SlideShare a Scribd company logo
1 of 30
1
of
Extending workforce
management support to
the back office
Debra Philips Verizon
#NICEi2016
2
Verizon Enterprise Solutions
Divisions include –
Global Networking &
Security
Business
Communications
IT Solutions
Managed Services
Functions include –
Order Management
Provisioning
Service Delivery &
Assurance
Billing
Currently - VRM built for
Americas, EMEA ,
India locations
Verizon Employees
and Contractors
+4400 Resources
Deliver the Connected World. Simply. Reliably. Securely.
#NICEi2016
3
Resource Management – (Vision)
3
Agent &
Admin Tools
VECNotification Engine
Fax Email Online
• Billing Inquiry
• Incidents
• Change Requests
• Provisioning
• Ordering Screener
Customer
AIMS
PhoneChat
Customer
Facing
VECRM
Internal Portal
360 Customer
View
Case Management
(Ticket Initiation)
VAD
Agent Desktop
ACD
Resource
Management
Work Horses
ETMS / WOW
RT Dashboard
Intra-day
Mgmt.
Work Dist.
Metrics Feed
iCI
RT Dashboard
Intra-day
Mgmt.
Work Dist.
Metrics Feed
UOTM
RT Dashboard
Intra-day
Mgmt.
Work Dist.
Metrics Feed
ACD
Dashboard
Chat
Dashboard
Data Data Data
IEX
Analytics
HELM / PMRA
MYINFO /
DRIVE
• Shrink Management
• OT Management
• Short-Term Forecasting
• Schedule Optimization
• Center Level Reporting
• Agent Perf. Reporting
• Coaching
Log in/out data
Metrics Metrics
Metrics
Metrics
Agent Skills,
functions
Multi-Gen System Integration Project Focused on VES Workforce Performance & Measurement
Long-Term High-Level Architecture
#NICEi2016
4
Implementing the Vision with WFM (NICE)
4
PHASE 1
Implement Common Interface
based on Inbound ACD
format.
• Historical 30-minute interval
queue statistics
PHASE 2
Implement agent-level data
(more complex and limited
based on work horse system
design).
• Historical agent queue
statistics
• Historical agent system
statistics
• Historical agent activity
states
PHASE 3
Automate file delivery based
on custom interface
integration for each system.
PHASE 4
Integrate Verizon Agent
Desktop (VAD) to workhorse
data streams for additional
timestamps for activities.
What DATA can we get from our Work Horse Systems and How?
#NICEi2016
5
Implementing the Vision with WFM (NICE)
1. Integrations of three Work Horse / Back Office systems
• Ticket/Task feed for Trouble Ticket Management
• Chat feed
• Integrated billing system / task feed
2. Fourth Work Horse / Back Office system in development for Order
Management
PROGRESS
1. What data can we get?
2. How do we handle concurrent data streams?
3. How do we extract data from system to measure desired KPI’s?
4. Limitations of system (application vs webpage design)
ISSUES
#NICEi2016
6
Back Office Systems – Data Available
6
Agent Activity Agent Detail
What events are available or already
built into the application / webpage?
Do we have time stamps available?
How can the data groups be
structured ?
a) Work Groups
b) Function
c) Location
What DATA can we get?
#NICEi2016
77
The Data – Event Sets
Chat System - limited Events based on binary structure
#NICEi2016
8
The Data – Event Sets
8
Ticket System – basic States and adopted Reason codes
#NICEi2016
99
The Data - Agent Activity (Multiple Streams)
10 – ACD feed
20 – Ticketing System
21 – Chat System
#NICEi2016
1010
The Data - Agent Detail (Multiple Workgroups)
20 – Ticketing System ( 200+ function/locations)
21 – Chat System ( 40 locations)
#NICEi2016
11
Back Office Systems – Data Available
11
Chat Ticket Billing Inquiry Ticket
• Count of chats and
length (Open to Close
window)
• Immediate response
• Chat Groups, center
location, subject
• Deferred response with
backlog
• Tasks associated with
Trouble Tickets
• System Time – Login to
Logout time stamps
• Deferred response with
backlog
• Tasks associated with
Billing/Orders Tickets
• NO System Time – Webpage
based ** (ISSUE)
(continue integration with
Agent Desktop screen
capture)
Queue Data
#NICEi2016
12
How to Use the Data? And Issues
12
Baseline Data – What is it telling us? Key Observations
• Large performance variations tied to system, process and reporting challenges
• Continued human dependency to measure accurately
KPI Calculations
• Average Handle Time – (Sum(Task)(Sec)) / # Tasks
