High Temperature Sulfidation
Ф52” just upstream of bend ruptured
Low Silicon CS
Tesoro Refinery, 2 Apr
2010, six fatalities
Thinning & Over pressurization
Shock Condensation & UDCBadly failed after 11 months of operation
CLSCC
Integrated Integrity
of Entire Plant from
cradle to grave
1. Desired operational reliability & safety between
TAs
2. Desired optimum plant run-length time between
TAs
3. Maximum cost effective life out of aging
equipment without failure
4. Optimum inspection interval for each item
5. Optimum spending on Capex and Revex
Plant Site:5 strategic goals
For the proactive culture to
survive over the long term, it
takes significant management
energy as well as a strong
commitment from all levels of
the organization
Change Reactive to Proactive Culture
We, as Site management be passionate in
overcoming the organizational inertia built
around a reactive culture. In the past, companies
that were successful in making the proactive
transition were under intense economic pressure
- they had to become reliable or go out of
business. If management energy is removed, the
culture will quickly return to being reactive.
Reactive Culture over
Proactive Culture is
Desirable in attending
Fire & safety matters
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM
MIQA & PSM

More Related Content

What's hot

Asset Integrity Management
Asset Integrity Management Asset Integrity Management
Asset Integrity Management
Advisian
 
Work permit
Work permitWork permit
Work permit
Bhuvana govind
 
Hazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C dasHazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C das
Bimal Chandra Das
 
General Safety Presentation
General Safety PresentationGeneral Safety Presentation
General Safety Presentation
gtwaddell
 
LOTO system integration with Permit to Work Software
LOTO system integration with Permit to Work SoftwareLOTO system integration with Permit to Work Software
LOTO system integration with Permit to Work Software
ASK EHS Engineering & Consultants
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
Gaurav Singh Rajput
 
Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
Ankit Narain
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
Anirudh Goyal
 
Gas cutting welding1
Gas cutting  welding1Gas cutting  welding1
Gas cutting welding1
soumenmakar
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
SUDHEER KUMAR KALYANAM
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
Karnav Rana
 
Innovations for Asset Integrity Management
Innovations for Asset Integrity ManagementInnovations for Asset Integrity Management
Innovations for Asset Integrity Management
SGS
 
Fire safety in the Workplace
Fire safety in the WorkplaceFire safety in the Workplace
Fire safety in the Workplace
AlphaPlusChampion
 
Permit to work
Permit to workPermit to work
Permit to work
Nikhil Barshettiwar
 
Welding safety
Welding safetyWelding safety
Welding safety
garfield Tulloch
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenance
Prasadroshan Mythin
 
Storage Tank Safety
Storage Tank SafetyStorage Tank Safety
Storage Tank Safety
Bipin ShyamSundar Tiwari
 
Fire fighting
Fire fightingFire fighting
Fire fighting
Tahseen Tahir
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
Gagan Tanwar
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
Mahendra K SHUKLA
 

What's hot (20)

Asset Integrity Management
Asset Integrity Management Asset Integrity Management
Asset Integrity Management
 
Work permit
Work permitWork permit
Work permit
 
Hazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C dasHazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C das
 
General Safety Presentation
General Safety PresentationGeneral Safety Presentation
General Safety Presentation
 
LOTO system integration with Permit to Work Software
LOTO system integration with Permit to Work SoftwareLOTO system integration with Permit to Work Software
LOTO system integration with Permit to Work Software
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
Gas cutting welding1
Gas cutting  welding1Gas cutting  welding1
Gas cutting welding1
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Innovations for Asset Integrity Management
Innovations for Asset Integrity ManagementInnovations for Asset Integrity Management
Innovations for Asset Integrity Management
 
Fire safety in the Workplace
Fire safety in the WorkplaceFire safety in the Workplace
Fire safety in the Workplace
 
Permit to work
Permit to workPermit to work
Permit to work
 
Welding safety
Welding safetyWelding safety
Welding safety
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenance
 
Storage Tank Safety
Storage Tank SafetyStorage Tank Safety
Storage Tank Safety
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 

Similar to MIQA & PSM

Operational Resilience
Operational ResilienceOperational Resilience
Operational Resilience
Gieomlabs
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Lattice Biologics Investor Pitchdeck
Lattice Biologics Investor PitchdeckLattice Biologics Investor Pitchdeck
Lattice Biologics Investor Pitchdeck
Melanie Battista, LEED AP
 
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Jonathan Lloyd
 
Be very efficient and innovative thanks to disorder!
Be very efficient and innovative thanks to disorder!Be very efficient and innovative thanks to disorder!
Be very efficient and innovative thanks to disorder!
Xavier Warzee
 
