Software Measurement  European Forum  2007 Conversion of Functional Size  FPA    COSMIC Harold van Heeringen Thursday May 10, 2007 Rome, Italy
Overview ,[object Object],[object Object],[object Object],[object Object],[object Object]
COSMIC-FFP  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sogeti Bid challenge ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Estimating wizard
Possible reasons to migrate to COSMIC ,[object Object],[object Object],[object Object],[object Object],[object Object]
Reasons why organizations don’t migrate ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sogeti conversion study  ,[object Object],[object Object],[object Object],[object Object]
[object Object]
FPA Users  Transactions Logical files (data functions) ILF EIF EI EQ EO
FPA in a nutshell ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
COSMIC W X R E Users Transactions Data
COSMIC in a nutshell ,[object Object],[object Object],[object Object],[object Object]
Most important differences Size is not limited Yes Size limit per function Few (ISBSG R10: n=110) Many (ISBSG R10: n=3108) Benchmarking data No, but local extensions are possible No Measurement of processing functionality Business, Real-time, Infrastructure Software Business Software Applicable on Domain Based on process model Based on data model Early sizing Possible Not possible Measurement of separate components? Not required (but useful) Required Data model required? COSMIC FPA
Correlation? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object]
Earlier conversion studies ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Earlier conversion studies ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sogeti Study (2006) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Division of the data set? ,[object Object],[object Object],CFP = 1,6 (FP NESMA-TX) -17 R 2  = 0.88 CFP = 0.68 (FP NESMA) +16 R 2  = 0.45 CFP = 1.24 (FP NESMA) -80 R 2  = 0.96
Sogeti 2006 ,[object Object],[object Object],[object Object]
Results ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object]
A Transition Framework ,[object Object],[object Object],[object Object],[object Object],[object Object]
Technical change ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Technical Change ,[object Object],[object Object],[object Object],[object Object]
Technical Change ,[object Object],[object Object],[object Object],[object Object],3) Create local statistically based  conversion formula
Technical Change ,[object Object],[object Object],[object Object],[object Object]
Organizational change ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],After conversion    COSMIC analysis
Conclusion & Discussion ,[object Object],[object Object],[object Object]
Questions Discussion

More Related Content

What's hot

software-effort_estimation(updated)9 ch05
 software-effort_estimation(updated)9 ch05 software-effort_estimation(updated)9 ch05
software-effort_estimation(updated)9 ch05Shahid Riaz
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)AmanSharma1172
 
Effort estimation( software Engineering)
Effort estimation( software Engineering)Effort estimation( software Engineering)
Effort estimation( software Engineering)kiran Patel
 
Enterprise Modelling Case Study
Enterprise Modelling Case StudyEnterprise Modelling Case Study
Enterprise Modelling Case Studynunpacker
 
It's Time to Reassess Your FDM Mappings
It's Time to Reassess Your FDM MappingsIt's Time to Reassess Your FDM Mappings
It's Time to Reassess Your FDM MappingsAlithya
 
Implementing Oracle Hyperion Profitability and Cost Management in a Professio...
Implementing Oracle Hyperion Profitability and Cost Management in a Professio...Implementing Oracle Hyperion Profitability and Cost Management in a Professio...
Implementing Oracle Hyperion Profitability and Cost Management in a Professio...InnovusPartners
 
Automatic measurements of use cases with cosmic thomas fehlmann
Automatic measurements of use cases with cosmic   thomas fehlmannAutomatic measurements of use cases with cosmic   thomas fehlmann
Automatic measurements of use cases with cosmic thomas fehlmannIWSM Mensura
 
Deployment entrada atd e saida atd
Deployment   entrada atd e saida atdDeployment   entrada atd e saida atd
Deployment entrada atd e saida atdAlfredo Neto
 
CONSTRUCTIVE COST MODEL TOOLS
CONSTRUCTIVE COST MODEL TOOLS CONSTRUCTIVE COST MODEL TOOLS
CONSTRUCTIVE COST MODEL TOOLS Hossam Nabih
 
A Deep Dive into HPCM for Planning and Essbase Professionals
A Deep Dive into HPCM for Planning and Essbase ProfessionalsA Deep Dive into HPCM for Planning and Essbase Professionals
A Deep Dive into HPCM for Planning and Essbase ProfessionalsAlithya
 
HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?Alithya
 
Software estimation models ii lec .05
Software estimation models ii lec .05Software estimation models ii lec .05
Software estimation models ii lec .05Noor Ul Hudda Memon
 
Estimation - The next level - and beyond
Estimation - The next level - and beyondEstimation - The next level - and beyond
Estimation - The next level - and beyondNesma
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimationumair khan
 

What's hot (19)

Cost estimation
Cost estimationCost estimation
Cost estimation
 
software-effort_estimation(updated)9 ch05
 software-effort_estimation(updated)9 ch05 software-effort_estimation(updated)9 ch05
software-effort_estimation(updated)9 ch05
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)
 
Effort estimation( software Engineering)
Effort estimation( software Engineering)Effort estimation( software Engineering)
Effort estimation( software Engineering)
 
Enterprise Modelling Case Study
Enterprise Modelling Case StudyEnterprise Modelling Case Study
Enterprise Modelling Case Study
 
It's Time to Reassess Your FDM Mappings
It's Time to Reassess Your FDM MappingsIt's Time to Reassess Your FDM Mappings
It's Time to Reassess Your FDM Mappings
 
Implementing Oracle Hyperion Profitability and Cost Management in a Professio...
Implementing Oracle Hyperion Profitability and Cost Management in a Professio...Implementing Oracle Hyperion Profitability and Cost Management in a Professio...
Implementing Oracle Hyperion Profitability and Cost Management in a Professio...
 
Automatic measurements of use cases with cosmic thomas fehlmann
Automatic measurements of use cases with cosmic   thomas fehlmannAutomatic measurements of use cases with cosmic   thomas fehlmann
Automatic measurements of use cases with cosmic thomas fehlmann
 
ITFT - Cocomo model
ITFT -  Cocomo modelITFT -  Cocomo model
ITFT - Cocomo model
 
Deployment entrada atd e saida atd
Deployment   entrada atd e saida atdDeployment   entrada atd e saida atd
Deployment entrada atd e saida atd
 
CONSTRUCTIVE COST MODEL TOOLS
CONSTRUCTIVE COST MODEL TOOLS CONSTRUCTIVE COST MODEL TOOLS
CONSTRUCTIVE COST MODEL TOOLS
 
A Deep Dive into HPCM for Planning and Essbase Professionals
A Deep Dive into HPCM for Planning and Essbase ProfessionalsA Deep Dive into HPCM for Planning and Essbase Professionals
A Deep Dive into HPCM for Planning and Essbase Professionals
 
HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?
 
Cocomomodel
CocomomodelCocomomodel
Cocomomodel
 
Cocomo m odel
Cocomo m odelCocomo m odel
Cocomo m odel
 
Software estimation models ii lec .05
Software estimation models ii lec .05Software estimation models ii lec .05
Software estimation models ii lec .05
 
Estimation - The next level - and beyond
Estimation - The next level - and beyondEstimation - The next level - and beyond
Estimation - The next level - and beyond
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimation
 
Commercial marketing update fw17'11
Commercial marketing update fw17'11Commercial marketing update fw17'11
Commercial marketing update fw17'11
 

Similar to Fpa Cosmic Ffp Convertability Final

Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees KuijpersNesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees KuijpersNesma
 
HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?Ray Février
 
Demantra Case Study Doug
Demantra Case Study DougDemantra Case Study Doug
Demantra Case Study Dougsichie
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 EstimationLawrence Bernstein
 
Holistic database for management of data including operational metrics
Holistic database for management of data including operational metricsHolistic database for management of data including operational metrics
Holistic database for management of data including operational metricsMika Aho
 
Software Estimating and Performance Measurement
Software Estimating and Performance MeasurementSoftware Estimating and Performance Measurement
Software Estimating and Performance MeasurementHarold van Heeringen
 
Migration of Domino Application Landscapes…using cedros Software Analysis & M...
Migration of Domino Application Landscapes…using cedros Software Analysis & M...Migration of Domino Application Landscapes…using cedros Software Analysis & M...
Migration of Domino Application Landscapes…using cedros Software Analysis & M...Philipp Königs
 
ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...
ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...
ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...CAST
 
ISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization success
ISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization successISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization success
ISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization successHarold van Heeringen
 
MOND Semantics Integration
MOND Semantics IntegrationMOND Semantics Integration
MOND Semantics IntegrationSales Emea
 
Documentation on bigmarket copy
Documentation on bigmarket   copyDocumentation on bigmarket   copy
Documentation on bigmarket copyswamypotharaveni
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
USING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICS
USING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICSUSING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICS
USING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICSHCL Technologies
 
Strategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive IndustryStrategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive IndustryVedant Borse
 
3803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v43803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v4Vedant Borse
 
SAPPHIRE - SAP WM and XSI with 3rd Party Logistics Providers
SAPPHIRE - SAP WM and XSI with 3rd Party Logistics ProvidersSAPPHIRE - SAP WM and XSI with 3rd Party Logistics Providers
SAPPHIRE - SAP WM and XSI with 3rd Party Logistics Providersbrishel
 

Similar to Fpa Cosmic Ffp Convertability Final (20)

Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees KuijpersNesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
 
HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?HPCM Management Ledger & FDMEE: The Perfect Partnership?
HPCM Management Ledger & FDMEE: The Perfect Partnership?
 
Demantra Case Study Doug
Demantra Case Study DougDemantra Case Study Doug
Demantra Case Study Doug
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 Estimation
 
1806 cosmic progress
1806 cosmic progress1806 cosmic progress
1806 cosmic progress
 
Holistic database for management of data including operational metrics
Holistic database for management of data including operational metricsHolistic database for management of data including operational metrics
Holistic database for management of data including operational metrics
 
Software Estimating and Performance Measurement
Software Estimating and Performance MeasurementSoftware Estimating and Performance Measurement
Software Estimating and Performance Measurement
 
Migration of Domino Application Landscapes…using cedros Software Analysis & M...
Migration of Domino Application Landscapes…using cedros Software Analysis & M...Migration of Domino Application Landscapes…using cedros Software Analysis & M...
Migration of Domino Application Landscapes…using cedros Software Analysis & M...
 
ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...
ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...
ERP Optimization: How to Save Cost And Gear Up For Business Innovation Simult...
 
ISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization success
ISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization successISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization success
ISMA 9 - van Heeringen - Using IFPUG and ISBSG to improve organization success
 
MOND Semantics Integration
MOND Semantics IntegrationMOND Semantics Integration
MOND Semantics Integration
 
RFP.docx
RFP.docxRFP.docx
RFP.docx
 
Documentation on bigmarket copy
Documentation on bigmarket   copyDocumentation on bigmarket   copy
Documentation on bigmarket copy
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
USING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICS
USING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICSUSING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICS
USING FACTORY DESIGN PATTERNS IN MAP REDUCE DESIGN FOR BIG DATA ANALYTICS
 
Strategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive IndustryStrategic Product Development and Cost Estimates for Automotive Industry
Strategic Product Development and Cost Estimates for Automotive Industry
 
3803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v43803_Strategic Product Development_ASUG v4
3803_Strategic Product Development_ASUG v4
 
SAPPHIRE - SAP WM and XSI with 3rd Party Logistics Providers
SAPPHIRE - SAP WM and XSI with 3rd Party Logistics ProvidersSAPPHIRE - SAP WM and XSI with 3rd Party Logistics Providers
SAPPHIRE - SAP WM and XSI with 3rd Party Logistics Providers
 

More from Harold van Heeringen

Improve Estimation maturity using Functional Size Measurement and Historical ...
Improve Estimation maturity using Functional Size Measurement and Historical ...Improve Estimation maturity using Functional Size Measurement and Historical ...
Improve Estimation maturity using Functional Size Measurement and Historical ...Harold van Heeringen
 
Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Harold van Heeringen
 
Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Harold van Heeringen
 
Methodisch begroten van projecten hanzehogeschool groningen december2014
Methodisch begroten van projecten   hanzehogeschool groningen december2014Methodisch begroten van projecten   hanzehogeschool groningen december2014
Methodisch begroten van projecten hanzehogeschool groningen december2014Harold van Heeringen
 
The importance of benchmarking software projects - Van Heeringen and Ogilvie
The importance of benchmarking software projects - Van Heeringen and OgilvieThe importance of benchmarking software projects - Van Heeringen and Ogilvie
The importance of benchmarking software projects - Van Heeringen and OgilvieHarold van Heeringen
 
Van Heeringen and van Gorp - Measure the functional size of a mobile app usi...
Van Heeringen and van Gorp  - Measure the functional size of a mobile app usi...Van Heeringen and van Gorp  - Measure the functional size of a mobile app usi...
Van Heeringen and van Gorp - Measure the functional size of a mobile app usi...Harold van Heeringen
 
Measuring the functional size of mobile apps with COSMIC FP
Measuring the functional size of mobile apps with COSMIC FPMeasuring the functional size of mobile apps with COSMIC FP
Measuring the functional size of mobile apps with COSMIC FPHarold van Heeringen
 
Avoid software project horror stories - check the reality value of the estima...
Avoid software project horror stories - check the reality value of the estima...Avoid software project horror stories - check the reality value of the estima...
Avoid software project horror stories - check the reality value of the estima...Harold van Heeringen
 
Gastcollege Hanzehogeschool Groningen 10 januari 2014
Gastcollege Hanzehogeschool Groningen 10 januari 2014Gastcollege Hanzehogeschool Groningen 10 januari 2014
Gastcollege Hanzehogeschool Groningen 10 januari 2014Harold van Heeringen
 
The value of benchmarking software projects
The value of benchmarking software projectsThe value of benchmarking software projects
The value of benchmarking software projectsHarold van Heeringen
 
Using the ISBSG data to improve your organization success - van Heeringen (Me...
Using the ISBSG data to improve your organization success - van Heeringen (Me...Using the ISBSG data to improve your organization success - van Heeringen (Me...
Using the ISBSG data to improve your organization success - van Heeringen (Me...Harold van Heeringen
 
Asl bi sl metrics themasessie 2013 devops sogeti
Asl bi sl metrics themasessie 2013   devops sogetiAsl bi sl metrics themasessie 2013   devops sogeti
Asl bi sl metrics themasessie 2013 devops sogetiHarold van Heeringen
 
Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013
Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013
Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013Harold van Heeringen
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, betterHarold van Heeringen
 
van Heeringen - estimate faster,cheaper and better!
van Heeringen - estimate faster,cheaper and better!van Heeringen - estimate faster,cheaper and better!
van Heeringen - estimate faster,cheaper and better!Harold van Heeringen
 
The value of benchmarking IT projects - H.S. van Heeringen
The value of benchmarking IT projects - H.S. van HeeringenThe value of benchmarking IT projects - H.S. van Heeringen
The value of benchmarking IT projects - H.S. van HeeringenHarold van Heeringen
 
Begroten van agile projecten, technical meeting Sogeti 2013-09
Begroten van agile projecten, technical meeting Sogeti 2013-09Begroten van agile projecten, technical meeting Sogeti 2013-09
Begroten van agile projecten, technical meeting Sogeti 2013-09Harold van Heeringen
 
Sogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance MeasurementSogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance MeasurementHarold van Heeringen
 
Project Control using functional size - which method to use?
Project Control using functional size - which method to use?Project Control using functional size - which method to use?
Project Control using functional size - which method to use?Harold van Heeringen
 
Metrics based software supplier selection - Best practice used in the largest...
Metrics based software supplier selection - Best practice used in the largest...Metrics based software supplier selection - Best practice used in the largest...
Metrics based software supplier selection - Best practice used in the largest...Harold van Heeringen
 

More from Harold van Heeringen (20)

Improve Estimation maturity using Functional Size Measurement and Historical ...
Improve Estimation maturity using Functional Size Measurement and Historical ...Improve Estimation maturity using Functional Size Measurement and Historical ...
Improve Estimation maturity using Functional Size Measurement and Historical ...
 
Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)
 
Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)Productivity measurement of agile teams (IWSM 2015)
Productivity measurement of agile teams (IWSM 2015)
 
Methodisch begroten van projecten hanzehogeschool groningen december2014
Methodisch begroten van projecten   hanzehogeschool groningen december2014Methodisch begroten van projecten   hanzehogeschool groningen december2014
Methodisch begroten van projecten hanzehogeschool groningen december2014
 
The importance of benchmarking software projects - Van Heeringen and Ogilvie
The importance of benchmarking software projects - Van Heeringen and OgilvieThe importance of benchmarking software projects - Van Heeringen and Ogilvie
The importance of benchmarking software projects - Van Heeringen and Ogilvie
 
Van Heeringen and van Gorp - Measure the functional size of a mobile app usi...
Van Heeringen and van Gorp  - Measure the functional size of a mobile app usi...Van Heeringen and van Gorp  - Measure the functional size of a mobile app usi...
Van Heeringen and van Gorp - Measure the functional size of a mobile app usi...
 
Measuring the functional size of mobile apps with COSMIC FP
Measuring the functional size of mobile apps with COSMIC FPMeasuring the functional size of mobile apps with COSMIC FP
Measuring the functional size of mobile apps with COSMIC FP
 
Avoid software project horror stories - check the reality value of the estima...
Avoid software project horror stories - check the reality value of the estima...Avoid software project horror stories - check the reality value of the estima...
Avoid software project horror stories - check the reality value of the estima...
 
Gastcollege Hanzehogeschool Groningen 10 januari 2014
Gastcollege Hanzehogeschool Groningen 10 januari 2014Gastcollege Hanzehogeschool Groningen 10 januari 2014
Gastcollege Hanzehogeschool Groningen 10 januari 2014
 
The value of benchmarking software projects
The value of benchmarking software projectsThe value of benchmarking software projects
The value of benchmarking software projects
 
Using the ISBSG data to improve your organization success - van Heeringen (Me...
Using the ISBSG data to improve your organization success - van Heeringen (Me...Using the ISBSG data to improve your organization success - van Heeringen (Me...
Using the ISBSG data to improve your organization success - van Heeringen (Me...
 
Asl bi sl metrics themasessie 2013 devops sogeti
Asl bi sl metrics themasessie 2013   devops sogetiAsl bi sl metrics themasessie 2013   devops sogeti
Asl bi sl metrics themasessie 2013 devops sogeti
 
Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013
Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013
Begroten van software projecten - Hogeschool Rotterdam gastcollege 05-11-2013
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
van Heeringen - estimate faster,cheaper and better!
van Heeringen - estimate faster,cheaper and better!van Heeringen - estimate faster,cheaper and better!
van Heeringen - estimate faster,cheaper and better!
 
The value of benchmarking IT projects - H.S. van Heeringen
The value of benchmarking IT projects - H.S. van HeeringenThe value of benchmarking IT projects - H.S. van Heeringen
The value of benchmarking IT projects - H.S. van Heeringen
 
Begroten van agile projecten, technical meeting Sogeti 2013-09
Begroten van agile projecten, technical meeting Sogeti 2013-09Begroten van agile projecten, technical meeting Sogeti 2013-09
Begroten van agile projecten, technical meeting Sogeti 2013-09
 
Sogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance MeasurementSogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance Measurement
 
Project Control using functional size - which method to use?
Project Control using functional size - which method to use?Project Control using functional size - which method to use?
Project Control using functional size - which method to use?
 
Metrics based software supplier selection - Best practice used in the largest...
Metrics based software supplier selection - Best practice used in the largest...Metrics based software supplier selection - Best practice used in the largest...
Metrics based software supplier selection - Best practice used in the largest...
 

Fpa Cosmic Ffp Convertability Final

  • 1. Software Measurement European Forum 2007 Conversion of Functional Size FPA  COSMIC Harold van Heeringen Thursday May 10, 2007 Rome, Italy
  • 2.
  • 3.
  • 4.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. FPA Users Transactions Logical files (data functions) ILF EIF EI EQ EO
  • 11.
  • 12. COSMIC W X R E Users Transactions Data
  • 13.
  • 14. Most important differences Size is not limited Yes Size limit per function Few (ISBSG R10: n=110) Many (ISBSG R10: n=3108) Benchmarking data No, but local extensions are possible No Measurement of processing functionality Business, Real-time, Infrastructure Software Business Software Applicable on Domain Based on process model Based on data model Early sizing Possible Not possible Measurement of separate components? Not required (but useful) Required Data model required? COSMIC FPA
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.