• Lost Time - (SignOnTime – (Available Time + Handle Time)) / SignOnTime
• Shrinkage - Sum of Time spent ( Meetings, Lunch, Doing Other Work)
• Occupancy % - (SUM(Task) + Sum(ATW)) / (TIME Available)
** ISSUE - How can we extract concurrent data streams? Limitation of
WFM reports primary or merged agent activity
• SmartSync – Actual Activity Detail and Summary
• (Internal) WFM Reporting Center – allows users to pull data by feed
#NICEi2016
13
VRM Initial Baseline Plan
13
System Compliance
Improvement
VRM Improvement
Process
• Abandoned Task Cap (90 min)
• Tasking Compliance (Start/Stop Task)
• Log In / Log Off
• Appropriate Code Usage
• Clean Up of Legacy Workflows
• Expand Measurable Workflows
• Daily Four KPI Reports
• Report & Shrink Checkbook Delivery
• Weekly Performance Review by Director
• Detailed Rollout Package
• New 30 Day Baseline
#NICEi2016
14
VRM KPIs Initial Baseline (sample report)
14
Systems, Workflow & VRM Process Enables Annualized Benefits ($11.8M)
7 Day KPI Report
KPI
1-
Mar
2-
Mar
3-
Mar
4-
Mar
5-
Mar
6-
Mar
7-
Mar
8-
Mar
9-
Mar
10-
Mar
11-
Mar
12-
Mar
13-
Mar
14-
Mar
15-
Mar
16-
Mar
17-
Mar
18-
Mar
19-
Mar
20-
Mar
21-
Mar
22-
Mar
23-
Mar
24-
Mar
25-
Mar
26-
Mar
27-
Mar
28-
Mar
29-
Mar
30-
Mar
31-
Mar
AHT (sec) 4253 1242 1061 77 117 98 122 136 94 84 123 161 142 135 159 115 105 117 111 105 217 313 253 259 222 241 206 219 265 221 230
Lost time (hrs) 154 489 811 842 856 694 299 174 591 922 895 947 801 289 157 339 990 837 736 891 355 222 600 772 594 860 704 338 190 410 541
Shrinkage %
-
159.
6
-3.6
-
156.
6
-
162.
3
-
116.8
-78.3
-
359.2
-46.5 -0.18 -87.5 -30.9 -48.9 -32.1 -84.9 -50.9 11.9 -26.7 -43.5 -5.25 -58.4
-
222.3
-
264.4
16.5 -38.6 6.5 -5.7 -15.7 -72.2 -45.9 14.8 1.3
Occupancy %
KPI Calculations
• Average Handle Time = ( Sum(Task)(Sec)) / # Tasks
• Lost Time = (SignOnTime-(AvailableTime+HandleTime))/SignOnTIme
• Shrinkage = Sum of Time spent (Meetings, Lunch, Doing other work)
• Occupancy % = ( SUM(Task) + Sum(ATW)) / ( TIME AVAILABLE)
Key Observations:
• Large performance variations tied to system, process and reporting challenges
• Continued human dependency to measure accurately
System Compliance Improvement
Abandoned Task Cap (90 min) IT
Tasking Compliance (start/stop task) IT / VRM In Progress
Log In / Log Off IT / VRM In Progress
Appropriate Code Usage IT / VRM In Progress
Clean Up of Legacy Workflows IT In Progress
Expand Measurable Workflows IT April
VRM Improvement Process
Daily Four KPI Reports VRM
Report & Shrink Checkbook Delivery VRM
Weekly Performance Review by
Director
VRM / Field
Detailed Rollout Package VRM / Field In Progress
New 30 Day Baseline VRM April
#NICEi2016
15
AHT by Skill Groups
AHT by Skill Groups –
Top 50% Outliers
Agent Behavior Report
Agent Behavior Report –
Top 50% Outliers
KPI Summary Reports,
Trending Graphs and Sub
Measurements
VRM KPIs – Sample Reports
15
KPI Reports
Data complied from WFM reports such as
Time Utilization, Agent Detail and Agent
Actual Activity through WebStation reports or
SmartSync
Pivot tables easily format reporting for roll up
of data from agent to Supervisor/ Manager/
Director/ VP
#NICEi2016
16
KPI Cadence (sample report)
16
• Organized by Director Groups
• AHT
• Shrinkage (Good)
• Lost Shrinkage (Bad)
• Occupancy
#NICEi2016
17
VRM - Week Over Week KPI Performance
17#NICEi2016
18
VRM - April KPI Sub Measurements
18
0
20
40
60
80
100
0
1000
2000
3000
4000
5000
Tasks with Zero AHT- May/June
0
10
20
30
40
50
60
0
50
100
150
200
250
300
350
Count of Lost Time > 120min - May/June
0
0.2
0.4
0.6
0.8
1
0
0.2
0.4
0.6
0.8
1
Logout Event in Hours - May/June
Sub Measurement Process Continues to Drive
Improvement in Four Core KPIs
#NICEi2016
19
Execution of the Vision w/Integrating Back Office Systems
19
69.0%
65.3%
68.2%
72.8%
79.1%
63.0%
78.3%
79.6%
81.2%
78.1%
50%
60%
70%
80%
90%
Jun Jul Aug Sep Oct
Abraldes Donovan
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
0.0
10.0
20.0
30.0
40.0
50.0
May Jun Jul Aug Sep Oct
Lost Time Shrink
RESULTS - KPI measurements
Service Level Improvements –
5 month period
• Abraldes Group - 63% to 79.1%
• Donovan Group - 69.0% to 78.1%
