March 18, 2014!
The Top 3 Location-Based Advertising
Insights Across Retail, QSR and Auto!
1	
  
M!A!M!Webinar Series!
2	
  
As the premier global trade association dedicated to accelerating the
transformation and innovation of marketing through mobile, the MMA
represents the entire marketing ecosystem and brings together over 700
organizations globally, allowing us to facilitate connections, deliver insight
and drive impactful action for our members and the industry at large!
For more information about membership email: membership@mmaglobal.com
or visit http://www.mmaglobal.com/member-center/benefits !
!
"INSIGHTS: !
"Access a world of insights through our white papers, articles and case
"studies. Support your mobile agenda and ensure mobile readiness!
!
"CONNECTIONS: !
"Interact with passionate leaders and stay on the cutting edge. Boost
"your business and career by connecting with the people that matter!
!
"IMPACT: !
"Influence industry frameworks, standards, guidelines and best
"practices. Join the industry initiatives that shape the future of mobile!
About the MMA !
3	
  
!
The MMA location committee was established to give
advertisers and their agency and media partners the
confidence to invest their ad dollars into a growing
new category of mobile ad products and services.
This webinar is being produced by the Advertising
Working Group of this committee and is meant to
provide key insights into the ad strategies and tactics
working for some of the top mobile advertising
categories in mobile-location today: Retail,
Restaurants and Automotive.!
Overview!
4	
  
•  " Location: the unique to mobile opportunity!
!
• " Common Location Terminology !
"!
• " Top Tactics by Category!
"!
• " Client Case Studies by Category!
!
• " Q&A!
"!
"!
Today’s Agenda!
5	
  
Moderator!
Presenters!
Monica Ho!
SVP, Marketing!
MMA Location Committee Co-Chair!
xAd!
Monica.ho@xad.com!
!
James Smith!
Chief Revenue Officer!
MMA Location Advertising, Working Group Lead!
Verve!
James.smith@verve.com!
!
Leo Scullin!
Head of Global Industry Initiatives!
Mobile Marketing Association!
Heather Sears!
Executive Director, Marketing!
MMA Location Advertising Committee Member!
YP Mobile!
Heather.sears@yp.com!
!
!
6	
  
Managing Your Questions!
Share the Insights!
#MMAWeb!
LOCATION:THE UNIQUE TO MOBILE OPPORTUNITY	

16%	
  
Mobile As a % of Online Sales	

Source:	
  IBM,	
  Q4	
  2013	
  
77%	
  20%	
  
Where Was Purchase Completed	

In	
  Person	
  Online	
  
Source:	
  xAd/Telmetrics	
  Mobile	
  Path	
  to	
  Purchase	
  
Study	
  Commissioned	
  by	
  Nielsen,	
  2013	
  
•  Today nearly 70% of smartphone access is spent out of the
home or on-the-go	

•  As a result, in addition to driving online actions – mobile
impacts offline activities as well
26%
18%
13%
12%
11%
10%
6%
4%
TOP INDUSTRIES FOR	

LOCATION-BASED ADVERTISING	

RETAIL 26%	

	

AUTO 18%	

	

QSR/RESTAURANTS 12%	

	

Retail	

Auto	

CE/Tech	

Restaurants	

CPG	

Finance / Insurance	

Telecom	

Travel
IN MOBILE - IMMEDIACY OF NEEDVARIES BY CATEGORY	

Source: xAd/Telmetrics Mobile Path to Purchase Study
commissioned by Nielsen: Understanding Mobile’s Role in the
Consumer Path to Purchase - 2013	

89%	
  
59%	
   55%	
  
Restaurant	

 Retail	

 Automotive	

Immediacy of Consumer Need	

Within the day	

 Within the month	

 Month +
AS A RESULT, SO DO CONSUMER EXPECTATIONS	

65%	
  
57%	
   53%	
  
0%	
  
10%	
  
20%	
  
30%	
  
40%	
  
50%	
  
60%	
  
70%	
  
Restaurant	

 Retail	

 Automotive	

Looking For Businesses Within 5 Miles
of Their Location	

Source: xAd/Telmetrics Mobile Path to Purchase Study
commissioned by Nielsen: Understanding Mobile’s Role in the
Consumer Path to Purchase - 2013
KEY INSIGHT	

IMMEDIACY OF NEED DRIVES IMPORTANCE OF PROXIMITY	

IMMEDIACY OF
NEED	

IMPORTANCE
OF PROXIMITY	

high	

low	

high	

low	

RESTAURANTS	

RETAIL	

AUTO
•  Geo-Fencing	

•  Identifies a point of interest on a map and establishes a
radius around it for targeting purposes.	

•  Geo-Conquesting	

•  Uses location data to identify a brand’s competitors in an
effort to promote a competing or competitive offering to
their customers.	

•  Geo-Behavioral/Location-Based Audiences	

•  The ability to target unique audiences and/or users based
on the context of a given location, past or present location
behaviors etc.	

•  Retargeting	

•  Re-messaging to users based on past offline and online
visitation behaviors	

MOBILE ADVERTISING
MORE THAN JUST PROXIMITY TARGETING	

hJp://www.mmaglobal.com/	
  
locaOon-­‐terminology-­‐guide	
  
QSR
TOP GOALS: QSR / RESTUARANTS	

Drive foot traffic away from
competitors’ and into their stores	

Increase foot traffic during key
times of day / day of week	

	

Increase awareness of new
offerings / special offers
GEO-CONQUESTING	

Reach consumers in and near
competitor stores	

GEO-FENCING	

Reach consumers near
your location	

	

RETARGETING	

Reach consumers after they visit 	

AUDIENCE TARGETING	

Target custom audiences based on
activity in the physical world	

	

