Wattie Pukeke has over 10 years of experience in construction, crane operation, rigging, scaffolding, and supervision. He possesses certificates in dogging, rigging, scaffolding, elevated work platforms, forklifts, and cranes. His resume lists employment history including positions as a rigger, dogman, truck driver, crane operator, and advanced rigger on various projects in Australia. References are provided.
1. Resume- Wattie Pukeke
Personal Details
Address: 505 Namarada Drive
Dundee Beach 0840 NT
Australia
Mobile: 0418 935 405
Email: wattiepukeke@bigpond.com
Certificates
• Dogging
• Advanced Rigging
• Advanced Scaffolding
• Elevated Work Platform
• Forklift
• CV, CN, C6,CO Crane
Inductions Attended
JKC Ichthys Project
Licenses
• Heavy Ridged Northern Territory
Skills, Knowledge and Abilities
I possess supervisory experience and skills, supervising crews of up to 10 employees on various
construction sites throughout the Perth metropolitan area.
Due to my diverse experience within the construction industry, I possess excellent knowledge of all
aspects of Crane Operations, Rigging, Dogging and Scaffolding.
2. Employment History
UGL
June 19th
2015- June 22nd
2016
Rigger and dogmen
On the Icthys CCPP Project, Bladin Point NT Darwin.
I did steel erecting and placing pipes and spools in and out of racks.
All so dogging and working with cranes from 20t up to 450t cranes.
Supervisor – Harry Bishop-Ph 0407572118
Aug 2014- May 2015
A B I Walker PTY LTD
Truck Driver
Alan Walker PH 0427901739
9 Jul 20013 -9 Jul 2014
BamClough
Rigging on barges and on land for construction of a new mof wharf for Ichthys Project in Darwin.
Peter Handson Ph; 0428765996 Supervisor
Sep 2012 Jun-2013
UGL
Crane operator in a 20 tone
Working on Jimbelbar Iron Ore Newman
March 2012-June 2012
United Group
Shut down as Advanced Rigger at Worsley Refinery.
Hays Recruitment
Shut down as Advanced Rigger and crane operator at Boddington gold mine.
3. October 2011-March 2012
Unemployed
April 2010-October 2011
United Group / Pluto gas plant.
Working as advanced rigger construction for Wood side gas plant
Steel erecting and placing pipes and spools in and out of racks
working with cranes from 20 tons to 275 tone
Some crane work up to 60 tone crane and forklift
Joe Giglia Ph; 0458512032 Supervisor
July 2008-December 2009
Harbour works Clough JV│ DAMPIER
Rigging on barge for construction of a new wharf for Wood side. on the Pluto gas plant.
Rob Peary Ph;0458998242 Supervisor
Employment History continued
August 2007- March 2008│ Western Constructions│ KWINANA
Cloud Break- Newman
Crane Operator; slewing and non-slewing crane operations.
Mark longdale Ph 0419930967 Supervisor
November 2006- April 2007││PCH Group LTD│ DAMPIER
Burr up Fertiliser Project
Rigging and Scaffolding, Crane Operator 14- 60 tones. The project was construction and maintained a
new fertiliser plant. Duties included; steel erecting and pipe work in racks and fit and tube in scaffolding.
At times, some crane work and forklifts.
Ph.: 0451056415- Wayne Smith, Supervisor
Referees
Harry Bishop- UGL- Supervisor ph 0407572118
. Joe Giglia- United Group-Supervisor- Ph;0458512032
4. Rob Peary - Harbour works Clough- Supervisor Ph0458998242
• Mark Longdale- Western Construction- Supervisor- Ph: 0419930967
• Dyffad Evens- Barclay Mowlem- Project Manager- Ph: 0418 179 552
.Peter Handson Bam Clough Supervisor – Ph 0428765996