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Cairn India Limited
 
Org-Resilience-WP-Nov-2015
Org-Resilience-WP-Nov-2015Org-Resilience-WP-Nov-2015
Org-Resilience-WP-Nov-2015David Horlock
 
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
juliekannai
 
A presentation on " What's the way forward to Reliability of Static Equipment...
A presentation on " What's the way forward to Reliability of Static Equipment...A presentation on " What's the way forward to Reliability of Static Equipment...
A presentation on " What's the way forward to Reliability of Static Equipment...
MAHENDRA KUMAR RASTOGI
 
Presentation
PresentationPresentation
Presentation
Fredrick Onasanya
 
Asset Management details are available .pptx
Asset Management details are available .pptxAsset Management details are available .pptx
Asset Management details are available .pptx
shahzadnasim3
 
Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...
Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...
Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...Sociotechnical Roundtable
 
Perspectives on resilience
Perspectives on resilience Perspectives on resilience
Perspectives on resilience
James Nachbaur
 
Supply chain risk mitigation strategies
Supply chain risk mitigation strategiesSupply chain risk mitigation strategies
Supply chain risk mitigation strategies
abhaynawab
 
1501-1380419 Portfolio management in oil and gas TL FINAL
1501-1380419 Portfolio management in oil and gas TL FINAL1501-1380419 Portfolio management in oil and gas TL FINAL
1501-1380419 Portfolio management in oil and gas TL FINALChris Pateman Jones
 
A Best of Breed Approach to Accelerate Projects with High Reliability
A Best of Breed Approach to Accelerate Projects  with High Reliability A Best of Breed Approach to Accelerate Projects  with High Reliability
A Best of Breed Approach to Accelerate Projects with High Reliability
binozu
 
MFC )UPNEWS & INFORMATIONFind more productsupplier info.docx
MFC )UPNEWS & INFORMATIONFind more productsupplier info.docxMFC )UPNEWS & INFORMATIONFind more productsupplier info.docx
MFC )UPNEWS & INFORMATIONFind more productsupplier info.docx
ARIV4
 

Similar to MIQA & PSM (20)

Operational Resilience
Operational ResilienceOperational Resilience
Operational Resilience
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Lattice Biologics Investor Pitchdeck
Lattice Biologics Investor PitchdeckLattice Biologics Investor Pitchdeck
Lattice Biologics Investor Pitchdeck
 
Refining & Prtochemical Conference
Refining & Prtochemical  ConferenceRefining & Prtochemical  Conference
Refining & Prtochemical Conference
 
Refining & Prtochemical Conference
Refining & Prtochemical  ConferenceRefining & Prtochemical  Conference
Refining & Prtochemical Conference
 
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
 
Be very efficient and innovative thanks to disorder!
Be very efficient and innovative thanks to disorder!Be very efficient and innovative thanks to disorder!
Be very efficient and innovative thanks to disorder!
 
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
 
Org-Resilience-WP-Nov-2015
Org-Resilience-WP-Nov-2015Org-Resilience-WP-Nov-2015
Org-Resilience-WP-Nov-2015
 
resume
resume resume
resume
 
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
 
A presentation on " What's the way forward to Reliability of Static Equipment...
A presentation on " What's the way forward to Reliability of Static Equipment...A presentation on " What's the way forward to Reliability of Static Equipment...
A presentation on " What's the way forward to Reliability of Static Equipment...
 
Presentation
PresentationPresentation
Presentation
 
Asset Management details are available .pptx
Asset Management details are available .pptxAsset Management details are available .pptx
Asset Management details are available .pptx
 
Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...
Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...
Complex Systems Failure: Designing Reliability Teams - 2012 STS Roundtable Pr...
 
Perspectives on resilience
Perspectives on resilience Perspectives on resilience
Perspectives on resilience
 
Supply chain risk mitigation strategies
Supply chain risk mitigation strategiesSupply chain risk mitigation strategies
Supply chain risk mitigation strategies
 
1501-1380419 Portfolio management in oil and gas TL FINAL
1501-1380419 Portfolio management in oil and gas TL FINAL1501-1380419 Portfolio management in oil and gas TL FINAL
1501-1380419 Portfolio management in oil and gas TL FINAL
 
A Best of Breed Approach to Accelerate Projects with High Reliability
A Best of Breed Approach to Accelerate Projects  with High Reliability A Best of Breed Approach to Accelerate Projects  with High Reliability
A Best of Breed Approach to Accelerate Projects with High Reliability
 
