Modern Duration 24 days
Earth Loading Calculations
General Information
Start Location: Wachusett Dam
End Location: 150 West Boylston St. Clinton, MA
Distance (miles): 2.5
Time(min round trip): 12
Dump Time 2
Amount of soil (cy): 43000
Modern Equipment: 1 Large Excavator
6 20 CY Dump Truck
Modern Duration: 11 Days
Equipment To Load Front Dump Bottom Dump
Equipment S. Excavator M. Excavator L. Excavator S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel
Cycles (cycles/hr) 250.00 200.00 150.00 170.00 160.00 135.00 190 180 150
Swing Depth Factor 1.33 1.33 1.33 1.16 1.16 1.16 1.16 1.16 1.16
Heaped Bucket Volume (LCY) 1.00 2.00 3.00 5.00 7.50 10.00 5.00 7.50 10.00
Bucket Fill Volume (cy) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Job Efficiency 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83
Productivity (LCY/hr) 277.08 443.33 498.75 821.67 1160.00 1305.00 918.33 1305.00 1450.00
Productivity (LCY/min) 4.62 7.39 8.31 13.69 19.33 21.75 15.31 21.75 24.17
Equipment To Haul One Ton Dump Truck Triaxle Dump Truck Trailer Dump Truck
Dump Truck Capacity 1.00 3.00 8.00 10.00 16.00 20.00 26.00
Total travel Time (min) 14.00 14.00 14.00 14.00 14.00 14.00 14.00
Time(min) for 1 load 0.12 0.36 0.96 1.20 1.92 2.41 3.13
Time Left After 2nd Load 13.88 13.64 13.04 12.80 12.08 11.59 10.87
Time Left After 3rd Load 13.76 13.28 12.08 11.59 10.15 9.19 7.74
Time Left After 4th Load 13.64 12.92 11.11 10.39 8.23 6.78 4.62
Time Left After 5th Load 13.52 12.56 10.15 9.19 6.30 4.38 1.49
Time Left After 6th Load 13.40 12.20 9.19 7.98 4.38 1.97 -1.64
Equipment To Load and Haul
Large Excavator Qty 1.00 2.00 3.00 4.00
20 CY Dump Truck Qty 6.00 12.00 18.00 24.00
Productivity (LCY/hr) 498.75 997.50 1496.25 1995.00
Productivity (LCY/day) 3990.00 7980.00 11970.00 15960.00
Duration To Complete 10.78 5.39 3.59 2.69
Rock Loading Calculations
General Information
Start Location: Wachusett Dam
End Location: 399 MA-62 Clinton, MA
Distance (miles): 0.6
Time(min round trip): 4
Amount of soil (cy): 24,370
Modern Equipment: 1 Large Excavator
2 16 CY Dump Truck
Modern Duration: 13 Days
Equipment To Load Front Dump Bottom Dump
Equipment S. Excavator M. Excavator L. Excavator S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel
Cycles (cycles/hr) 250.00 200.00 150.00 170.00 160.00 135.00 190 180 150
Swing Depth Factor 1.33 1.33 1.33 1.16 1.16 1.16 1.16 1.16 1.16
Heaped Bucket Volume (LCY) 1.00 2.00 3.00 5.00 7.50 10.00 5.00 7.50 10.00
Bucket Fill Volume (cy) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Job Efficiency 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83
Productivity (LCY/hr) 138.54 221.67 249.38 410.83 580.00 652.50 459.17 652.50 725.00
Productivity (LCY/min) 2.31 3.69 4.16 6.85 9.67 10.88 7.65 10.88 12.08
Equipment To Haul One Ton Dump Truck Triaxle Dump Truck Trailer Dump Truck
Dump Truck Capacity 1.00 3.00 8.00 10.00 16.00 20.00 26.00
Travel Time (min) 6.00 6.00 6.00 6.00 6.00 6.00 6.00
Time(min) for 1 load 0.24 0.72 1.92 2.41 3.85 4.81 6.26
Equipment To Load and Haul
Large Excavator Qty 1.00 2.00 3.00 4.00
16 CY Dump Truck Qty 2.00 1.00 1.00 1.00
Productivity (LCY/hr) 249.38 498.75 748.13 997.50
Productivity (LCY/day) 1995.00 3990.00 5985.00 7980.00
Duration To Complete 12.22 6.11 4.07 3.05
Stripping the Quarry Quarry Size without Path
Location 150 Boylston Rd acre yard2 volume
Quarry Size(acres) 4.45 OR 21538 yard2 2.22 10744.8 3581.6
Trees/Acre 50
Total Trees 222.5 Volume for path
Volume to Strip 7179.33333333333cy 3597.73333333333cy
Modern Duration: 7.6 days
DEFORESTATION STRIPPING AND HAULING FOR QUARRY BLASTING AND SEPERATING
Harvester Total Equipment Needed 3 CY Excavator Total Equipment Needed Hydraulic Drill Total Equipment Needed
Trees cut/min 1.29 min 1 Harvester Cycles (cycles/hr) 150.00 2 3CY Excavator Drill Diameter 6 1 Hydraulic Drill
Total Time min 287.025 min 1 Forwarder Swing Depth Factor 1.33 7 20CY Dump Trucks Drill Depth 11 38 Explosives
Total Time hrs 4.78 hrs 24.9 4 Axle Truck Heaped Bucket Volume (LCY) 3.00 Total Time Drill ft/hr 52.5 1 10CY Hydraulic Bucket
