SlideShare a Scribd company logo
MOHD ASIF ANSARI
Phone : +91-8433584020, +91-9169023627
Email : asif007me@gmail.com
Skype id /Username : ansariasif007
CURRICULAM-VITAE
Applying For The post Of ELECTRICAL ENGINEER
CAREER OBJECTIVE :
To work in a challenging environment demanding all my skills and efforts to
explore and adapt myself in professional fields, and realize my potential and
contribute to the development of organization with impressive performance.
PERSONAL DETAILS :
NAME : MOHAMMAD ASIF ANSARI
FATHER NAME : MOHAMMAD KALAMUDDIN ANSARI
DATE & PLACE OF BIRTH : 02. 02. 1992 , BARABANKI , U.P.
NATIONALITY / RELIGION : INDIAN / ISLAM
MARITAL STATUS : UNMARRIED
LANGUAGES KNOWN : HINDI, URDU & ENGLISH
PERMANENT ADDRESS : DR. ANSARI , OPP. HANFIA MASJID, NEAR
PIONEER INTER COLLEGE, LAKHPERA BAGH ,
COLONY, BARABANKI , U. P.-225001.
MOBILE : +91-9044452479 ,+91-9169023627
ACADEMIC QUALIFICATION:
COURSE COLLEGE / UNIVERSITY YEAR OF
PASSING
PERCENTAGE
B.tech
(Electrical
Engineering)
NATIONAL INSTITUTE OF
TECHNOLOGY , AGARTALA 2015 72
XIIth
(U.P BOARD)
PIONEER MONTESSORI INTER
COLLEGE,BARABANKI
2009 79
Xth
(U.P BOARD)
ANAND VIHAR CONVENT
INTER COLLEGE,BARABANKI
2007 77
PASSPORT DETAILS :
PASSPORT NO. : K – 1289435
PLACE OF ISSUE : LUCKNOW
DATE OF ISSUE : 20.09.2011
DATE OF EXPIRY : 19.09.2021
TECHNICAL SKILLS :
• Software Known : MATLAB
• Languages : BASIC C
• Packages : Ms-Office (Word/Power Point/Excel)
• Operating system : Windows 7/8
WORKSHOPS AND TECHNICAL VISITS:
• Attended Summer training Programme with INDIAN OIL CORPORATION
LIMITED , Barauni Oil Refinery , Begusarai (duration-30days) .
• Attended The Workshop On AERO-MODELLING held in NIT Agartala.
PROJECT UNDERTAKEN :
TITLE : Enhancement Of Power Quality Using D-STATCOM.
STUDIED : Introduction, Power Quality, D-STATCOM, Simulation
AREA OF INTEREST :
• Power System(Transmission And Distribution)
• Electric Machine (Transformer ,Synchronous Machine ,Induction Machine)
• Control system And Measurment
QUALITATIVE ANALYSIS :
Excellent problem solving skills ; Adaptable in new environment ; Interest in
learning new things ; Capable to work in team or independently ;
Responsible and sincere in attitude.
WORKING EXPERIENCE :
Working As An ELECTRICAL ENGINEER from June 2015 in LARSEN &
TOUBRO ( Bandra (East),MUMBAI)
NATURE OF JOB :
• Installation, Termination & Maintenance of Electrical Panel, Motors, Generators,
Transformer & UPS as well as Control and Distribution apparatus such as switches,
Relays and Circuit-Breaker Panels.
• Installation of PCC & MCC Panel, Glanding & Termination of panel.
• Installation, Termination & Maintenance Of fiber optic cable, splicing, Data
Telephone Cable, Access Control systems, Building management systems (BMS)
Read High Voltage, Low Voltage and Low Current Building Constructions
Drawing.
• To Execute Various Electrical Work Concerning Cable Laying (Underground)
Glanding , Ferruling, Termination As Per Drawing.
• Fabrication & Installation of Different types of Cable Tray, PVC & G.I. Conduits.
• Installation of Earthing Pit & Testing of Earth Resistance by using "Earth Resistance
Tester"
• Installation of electrical Equipments, Cable Tray, Duct work, Panel shifting, Cable
Laying and Termination.
• Installation and Termination of building Lighting and Socket system as like different
type of Power & Lighting Supervision.
• Glanding & Termination of MCC, PCC Panel, Motor and all types of lighting etc.
• Lighting cable pulling, Glanding & termination of all types of light.
• Cable laying, dressing, Cable Glanding and Termination in instrument junction
Box, Motors and Panels.
• Cable meggaring and continuity checking.
• Supervision & co-ordination of all electrical supervision.
• Operate in-accordance with the requirements of the safety, health and environment
policy .
• To be fully aware of the quality standard requirement of the company, preparing
work orders etc.
DATE : 21-06-2016
PLACE : MUMBAI MOHD ASIF ANSARI
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari
Mohd asif ansari