MOBILE COUPONS	

Variety of executions	

QSR
CATEGORY	

QSR / RESTAURANT TACTICS
1.  Proximity is a key relevance driver	

2.  Timing is Everything	

3.  Creative – Keep it simple	

4.  Plan for metrics that matter	

TOP QSR INSIGHTS
1. PROXIMITY MATTERS	

Nearly 7 out of 10 mobile restaurant users look up a business
location and/or map and driving directions	

Source: xAd/Telmetrics Mobile Path to Purchase Study - Restaurants	

Location Targeting is Essential	

	

Leverage geo-precise targeting capabilities to
reach consumers when they are near your / or
your competitors locations	

	

Most Popular Targeting Tactics	

	

•  Geo-Fencing	

— Reach and engage customers around your own QSR
locations	

•  Geo-Conquesting	

— Reach and engage customers around your competitors
locations	

Immediate
Proximity, 64%	

No Proximity
Expectation, 36%	

Location Expectations When 	

Searching for a 	

Restaurant on Mobile
2.TIMING IS EVERYTHING	

Over 60% of mobile restaurant
users look to make a purchase
within the hour	

Source: xAd/Telmetrics Mobile Path to Purchase Study - Restaurants	

	

Marry Immediacy with Context	

	

•  Time of Day and Day of Week targeted
campaigns satisfy both convenience and
user intent	

•  Don’t assume consumers will remember
your breakfast ad if served during the
lunch hour	

Immediatley, 30%	

Within Hour, 34%	

Within day, 25%	

Within Month, 7%	

[SERIES NAME], 3%	

Immediacy of Consumer Need
3. KEEP IT SIMPLE	

19	

Source: xAd/Telmetrics Mobile Path to Purchase Study - Restaurants
Fancy, Fluffy Ad
Creative is Seldom
“Quick”	

	

•  QSR ad creative should include
location, deal or offer, and a
direct call to action	

•  Ads direct to landing pages
with nearest location
information and preferred
actions such as map  driving
directions	

Decisions are made quickly. Make sure every second counts by
providing users quick access to the information they need.	

78%	
  
65%	
  
48%	
  
27%	
  
Food Type	

 Location /
Proximity	

Price	

 Reviews	

Top Reasons for QSR Selection
4. PLAN FOR METRICS THAT MATTER	

Mobile makes fast food FASTER, revealing user preference in
secondary actions that drive offline conversion	

Top Mobile Secondary Actions: QSR!Measure Success of
Intention-Driven Activities	

	

•  Clicks/CTR mean nothing when it
comes to mobile restaurant user
intent	

•  Plan and optimize based on QSR
user action of choice – Map 
Driving Direction or Actual
In-Store Visits	

	

Source: xAd Network Data
CASE STUDIES	

•  Pinkberry	

•  Quiznos
22
GOAL:	

Drive foot traffic into Pinkberry stores and generate awareness of current promotional offers to try
the new Pinkberry greek yogurt.	

SOLUTION:	

Leverage geo-fencing combined with an audience target to reach Pinkberry’s Ideal audience.	

	

RESULTS	

The campaign doubled 	

Pinkberry's 	

performance 	

benchmark	

	

CLIENT SUCCESS STORY: PINKBERRY
SUCCESS STORY: QUIZNOS	

“Must have a testing mentality -- always,” Tim Kraus, Director of Digital
Marketing, Quiznos.	

	

Quiznos has been testing with Sense
Networks/YP since 2012 over several
campaigns to learn what works best in their
business.	

Targeting:	

• San Francisco, Madison, Seattle test markets	

• Competitors’ customers (Subway, McDonald’s,
Wendy’s)	

• Within 10 miles of locations	

	

Results:	

• 6% lift in sales over national average	

Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
RETAIL
Drive Foot Traffic into Stores	

Special Sales or Promotions	

	

Market Focused Media Heavy-Ups	

	

Support Store Openings 	

	

TOP GOALS: RETAIL
GEO-CONQUESTING	

Reach consumers in and near
competitor stores	

GEO-FENCING	

Reach consumers near your
retail location	

	

RETARGETING	

Reach consumers after they visit
retailers	

AUDIENCE TARGETING	

Target custom audiences based on
activity in the physical world	

	

MOBILE COUPONS	

Variety of executions	

RETAIL
CATEGORY	

RETAIL TACTICS
1.  Geo-Fencing Might be Too Late	

2.  Sometimes Location Doesn’t Matter…	

3.  Target People, Not Places 	

4.  *Bonus Insight* Get Smart about Mobile Coupons 	

RETAIL INSIGHTS
70% of purchases are planned. Shopping decisions can be better impacted by reaching
shoppers in advance of going to a store. 	

	

1. GEO-FENCING MIGHT BE TOO LATE	

1. Here’s a consumer
who goes to Lowe’s	

2. Here are 15 more
opportunities to reach him.	

Lowe’s	

Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
2. SOMETIMES LOCATION DOESN’T MATTER...	

Distance to
Store	

CTR	

 .5 mi	

 0.77%	

.5-1 mi.	

 0.79%	

1-3 mi.	

 0.80%	

3-5 mi.	

 0.78%	

5-8 mi.	

 0.80%	

8-10 mi.	

 0.79%	

10+ mi.	

 0.80%	

Contrary to popular belief, there is not always a relationship between real-
time distance to retail store and clicks.	

Red=	
  campaigns,	
  series	
  A	
  
Blue	
  =	
  campaigns,	
  series	
  B	
  Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
… AT LEAST NOT HOWYOU THINK…	

Home/work location and attributes extracted from location data can drive
greater lift in results.	

Especially for national brands with many well-known locations in a metro area
other targeting will have a greater impact on response than being “1 mile from a retail store.”	

