60 100
Yes
50%
No
10%
Frequently
15%
Rarely
25%
Yes No Partially
Yes, 95
No, 1.67 Partially, 3.33
Series1, 95
Series1, 1.67
Series1, 3.33
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 439
Graph shows that 91.67% of respondents agree with the
suggestion- “All universities, providing Engineering
graduation, must ensure educational quality and standard up to
professional level. To achieve such level of standard,
universities must have co-operation with industries, so that
students can conduct UG/PG research on industry’s need
based projects, that is on real time project not only on
academic projects”.
Q.-5 There should be a realistic procurement plan for each
development project, the procurement plan should be
developed by team works, team members should have
experience on implementation, installation, testing,
commissioning and operation maintenance of such projects.
Ans.: Yes / No/ Partially
Graphical Representation
Graph show that 93.33% of respondents agree with the
suggestion - “There should be a realistic procurement plan for
each development project, the procurement plan should be
developed by team works, and team members should have
experience on implementation, installation, testing,
commissioning and operation / maintenance of such projects”.
Q- 7 Quality and standard of goods, like vehicles,
equipments, machines, plants, devices, systems should be
ensured in 3 stages:
a) Preparing tender documents (TD), specially technical
specification.
b) Tender/proposal evaluation: TEC/PEC should be
formed properly by honest, sincere and professionally skilled
resource and evaluation should be done as per regulation.
Process should be free from political influence.
c) Inspection on delivery, installation, testing,
commissioning and O/M.
Ans.: Yes / No/ Partially
Graphical Representation
Which show that 86.66% of respondents agree with the
suggestion for ensuring quality and standard of goods, like
vehicles, equipments, machines, plans, devices and systems
should be ensured in 3 phases as mentioned above.
6. SUGGESTIONS ON CAPACITY BUILDING
FOR SUSTAINABLE DEVELOPMENT:
As per empirical outcomes following lacks, gaps or problems
of existing PPM are found.
i) There are political pressure and influence on existing
PPM.
ii) Human resources involved in public procurement
have poor education and practices in honesty,
morality and professional ethics.
iii) DPP, TD, PD etc. prepared by PE, are not 100%
proper for ensuring quality and standard of procured
goods, works and services.
iv) External members of the TEC/PEC play poor role on
evaluation of Tenders/ Proposals
v) Tender evaluation is influenced by HOPE/Political
leaders/Development partners.
vi) Tendering process is influenced by coercive/
collusive /fraudulent practices.
vii) Procurement efficiency is poor due to corruption,
improper procurement plan and drawbacks of PPR.
viii) Tenderers / suppliers/ contractors of our country are
not skilled to follow PPR.
To overcome above drawbacks in existing PPM, following
suggestions for sustainable development are supported by the
present study:
a) All universities should have sufficient courses (likely at
least 3 courses, each having 3 credits in graduation
86.66
11.67
1.67
0 20 40 60 80 100
Yes
No
Partially
1.67 5
93.33
0
10
20
30
40
50
60
70
80
90
100
Yes No Partially
3.33 5
91.67
0
10
20
30
40
50
60
70
80
90
100
Yes No Partially
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 440
level) on education and practices on honesty, morality
and professional ethics. Course contents should be
taken from religions and from life history of famous
personnel of the history.
b) As approximately 75% of national budget is utilized in
development projects, and engineers are mainly
involved in development projects, all engineering
graduation courses should include a course on Public
Procurement Management.
c) All universities, providing engineering graduation, must
ensure educational quality and standard up to
professional level. To achieve such level of standard,
universities must have co-operation with industries, so
that students can conduct UG/PG research on
industry’s need based projects, that is on real time
projects not only on academic projects.
d) There should be a realistic procurement plan for each
development project, the procurement plan should be
developed by team-work, team members should have
experience on implementation, installation, testing,
commissioning, operation maintenance of such
projects.
e) Human resources involved in preparation of DPP, TD,
PD etc. should have knowledge, skill and experience
on procurement management, project management,
organizational conflict management, quality
management and implementation of such projects.
F) e-Tendering should be introduced as soon as possible.
CONCLUSIONS
This paper present a part of author’s Ph. D research under
supervision of Professor Dr. Zahidul Islam of the University
of Dhaka. Research title was “Evaluation of Public
Procurement Reforms for Sustainable Development in
Bangladesh”. Research field and findings are very much
interesting and realistic to present situation and should be
followed by the GoB. But as an academic research work and
as per strategic analysis and procedure of the research, there
may have some wrong facts, findings, feelings etc. So
constructive suggestions and criticisms are appreciated
REFERENCES
Sl Author(s) Title Publisher, Edition &
Year
1.
M A
Mannan
Evaluation of
Public
Procurement
Reforms for
Sustainable
Development
in
Bangladesh
Ph. D Thesis,
December-1012 AWU,
California, USA.
2.
CPTU,
IMED
MoP, GoB
Training
Modules
1,2,3,4
“National
Training on
Public
Procurement”
Government of
Bangladesh (GoB)-
2004
3.
CPTU,
IMED
MoP, GoB
The
procedure for
implementati
on of PPR-3
Government of
Bangladesh (GoB)-
2004
4.
David I.
Cleland
et.al
Systems
Analysis and
Project
Management
McGraw-Hill Book
Company
Third Edition-1983
5. E.M. Awad
Systems
Analysis &
Design
Galgotia Publications
(P) Ltd.
Second Edition-2008
6. Grant et.al
Principles of
Engg.
Economy
John Willy and Sons
8th
Edition-1990
7.
Harvey
Maylor
Project
Management
Pearson Education
Third Edition-2000
8. J.A. Barton
Asking the
embarrassing
question
Public opinion
quarterly,-1958
9.
JH Anderson
et.al
Survey
methods in
community
medicine
Edinburg:
Churchil living stone-
1999
Vol-9
10.
Jhon A.
White
et.al
Principles of
Engineering
Economic
Analysis
John Wiley & Sons
Second Edition-1984