Lost Time Improvements – 5 month period
• Avg 42 hrs per rep per month to 22 hrs
Shrinkage Improvements – 5 month period
• Avg 17 % per month to 35 %
+25%
+13%
+50%
+50%
#NICEi2016
2020
Execution of the Vision w/Integrating Back Office Systems
EXECUTION – VRM Processes & Communication
Service Level Management
Daily Command Center calls
Weekly outlook meetings
Field Engagement
KPI meetings
Centralized / Offshore support model (VRM functions)
Command Center Implementation
Streamlined communication with CC 800# and consolidated email box
IEX project - continued integration with VAD (Agent Desktop) to
improve task model-based tools
#NICEi2016
2121
Execution of the Vision w/Integrating Back Office Systems
PLANNING – Forecasting & Scheduling
FTL ( Force to Load)
• Pipeline reduction plan outlined for OM
• Gathered revenue plan by circuit
• Vendor FTL meetings
• Revised plan incorporated
Scheduling
• Arrival pattern analysis
• Vacation bid
Field Engagement
• Skill group alignment
• Vendor hiring
recommendation
#NICEi2016
22
• Review BO system design with IT
Developers, End Users, and WFM
• Discuss how widgets are counted and
does it make sense to count or is there
another way
• Discuss with IT their method for counting
and ability to change
• Phased approach on system integration
and population of users to measure for a
baseline
Recommendations
Do’s
• Don’t be limited by current reporting
methods or structure
• Don’t assume users are following the
same process – they always find the
shortcuts or work around
• Don’t ignore outlier data – review for
potential system design issues or
process changes.
Don’ts
22
23
Q & A
logo#NICEi2016
24
Biography – Debra Phillips
Debra Phillips is currently an IT Systems Engineer supporting the NICE IEX WFM software
platform for Verizon’s Wireline and Enterprise Solutions Organizations. This includes
implementation, design and build, user acceptance testing, training, and tier 2 support of
software/hardware issues.
Debra has over 20 years experience in Workforce Management and Contact Centers that
include Sales, Customer Service, and Outsourcing supporting Telecom/Cable, Healthcare,
Retail, Catalog, and Government Industries. She has extensive experience in strategic and
operational functions of Workforce Management in the Contact Center environment, covering
scheduling, forecasting, budgeting, and intraday management process design, implementation,
and operations. Design and operational experience in multi-contact type and multi-skilled agent
environments.
#NICEi2016
25
Appendix
25
• Sample Reports
• AHT by Skill and Rep
• Zero AHT by Skill Outliers - System Limitation /Design
• Agent Behavior Report - Schedule and System Activity Summary
• Agent Behavior Report Outliers – System States or Lost Time
26
AHT by Skill Report (Tickets)
26
AHT Report
• The AHT Report provides an AHT breakout by Skill with a
month to date view, as well as the capability to view by day.
• Rep AHT by skill provides a summary of the AHT by skill for
Director, Manager and Agent with a month to date view, as well
as the capability to select by day.
• Currently available for agents in ETMS pilot.
#NICEi2016
27
AHT by Skill Report (Tickets) – Outliers
27#NICEi2016
28
Agent Behavior Report
28
Metric Definition Calculation
Lost Time / MTD
% of time signed in, not associated with inbound
calls
(SignOnTime-
(AvailableTime+IBHandleTime))/SignOnTIme
Agent Behavior Report
• Agent Behavior Report
captures Lost Time and Lost
Shrinkage
• Will provide a detailed view of
lost time by Director, Manager
and Agent
• Provides the ability to view the
time agents are spending on
each status and the
percentage deviated from the
original schedule in IEX
• Compiled from Schedule
Activity and Actual Events
from phone & BO systems
#NICEi2016
29
Agent Behavior Report - Outliers
29
• Line of Sight to
recorded activity based
on events states from
BO System.
• Large data points led
to investigation
• Enhance System
processes / expanded
reason codes
• Reclassify production /
unproductive codes
#NICEi2016
30
Share your thoughts with #NICEi2016
and your feedback using the NICE app

