Gantt. Chart
5jan 20jan 10feb 15feb 29april 10may
Software Model FollowedWaterfall Model
Software Model FollowedWaterfall Model
 Each phase is defined in terms of output during the phase,
not only by the activities occurring.
 A tangible output is the only criterion of progress.
 A phase product represents a natural milestone, a change
in emphasis point, and is used as the basis for the next
phase.
 Products of next phase can be formally verified against the
previous as part of quality assessment.
 The process is plan-driven
 Each step and its components must be planned and scheduled
before work begins
Software Model FollowedWaterfall Model Advantages
 Clear, simple to understand development process
 "Signing off" clarifies contractual position
 Makes development process visible
 Makes planning/management/system building easier
 Less likely to affect overall design by late design changes
Technology Used Front End
 ASP.Net/C#.Net
 Back End
 SQL Server 2012
Technology Used ASP.Net
 Easy Programming Model
 Flexible Language Options
 Great Tool Support
 Rich Class Framework
 Compiled execution
 Rich output caching
 Web-Farm Session State
Technology Used ASP.Net
 Enhanced Reliability
 Memory Leak, DeadLock and Crash Protection
 Easy Deployment
 Dynamic update of running application
 Easy Migration Path
 XML Web Services
 Mobile Web Device Support
Technology Used SQL Server 2012
 Native Support and Integration in .net
 Activity Monitor
 IntelliSense for Query Editing
 Backup Compression
 Multi Server Query
 Data Warehousing
Technology Used SQL Server 2012
 Data Compression
 Policy Based Management
 Predictable Performance and Concurrency
 Inline Variable Assignment
 Data Encryption
Hardware Requirements (Server)
 Intel i3/i5/i7 processor
 2 GB RAM
 80+ Hard Disk space
 Optical Drive
 Keyboard mouse
 High Speed Internet Connection (Leased Line preferred)
Software Requirements (Server)
 Server Based Operating System (e.g. Microsoft Server 2008
R2 etc.)
 IIS (Internet Information Services)
 .Net 4.0 Framework
 Ajax Support
Hardware Requirements (Client)
 Any PC Processor
 512 MB RAM
 5400 RPM HDD
 Keyboard
 Mouse
 Internet Connection (DSL with 256 Kbps or more speed)
Software Requirements (Client)
 Any Operating System (e.g. Microsoft Windows
Xp/Vista/7, Linux etc.)
 Any Web Browser (e.g. Internet Explorer, Mozilla Firefox,
Google Chrome, Safari etc.)
Users Of Mobile CommerceAdmin
 Manage power-users.
 Manage limited-users.
 Can send SMS alerts to single/multiple users, single
student/multiple students, single/ multiply employees.
 Can send Emai to single/multiple users, single
student/multiple students, single/ multiply employees.
 Can manage events.
 Can edit the information of the website.
 Can issue pass key to other users.
Users Of Mobile CommercePower - User
 Manage limited-users.
 Manage events.
 Sends SMS Alerts to limited-users and power-users.
 Manage information of mobilephones.
 Manage information of the phone searches.
 Manage phone comparison details.
 Manage surveys.
Users Of Mobile CommerceLimited - User
 Can participate in surveys.
 Can provide feedback about the website
developments.
ER Diagram
Data Flow Diagram – Level 0
Data Flow Diagram – Level 1 (Add
User)
Resolve Issue
Deployment of website
Deploying a website for hosting helps to set a network for the client to
easily access the server & such that server could easily respond to the
client’s request. “Web Server Software” is mainly used to deploy the
website of Asp.Net.
Web Server Software includes three main things:
Microsoft Internet Information Service-------
Register with
+ .Net Framework 4.5
+ Sql Server
Here, as the website development is taken place in Visual Studio Express
Edition. This Edition provides the .Net Framework as well as Sql server
included in this. Thus, only we have to do is to install IIS( Internet
Information Service) to deploy or host our website.
We have seen that in widows 7 (or above) we can have IIS pre-
downloaded in the system which would be saved as IIS 7.5 or 7.x
Steps to Deploy .Net Website
Step 1: Run IIS by typing the command in inetmgr in windows command prompt as shown in the picture below:
Step 2: In IIS right click on Sites Node and then Select Add Web Site as shown in the diagram below:
Step 3: Inside Add Website Window type the name of website under Site name and in Physical path select the location of the
website on the local system as shown in the picture below:
Step 4: Select the site to be added in this project I have created website with the name Demo in .net and stored it on F drive of my computer. I am
browsing that website for deployment . You can select your site to be added in IIS as shown in the below diagram :
Step 5: Under Binding change the port Number from 80 as it is the default port and assigned to Default website in IIS . I have set the
port number to 8085. You can set it according to your choice as shown in the picture below and then click on ok button:
Step 6: Next select the Application Pools in the left side in IIS then Right click on the Name of website added in the previous step and
then select Advanced Settings as shown in the picture below:
the Advanced Settings select the .Net Framework Version 4.0 and then click on ok button as shown in the picture below:
Step 8: Select the website and then double Click on Directory Browsing and Enable it as shown below:
Step 9: Now the whole procedure of adding website is done now to check the site in browser Right click on the website you added in IIS then go
to Manage Web Site and then click on Browse as shown in the diagram:
Mobile Commerce ppt....... Provides a website interface to the customers to buy & get the details about mobiles.

Mobile Commerce ppt....... Provides a website interface to the customers to buy & get the details about mobiles.

  • 1.
  • 2.