More Related Content

Viewers also liked

Copyright protection for images on android phones
Copyright protection for images on android phonesCopyright protection for images on android phones
Copyright protection for images on android phoneseSAT Publishing House
 
An effective adaptive approach for joining data in data
An effective adaptive approach for joining data in dataAn effective adaptive approach for joining data in data
An effective adaptive approach for joining data in dataeSAT Publishing House
 
Transmission of arm based real time ecg for monitoring remotely located patient
Transmission of arm based real time ecg for monitoring remotely located patientTransmission of arm based real time ecg for monitoring remotely located patient
Transmission of arm based real time ecg for monitoring remotely located patienteSAT Publishing House
 
Principal component analysis based approach for fault diagnosis in pneumatic ...
Principal component analysis based approach for fault diagnosis in pneumatic ...Principal component analysis based approach for fault diagnosis in pneumatic ...
Principal component analysis based approach for fault diagnosis in pneumatic ...eSAT Publishing House
 
Numerical study of natural convection in an enclosed
Numerical study of natural convection in an enclosedNumerical study of natural convection in an enclosed
Numerical study of natural convection in an enclosedeSAT Publishing House
 
Detection of crossover & bifurcation points on a retinal fundus image by anal...
Detection of crossover & bifurcation points on a retinal fundus image by anal...Detection of crossover & bifurcation points on a retinal fundus image by anal...
Detection of crossover & bifurcation points on a retinal fundus image by anal...eSAT Publishing House
 
Bearing fault detection using acoustic emission signals analyzed by empirical...
Bearing fault detection using acoustic emission signals analyzed by empirical...Bearing fault detection using acoustic emission signals analyzed by empirical...
Bearing fault detection using acoustic emission signals analyzed by empirical...eSAT Publishing House
 
Implementation of pid control to reduce wobbling in a
Implementation of pid control to reduce wobbling in aImplementation of pid control to reduce wobbling in a
Implementation of pid control to reduce wobbling in aeSAT Publishing House
 