0	
  
1	
  
2	
  
3	
  
4	
  
5	
  
Real Time
Location	

Behavior	

 Demos	

 Home
Location	

Group A	

Group B	

Group C	

Sample CTR Lift Multiple	

Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
“Groupon” Model	

• Deal Oriented	

• Hyper-Local	

• Banner states Distance to Retailer	

	

Brand Retailer	

• Generic banner	

• No deal	

* Have observed lack of correlation
of Distance to CTR	

Correlation	

CTR- Distance to Store	

… NEED TO INVESTIGATE TO UNDERSTAND DRIVERS 	

 If there's no deal, people who are
frequently in close proximity to a
brand or establishment can
be less interested in the ad. 	

Level of
Correlation	

Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
3.TARGET PEOPLE, NOT JUST PLACES	

Location-powered audience profiles deliver a 3-5x lift !
over simple geo-fencing for retail brands. !
YPmobile Targeting !
Customer Information !
Works: Midtown Manhattan!
Lives: Garden City, NY

Shops at: Costco, Macy’s!
Age: 35-44!
Income: $150k+!
Travels for business!
YPmobile Targeting !
Customer Information !
Works: Minneapolis, MN!
Lives: St. Paul, MN!
Shops: Quiznos, Target!
Age: 25-29!
Income: $50-75k+!
Interests: Concerts!
Works: Unknown 
Lives: Unknown 
Shops: Unknown 
Age: Unknown 
Income: Unknown 
Interests: Unknown 
Traditional Location Targeting
Customer Information!
Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
•  Use location to geo-conquest competitors’ shoppers	

•  Hyper-target with exclusive coupons per competitor	

•  Give shoppers control; save coupons to phone screen	

•  Measure multiple levels of action	

4. GET SMART ABOUT MOBILE COUPONS	

Measure secondary	

~20% save to phone	

Measure Coupons	

~2% redeemed	

Measure Store
Visits	

~6% visited store	

Vs. Beauty
Competitor:	

Vs. Fashion
Competitor:	

Vs. Home/
Cookware
Competitor:	

~Measure Cost Per
Store Visit	

~$5	

Source:	
  YP/Sense	
  Networks	
  
hJp://naOonal.yp.com/mobile	
  
CASE STUDIES	

•  Columbia	

•  Vespa / Moto Guzzi
SUCCESS STORY: COLUMBIA	

Campaign Goals:	

To increase awareness around Columbia’s Omni-Heat jacket
and incent mobile users to come in-store to try it on	

	

Solution:	

•  Users were targeted in and around locations offering the
new Omni-Heat jacket with a location-aware message	

•  Post click, users were taken to a custom landing page
showing contact details for the nearest store location
and a special offer	

Results:	

•  CTR was 52% above the industry average	

•  Driving directions and an exclusive offer that could be
redeemed at retail locations were the highest secondary
actions
Targeting:	

• RetargetedVespa and Moto Guzzi shoppers	

• Motorcycle enthusiasts	

• Demographics (high HHI)	

Results:	

• Banner CTR: 0.75%	

• ~4x lift over untargeted	

• Interstitial CTR: 2.33%	

• 9% of clicks visited the dealer	

SUCCESS STORY:VESPA/MOTO GUZZI	

“This was not even an exercise in branding, but an exercise in sales,” Melissa
MacCaull,VP of marketing at Piaggio Group America.	

“The campaign had the highest click-through rates of
any other aspect of the program, including search and
online display.” 	

	

Read more:
http://www.mediapost.com/publications/article/209818/vespa-retargets-dealer-visitors-to-
move-buyers-dow.html
AUTO	

MOBILE CAN KICK START THE
AUTO SHOPPING PROCESS
ADVERTISING OBJECTIVES FOR AUTOVARY BY “TIER”	

Auto mobile strategy varies depending on funding source:	

TIER 1: 	

NATIONAL/
BRANDING	

Objective: Increase awareness
and shift consideration	

TIER 2: 	

REGIONAL	

DEALER GROUPS	

Drive qualified leads and promote
regional incentives	

TIER 3: 	

LOCAL DEALER	

Reach in-market shoppers and drive
foot traffic to individual dealerships
GEO-CONQUESTING	

Reach consumers visiting competitor lots.	

	

GEO-FENCING	

Reach consumers near dealership:
fencing proximity based on
machine learnings.	

	

RETARGETING	

Reach consumers after they visit lot or
competitor dealerships for 30 days,
anytime/anywhere.	

AUDIENCE TARGETING	

Target custom audiences based
primarily on a combination of
activity in the physical world;
and HH matching data.	

	

ZIP+4 CODE
TARGETING	

Target key zip codes for
specific Models based on Polk
sales data.	

	

AUTO
CATEGORY	

AUTO OVERALL	

MOST EFFECTIVE LOCATION TACTICS	

BEACON TRIGGERED
MESSAGING/OFFERS:	

Targeted ads integrated into
Beacon technology.	

HH MATCHING/
“PATH” OVERLAY:	

Target based on HH to Device
matching Auto data and
optimize for path to purchase.	

“PATH” TARGETING	

Targeting locations that are seen on path to dealer lots, e.g.,
relevant Starbucks locations..
AUTO OVERALL	

GEO-CONQUESTING WORKS	

Consumers who are out on dealer lots are at the lowest part of the funnel and seeking deals. 	