More Related Content

What's hot

Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...Linh Nguyen
 
Winter Simulation Conference 2021 - Process Wind Tunnel Talk
Winter Simulation Conference 2021 - Process Wind Tunnel TalkWinter Simulation Conference 2021 - Process Wind Tunnel Talk
Winter Simulation Conference 2021 - Process Wind Tunnel TalkSudhendu Rai
 
IoT SAP SETU Middleware Integrated Approach
IoT SAP SETU Middleware Integrated ApproachIoT SAP SETU Middleware Integrated Approach
IoT SAP SETU Middleware Integrated ApproachSurendra Kancherla
 
M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316sabbir456
 
Audit ranking & Rental Quality Scorecard Lyons Information Systems
Audit ranking & Rental Quality Scorecard Lyons Information SystemsAudit ranking & Rental Quality Scorecard Lyons Information Systems
Audit ranking & Rental Quality Scorecard Lyons Information SystemseAuditor Audits & Inspections
 
Chrysalis simplicity
Chrysalis simplicityChrysalis simplicity
Chrysalis simplicityRamco Systems
 
Mobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and ManagersMobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and ManagersTata Consultancy Services
 
The Earned Value Matutity Management Model
The Earned Value Matutity Management ModelThe Earned Value Matutity Management Model
The Earned Value Matutity Management ModelDr Ezzat Mansour
 