Soft real time auction scheme for task allocation in wireless sensor networks
Soft real time auction scheme for task allocation in wireless sensor networksSoft real time auction scheme for task allocation in wireless sensor networks
Soft real time auction scheme for task allocation in wireless sensor networkseSAT Publishing House
 
An overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemAn overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemeSAT Publishing House
 
Statistical optimization of process parameters for
Statistical optimization of process parameters forStatistical optimization of process parameters for
Statistical optimization of process parameters foreSAT Publishing House
 
Evaluation of the impact of oil spillage on izombe community and their produc...
Evaluation of the impact of oil spillage on izombe community and their produc...Evaluation of the impact of oil spillage on izombe community and their produc...
Evaluation of the impact of oil spillage on izombe community and their produc...eSAT Publishing House
 
Counting of wb cs and rbcs from blood images using gray thresholding
Counting of wb cs and rbcs from blood images using gray thresholdingCounting of wb cs and rbcs from blood images using gray thresholding
Counting of wb cs and rbcs from blood images using gray thresholdingeSAT Publishing House
 
Single sign on mechanism for distributed computing
Single sign on mechanism for distributed computingSingle sign on mechanism for distributed computing
Single sign on mechanism for distributed computingeSAT Publishing House
 
Performance analysis of miso ofdm system with delayed
Performance analysis of miso ofdm system with delayedPerformance analysis of miso ofdm system with delayed
Performance analysis of miso ofdm system with delayedeSAT Publishing House
 
Synthesis, characterization and mechanical behavior
Synthesis, characterization and mechanical behaviorSynthesis, characterization and mechanical behavior
Synthesis, characterization and mechanical behavioreSAT Publishing House
 
Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...eSAT Publishing House
 
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorerVoltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorereSAT Publishing House
 
An area and power efficient on chip communication architectures for image enc...
An area and power efficient on chip communication architectures for image enc...An area and power efficient on chip communication architectures for image enc...
An area and power efficient on chip communication architectures for image enc...eSAT Publishing House
 
Impact analysis of epda and ipda attack with increasing
Impact analysis of epda and ipda attack with increasingImpact analysis of epda and ipda attack with increasing
Impact analysis of epda and ipda attack with increasingeSAT Publishing House
 

Viewers also liked (20)

Copyright protection for images on android phones
Copyright protection for images on android phonesCopyright protection for images on android phones
Copyright protection for images on android phones
 
An effective adaptive approach for joining data in data
An effective adaptive approach for joining data in dataAn effective adaptive approach for joining data in data
An effective adaptive approach for joining data in data
 
Transmission of arm based real time ecg for monitoring remotely located patient
Transmission of arm based real time ecg for monitoring remotely located patientTransmission of arm based real time ecg for monitoring remotely located patient
Transmission of arm based real time ecg for monitoring remotely located patient
 
Principal component analysis based approach for fault diagnosis in pneumatic ...
Principal component analysis based approach for fault diagnosis in pneumatic ...Principal component analysis based approach for fault diagnosis in pneumatic ...
Principal component analysis based approach for fault diagnosis in pneumatic ...
 
Numerical study of natural convection in an enclosed
Numerical study of natural convection in an enclosedNumerical study of natural convection in an enclosed
Numerical study of natural convection in an enclosed
 
Detection of crossover & bifurcation points on a retinal fundus image by anal...
Detection of crossover & bifurcation points on a retinal fundus image by anal...Detection of crossover & bifurcation points on a retinal fundus image by anal...
Detection of crossover & bifurcation points on a retinal fundus image by anal...
 
Bearing fault detection using acoustic emission signals analyzed by empirical...
Bearing fault detection using acoustic emission signals analyzed by empirical...Bearing fault detection using acoustic emission signals analyzed by empirical...
Bearing fault detection using acoustic emission signals analyzed by empirical...
 