More Related Content

What's hot

REPORT BY AJIT
REPORT BY AJITREPORT BY AJIT
REPORT BY AJITAJIT DADA
 
MKY CV
MKY CVMKY CV
MKY CVKY Mah
 
Cv omar baharum
Cv omar baharumCv omar baharum
Cv omar baharumomskiii
 
Crestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price Location
Crestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price LocationCrestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price Location
Crestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price LocationProperty Gyaan
 
Raul Sanchez Resume updated 8-13
Raul Sanchez Resume updated 8-13Raul Sanchez Resume updated 8-13
Raul Sanchez Resume updated 8-13Raul Sanchez
 
SURAJIT DAS CV -PDF
SURAJIT DAS CV  -PDFSURAJIT DAS CV  -PDF
SURAJIT DAS CV -PDFSURAJIT DAS
 

What's hot (9)

REPORT BY AJIT
REPORT BY AJITREPORT BY AJIT
REPORT BY AJIT
 
Roelyn b
Roelyn bRoelyn b
Roelyn b
 
MKY CV
MKY CVMKY CV
MKY CV
 
Cv omar baharum
Cv omar baharumCv omar baharum
Cv omar baharum
 
sara[1]
sara[1]sara[1]
sara[1]
 
Crestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price Location
Crestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price LocationCrestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price Location
Crestwood Apartments Neumec Group Presents 1 BHK Flats for sale Price Location
 
Raul Sanchez Resume updated 8-13
Raul Sanchez Resume updated 8-13Raul Sanchez Resume updated 8-13
Raul Sanchez Resume updated 8-13
 
SURAJIT DAS CV -PDF
SURAJIT DAS CV  -PDFSURAJIT DAS CV  -PDF
SURAJIT DAS CV -PDF
 
8445551559
84455515598445551559
8445551559
 

Viewers also liked

Appendix b structural steel design based on allowable stress
Appendix  b structural steel design based on allowable stressAppendix  b structural steel design based on allowable stress
Appendix b structural steel design based on allowable stressChhay Teng
 
UX:UI at Officeworks_Jo Wittman
UX:UI at Officeworks_Jo WittmanUX:UI at Officeworks_Jo Wittman
UX:UI at Officeworks_Jo WittmanJoanna Wittman
 
Intergrating facebook into your business part 1
Intergrating facebook into your business part 1Intergrating facebook into your business part 1
Intergrating facebook into your business part 1John Choy
 
Matrix formulation of truss analysis
Matrix formulation of truss analysisMatrix formulation of truss analysis
Matrix formulation of truss analysisChhay Teng
 
Федеральный Семинар Битрикс, Владимир Писков
Федеральный Семинар Битрикс, Владимир ПисковФедеральный Семинар Битрикс, Владимир Писков
Федеральный Семинар Битрикс, Владимир Писковvpiskov
 
2012-03-13 經工字第10102603850號
2012-03-13 經工字第10102603850號2012-03-13 經工字第10102603850號
2012-03-13 經工字第10102603850號顥中 王
 
tutorial pembuatan modul
tutorial pembuatan modultutorial pembuatan modul
tutorial pembuatan modulRizal55
 
wünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeit
wünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeitwünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeit
wünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeitwuenschdirwas
 

Viewers also liked (13)

Appendix b structural steel design based on allowable stress
Appendix  b structural steel design based on allowable stressAppendix  b structural steel design based on allowable stress
Appendix b structural steel design based on allowable stress
 
UX:UI at Officeworks_Jo Wittman
UX:UI at Officeworks_Jo WittmanUX:UI at Officeworks_Jo Wittman
UX:UI at Officeworks_Jo Wittman
 
Intergrating facebook into your business part 1
Intergrating facebook into your business part 1Intergrating facebook into your business part 1
Intergrating facebook into your business part 1
 
Matrix formulation of truss analysis
Matrix formulation of truss analysisMatrix formulation of truss analysis
Matrix formulation of truss analysis
 
Imagen de laboratorio 3
Imagen de laboratorio 3Imagen de laboratorio 3
Imagen de laboratorio 3
 