Time Spent: 21 Seconds	

Expandable Banner: 200 meter Geo-Fence
of Owned and Operated Dealerships	

Time Spent: 20 Seconds	

Expandable Banner:	

Geo-Fencing Competitive Dealer Lots	

Expanded Panel Duration (Expandable Banners)
AUTO OVERALL	

LOCATION AWARE CREATIVE OUTPERFORMS GENERIC CREATIVE	

DYNAMIC DISTANCE	

DYNAMIC LOCALIZATION	

1.8 MILES AWAY!
ACTIONABLE CTA	

3.2	
  MILES	
  
Ads that are dynamic and customized to the user increase CTR by over
60% and eliminate the need for multiple creatives
AUTO OVERALL	

FOR AUTO, CUSTOM LOCATION-BASE CONSUMER SEGMENTS WORK*	

	


	

OUTDOOR
ENTHUSIASTS
	

	

	

An auto OEM campaign focusing on off-road vehicles  SUVs performed better using:	

The Custom Audience Profiles for Outdoor Enthusiast	

78% CTR and 134 FTI Index	

* Versus Standard Outdoor Content Targeting = .58% CTR and 118 FTI Index	

DEVICE
BEHAVIORAL
PATTERNS/PATHS	

	

Seen at state and national
parks multiple times a year	

	

HOUSEHOLD-
LEVEL DEVICE
MATCHING:	

DEMOGRAPHICS	

	

Lives in average to
above average HHI
neighborhoods in key
outdoor DMAS
(Denver, Minneapolis,
etc)	

	

	

SOCIAL LOCATION	

INSIGHTS	

	

Lives in areas indexing
highly for social posts with
keywords such as:	

	

Camping	

Fishing	

Hiking	

Etc.	

	

HOUSEHOLD-LEVEL	

DEVICE MATCHING:	

TRANSACTIONAL	

	

Household purchase history
for camping/outdoor gear
(fishing poles, merrell shoes,
Arcteryx etc)	

	

POI 
COMMERCIAL 	

LOCATION
ANALYSIS	

	

Temporal visits to
outdoor themed
retailers such as:	

	

Cabela's	

Bass Pro Shop	

Gander Mountain	

REI
1.  For all Tiers, location-aware creative outperforms generic/mass
creative for ad engagement by over 2x*	

2.  For Tier I Consumer Segments utilizing location and audience data
combined, outperform all other tactics in terms of ad engagement and
foot traffic.	

3.  For Tier II and III, Geo-Conquesting is extremely effective at driving ad
engagement and foot traffic.	

	

*Avg.: 2.1X ad engagement based on total campaigns, 2013.	

AUTO OVERALL	

TACTICS THAT ARE MOST EFFECTIVE BY TIER/OBJECTIVE
TIER 1:	

Driving Model Branding
TIER 1: TOP TACTICS THAT WORK 	



!
! Auto Intenders!
Targeting People: Custom Consumer Segments: 	

Target: Soccer Mom’s With Kids in HH	

	

1.  HH to Device Matching	

1.  Polk Reg. shows Minivan in garage	

2.  3rd Party data shows HH with children under 18 in HH	

	

	

	

Targeting Places: 	

Target: Areas where Mom’s with kids frequent:	

	

	

1. Retailers, e.g., Gapkids	

	

2. POIs: Parks, Playgrounds
TIER 1: TOP TACTICS THAT WORK	

Creative That Works:	

Rich Media experience highlighting the cars features/functions
TIER II:	

Driving regional brand
interest and incentives
Geo-Fencing/Geo-Conquesting:	

Geo fencing lots and competitive lots.	

	

Zip+ 4 Targeting: Using Polk reg. data, targeting neighborhood blocks that are
in top percentages for target prospects based on relevant auto registration data,
e.g., own sub-compact over two years old.	

Audience Targeting:	

Using HH matching, Polk data and demographics matching data.	

TIER 2: TOP TACTICS THAT WORK	

Path Targeting	

Target using daypart and locations frequently seen prior to lot visits, e.g., Starbucks.	

Geo-Retargeting	

Retarget those on relevant lots in past 30 days.
TIER 2: TOP TACTICS THAT WORK	

Creative That Works:	

Dynamic incentives are most effective: same look/feel (car image) but each regional group can set their offer (expandable or animated)	

•  1.8% APR financing in Northeast	

•  $500 cashback in Midwest	

	

	

3. Offer Based	

	

1. Map to Nearest Dealer(’s)	

 2. Get a Quote
GOAL:	

Drive leads and dealer quotes to Nissan Tier Two Dealership site for dealer follow-up.	

	

TACTICS THAT WORKED:	

	

ZIP+4 REGISTRATION TARGETING	

Target key zip+4s for specific Models based on Polk sales data	

•  Customized make/model list based on market 	

•  Certain markets focused on conquesting specific Nissan competitors if Nissan's brand name (BDI)
was weak but category (CDI) is strong	

•  Others reinforced Nissan make/model where brand and category (i.e. Sedan, or SUV) were strong	

	

CUSTOM CONSUMER SEGMENT:	

-  Segment based on combination of HH to Device Demo and Polk data matching and activities in
the real world, e.g., visited any auto-lots.	

TIER 2 SUCCESS STORY: NISSAN
RESULTS	

Reduction in CPL by 62%  CPA by 25% year over year	

TIER 2 SUCCESS STORY: NISSAN
TIER 3 	

Driving Traffic to
Specific Dealers
MICRO-LOCATION TARGETING*	

	

Utilize Passbook enabled offers, activated by Beacons on-lot/premise.	

GEO-FENCING/GEO-CONQUESTING	

	

Geo-fencing individually owned and operated lots	

Geo-conquesting all regional competitor lots.	