1 40' Trailer Truck Bucket Fill Volume (cy) 1.00 1.3 Days Drills/hr 5 1 Flatbed
Forwarder Total Time Job Efficiency 0.83 rounding up Drills per day 38 Total Time
Trees to bunch 222.5 trees 14.51 hrs Productivity (LCY/hr) 498.75 1.5 Days Total Time (days) 1 2.5 Days
Time per tree 1.29 min equal to: Productivity (LCY/min) 8.31 Explosives Rounding Up
Time to load truck 12 min 2 Day Productivity (LCY/day) 3990.00 Total needed 38 3 Days
Total Time 4.78 hrs Total Strip Time (hr) 7 Time (days) 0.125
Strip Time with 2 excavators (hr) 4
Strip Time with 2 excavators (day) 0.4 Amt. of rocks 7179.3
4 Axle Log Truck Large 5456.3
Capacity 80,000 lbs Each Large 2.3
Tree min weight 1500 lbs 20 CY Dump Truck Total Large 2372.3
Tree Max weight 16420 lbs Time to Fill 1 Truck 2.41 min Spalls 1723.0
Avg Tree Weight 8960 lbs Round Trip Time 16 min Large Hydraulic Bucket 10CY
Total Tree Weight 1993600 lbs Trucks to fill during trip 6.0 trucks Cycles (cycles/hr) 135.00
Tree Amt on Truck 9 trees Time To Clear 1 days Swing Depth Factor 1.16
Trucks needed 24.9 trucks Heaped Bucket Volume (LCY) 10.00
STRIPPING AND HAULING QUARRY PATH Bucket Fill Volume (cy) 0.50
48' Trailer Truck 3 CY Excavator Total Equipment Needed Job Efficiency 0.83
Truck Capacity 3465 ft3 Cycles (cycles/hr) 150.00 1 3CY Excavator Productivity (LCY/hr) 652.50
Avg Volume/Tree 13.4 ft3 Swing Depth Factor 1.33 7 20CY Dump Trucks Productivity (LCY/min) 10.88
Total Tree Volume 2981.5 ft3 Heaped Bucket Volume (LCY) 3.00 Total Time Productivity (LCY/day) 5220.00
Trucks Needed 1 truck Bucket Fill Volume (cy) 1.00 2 Days Large Stones/hour 284
minimum PMH 464 Job Efficiency 0.83 Large Stones/day 2270
Maximum PMH 743 Productivity (LCY/hr) 498.75 Total Time Large Stones (days) 1.0
Avg PMH 603.5 Productivity (LCY/min) 8.31 Flatbeds needed 1
Time to be loaded 4.9 hrs Productivity (LCY/day) 3990.00 Total Time Spalls (days) 0.3
Total Strip Time (hr) 7
Total Strip Time (day) 1
20 CY Dump Truck
Time to Fill 1 Truck 2.41 min
Round Trip Time 16 min
Trucks to fill during trip 6.0 trucks
Time To Clear 1 days
Batch Plant
Modern Duration 2 days
Total Rocks 42979.2
Rock Percentage 71
Total Volume with mortar 60534.0845070423
Mortar Volume 17554.8845070423 CY
Mobile Batch Plant Set Up 4 hrs
Time to arrive onsite 1 day
Extra Info (Misc.)
Min Production 120 cy/hr
Max Production 400 cy/hr
Avg Production 260
Time to create all mortar 67.5187865655471 hr
Total time 8.43984832069339 days
Stripping the Gravel Pit
Location Carville Basin
Quarry Size(acres) 3.7 OR 17908 yard2
Trees/Acre 50
Total Trees 185
Volume to Strip 5969.33333333333cy
Modern Duration 3.7 days
DEFORASTATION STRIPPING AND HAULING
Harvester Total Equipment Needed 3 CY Excavator Total Equipment Needed
Trees cut/min 1.29 min 1 Harvester Cycles (cycles/hr) 150.00 2 3CY Excavator
Total Time min 238.65 min 1 Forwarder Swing Depth Factor 1.33 7 20CY Dump Trucks
Total Time hrs 3.98 hrs 21 4 Axle Truck Heaped Bucket Volume (LCY) 3.00 Total Time
1 45' Trailer Truck Bucket Fill Volume (cy) 1.00 2 Days
Forwarder Total Time Job Efficiency 0.83
Trees to bunch 185 trees 12.06 hrs Productivity (LCY/hr) 498.75
Time per tree 1.29 min equal to: Productivity (LCY/min) 8.31
Time to load truck 12 min 1.5 Days Productivity (LCY/day) 3990.00
Total Time 3.98 hrs Total Strip Time (hr) 12
Strip Time with 2 excavators (hr) 6
Strip Time with 2 excavators (day) 0.7
4 Axle Log Truck
Capacity 80,000 lbs
Tree min weight 1500 lbs 20 CY Dump Truck
Tree Max weight 16420 lbs Time to Fill 1 Truck 2.41 min
Avg Tree Weight 8960 lbs Round Trip Time 14 min
Total Tree Weight 1657600 lbs Trucks to fill during trip 6 trucks
Tree Amt on Truck 9 trees Time To Clear 1 days
Trucks needed 21 trucks
45' Trailer Truck
Truck Capacity 2700 ft3
Avg Volume/Tree 13.4 ft3
Total Tree Volume 2479 ft3
Trucks Needed 1 truck
minimum PMH 464
Maximum PMH 743
Avg PMH 603.5
Time to be loaded 4.1 hrs
Comparison of Activity Durations
Actvities Past Modern
Rail Branch 51 0
Cableways 38 0
Deep Excavation 240 24
Compressor Plant 92 0
Open Quarry 37 8
Batch Plant 64 2
Gravel Pit 66 4
TOTAL 588 38