Implementation of pid control to reduce wobbling in a
Implementation of pid control to reduce wobbling in aImplementation of pid control to reduce wobbling in a
Implementation of pid control to reduce wobbling in a
 
Soft real time auction scheme for task allocation in wireless sensor networks
Soft real time auction scheme for task allocation in wireless sensor networksSoft real time auction scheme for task allocation in wireless sensor networks
Soft real time auction scheme for task allocation in wireless sensor networks
 
An overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemAn overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring system
 
Statistical optimization of process parameters for
Statistical optimization of process parameters forStatistical optimization of process parameters for
Statistical optimization of process parameters for
 
Evaluation of the impact of oil spillage on izombe community and their produc...
Evaluation of the impact of oil spillage on izombe community and their produc...Evaluation of the impact of oil spillage on izombe community and their produc...
Evaluation of the impact of oil spillage on izombe community and their produc...
 
Counting of wb cs and rbcs from blood images using gray thresholding
Counting of wb cs and rbcs from blood images using gray thresholdingCounting of wb cs and rbcs from blood images using gray thresholding
Counting of wb cs and rbcs from blood images using gray thresholding
 
Single sign on mechanism for distributed computing
Single sign on mechanism for distributed computingSingle sign on mechanism for distributed computing
Single sign on mechanism for distributed computing
 
Performance analysis of miso ofdm system with delayed
Performance analysis of miso ofdm system with delayedPerformance analysis of miso ofdm system with delayed
Performance analysis of miso ofdm system with delayed
 
Synthesis, characterization and mechanical behavior
Synthesis, characterization and mechanical behaviorSynthesis, characterization and mechanical behavior
Synthesis, characterization and mechanical behavior
 
Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...Experimental investigation of thermal performance of petrol engine using fuel...
Experimental investigation of thermal performance of petrol engine using fuel...
 
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorerVoltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
 
An area and power efficient on chip communication architectures for image enc...
An area and power efficient on chip communication architectures for image enc...An area and power efficient on chip communication architectures for image enc...
An area and power efficient on chip communication architectures for image enc...
 
Impact analysis of epda and ipda attack with increasing
Impact analysis of epda and ipda attack with increasingImpact analysis of epda and ipda attack with increasing
Impact analysis of epda and ipda attack with increasing
 

Similar to Evaluation of public procurement mechanism for

MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...
MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...
MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...AM Publications
 
Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...eSAT Journals
 
The construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysiaThe construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysiaeSAT Journals
 
The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,eSAT Publishing House
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...eSAT Journals
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management systemeSAT Publishing House
 
Dataquest cmr e-readiness assessment of indian states 2013 29-august2013
Dataquest cmr e-readiness assessment of indian states 2013 29-august2013Dataquest cmr e-readiness assessment of indian states 2013 29-august2013
Dataquest cmr e-readiness assessment of indian states 2013 29-august2013Cyber Media Research Ltd.
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...eSAT Publishing House
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET Journal
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET Journal
 
project-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDFproject-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDFGurjotSiDhu14
 
project-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDFproject-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDFGurjotSiDhu14
 
Construction industry survey and study the sustainable public procurement
Construction industry survey and study the sustainable public procurementConstruction industry survey and study the sustainable public procurement
Construction industry survey and study the sustainable public procurementeSAT Journals
 
Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015Raja Seevan
 
Procurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projectsProcurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projectseSAT Publishing House
 
Cement report
Cement reportCement report
Cement reportsamrv411
 
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...IRJET Journal
 
The measurement model for outsourcing worker
The measurement model for outsourcing workerThe measurement model for outsourcing worker
The measurement model for outsourcing workereSAT Publishing House
 
The measurement model for outsourcing worker performance by middle and big cl...
The measurement model for outsourcing worker performance by middle and big cl...The measurement model for outsourcing worker performance by middle and big cl...
The measurement model for outsourcing worker performance by middle and big cl...eSAT Journals
 

Similar to Evaluation of public procurement mechanism for (20)

MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...
MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...
MONITORING AND EVALUTION (M&E) MODEL OF PROCUMENT OF GOODS AND SERVICES CONTR...
 
Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...
 
The construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysiaThe construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysia
 
The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management system
 
Dataquest cmr e-readiness assessment of indian states 2013 29-august2013
Dataquest cmr e-readiness assessment of indian states 2013 29-august2013Dataquest cmr e-readiness assessment of indian states 2013 29-august2013
Dataquest cmr e-readiness assessment of indian states 2013 29-august2013
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
 
project-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDFproject-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDF
 
project-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDFproject-report-on-performance-appraisal .PDF
project-report-on-performance-appraisal .PDF
 
Construction industry survey and study the sustainable public procurement
Construction industry survey and study the sustainable public procurementConstruction industry survey and study the sustainable public procurement
Construction industry survey and study the sustainable public procurement
 
Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015Indian CST's GPMS Products Portfolio 2015
Indian CST's GPMS Products Portfolio 2015
 
Procurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projectsProcurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projects
 
Cement report
Cement reportCement report
Cement report
 
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
 
The measurement model for outsourcing worker
The measurement model for outsourcing workerThe measurement model for outsourcing worker
The measurement model for outsourcing worker
 
The measurement model for outsourcing worker performance by middle and big cl...
The measurement model for outsourcing worker performance by middle and big cl...The measurement model for outsourcing worker performance by middle and big cl...
The measurement model for outsourcing worker performance by middle and big cl...
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Evaluation of public procurement mechanism for