Федеральный Семинар Битрикс, Владимир Писков
Федеральный Семинар Битрикс, Владимир ПисковФедеральный Семинар Битрикс, Владимир Писков
Федеральный Семинар Битрикс, Владимир Писков
 
2012-03-13 經工字第10102603850號
2012-03-13 經工字第10102603850號2012-03-13 經工字第10102603850號
2012-03-13 經工字第10102603850號
 
OptiPlex Overview
OptiPlex OverviewOptiPlex Overview
OptiPlex Overview
 
DANISH KHAN.doc1
DANISH KHAN.doc1DANISH KHAN.doc1
DANISH KHAN.doc1
 
tutorial pembuatan modul
tutorial pembuatan modultutorial pembuatan modul
tutorial pembuatan modul
 
Value engineerinG
Value engineerinGValue engineerinG
Value engineerinG
 
Hidrostática
HidrostáticaHidrostática
Hidrostática
 
wünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeit
wünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeitwünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeit
wünschdirwas – Ein Rückblick auf 24 Jahre Vereinsarbeit
 

Similar to Mohd asif ansari

shimul_c.v_2_NEW 1
shimul_c.v_2_NEW 1shimul_c.v_2_NEW 1
shimul_c.v_2_NEW 1shimul das
 
shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul das
 
Subodh,Resume updtd
Subodh,Resume updtdSubodh,Resume updtd
Subodh,Resume updtdSubodh Swain
 
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...anas pareed
 
Jaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CLJaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CLJaz Morton
 
CURRICULUM VITAE for Eelctrical Engineer
CURRICULUM VITAE for Eelctrical EngineerCURRICULUM VITAE for Eelctrical Engineer
CURRICULUM VITAE for Eelctrical EngineerNasir Khan
 
Samar khan resume (1)
Samar khan resume (1)Samar khan resume (1)
Samar khan resume (1)Samar Khan
 
EHV 765/400kv Substation Executive Engineer
EHV 765/400kv Substation Executive EngineerEHV 765/400kv Substation Executive Engineer
EHV 765/400kv Substation Executive EngineerChandra Mohan
 

Similar to Mohd asif ansari (20)

shimul_c.v_2_NEW 1
shimul_c.v_2_NEW 1shimul_c.v_2_NEW 1
shimul_c.v_2_NEW 1
 
Manager c.v sajjad
Manager c.v sajjadManager c.v sajjad
Manager c.v sajjad
 
shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1
 
Subodh,Resume updtd
Subodh,Resume updtdSubodh,Resume updtd
Subodh,Resume updtd
 
MOHUBU CV2015
MOHUBU CV2015MOHUBU CV2015
MOHUBU CV2015
 
CV LASFORD
CV LASFORDCV LASFORD
CV LASFORD
 
Saqib cv
Saqib cvSaqib cv
Saqib cv
 
danish resume
danish resumedanish resume
danish resume
 
mohd shahbaz elec tech
mohd shahbaz elec techmohd shahbaz elec tech
mohd shahbaz elec tech
 
Resume -naushad
Resume -naushadResume -naushad
Resume -naushad
 
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
 
cv usman latif.
cv usman latif.cv usman latif.
cv usman latif.
 
Riyaz cv 2015 -2.DOC
Riyaz   cv 2015 -2.DOCRiyaz   cv 2015 -2.DOC
Riyaz cv 2015 -2.DOC
 
Jaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CLJaz Morton Electrical CV + CL
Jaz Morton Electrical CV + CL
 
Anthony Hansungule Jempa ed
Anthony Hansungule Jempa edAnthony Hansungule Jempa ed
Anthony Hansungule Jempa ed
 
CURRICULUM VITAE for Eelctrical Engineer
CURRICULUM VITAE for Eelctrical EngineerCURRICULUM VITAE for Eelctrical Engineer
CURRICULUM VITAE for Eelctrical Engineer
 
Samar khan resume (1)
Samar khan resume (1)Samar khan resume (1)
Samar khan resume (1)
 
Resume Chandramohan
Resume ChandramohanResume Chandramohan
Resume Chandramohan
 
EHV 765/400kv Substation Executive Engineer
EHV 765/400kv Substation Executive EngineerEHV 765/400kv Substation Executive Engineer
EHV 765/400kv Substation Executive Engineer
 
Sant
SantSant
Sant
 

Recently uploaded

fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfNurvisNavarroSanchez
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptssuser9bd3ba
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdfKamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxViniHema
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 