More Related Content

More from FeteneBefekadu

eca.ppt
eca.ppteca.ppt
Belete Tafesse.pdf
Belete Tafesse.pdfBelete Tafesse.pdf
Belete Tafesse.pdf
FeteneBefekadu
 
TS8_1_belaid.pdf
TS8_1_belaid.pdfTS8_1_belaid.pdf
TS8_1_belaid.pdf
FeteneBefekadu
 
ERDAS_1.pdf
ERDAS_1.pdfERDAS_1.pdf
ERDAS_1.pdf
FeteneBefekadu
 
s552.pdf
s552.pdfs552.pdf
s552.pdf
FeteneBefekadu
 
stonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdfstonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdf
FeteneBefekadu
 
Slick.PDF
Slick.PDFSlick.PDF
Slick.PDF
FeteneBefekadu
 
stonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdfstonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdf
FeteneBefekadu
 
TSX_BBL_2017.pdf
TSX_BBL_2017.pdfTSX_BBL_2017.pdf
TSX_BBL_2017.pdf
FeteneBefekadu
 
sustainability-08-00403.pdf
sustainability-08-00403.pdfsustainability-08-00403.pdf
sustainability-08-00403.pdf
FeteneBefekadu
 
HCB Manual gtz 2008.doc
HCB Manual gtz 2008.docHCB Manual gtz 2008.doc
HCB Manual gtz 2008.doc
FeteneBefekadu
 
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdfdolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
FeteneBefekadu
 
Blockbooklet (1).pdf
Blockbooklet (1).pdfBlockbooklet (1).pdf
Blockbooklet (1).pdf
FeteneBefekadu
 
10.pdf
10.pdf10.pdf
concreteblocks (3).pdf
concreteblocks (3).pdfconcreteblocks (3).pdf
concreteblocks (3).pdf
FeteneBefekadu
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopia
FeteneBefekadu
 
Dam pictures
Dam picturesDam pictures
Dam pictures
FeteneBefekadu
 
Dam focus
Dam focusDam focus
Dam focus
FeteneBefekadu
 
Dam engineering 6
Dam engineering 6Dam engineering 6
Dam engineering 6
FeteneBefekadu
 
Dam engineering i 2
Dam engineering i 2Dam engineering i 2
Dam engineering i 2
FeteneBefekadu
 