Sue's Presentation
Sue's PresentationSue's Presentation
Sue's PresentationSusan Cobb
 
Realtech tco study
Realtech tco studyRealtech tco study
Realtech tco studyPdunn42
 
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...Linh Nguyen
 
2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...Soumya De
 
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff ShinSing Yee Khoo
 
Maintaining Control and Compliance of your Fixed Assets with Sage Fixed Assets
Maintaining Control and Compliance of your Fixed Assets with Sage Fixed AssetsMaintaining Control and Compliance of your Fixed Assets with Sage Fixed Assets
Maintaining Control and Compliance of your Fixed Assets with Sage Fixed AssetsNet at Work
 

What's hot (20)

Prosoft BI Accelerator
Prosoft BI AcceleratorProsoft BI Accelerator
Prosoft BI Accelerator
 
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
 
Winter Simulation Conference 2021 - Process Wind Tunnel Talk
Winter Simulation Conference 2021 - Process Wind Tunnel TalkWinter Simulation Conference 2021 - Process Wind Tunnel Talk
Winter Simulation Conference 2021 - Process Wind Tunnel Talk
 
IoT SAP SETU Middleware Integrated Approach
IoT SAP SETU Middleware Integrated ApproachIoT SAP SETU Middleware Integrated Approach
IoT SAP SETU Middleware Integrated Approach
 
Telecom testing
Telecom testingTelecom testing
Telecom testing
 
M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316
 
Audit ranking & Rental Quality Scorecard Lyons Information Systems
Audit ranking & Rental Quality Scorecard Lyons Information SystemsAudit ranking & Rental Quality Scorecard Lyons Information Systems
Audit ranking & Rental Quality Scorecard Lyons Information Systems
 
Chrysalis simplicity
Chrysalis simplicityChrysalis simplicity
Chrysalis simplicity
 
Mobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and ManagersMobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and Managers
 
The Earned Value Matutity Management Model
The Earned Value Matutity Management ModelThe Earned Value Matutity Management Model
The Earned Value Matutity Management Model
 
Gi oss offering top cell_partnership (1)
Gi oss offering top cell_partnership (1)Gi oss offering top cell_partnership (1)
Gi oss offering top cell_partnership (1)
 
Sue's Presentation
Sue's PresentationSue's Presentation
Sue's Presentation
 
About Diksha
About Diksha About Diksha
About Diksha
 
Realtech tco study
Realtech tco studyRealtech tco study
Realtech tco study
 
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
 
2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...
 
Field service management (FSM)
Field service management (FSM)Field service management (FSM)
Field service management (FSM)
 
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
 
What is OSS?
What is OSS?What is OSS?
What is OSS?
 
Maintaining Control and Compliance of your Fixed Assets with Sage Fixed Assets
Maintaining Control and Compliance of your Fixed Assets with Sage Fixed AssetsMaintaining Control and Compliance of your Fixed Assets with Sage Fixed Assets
Maintaining Control and Compliance of your Fixed Assets with Sage Fixed Assets
 

Similar to 07_Extending Workforce Management_Verizon (3)dp

2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptxismailsheriff14
 
Logicentrix Dashboards And Scorecards
Logicentrix Dashboards And ScorecardsLogicentrix Dashboards And Scorecards
Logicentrix Dashboards And Scorecardssanolan
 
Introducing "ReNDevoZ"--Work Flow Management software for Renewable projects
Introducing "ReNDevoZ"--Work Flow Management software for Renewable projectsIntroducing "ReNDevoZ"--Work Flow Management software for Renewable projects
Introducing "ReNDevoZ"--Work Flow Management software for Renewable projectsM V Radhakrishna
 
Operational Efficiency with Mobility Presentation
Operational Efficiency with  Mobility PresentationOperational Efficiency with  Mobility Presentation
Operational Efficiency with Mobility PresentationNeeraj Sahu
 