Recently uploaded (20)

fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 

Mohd asif ansari

  • 1. MOHD ASIF ANSARI Phone : +91-8433584020, +91-9169023627 Email : asif007me@gmail.com Skype id /Username : ansariasif007 CURRICULAM-VITAE Applying For The post Of ELECTRICAL ENGINEER CAREER OBJECTIVE : To work in a challenging environment demanding all my skills and efforts to explore and adapt myself in professional fields, and realize my potential and contribute to the development of organization with impressive performance. PERSONAL DETAILS : NAME : MOHAMMAD ASIF ANSARI FATHER NAME : MOHAMMAD KALAMUDDIN ANSARI DATE & PLACE OF BIRTH : 02. 02. 1992 , BARABANKI , U.P. NATIONALITY / RELIGION : INDIAN / ISLAM MARITAL STATUS : UNMARRIED LANGUAGES KNOWN : HINDI, URDU & ENGLISH PERMANENT ADDRESS : DR. ANSARI , OPP. HANFIA MASJID, NEAR PIONEER INTER COLLEGE, LAKHPERA BAGH , COLONY, BARABANKI , U. P.-225001. MOBILE : +91-9044452479 ,+91-9169023627
  • 2. ACADEMIC QUALIFICATION: COURSE COLLEGE / UNIVERSITY YEAR OF PASSING PERCENTAGE B.tech (Electrical Engineering) NATIONAL INSTITUTE OF TECHNOLOGY , AGARTALA 2015 72 XIIth (U.P BOARD) PIONEER MONTESSORI INTER COLLEGE,BARABANKI 2009 79 Xth (U.P BOARD) ANAND VIHAR CONVENT INTER COLLEGE,BARABANKI 2007 77 PASSPORT DETAILS : PASSPORT NO. : K – 1289435 PLACE OF ISSUE : LUCKNOW DATE OF ISSUE : 20.09.2011 DATE OF EXPIRY : 19.09.2021 TECHNICAL SKILLS : • Software Known : MATLAB • Languages : BASIC C • Packages : Ms-Office (Word/Power Point/Excel) • Operating system : Windows 7/8 WORKSHOPS AND TECHNICAL VISITS: • Attended Summer training Programme with INDIAN OIL CORPORATION LIMITED , Barauni Oil Refinery , Begusarai (duration-30days) . • Attended The Workshop On AERO-MODELLING held in NIT Agartala. PROJECT UNDERTAKEN : TITLE : Enhancement Of Power Quality Using D-STATCOM. STUDIED : Introduction, Power Quality, D-STATCOM, Simulation AREA OF INTEREST : • Power System(Transmission And Distribution) • Electric Machine (Transformer ,Synchronous Machine ,Induction Machine) • Control system And Measurment
  • 3. QUALITATIVE ANALYSIS : Excellent problem solving skills ; Adaptable in new environment ; Interest in learning new things ; Capable to work in team or independently ; Responsible and sincere in attitude. WORKING EXPERIENCE : Working As An ELECTRICAL ENGINEER from June 2015 in LARSEN & TOUBRO ( Bandra (East),MUMBAI) NATURE OF JOB : • Installation, Termination & Maintenance of Electrical Panel, Motors, Generators, Transformer & UPS as well as Control and Distribution apparatus such as switches, Relays and Circuit-Breaker Panels. • Installation of PCC & MCC Panel, Glanding & Termination of panel. • Installation, Termination & Maintenance Of fiber optic cable, splicing, Data Telephone Cable, Access Control systems, Building management systems (BMS) Read High Voltage, Low Voltage and Low Current Building Constructions Drawing. • To Execute Various Electrical Work Concerning Cable Laying (Underground) Glanding , Ferruling, Termination As Per Drawing. • Fabrication & Installation of Different types of Cable Tray, PVC & G.I. Conduits. • Installation of Earthing Pit & Testing of Earth Resistance by using "Earth Resistance Tester" • Installation of electrical Equipments, Cable Tray, Duct work, Panel shifting, Cable Laying and Termination. • Installation and Termination of building Lighting and Socket system as like different type of Power & Lighting Supervision. • Glanding & Termination of MCC, PCC Panel, Motor and all types of lighting etc. • Lighting cable pulling, Glanding & termination of all types of light. • Cable laying, dressing, Cable Glanding and Termination in instrument junction Box, Motors and Panels. • Cable meggaring and continuity checking. • Supervision & co-ordination of all electrical supervision. • Operate in-accordance with the requirements of the safety, health and environment policy . • To be fully aware of the quality standard requirement of the company, preparing work orders etc. DATE : 21-06-2016 PLACE : MUMBAI MOHD ASIF ANSARI