More from FeteneBefekadu (20)

eca.ppt
eca.ppteca.ppt
eca.ppt
 
Belete Tafesse.pdf
Belete Tafesse.pdfBelete Tafesse.pdf
Belete Tafesse.pdf
 
TS8_1_belaid.pdf
TS8_1_belaid.pdfTS8_1_belaid.pdf
TS8_1_belaid.pdf
 
ERDAS_1.pdf
ERDAS_1.pdfERDAS_1.pdf
ERDAS_1.pdf
 
s552.pdf
s552.pdfs552.pdf
s552.pdf
 
stonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdfstonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdf
 
Slick.PDF
Slick.PDFSlick.PDF
Slick.PDF
 
stonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdfstonemasonrybc-131212033019-phpapp01.pdf
stonemasonrybc-131212033019-phpapp01.pdf
 
TSX_BBL_2017.pdf
TSX_BBL_2017.pdfTSX_BBL_2017.pdf
TSX_BBL_2017.pdf
 
sustainability-08-00403.pdf
sustainability-08-00403.pdfsustainability-08-00403.pdf
sustainability-08-00403.pdf
 
HCB Manual gtz 2008.doc
HCB Manual gtz 2008.docHCB Manual gtz 2008.doc
HCB Manual gtz 2008.doc
 
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdfdolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
 
Blockbooklet (1).pdf
Blockbooklet (1).pdfBlockbooklet (1).pdf
Blockbooklet (1).pdf
 
10.pdf
10.pdf10.pdf
10.pdf
 
concreteblocks (3).pdf
concreteblocks (3).pdfconcreteblocks (3).pdf
concreteblocks (3).pdf
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopia
 
Dam pictures
Dam picturesDam pictures
Dam pictures
 
Dam focus
Dam focusDam focus
Dam focus
 
Dam engineering 6
Dam engineering 6Dam engineering 6
Dam engineering 6
 
Dam engineering i 2
Dam engineering i 2Dam engineering i 2
Dam engineering i 2
 

Recently uploaded

一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
amsjournal
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 

Recently uploaded (20)

一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
UNLOCKING HEALTHCARE 4.0: NAVIGATING CRITICAL SUCCESS FACTORS FOR EFFECTIVE I...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 