MFC )UPNEWS & INFORMATIONFind more productsupplier info.docx
MFC )UPNEWS & INFORMATIONFind more productsupplier info.docxMFC )UPNEWS & INFORMATIONFind more productsupplier info.docx
MFC )UPNEWS & INFORMATIONFind more productsupplier info.docx
 

More from MAHENDRA KUMAR RASTOGI

Third eye inspection no. 2
Third eye inspection no. 2Third eye inspection no. 2
Third eye inspection no. 2
MAHENDRA KUMAR RASTOGI
 
Third eye inspection no. 1
Third eye inspection no. 1Third eye inspection no. 1
Third eye inspection no. 1
MAHENDRA KUMAR RASTOGI
 
Third eye inspection no. 1
Third eye inspection no. 1Third eye inspection no. 1
Third eye inspection no. 1
MAHENDRA KUMAR RASTOGI
 
Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...
Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...
Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...
MAHENDRA KUMAR RASTOGI
 
"Wake up call " to all operators & Regulators of Ageing petroleum industries.
"Wake up call " to all operators & Regulators of Ageing petroleum industries. "Wake up call " to all operators & Regulators of Ageing petroleum industries.
"Wake up call " to all operators & Regulators of Ageing petroleum industries.
MAHENDRA KUMAR RASTOGI
 
How Ageing Assets are Threat to sustenance for petroleum industries in low cr...
How Ageing Assets are Threat to sustenance for petroleum industries in low cr...How Ageing Assets are Threat to sustenance for petroleum industries in low cr...
How Ageing Assets are Threat to sustenance for petroleum industries in low cr...
MAHENDRA KUMAR RASTOGI
 
Why Globally Future of Future of petroleum industries is in doldrum ?
Why Globally Future of Future of petroleum industries is in doldrum ?Why Globally Future of Future of petroleum industries is in doldrum ?
Why Globally Future of Future of petroleum industries is in doldrum ?
MAHENDRA KUMAR RASTOGI
 
Why Globally Future of petroleum industries is in doldrum ?
Why Globally Future of petroleum industries is in doldrum ?Why Globally Future of petroleum industries is in doldrum ?
Why Globally Future of petroleum industries is in doldrum ?
MAHENDRA KUMAR RASTOGI
 
MIQA, An Ultimate Element of PSM Implementation
MIQA, An Ultimate Element of PSM ImplementationMIQA, An Ultimate Element of PSM Implementation
MIQA, An Ultimate Element of PSM Implementation
MAHENDRA KUMAR RASTOGI
 
Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...
Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...
Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...
MAHENDRA KUMAR RASTOGI
 
Radison Refining & Petrochemicals New Delhi
Radison Refining & Petrochemicals New DelhiRadison Refining & Petrochemicals New Delhi
Radison Refining & Petrochemicals New DelhiMAHENDRA KUMAR RASTOGI
 
3rd Asian Refinery & Petrochemical Forum 26-27 April'2017
3rd Asian Refinery & Petrochemical Forum 26-27 April'20173rd Asian Refinery & Petrochemical Forum 26-27 April'2017
3rd Asian Refinery & Petrochemical Forum 26-27 April'2017MAHENDRA KUMAR RASTOGI
 
Operational Excellence at Ibis Hotel London IQPC MAHENDRA
Operational Excellence at Ibis Hotel London IQPC MAHENDRAOperational Excellence at Ibis Hotel London IQPC MAHENDRA
Operational Excellence at Ibis Hotel London IQPC MAHENDRAMAHENDRA KUMAR RASTOGI
 
What's the way forward to reliability in ageing petroleum industries
What's the way forward to reliability in ageing petroleum industriesWhat's the way forward to reliability in ageing petroleum industries
What's the way forward to reliability in ageing petroleum industriesMAHENDRA KUMAR RASTOGI
 

More from MAHENDRA KUMAR RASTOGI (20)

Third eye inspection no. 2
Third eye inspection no. 2Third eye inspection no. 2
Third eye inspection no. 2
 
Third eye inspection no. 1
Third eye inspection no. 1Third eye inspection no. 1
Third eye inspection no. 1
 
Third eye inspection no. 1
Third eye inspection no. 1Third eye inspection no. 1
Third eye inspection no. 1
 
Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...
Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...
Global Energy shift : Oil to Solar - The greatest energy revolution of 21st c...
 
"Wake up call " to all operators & Regulators of Ageing petroleum industries.
"Wake up call " to all operators & Regulators of Ageing petroleum industries. "Wake up call " to all operators & Regulators of Ageing petroleum industries.
"Wake up call " to all operators & Regulators of Ageing petroleum industries.
 