	

TIER 3: TOP TACTICS THAT WORK	

*In test market currently.
TIER 3: CREATIVES THAT WORK	

CREATIVE THAT WORKS	

Very specific to dealer or dealer group and driving traffic (geo-aware/geo-fence)	

Incentives to come in and visit (passbook)	

	

4. Dynamic Distance	

to Dealership	

1. Mapping 	

 2. Offer Based	

 3. Incentive-Based
1. Person near the
dealership location (lat /
long) sees product offer on
their iPhone	

2. While in the dealer, the	

iBeacon triggers the offer
to display	

	

3. Customer redeems	

incentive with dealer	

FREE	
  
GIFT	
  FREE	
  GIFT	
  WITH	
  
A	
  TEST	
  DRIVE	
  
FREE	
  GIFT	
  WITH	
  
A	
  TEST	
  DRIVE	
  
4. Beacons then provide
“micro-location data that gives
dealerships insights into
customers and close loop from
impression to attribution	

TIER 3 MICRO-LOCATION TACTICS THAT WORK
56	
  
!
•  “Location” doesn’t always mean “local”!
•  Relevance is key to the mobile experience!
–  Don’t just stop at targeting --- creative is just as important!
•  Measure beyond the ad click!
!
!
      !
Closing: Key Takeaways!
57	
  
MMA New York Forum!
May 7-9, 2014!
MMA Singapore Forum!
May 22, 2014!
Cannes Lions Festival!
June 15-21, 3014!
Mobile CEO  CMO Summit!
July 13-15, 2014!
MMA Shanghai Forum!
July 24, 2014!
!
Upcoming MMA Events!!
58	
  
Smartbrief click here!
Mobile Smart Fundamentals click here!
LinkedIn Group click here!
Twitter click here!
MMA Online: Committees at Work click here!
MMA Online: Webinar Archive click here!
MMA Online: White Papers click here!
Additional Resources!
59	
  
!
!
!
      !
MMA Members Include!
60	
  
!
!
!
     !
MMA Members Include!