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 436 EVALUATION OF PUBLIC PROCUREMENT MECHANISM FOR SUSTAINABLE DEVELOPMENT IN BANGLADESH Mohammad Abdul Mannan1 , Zahidul Islam2 1 Department of Electrical & Electronic Engineering, Dhaka University of Engineering & Technology, Gazipur, mannan489@yahoo.com 2 Department of Anthropology, University of Dhaka Abstract Transparency, accountability and efficiency in PPM is the vital requirement for sustainable development of all sectors of a developing country like Bangladesh. Developing countries utilize huge amount of their national budget in development projects through procurement of goods, works and services. For sustainable development, proper utilization of this huge amount of national budget must be ensured through establishing sound (PPM). This paper presents a study in PPM of Bangladesh and corresponding empirical outcomes with object oriented suggestions for sustainable development. Participant Observation Method, Case Study Method and Questionnaire techniques are used to collect primary data. Questionnaire comprising of 29 queries is administered among 60 respondents involved in public procurement. Author has been involved in public procurement mechanism, as member (TEC/PEC) and consultant for the last ten years to study the system as a participant & case study observer. Secondary data is collected from related books, journals and documents of GoB. Empirical outcomes and object oriented suggestions are obtained through analysis of data. Final outcomes are evaluated lacks, gaps, problems etc of existing PPM and specific suggestions for sustainable development in Bangladesh. Keywords: Sound PPM: A public procurement mechanism which ensures transparent procurement process, best value for money, quality and standard of procured goods / works / services, accountability and strongly resist corruptions and misuse of national budget. Poor PPM: A PPM which includes opaque procurement process, corruption favoring rules and procedures, fails to ensure best value for money, transparency and accountability, quality and standard of procured goods/works/services. --------------------------------------------------------------------***----------------------------------------------------------------------- 1. INTRODUCTION As a developing country, Bangladesh utilizes approximately 75% of national budget in development projects. This huge amount of national budget has been used for procurement of goods, works and services. For sustainable development of Bangladesh, we should ensure proper utilization of this major portion of our national budget ie ensure best value for money through establishing sound PPM. But due to systemic deficiencies including opaque procurement practices, outdated procurement rules and procedures, inadequate management capacity, lack of transparency and accountability mechanisms, pervasive rent-seeking, corruption, fraudulent/collusive/ coercive practices, dishonesty, lack of morality and ethics etc, a large sum of money is wasted[2]. This leads not only to misuse of scarce public resources, domestic & foreign aids, but also leads to acquisition of poor quality of goods, works and services [2]. At a more fundamental level, it causes erosion of public confidence and deterioration of investment climate i.e. poor PPM is the main barrier in our national development. On the other hand, sound SPPM promises significant benefits for sustainable development in Bangladesh. These include economy, efficiency and transparency in public procurement leading to timely and cost effective implementation of development projects[2]. It has the potential for enhancing Bangladesh’s aid utilization capacity, creating opportunities for increasing foreign aids, reducing cost of doing business in Bangladesh and improving investment climate, for the better interest of the state as well as the people or mankind. It offers a promise for developing the capacity of domestic contracting and consulting industries/firms for entry into the regional and global markets [2]. To achieve sound PPM, GoB, as a part of Public Procurement reform activities, developed and implemented PPR-03 in 2003, PPA-06, PPR-08 and PPR-11. But expected goal is not yet achieved. Present research was aimed to conduct a systematic study and evaluation of existing
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 437 public procurement mechanism of GoB and to develop significant suggestions for sustainable development in Bangladesh. 2. METHODOLOGY Participant Observation Method, Case Study Method and Questionnaire techniques of Survey Method are used to collect primary data from public bodies like Rural Electrification Board, Bangladesh Bank, Bangladesh Rice Research Institute, Dhaka University of Engineering & Technology, Bangladesh Power Development Board, Security Printing Corporation Ltd, Telephone Shilpa Songstha etc. As a member of TEC/PEC and consultant to many engineering projects. Participant observation and case study methods had been used to know activities, involvement, and professionalism of prevailing PPM for the last ten years. Qualitative outcomes, from this long study are incorporated in construction of questionnaire. Following steps are followed in construction of questionnaire [4]. (i) As per definition of the problem to be investigated, data requirement is fixed. And qualitative outcomes from case study and participant observation are incorporated. (ii) Type of questionnaire (closed/open ended) is decided. (iii) Topics of questionnaire are outlined and questions are written on three areas; general queries on PPR, drawbacks of PPM, suggestions for Sustainable Development in Bangladesh[5]. (iv) Questionnaire are edited for technical defects or bases that reflect personal values. (v) Questions are pre-tested to know how well to work. (vi) After pretest, final edition is made of ensure that the questionnaire is ready for administration. This includes a close look at the content, sequence of questions, appearance and clarity of the procedure for using the questionnaire. (vii) Finally the questionnaire is formulated to made it reliable and valid. To do a satisfactory formulation job, procedural check lists are considered. 