Modern_Equipment_Calculations.pdf

  • 1. Modern Duration 24 days Earth Loading Calculations General Information Start Location: Wachusett Dam End Location: 150 West Boylston St. Clinton, MA Distance (miles): 2.5 Time(min round trip): 12 Dump Time 2 Amount of soil (cy): 43000 Modern Equipment: 1 Large Excavator 6 20 CY Dump Truck Modern Duration: 11 Days Equipment To Load Front Dump Bottom Dump Equipment S. Excavator M. Excavator L. Excavator S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel Cycles (cycles/hr) 250.00 200.00 150.00 170.00 160.00 135.00 190 180 150 Swing Depth Factor 1.33 1.33 1.33 1.16 1.16 1.16 1.16 1.16 1.16 Heaped Bucket Volume (LCY) 1.00 2.00 3.00 5.00 7.50 10.00 5.00 7.50 10.00 Bucket Fill Volume (cy) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Job Efficiency 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 Productivity (LCY/hr) 277.08 443.33 498.75 821.67 1160.00 1305.00 918.33 1305.00 1450.00 Productivity (LCY/min) 4.62 7.39 8.31 13.69 19.33 21.75 15.31 21.75 24.17 Equipment To Haul One Ton Dump Truck Triaxle Dump Truck Trailer Dump Truck Dump Truck Capacity 1.00 3.00 8.00 10.00 16.00 20.00 26.00 Total travel Time (min) 14.00 14.00 14.00 14.00 14.00 14.00 14.00 Time(min) for 1 load 0.12 0.36 0.96 1.20 1.92 2.41 3.13 Time Left After 2nd Load 13.88 13.64 13.04 12.80 12.08 11.59 10.87 Time Left After 3rd Load 13.76 13.28 12.08 11.59 10.15 9.19 7.74 Time Left After 4th Load 13.64 12.92 11.11 10.39 8.23 6.78 4.62 Time Left After 5th Load 13.52 12.56 10.15 9.19 6.30 4.38 1.49 Time Left After 6th Load 13.40 12.20 9.19 7.98 4.38 1.97 -1.64 Equipment To Load and Haul Large Excavator Qty 1.00 2.00 3.00 4.00 20 CY Dump Truck Qty 6.00 12.00 18.00 24.00 Productivity (LCY/hr) 498.75 997.50 1496.25 1995.00 Productivity (LCY/day) 3990.00 7980.00 11970.00 15960.00 Duration To Complete 10.78 5.39 3.59 2.69 Rock Loading Calculations General Information Start Location: Wachusett Dam End Location: 399 MA-62 Clinton, MA Distance (miles): 0.6 Time(min round trip): 4 Amount of soil (cy): 24,370 Modern Equipment: 1 Large Excavator 2 16 CY Dump Truck Modern Duration: 13 Days Equipment To Load Front Dump Bottom Dump Equipment S. Excavator M. Excavator L. Excavator S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel S. Hydraulic Shovel M. Hydraulic Shovel L. Hydraulic Shovel Cycles (cycles/hr) 250.00 200.00 150.00 170.00 160.00 135.00 190 180 150 Swing Depth Factor 1.33 1.33 1.33 1.16 1.16 1.16 1.16 1.16 1.16 Heaped Bucket Volume (LCY) 1.00 2.00 3.00 5.00 7.50 10.00 5.00 7.50 10.00 Bucket Fill Volume (cy) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 Job Efficiency 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 Productivity (LCY/hr) 138.54 221.67 249.38 410.83 580.00 652.50 459.17 652.50 725.00 Productivity (LCY/min) 2.31 3.69 4.16 6.85 9.67 10.88 7.65 10.88 12.08 Equipment To Haul One Ton Dump Truck Triaxle Dump Truck Trailer Dump Truck Dump Truck Capacity 1.00 3.00 8.00 10.00 16.00 20.00 26.00 Travel Time (min) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 Time(min) for 1 load 0.24 0.72 1.92 2.41 3.85 4.81 6.26 Equipment To Load and Haul Large Excavator Qty 1.00 2.00 3.00 4.00 16 CY Dump Truck Qty 2.00 1.00 1.00 1.00 Productivity (LCY/hr) 249.38 498.75 748.13 997.50 Productivity (LCY/day) 1995.00 3990.00 5985.00 7980.00 Duration To Complete 12.22 6.11 4.07 3.05
  • 2. Stripping the Quarry Quarry Size without Path Location 150 Boylston Rd acre yard2 volume Quarry Size(acres) 4.45 OR 21538 yard2 2.22 10744.8 3581.6 Trees/Acre 50 Total Trees 222.5 Volume for path Volume to Strip 7179.33333333333cy 3597.73333333333cy Modern Duration: 7.6 days DEFORESTATION STRIPPING AND HAULING FOR QUARRY BLASTING AND SEPERATING Harvester Total Equipment Needed 3 CY Excavator Total Equipment Needed Hydraulic Drill Total Equipment Needed Trees cut/min 1.29 min 1 Harvester Cycles (cycles/hr) 150.00 2 3CY Excavator Drill Diameter 6 1 Hydraulic Drill Total Time min 287.025 min 1 Forwarder Swing Depth Factor 1.33 7 20CY Dump Trucks Drill Depth 11 38 Explosives Total Time hrs 4.78 hrs 24.9 4 Axle Truck Heaped Bucket Volume (LCY) 3.00 Total Time