The Top 3 Location-Based Advertising Insights Across Retail, QSR and Auto

  • 1.
    March 18, 2014! TheTop 3 Location-Based Advertising Insights Across Retail, QSR and Auto! 1   M!A!M!Webinar Series!
  • 2.
    2   As thepremier global trade association dedicated to accelerating the transformation and innovation of marketing through mobile, the MMA represents the entire marketing ecosystem and brings together over 700 organizations globally, allowing us to facilitate connections, deliver insight and drive impactful action for our members and the industry at large! For more information about membership email: membership@mmaglobal.com or visit http://www.mmaglobal.com/member-center/benefits ! ! "INSIGHTS: ! "Access a world of insights through our white papers, articles and case "studies. Support your mobile agenda and ensure mobile readiness! ! "CONNECTIONS: ! "Interact with passionate leaders and stay on the cutting edge. Boost "your business and career by connecting with the people that matter! ! "IMPACT: ! "Influence industry frameworks, standards, guidelines and best "practices. Join the industry initiatives that shape the future of mobile! About the MMA !
  • 3.
    3   ! The MMAlocation committee was established to give advertisers and their agency and media partners the confidence to invest their ad dollars into a growing new category of mobile ad products and services. This webinar is being produced by the Advertising Working Group of this committee and is meant to provide key insights into the ad strategies and tactics working for some of the top mobile advertising categories in mobile-location today: Retail, Restaurants and Automotive.! Overview!
  • 4.
    4   •  "Location: the unique to mobile opportunity! ! • " Common Location Terminology ! "! • " Top Tactics by Category! "! • " Client Case Studies by Category! ! • " Q&A! "! "! Today’s Agenda!
  • 5.
    5   Moderator! Presenters! Monica Ho! SVP,Marketing! MMA Location Committee Co-Chair! xAd! Monica.ho@xad.com! ! James Smith! Chief Revenue Officer! MMA Location Advertising, Working Group Lead! Verve! James.smith@verve.com! ! Leo Scullin! Head of Global Industry Initiatives! Mobile Marketing Association! Heather Sears! Executive Director, Marketing! MMA Location Advertising Committee Member! YP Mobile! Heather.sears@yp.com! ! !
  • 6.
    6   Managing YourQuestions! Share the Insights! #MMAWeb!
  • 7.
    LOCATION:THE UNIQUE TOMOBILE OPPORTUNITY 16%   Mobile As a % of Online Sales Source:  IBM,  Q4  2013   77%  20%   Where Was Purchase Completed In  Person  Online   Source:  xAd/Telmetrics  Mobile  Path  to  Purchase   Study  Commissioned  by  Nielsen,  2013   •  Today nearly 70% of smartphone access is spent out of the home or on-the-go •  As a result, in addition to driving online actions – mobile impacts offline activities as well
  • 8.
    26% 18% 13% 12% 11% 10% 6% 4% TOP INDUSTRIES FOR LOCATION-BASEDADVERTISING RETAIL 26% AUTO 18% QSR/RESTAURANTS 12% Retail Auto CE/Tech Restaurants CPG Finance / Insurance Telecom Travel
  • 9.
    IN MOBILE -IMMEDIACY OF NEEDVARIES BY CATEGORY Source: xAd/Telmetrics Mobile Path to Purchase Study commissioned by Nielsen: Understanding Mobile’s Role in the Consumer Path to Purchase - 2013 89%   59%   55%   Restaurant Retail Automotive Immediacy of Consumer Need Within the day Within the month Month +
  • 10.
    AS A RESULT,SO DO CONSUMER EXPECTATIONS 65%   57%   53%   0%   10%   20%   30%   40%   50%   60%   70%   Restaurant Retail Automotive Looking For Businesses Within 5 Miles of Their Location Source: xAd/Telmetrics Mobile Path to Purchase Study commissioned by Nielsen: Understanding Mobile’s Role in the Consumer Path to Purchase - 2013
  • 11.
    KEY INSIGHT IMMEDIACY OFNEED DRIVES IMPORTANCE OF PROXIMITY IMMEDIACY OF NEED IMPORTANCE OF PROXIMITY high low high low RESTAURANTS RETAIL AUTO
  • 12.
    •  Geo-Fencing •  Identifiesa point of interest on a map and establishes a radius around it for targeting purposes. •  Geo-Conquesting •  Uses location data to identify a brand’s competitors in an effort to promote a competing or competitive offering to their customers. •  Geo-Behavioral/Location-Based Audiences •  The ability to target unique audiences and/or users based on the context of a given location, past or present location behaviors etc. •  Retargeting •  Re-messaging to users based on past offline and online visitation behaviors MOBILE ADVERTISING MORE THAN JUST PROXIMITY TARGETING hJp://www.mmaglobal.com/   locaOon-­‐terminology-­‐guide  
  • 13.
  • 14.
    TOP GOALS: QSR/ RESTUARANTS Drive foot traffic away from competitors’ and into their stores Increase foot traffic during key times of day / day of week Increase awareness of new offerings / special offers
  • 15.
    GEO-CONQUESTING Reach consumers inand near competitor stores GEO-FENCING Reach consumers near your location RETARGETING Reach consumers after they visit AUDIENCE TARGETING Target custom audiences based on activity in the physical world MOBILE COUPONS Variety of executions QSR CATEGORY QSR / RESTAURANT TACTICS
  • 16.
    1.  Proximity isa key relevance driver 2.  Timing is Everything 3.  Creative – Keep it simple 4.  Plan for metrics that matter TOP QSR INSIGHTS
  • 17.
    1. PROXIMITY MATTERS Nearly7 out of 10 mobile restaurant users look up a business location and/or map and driving directions Source: xAd/Telmetrics Mobile Path to Purchase Study - Restaurants Location Targeting is Essential Leverage geo-precise targeting capabilities to reach consumers when they are near your / or your competitors locations Most Popular Targeting Tactics •  Geo-Fencing — Reach and engage customers around your own QSR locations •  Geo-Conquesting — Reach and engage customers around your competitors locations Immediate Proximity, 64% No Proximity Expectation, 36% Location Expectations When Searching for a Restaurant on Mobile
  • 18.
    2.TIMING IS EVERYTHING Over60% of mobile restaurant users look to make a purchase within the hour Source: xAd/Telmetrics Mobile Path to Purchase Study - Restaurants Marry Immediacy with Context •  Time of Day and Day of Week targeted campaigns satisfy both convenience and user intent •  Don’t assume consumers will remember your breakfast ad if served during the lunch hour Immediatley, 30% Within Hour, 34% Within day, 25% Within Month, 7% [SERIES NAME], 3% Immediacy of Consumer Need
  • 19.
    3. KEEP ITSIMPLE 19 Source: xAd/Telmetrics Mobile Path to Purchase Study - Restaurants Fancy, Fluffy Ad Creative is Seldom “Quick” •  QSR ad creative should include location, deal or offer, and a direct call to action •  Ads direct to landing pages with nearest location information and preferred actions such as map driving directions Decisions are made quickly. Make sure every second counts by providing users quick access to the information they need. 78%   65%   48%   27%   Food Type Location / Proximity Price Reviews Top Reasons for QSR Selection