3. QUESTIONNAIRE Questionnaire technique of survey method is used to collect primary data from GoB’s procurement sector. Sample random sampling method is used to select 60 respondents; 40 from procuring entity and 20 from suppliers/contractors/consultants engaged in development projects. For limitation of paper size, questionnaire format comprising of 27 queries; 9 for assessment of PPR, 9 to find out drawbacks of PPR and 9 for development of suggestions to establish sound PPM that was administered on 6 respondents is not presented(available in ref-1). 4. STATISTICS OF RESPONDENTS Demographic information and statistics of respondents are shown below: 1. Code No 2. Category 3. Age 4. Education 5. Religion 6. Marital status 7. Sex 8. Occupation (position) Table – 1: Age of Respondents Age structure No of respondent Percentage (%) Age up to 30 years Age 30 to 35 years Age 36 to 40 years Age 41 to 45 years Age 46 to 50 years Above 50 5 10 10 15 15 5 8.33 16.67 16.67 25 25 8.33 N 60 Table 1 shows that age group of 41 to 50 predominating public procurement process. Table – 2: Education of Respondents Level of education No of respondent Percentage (%) 01 02 03 04 B.Sc. Engg. degree M.Sc. Engg./Ph.D. Masters degree Diploma Engg./Pass course 40 10 6 4 66.67 16.67 10 6.66 N 60 100 Table 2 shows that B.Sc. Engineers are major resources (66.67%) involved in existing PPM. Table – 3: Religion, Marital status and Sex of Respondents Religion, Marital status and Sex No of respondent Percentage (%) Islam Others Married Unmarried Male Female 58 2 59 1 59 1 96.67 3.33 98.33 1.67 98.33 1.67 N 60 100
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 438 Table 3 shows that Muslims, Married & Male officers are predominating in existing PPM. Number female officer is very low. Table – 4: Position of Respondents Table 4 shows that officers of national grade no 3 have highest position and grades 2, 4 & 5 have second position. 5. EMPIRICAL OUTCOMES Empirical outcomes from the questionnaire administered on selected respondents are presented below: for limitation of paper size, only outcomes on queries of special importance are presented below (interested readers on requested read ref 1). Q-1 Tendering process is influenced by coercive/ collusive /fraudulent practices. Ans.: yes / no / frequently / rarely Graphical Representation So tendering process should be free from coercive/ collusive /fraudulent practices. Q.-2 All universities should have sufficient courses (likely at least 3 courses, each having 3 credits in graduation level) on education and practices on honesty, morality and professional ethics. Course contents should be taken from religions and from life history of famous personnel of the history. Ans.: Yes / No / Partially Graphical Representation Which show that 95% of respondents are completely agreed with the suggestion of “All university should have sufficient courses (likely at least 3 courses, each having 3 credits in graduation level) on education and practices on honesty, morality and professional ethics. Course contents should be taken from religions and from life history of famous personnel of the history”. Q.-3 As approximately 75% of national budget is utilized in development projects, and engineers are mainly involved in development project, all engineering graduation courses should include a course on Public Procurement Management. Ans.: Yes / No/ Partially Graphical Representation Which show that 95% of respondents are agreed with the suggestion of “All engineering graduation courses should include a course on Public Procurement Management”. Q.-4 All universities, providing engineering graduation, must ensure educational quality and standard up to professional level. To achieve such level of standard, Universities must have co-operation with industries, so that students can conduct UG/PG research on industry’s need based projects, that is on real time project not only on academic projects. Ans.: Yes / No/ Partially Graphical Representation Position Structure No of respondent Percentage (%) 1 2 3 4 5 6 7 8 national scale No. 2 national scale No. 3 national scale No. 4 national scale No. 5 national scale No. 6 national scale No. 7 national scale No. 8 national scale No. 9 10 20 10 10 3 3 2 2 16.67 33.33 16.67 16.67 5.00 5.00 3.33 3.33 N 60 100 Yes 50% No 10% Frequently 15% Rarely 25% Yes No Partially Yes, 95 No, 1.67 Partially, 3.33 Series1, 95 Series1, 1.67 Series1, 3.33
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 439 Graph shows that 91.67% of respondents agree with the suggestion- “All universities, providing Engineering graduation, must ensure educational quality and standard up to professional level. To achieve such level of standard, universities must have co-operation with industries, so that students can conduct UG/PG research on industry’s need based projects, that is on real time project not only on academic projects”. Q.-5 There should be a realistic procurement plan for each development project, the procurement plan should be developed by team works, team members should have experience on implementation, installation, testing, commissioning and operation maintenance of such projects. Ans.: Yes / No/ Partially Graphical Representation Graph show that 93.33% of respondents agree with the suggestion - “There should be a realistic procurement plan for each development project, the procurement plan should be developed by team works, and team members should have experience on implementation, installation, testing, commissioning and operation / maintenance of such projects”. Q- 7 Quality and standard of goods, like vehicles, equipments, machines, plants, devices, systems should be ensured in 3 stages: a) Preparing tender documents (TD), specially technical specification. b) Tender/proposal evaluation: TEC/PEC should be formed properly by honest, sincere and professionally skilled resource and evaluation should be done as per regulation. Process should be free from political influence. c) Inspection on delivery, installation, testing, commissioning and O/M. Ans.: Yes / No/ Partially Graphical Representation Which show that 86.66% of respondents agree with the suggestion for ensuring quality and standard of goods, like vehicles, equipments, machines, plans, devices and systems should be ensured in 3 phases as mentioned above. 6. SUGGESTIONS ON CAPACITY BUILDING FOR SUSTAINABLE DEVELOPMENT: As per empirical outcomes following lacks, gaps or problems of existing PPM are found. i) There are political pressure and influence on existing PPM. ii) Human resources involved in public procurement have poor education and practices in honesty, morality and professional ethics. iii) DPP, TD, PD etc. prepared by PE, are not 100% proper for ensuring quality and standard of procured goods, works and services. iv) External members of the TEC/PEC play poor role on evaluation of Tenders/ Proposals v) Tender evaluation is influenced by HOPE/Political leaders/Development partners. vi) Tendering process is influenced by coercive/ collusive /fraudulent practices. vii) Procurement efficiency is poor due to corruption, improper procurement plan and drawbacks of PPR. viii) Tenderers / suppliers/ contractors of our country are not skilled to follow PPR. To overcome above drawbacks in existing PPM, following suggestions for sustainable development are supported by the present study: a) All universities should have sufficient courses (likely at least 3 courses, each having 3 credits in graduation 86.66 11.67 1.67 0 20 40 60 80 100 Yes No Partially 1.67 5 93.33 0 10 20 30 40 50 60 70 80 90 100 Yes No Partially 3.33 5 91.67 0 10 20 30 40 50 60 70 80 90 100 Yes No Partially
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 09 | Sep-2013, Available @ http://www.ijret.org 440 level) on education and practices on honesty, morality and professional ethics. Course contents should be taken from religions and from life history of famous personnel of the history. b) As approximately 75% of national budget is utilized in development projects, and engineers are mainly involved in development projects, all engineering graduation courses should include a course on Public Procurement Management. c) All universities, providing engineering graduation, must ensure educational quality and standard up to professional level. To achieve such level of standard, universities must have co-operation with industries, so that students can conduct UG/PG research on industry’s need based projects, that is on real time projects not only on academic projects. d) There should be a realistic procurement plan for each development project, the procurement plan should be developed by team-work, team members should have experience on implementation, installation, testing, commissioning, operation maintenance of such projects. e) Human resources involved in preparation of DPP, TD, PD etc. should have knowledge, skill and experience on procurement management, project management, organizational conflict management, quality management and implementation of such projects. F) e-Tendering should be introduced as soon as possible. CONCLUSIONS This paper present a part of author’s Ph. D research under supervision of Professor Dr. Zahidul Islam of the University of Dhaka. Research title was “Evaluation of Public Procurement Reforms for Sustainable Development in Bangladesh”. Research field and findings are very much interesting and realistic to present situation and should be followed by the GoB. But as an academic research work and as per strategic analysis and procedure of the research, there may have some wrong facts, findings, feelings etc. So constructive suggestions and criticisms are appreciated REFERENCES Sl Author(s) Title Publisher, Edition & Year 1. M A Mannan Evaluation of Public Procurement Reforms for Sustainable Development in Bangladesh Ph. D Thesis, December-1012 AWU, California, USA. 2. CPTU, IMED MoP, GoB Training Modules 1,2,3,4 “National Training on Public Procurement” Government of Bangladesh (GoB)- 2004 3. CPTU, IMED MoP, GoB The procedure for implementati on of PPR-3 Government of Bangladesh (GoB)- 2004 4. David I. Cleland et.al Systems Analysis and Project Management McGraw-Hill Book Company Third Edition-1983 5. E.M. Awad Systems Analysis & Design Galgotia Publications (P) Ltd. Second Edition-2008 6. Grant et.al Principles of Engg. Economy John Willy and Sons 8th Edition-1990 7. Harvey Maylor Project Management Pearson Education Third Edition-2000 8. J.A. Barton Asking the embarrassing question Public opinion quarterly,-1958 9. JH Anderson et.al Survey methods in community medicine Edinburg: Churchil living stone- 1999 Vol-9 10. Jhon A. White et.al Principles of Engineering Economic Analysis John Wiley & Sons Second Edition-1984