How Ageing Assets are Threat to sustenance for petroleum industries in low cr...
How Ageing Assets are Threat to sustenance for petroleum industries in low cr...How Ageing Assets are Threat to sustenance for petroleum industries in low cr...
How Ageing Assets are Threat to sustenance for petroleum industries in low cr...
 
Why Globally Future of Future of petroleum industries is in doldrum ?
Why Globally Future of Future of petroleum industries is in doldrum ?Why Globally Future of Future of petroleum industries is in doldrum ?
Why Globally Future of Future of petroleum industries is in doldrum ?
 
Why Globally Future of petroleum industries is in doldrum ?
Why Globally Future of petroleum industries is in doldrum ?Why Globally Future of petroleum industries is in doldrum ?
Why Globally Future of petroleum industries is in doldrum ?
 
MIQA, An Ultimate Element of PSM Implementation
MIQA, An Ultimate Element of PSM ImplementationMIQA, An Ultimate Element of PSM Implementation
MIQA, An Ultimate Element of PSM Implementation
 
Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...
Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...
Key Point Message to Attendees on " Global Turbulence in Oil & Gas Sector and...
 
Radison Refining & Petrochemicals New Delhi
Radison Refining & Petrochemicals New DelhiRadison Refining & Petrochemicals New Delhi
Radison Refining & Petrochemicals New Delhi
 
Reliability & Maintenance Dubai
Reliability & Maintenance DubaiReliability & Maintenance Dubai
Reliability & Maintenance Dubai
 
Saudi Arabia turn around conference
Saudi Arabia turn around conferenceSaudi Arabia turn around conference
Saudi Arabia turn around conference
 
Saudi Arabia turn around conference
Saudi Arabia turn around conferenceSaudi Arabia turn around conference
Saudi Arabia turn around conference
 
3rd Asian Refinery & Petrochemical Forum 26-27 April'2017
3rd Asian Refinery & Petrochemical Forum 26-27 April'20173rd Asian Refinery & Petrochemical Forum 26-27 April'2017
3rd Asian Refinery & Petrochemical Forum 26-27 April'2017
 
Operational Excellence at Ibis Hotel London IQPC MAHENDRA
Operational Excellence at Ibis Hotel London IQPC MAHENDRAOperational Excellence at Ibis Hotel London IQPC MAHENDRA
Operational Excellence at Ibis Hotel London IQPC MAHENDRA
 
Abberdeen UK Presentation
Abberdeen  UK PresentationAbberdeen  UK Presentation
Abberdeen UK Presentation
 
AIM Scotland
AIM ScotlandAIM Scotland
AIM Scotland
 
Mahendra on Asset Integrity
Mahendra on Asset IntegrityMahendra on Asset Integrity
Mahendra on Asset Integrity
 
What's the way forward to reliability in ageing petroleum industries
What's the way forward to reliability in ageing petroleum industriesWhat's the way forward to reliability in ageing petroleum industries
What's the way forward to reliability in ageing petroleum industries
 

MIQA & PSM

  • 1.
  • 2.
  • 3.
  • 5.
  • 6. If we are not aware about probability of failure due to complexity but at least we should be aware about consequence if things fail and have the barriers and monitoring as well as its hazard control .
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. High Temperature Sulfidation Ф52” just upstream of bend ruptured Low Silicon CS
  • 17. Tesoro Refinery, 2 Apr 2010, six fatalities
  • 18. Thinning & Over pressurization
  • 19.
  • 20.
  • 21.
  • 22. Shock Condensation & UDCBadly failed after 11 months of operation
  • 23. CLSCC
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71. Integrated Integrity of Entire Plant from cradle to grave
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86. 1. Desired operational reliability & safety between TAs 2. Desired optimum plant run-length time between TAs 3. Maximum cost effective life out of aging equipment without failure 4. Optimum inspection interval for each item 5. Optimum spending on Capex and Revex Plant Site:5 strategic goals
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92. For the proactive culture to survive over the long term, it takes significant management energy as well as a strong commitment from all levels of the organization
  • 93. Change Reactive to Proactive Culture We, as Site management be passionate in overcoming the organizational inertia built around a reactive culture. In the past, companies that were successful in making the proactive transition were under intense economic pressure - they had to become reliable or go out of business. If management energy is removed, the culture will quickly return to being reactive.
  • 94.
  • 95. Reactive Culture over Proactive Culture is Desirable in attending Fire & safety matters