  • 20.
    4. PLAN FORMETRICS THAT MATTER Mobile makes fast food FASTER, revealing user preference in secondary actions that drive offline conversion Top Mobile Secondary Actions: QSR!Measure Success of Intention-Driven Activities •  Clicks/CTR mean nothing when it comes to mobile restaurant user intent •  Plan and optimize based on QSR user action of choice – Map Driving Direction or Actual In-Store Visits Source: xAd Network Data
  • 21.
  • 22.
    22 GOAL: Drive foot trafficinto Pinkberry stores and generate awareness of current promotional offers to try the new Pinkberry greek yogurt. SOLUTION: Leverage geo-fencing combined with an audience target to reach Pinkberry’s Ideal audience. RESULTS The campaign doubled Pinkberry's performance benchmark CLIENT SUCCESS STORY: PINKBERRY
  • 23.
    SUCCESS STORY: QUIZNOS “Musthave a testing mentality -- always,” Tim Kraus, Director of Digital Marketing, Quiznos. Quiznos has been testing with Sense Networks/YP since 2012 over several campaigns to learn what works best in their business. Targeting: • San Francisco, Madison, Seattle test markets • Competitors’ customers (Subway, McDonald’s, Wendy’s) • Within 10 miles of locations Results: • 6% lift in sales over national average Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 24.
  • 25.
    Drive Foot Trafficinto Stores Special Sales or Promotions Market Focused Media Heavy-Ups Support Store Openings TOP GOALS: RETAIL
  • 26.
    GEO-CONQUESTING Reach consumers inand near competitor stores GEO-FENCING Reach consumers near your retail location RETARGETING Reach consumers after they visit retailers AUDIENCE TARGETING Target custom audiences based on activity in the physical world MOBILE COUPONS Variety of executions RETAIL CATEGORY RETAIL TACTICS
  • 27.
    1.  Geo-Fencing Mightbe Too Late 2.  Sometimes Location Doesn’t Matter… 3.  Target People, Not Places 4.  *Bonus Insight* Get Smart about Mobile Coupons RETAIL INSIGHTS
  • 28.
    70% of purchasesare planned. Shopping decisions can be better impacted by reaching shoppers in advance of going to a store. 1. GEO-FENCING MIGHT BE TOO LATE 1. Here’s a consumer who goes to Lowe’s 2. Here are 15 more opportunities to reach him. Lowe’s Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 29.
    2. SOMETIMES LOCATIONDOESN’T MATTER... Distance to Store CTR .5 mi 0.77% .5-1 mi. 0.79% 1-3 mi. 0.80% 3-5 mi. 0.78% 5-8 mi. 0.80% 8-10 mi. 0.79% 10+ mi. 0.80% Contrary to popular belief, there is not always a relationship between real- time distance to retail store and clicks. Red=  campaigns,  series  A   Blue  =  campaigns,  series  B  Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 30.
    … AT LEASTNOT HOWYOU THINK… Home/work location and attributes extracted from location data can drive greater lift in results. Especially for national brands with many well-known locations in a metro area other targeting will have a greater impact on response than being “1 mile from a retail store.” 0   1   2   3   4   5   Real Time Location Behavior Demos Home Location Group A Group B Group C Sample CTR Lift Multiple Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 31.
    “Groupon” Model • Deal Oriented • Hyper-Local • Bannerstates Distance to Retailer Brand Retailer • Generic banner • No deal * Have observed lack of correlation of Distance to CTR Correlation CTR- Distance to Store … NEED TO INVESTIGATE TO UNDERSTAND DRIVERS  If there's no deal, people who are frequently in close proximity to a brand or establishment can be less interested in the ad. Level of Correlation Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 32.
    3.TARGET PEOPLE, NOTJUST PLACES Location-powered audience profiles deliver a 3-5x lift ! over simple geo-fencing for retail brands. ! YPmobile Targeting ! Customer Information ! Works: Midtown Manhattan! Lives: Garden City, NY
 Shops at: Costco, Macy’s! Age: 35-44! Income: $150k+! Travels for business! YPmobile Targeting ! Customer Information ! Works: Minneapolis, MN! Lives: St. Paul, MN! Shops: Quiznos, Target! Age: 25-29! Income: $50-75k+! Interests: Concerts! Works: Unknown Lives: Unknown Shops: Unknown Age: Unknown Income: Unknown Interests: Unknown Traditional Location Targeting Customer Information! Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 33.
    •  Use locationto geo-conquest competitors’ shoppers •  Hyper-target with exclusive coupons per competitor •  Give shoppers control; save coupons to phone screen •  Measure multiple levels of action 4. GET SMART ABOUT MOBILE COUPONS Measure secondary ~20% save to phone Measure Coupons ~2% redeemed Measure Store Visits ~6% visited store Vs. Beauty Competitor: Vs. Fashion Competitor: Vs. Home/ Cookware Competitor: ~Measure Cost Per Store Visit ~$5 Source:  YP/Sense  Networks   hJp://naOonal.yp.com/mobile  
  • 34.
  • 35.
    SUCCESS STORY: COLUMBIA CampaignGoals: To increase awareness around Columbia’s Omni-Heat jacket and incent mobile users to come in-store to try it on Solution: •  Users were targeted in and around locations offering the new Omni-Heat jacket with a location-aware message •  Post click, users were taken to a custom landing page showing contact details for the nearest store location and a special offer Results: •  CTR was 52% above the industry average •  Driving directions and an exclusive offer that could be redeemed at retail locations were the highest secondary actions
  • 36.
    Targeting: • RetargetedVespa and MotoGuzzi shoppers • Motorcycle enthusiasts • Demographics (high HHI) Results: • Banner CTR: 0.75% • ~4x lift over untargeted • Interstitial CTR: 2.33% • 9% of clicks visited the dealer SUCCESS STORY:VESPA/MOTO GUZZI “This was not even an exercise in branding, but an exercise in sales,” Melissa MacCaull,VP of marketing at Piaggio Group America. “The campaign had the highest click-through rates of any other aspect of the program, including search and online display.”  Read more: http://www.mediapost.com/publications/article/209818/vespa-retargets-dealer-visitors-to- move-buyers-dow.html
  • 37.
    AUTO MOBILE CAN KICKSTART THE AUTO SHOPPING PROCESS
  • 38.
    ADVERTISING OBJECTIVES FORAUTOVARY BY “TIER” Auto mobile strategy varies depending on funding source: TIER 1: NATIONAL/ BRANDING Objective: Increase awareness and shift consideration TIER 2: REGIONAL DEALER GROUPS Drive qualified leads and promote regional incentives TIER 3: LOCAL DEALER Reach in-market shoppers and drive foot traffic to individual dealerships
  • 39.