    Introduction  Provides aninterface to the customers to buy & get the details about mobiles.  Helps to buy, order & remain updated in just a click.  Contains information of all the upcoming mobiles of different brands in the market.  Purchase & stock Management.  All customers will get all important updates via website.
  • 3.
    Gantt. Chart 5jan 20jan10feb 15feb 29april 10may
  • 4.
  • 5.
    Software Model FollowedWaterfallModel  Each phase is defined in terms of output during the phase, not only by the activities occurring.  A tangible output is the only criterion of progress.  A phase product represents a natural milestone, a change in emphasis point, and is used as the basis for the next phase.  Products of next phase can be formally verified against the previous as part of quality assessment.  The process is plan-driven  Each step and its components must be planned and scheduled before work begins
  • 6.
    Software Model FollowedWaterfallModel Advantages  Clear, simple to understand development process  "Signing off" clarifies contractual position  Makes development process visible  Makes planning/management/system building easier  Less likely to affect overall design by late design changes
  • 7.
    Technology Used FrontEnd  ASP.Net/C#.Net  Back End  SQL Server 2012
  • 8.
    Technology Used ASP.Net Easy Programming Model  Flexible Language Options  Great Tool Support  Rich Class Framework  Compiled execution  Rich output caching  Web-Farm Session State
  • 9.
    Technology Used ASP.Net Enhanced Reliability  Memory Leak, DeadLock and Crash Protection  Easy Deployment  Dynamic update of running application  Easy Migration Path  XML Web Services  Mobile Web Device Support
  • 10.
    Technology Used SQLServer 2012  Native Support and Integration in .net  Activity Monitor  IntelliSense for Query Editing  Backup Compression  Multi Server Query  Data Warehousing
  • 11.
    Technology Used SQLServer 2012  Data Compression  Policy Based Management  Predictable Performance and Concurrency  Inline Variable Assignment  Data Encryption
  • 12.
    Hardware Requirements (Server) Intel i3/i5/i7 processor  2 GB RAM  80+ Hard Disk space  Optical Drive  Keyboard mouse  High Speed Internet Connection (Leased Line preferred)
  • 13.
    Software Requirements (Server) Server Based Operating System (e.g. Microsoft Server 2008 R2 etc.)  IIS (Internet Information Services)  .Net 4.0 Framework  Ajax Support
  • 14.
    Hardware Requirements (Client) Any PC Processor  512 MB RAM  5400 RPM HDD  Keyboard  Mouse  Internet Connection (DSL with 256 Kbps or more speed)
  • 15.
    Software Requirements (Client) Any Operating System (e.g. Microsoft Windows Xp/Vista/7, Linux etc.)  Any Web Browser (e.g. Internet Explorer, Mozilla Firefox, Google Chrome, Safari etc.)
  • 16.
    Users Of MobileCommerceAdmin  Manage power-users.  Manage limited-users.  Can send SMS alerts to single/multiple users, single student/multiple students, single/ multiply employees.  Can send Emai to single/multiple users, single student/multiple students, single/ multiply employees.  Can manage events.  Can edit the information of the website.  Can issue pass key to other users.
  • 17.
    Users Of MobileCommercePower - User  Manage limited-users.  Manage events.  Sends SMS Alerts to limited-users and power-users.  Manage information of mobilephones.  Manage information of the phone searches.  Manage phone comparison details.  Manage surveys.
  • 18.
    Users Of MobileCommerceLimited - User  Can participate in surveys.  Can provide feedback about the website developments.
  • 19.
  • 20.
    Data Flow Diagram– Level 0
  • 21.
    Data Flow Diagram– Level 1 (Add User)
  • 22.
  • 25.
    Deployment of website Deployinga website for hosting helps to set a network for the client to easily access the server & such that server could easily respond to the client’s request. “Web Server Software” is mainly used to deploy the website of Asp.Net. Web Server Software includes three main things: Microsoft Internet Information Service------- Register with + .Net Framework 4.5 + Sql Server Here, as the website development is taken place in Visual Studio Express Edition. This Edition provides the .Net Framework as well as Sql server included in this. Thus, only we have to do is to install IIS( Internet Information Service) to deploy or host our website. We have seen that in widows 7 (or above) we can have IIS pre- downloaded in the system which would be saved as IIS 7.5 or 7.x
  • 27.
    Steps to Deploy.Net Website Step 1: Run IIS by typing the command in inetmgr in windows command prompt as shown in the picture below: Step 2: In IIS right click on Sites Node and then Select Add Web Site as shown in the diagram below:
  • 28.
    Step 3: InsideAdd Website Window type the name of website under Site name and in Physical path select the location of the website on the local system as shown in the picture below: Step 4: Select the site to be added in this project I have created website with the name Demo in .net and stored it on F drive of my computer. I am browsing that website for deployment . You can select your site to be added in IIS as shown in the below diagram :
  • 29.
    Step 5: UnderBinding change the port Number from 80 as it is the default port and assigned to Default website in IIS . I have set the port number to 8085. You can set it according to your choice as shown in the picture below and then click on ok button: Step 6: Next select the Application Pools in the left side in IIS then Right click on the Name of website added in the previous step and then select Advanced Settings as shown in the picture below:
  • 30.
    the Advanced Settingsselect the .Net Framework Version 4.0 and then click on ok button as shown in the picture below: Step 8: Select the website and then double Click on Directory Browsing and Enable it as shown below:
  • 31.
    Step 9: Nowthe whole procedure of adding website is done now to check the site in browser Right click on the website you added in IIS then go to Manage Web Site and then click on Browse as shown in the diagram: