5. Problem Description
Electronically submit data to National Transit
Database (NTD).
S-10 Service Form:
Number of Trips
Number of Passengers
Miles traveled
Data collection from multiple sources:
Trapeze software
Contractors
Dispatch entered data
Manual input information
Improvement
Opportunity
Large amount of data
collected from different
sources
6. • Document processes for monthly and
annual data collection and submission
of S10 DR/PT form.
• Identify process improvements to
reduce margin of error and manual
process for S10 DR/PT form.
Deliverables
Standardize and document
data entry processes
Reduce manual entry
through automation
Objectives
7. Constraint:
Insufficient allocated time for actual data
collection and validation.
Assumptions:
All data reported from Trapeze and contractor
files is correct and complete.
Data collection process is accepted as
accurate.
Assumptions & Constraints
8. Define Define the problem
Measure Map out current process
Analyze Identify cause of problem
Improve Implement and verify solution
Control Maintain solution
Methodology
9. Define
Analyze the current state:
Understand METRO data
collection process.
Create matrix tables in Excel:
Narrow down areas of interest.
Assumption: Data collected is
accurate.
Evaluate each line in S10 DR/PT
Form.
10. Quantify current METRO data
collection process.
Evaluate Trapeze and contractor data
transfer reports.
Multi-step process followed has been
used for years.
Print Manually input necessary data
Observation:
Trapeze report can be exported
Measure
13. Main Goal: Reduce margin of error
Manual handling information
High risk of error
Excel mainly used
Complex procedures
Analyze each line carefully
Extensive workbooks
Reduce redundancy
Solution for
Trapeze and
Contractor Reports
Automate Trapeze
Reports
Create Standard
Contractor Form
Analyze
14. Streamline Excel tabs:
Unnecessary steps
Redundancy
Incorporate simple equations
Took advantage of Excel formulas
Results:
Reduced # of steps
Increased accuracy
Improve
IF Statements COUNTIF
VLOOKUPMAX
Excel Logic
15. Improve
VBA Macros used for simplifying reports.
Advantage: Export Trapeze report.
Problem: Search for needed data.
Need to eliminate manual input errors .
No standard form for contractor data.
Create unified data collection method.
17. VBA Macro Contractor Report
Standard form for all
contractors.
Van & Van Lite
Weekday and weekend
calculations.
Validation:
Total days/month
Revenue miles/hour
19. Control
Saved macros on project manager’s computer
and shared-drive.
IMPORTANT If different software is used,
VBA macros won’t apply.
Work instructions created:
Trapeze Macro
Contractor Macro
Contractor Template
25. Conclusion
• S10 DR/PT data entry process has been streamlined
• Consequently, S10 DT/PT data entry process has been
streamlined as well.
• Trapeze and contractor manual entry has been
eliminated by 100%.
• Recommendations are now used on data collected for
the month of March.
26. Theoretical ideal system: Automatic
data collection and automatic
reporting.
Ultimate ideal system and
technologically workable system: Use
of relational database management
system (Microsoft SQL).
Data in a single location
Recommendations
27. Recommendations
Recommended system: Implementation and control of VBA macros.
This uses the resources currently available to METRO and presents a
free and clever solution to a complicated problem.
METROLift is a complementary paratransit service offered by the Metropolitan Transit Authority of Harris County in accordance with the ADA. METROLift provides transportation for persons with disabilities who cannot board, ride or disembark from a METRO fixed-route bus, even if that bus is equipped with a wheelchair lift or ramp.