Drill ft/hr 52.5 1 10CY Hydraulic Bucket 1 40' Trailer Truck Bucket Fill Volume (cy) 1.00 1.3 Days Drills/hr 5 1 Flatbed Forwarder Total Time Job Efficiency 0.83 rounding up Drills per day 38 Total Time Trees to bunch 222.5 trees 14.51 hrs Productivity (LCY/hr) 498.75 1.5 Days Total Time (days) 1 2.5 Days Time per tree 1.29 min equal to: Productivity (LCY/min) 8.31 Explosives Rounding Up Time to load truck 12 min 2 Day Productivity (LCY/day) 3990.00 Total needed 38 3 Days Total Time 4.78 hrs Total Strip Time (hr) 7 Time (days) 0.125 Strip Time with 2 excavators (hr) 4 Strip Time with 2 excavators (day) 0.4 Amt. of rocks 7179.3 4 Axle Log Truck Large 5456.3 Capacity 80,000 lbs Each Large 2.3 Tree min weight 1500 lbs 20 CY Dump Truck Total Large 2372.3 Tree Max weight 16420 lbs Time to Fill 1 Truck 2.41 min Spalls 1723.0 Avg Tree Weight 8960 lbs Round Trip Time 16 min Large Hydraulic Bucket 10CY Total Tree Weight 1993600 lbs Trucks to fill during trip 6.0 trucks Cycles (cycles/hr) 135.00 Tree Amt on Truck 9 trees Time To Clear 1 days Swing Depth Factor 1.16 Trucks needed 24.9 trucks Heaped Bucket Volume (LCY) 10.00 STRIPPING AND HAULING QUARRY PATH Bucket Fill Volume (cy) 0.50 48' Trailer Truck 3 CY Excavator Total Equipment Needed Job Efficiency 0.83 Truck Capacity 3465 ft3 Cycles (cycles/hr) 150.00 1 3CY Excavator Productivity (LCY/hr) 652.50 Avg Volume/Tree 13.4 ft3 Swing Depth Factor 1.33 7 20CY Dump Trucks Productivity (LCY/min) 10.88 Total Tree Volume 2981.5 ft3 Heaped Bucket Volume (LCY) 3.00 Total Time Productivity (LCY/day) 5220.00 Trucks Needed 1 truck Bucket Fill Volume (cy) 1.00 2 Days Large Stones/hour 284 minimum PMH 464 Job Efficiency 0.83 Large Stones/day 2270 Maximum PMH 743 Productivity (LCY/hr) 498.75 Total Time Large Stones (days) 1.0 Avg PMH 603.5 Productivity (LCY/min) 8.31 Flatbeds needed 1 Time to be loaded 4.9 hrs Productivity (LCY/day) 3990.00 Total Time Spalls (days) 0.3 Total Strip Time (hr) 7 Total Strip Time (day) 1 20 CY Dump Truck Time to Fill 1 Truck 2.41 min Round Trip Time 16 min Trucks to fill during trip 6.0 trucks Time To Clear 1 days
  • 3. Batch Plant Modern Duration 2 days Total Rocks 42979.2 Rock Percentage 71 Total Volume with mortar 60534.0845070423 Mortar Volume 17554.8845070423 CY Mobile Batch Plant Set Up 4 hrs Time to arrive onsite 1 day Extra Info (Misc.) Min Production 120 cy/hr Max Production 400 cy/hr Avg Production 260 Time to create all mortar 67.5187865655471 hr Total time 8.43984832069339 days
  • 4. Stripping the Gravel Pit Location Carville Basin Quarry Size(acres) 3.7 OR 17908 yard2 Trees/Acre 50 Total Trees 185 Volume to Strip 5969.33333333333cy Modern Duration 3.7 days DEFORASTATION STRIPPING AND HAULING Harvester Total Equipment Needed 3 CY Excavator Total Equipment Needed Trees cut/min 1.29 min 1 Harvester Cycles (cycles/hr) 150.00 2 3CY Excavator Total Time min 238.65 min 1 Forwarder Swing Depth Factor 1.33 7 20CY Dump Trucks Total Time hrs 3.98 hrs 21 4 Axle Truck Heaped Bucket Volume (LCY) 3.00 Total Time 1 45' Trailer Truck Bucket Fill Volume (cy) 1.00 2 Days Forwarder Total Time Job Efficiency 0.83 Trees to bunch 185 trees 12.06 hrs Productivity (LCY/hr) 498.75 Time per tree 1.29 min equal to: Productivity (LCY/min) 8.31 Time to load truck 12 min 1.5 Days Productivity (LCY/day) 3990.00 Total Time 3.98 hrs Total Strip Time (hr) 12 Strip Time with 2 excavators (hr) 6 Strip Time with 2 excavators (day) 0.7 4 Axle Log Truck Capacity 80,000 lbs Tree min weight 1500 lbs 20 CY Dump Truck Tree Max weight 16420 lbs Time to Fill 1 Truck 2.41 min Avg Tree Weight 8960 lbs Round Trip Time 14 min Total Tree Weight 1657600 lbs Trucks to fill during trip 6 trucks Tree Amt on Truck 9 trees Time To Clear 1 days Trucks needed 21 trucks 45' Trailer Truck Truck Capacity 2700 ft3 Avg Volume/Tree 13.4 ft3 Total Tree Volume 2479 ft3 Trucks Needed 1 truck minimum PMH 464 Maximum PMH 743 Avg PMH 603.5 Time to be loaded 4.1 hrs
  • 5. Comparison of Activity Durations Actvities Past Modern Rail Branch 51 0 Cableways 38 0 Deep Excavation 240 24 Compressor Plant 92 0 Open Quarry 37 8 Batch Plant 64 2 Gravel Pit 66 4 TOTAL 588 38