    GEO-CONQUESTING Reach consumers visitingcompetitor lots. GEO-FENCING Reach consumers near dealership: fencing proximity based on machine learnings. RETARGETING Reach consumers after they visit lot or competitor dealerships for 30 days, anytime/anywhere. AUDIENCE TARGETING Target custom audiences based primarily on a combination of activity in the physical world; and HH matching data. ZIP+4 CODE TARGETING Target key zip codes for specific Models based on Polk sales data. AUTO CATEGORY AUTO OVERALL MOST EFFECTIVE LOCATION TACTICS BEACON TRIGGERED MESSAGING/OFFERS: Targeted ads integrated into Beacon technology. HH MATCHING/ “PATH” OVERLAY: Target based on HH to Device matching Auto data and optimize for path to purchase. “PATH” TARGETING Targeting locations that are seen on path to dealer lots, e.g., relevant Starbucks locations..
  • 40.
    AUTO OVERALL GEO-CONQUESTING WORKS Consumerswho are out on dealer lots are at the lowest part of the funnel and seeking deals. Time Spent: 21 Seconds Expandable Banner: 200 meter Geo-Fence of Owned and Operated Dealerships Time Spent: 20 Seconds Expandable Banner: Geo-Fencing Competitive Dealer Lots Expanded Panel Duration (Expandable Banners)
  • 41.
    AUTO OVERALL LOCATION AWARECREATIVE OUTPERFORMS GENERIC CREATIVE DYNAMIC DISTANCE DYNAMIC LOCALIZATION 1.8 MILES AWAY! ACTIONABLE CTA 3.2  MILES   Ads that are dynamic and customized to the user increase CTR by over 60% and eliminate the need for multiple creatives
  • 42.
    AUTO OVERALL FOR AUTO,CUSTOM LOCATION-BASE CONSUMER SEGMENTS WORK* OUTDOOR ENTHUSIASTS An auto OEM campaign focusing on off-road vehicles SUVs performed better using: The Custom Audience Profiles for Outdoor Enthusiast 78% CTR and 134 FTI Index * Versus Standard Outdoor Content Targeting = .58% CTR and 118 FTI Index DEVICE BEHAVIORAL PATTERNS/PATHS Seen at state and national parks multiple times a year HOUSEHOLD- LEVEL DEVICE MATCHING: DEMOGRAPHICS Lives in average to above average HHI neighborhoods in key outdoor DMAS (Denver, Minneapolis, etc) SOCIAL LOCATION INSIGHTS Lives in areas indexing highly for social posts with keywords such as: Camping Fishing Hiking Etc. HOUSEHOLD-LEVEL DEVICE MATCHING: TRANSACTIONAL Household purchase history for camping/outdoor gear (fishing poles, merrell shoes, Arcteryx etc) POI COMMERCIAL LOCATION ANALYSIS Temporal visits to outdoor themed retailers such as: Cabela's Bass Pro Shop Gander Mountain REI
  • 43.
    1.  For allTiers, location-aware creative outperforms generic/mass creative for ad engagement by over 2x* 2.  For Tier I Consumer Segments utilizing location and audience data combined, outperform all other tactics in terms of ad engagement and foot traffic. 3.  For Tier II and III, Geo-Conquesting is extremely effective at driving ad engagement and foot traffic. *Avg.: 2.1X ad engagement based on total campaigns, 2013. AUTO OVERALL TACTICS THAT ARE MOST EFFECTIVE BY TIER/OBJECTIVE
  • 44.
  • 45.
    TIER 1: TOPTACTICS THAT WORK ! ! Auto Intenders! Targeting People: Custom Consumer Segments: Target: Soccer Mom’s With Kids in HH 1.  HH to Device Matching 1.  Polk Reg. shows Minivan in garage 2.  3rd Party data shows HH with children under 18 in HH Targeting Places: Target: Areas where Mom’s with kids frequent: 1. Retailers, e.g., Gapkids 2. POIs: Parks, Playgrounds
  • 46.
    TIER 1: TOPTACTICS THAT WORK Creative That Works: Rich Media experience highlighting the cars features/functions
  • 47.
    TIER II: Driving regionalbrand interest and incentives
  • 48.
    Geo-Fencing/Geo-Conquesting: Geo fencing lotsand competitive lots. Zip+ 4 Targeting: Using Polk reg. data, targeting neighborhood blocks that are in top percentages for target prospects based on relevant auto registration data, e.g., own sub-compact over two years old. Audience Targeting: Using HH matching, Polk data and demographics matching data. TIER 2: TOP TACTICS THAT WORK Path Targeting Target using daypart and locations frequently seen prior to lot visits, e.g., Starbucks. Geo-Retargeting Retarget those on relevant lots in past 30 days.
  • 49.
    TIER 2: TOPTACTICS THAT WORK Creative That Works: Dynamic incentives are most effective: same look/feel (car image) but each regional group can set their offer (expandable or animated) •  1.8% APR financing in Northeast •  $500 cashback in Midwest 3. Offer Based 1. Map to Nearest Dealer(’s) 2. Get a Quote
  • 50.
    GOAL: Drive leads anddealer quotes to Nissan Tier Two Dealership site for dealer follow-up. TACTICS THAT WORKED: ZIP+4 REGISTRATION TARGETING Target key zip+4s for specific Models based on Polk sales data •  Customized make/model list based on market  •  Certain markets focused on conquesting specific Nissan competitors if Nissan's brand name (BDI) was weak but category (CDI) is strong •  Others reinforced Nissan make/model where brand and category (i.e. Sedan, or SUV) were strong CUSTOM CONSUMER SEGMENT: -  Segment based on combination of HH to Device Demo and Polk data matching and activities in the real world, e.g., visited any auto-lots. TIER 2 SUCCESS STORY: NISSAN
  • 51.
    RESULTS Reduction in CPLby 62% CPA by 25% year over year TIER 2 SUCCESS STORY: NISSAN
  • 52.
    TIER 3 DrivingTraffic to Specific Dealers
  • 53.
    MICRO-LOCATION TARGETING* Utilize Passbookenabled offers, activated by Beacons on-lot/premise. GEO-FENCING/GEO-CONQUESTING Geo-fencing individually owned and operated lots Geo-conquesting all regional competitor lots. TIER 3: TOP TACTICS THAT WORK *In test market currently.
  • 54.
    TIER 3: CREATIVESTHAT WORK CREATIVE THAT WORKS Very specific to dealer or dealer group and driving traffic (geo-aware/geo-fence) Incentives to come in and visit (passbook) 4. Dynamic Distance to Dealership 1. Mapping 2. Offer Based 3. Incentive-Based
  • 55.
    1. Person nearthe dealership location (lat / long) sees product offer on their iPhone 2. While in the dealer, the iBeacon triggers the offer to display 3. Customer redeems incentive with dealer FREE   GIFT  FREE  GIFT  WITH   A  TEST  DRIVE   FREE  GIFT  WITH   A  TEST  DRIVE   4. Beacons then provide “micro-location data that gives dealerships insights into customers and close loop from impression to attribution TIER 3 MICRO-LOCATION TACTICS THAT WORK
  • 56.
    56   ! •  “Location”doesn’t always mean “local”! •  Relevance is key to the mobile experience! –  Don’t just stop at targeting --- creative is just as important! •  Measure beyond the ad click! ! ! ! Closing: Key Takeaways!
  • 57.
    57   MMA NewYork Forum! May 7-9, 2014! MMA Singapore Forum! May 22, 2014! Cannes Lions Festival! June 15-21, 3014! Mobile CEO CMO Summit! July 13-15, 2014! MMA Shanghai Forum! July 24, 2014! ! Upcoming MMA Events!!
  • 58.
    58   Smartbrief clickhere! Mobile Smart Fundamentals click here! LinkedIn Group click here! Twitter click here! MMA Online: Committees at Work click here! MMA Online: Webinar Archive click here! MMA Online: White Papers click here! Additional Resources!
  • 59.
    59   ! ! ! ! MMA Members Include!
  • 60.
    60   ! ! ! ! MMA Members Include!