Android Based Water Meter Reader for Water Comoanies
Android Based Water Meter Reader for Water ComoaniesAndroid Based Water Meter Reader for Water Comoanies
Android Based Water Meter Reader for Water ComoaniesCOMPUTING DEV STRATEGIES
 
Case study leading mnc apparel group co
Case study   leading mnc apparel group coCase study   leading mnc apparel group co
Case study leading mnc apparel group coAntony Georgin G
 
Are Those End-User Hardware Upgrades Necessary Right Now? Maybe Not
Are Those End-User Hardware Upgrades Necessary Right Now? Maybe NotAre Those End-User Hardware Upgrades Necessary Right Now? Maybe Not
Are Those End-User Hardware Upgrades Necessary Right Now? Maybe Notpanagenda
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!Unanet
 
Sap tech ed13_asug_delivering_continuous_sap_solution_availability
Sap tech ed13_asug_delivering_continuous_sap_solution_availabilitySap tech ed13_asug_delivering_continuous_sap_solution_availability
Sap tech ed13_asug_delivering_continuous_sap_solution_availabilityRobert Max
 
How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...Informatica Cloud
 
EMA Presentation: Driving Business Value with Continuous Operational Intellig...
EMA Presentation: Driving Business Value with Continuous Operational Intellig...EMA Presentation: Driving Business Value with Continuous Operational Intellig...
EMA Presentation: Driving Business Value with Continuous Operational Intellig...ExtraHop Networks
 
Sunrun slide for informatica summit - Harish Ramachandraiah
Sunrun slide for informatica summit - Harish RamachandraiahSunrun slide for informatica summit - Harish Ramachandraiah
Sunrun slide for informatica summit - Harish RamachandraiahHarish Ramachandraiah
 
Solving 21st Century App Performance Problems Without 21 People
Solving 21st Century App Performance Problems Without 21 PeopleSolving 21st Century App Performance Problems Without 21 People
Solving 21st Century App Performance Problems Without 21 PeopleDynatrace
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6keith inman
 
2-1 Remember the Help Desk with AFCU - Jared Flanders, Final
2-1 Remember the Help Desk with AFCU - Jared Flanders, Final2-1 Remember the Help Desk with AFCU - Jared Flanders, Final
2-1 Remember the Help Desk with AFCU - Jared Flanders, FinalJared Flanders
 
2i solutions overview march18
2i solutions overview march182i solutions overview march18
2i solutions overview march18Virendra Rai, PMP
 
Business Systems Analyst Resume
Business Systems Analyst ResumeBusiness Systems Analyst Resume
Business Systems Analyst ResumeRose Ann Reyes
 
Business Systems Analyst Resume
Business Systems Analyst ResumeBusiness Systems Analyst Resume
Business Systems Analyst ResumeRose Ann Reyes
 
Business Systems Analyst Resume
Business Systems Analyst ResumeBusiness Systems Analyst Resume
Business Systems Analyst ResumeRose Ann Reyes
 
data information and management system user prespective
data information and management system user prespectivedata information and management system user prespective
data information and management system user prespectiveVinay Shankar
 

Similar to 07_Extending Workforce Management_Verizon (3)dp (20)

2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx
 
Logicentrix Dashboards And Scorecards
Logicentrix Dashboards And ScorecardsLogicentrix Dashboards And Scorecards
Logicentrix Dashboards And Scorecards
 
Introducing "ReNDevoZ"--Work Flow Management software for Renewable projects
Introducing "ReNDevoZ"--Work Flow Management software for Renewable projectsIntroducing "ReNDevoZ"--Work Flow Management software for Renewable projects
Introducing "ReNDevoZ"--Work Flow Management software for Renewable projects
 
Operational Efficiency with Mobility Presentation
Operational Efficiency with  Mobility PresentationOperational Efficiency with  Mobility Presentation
Operational Efficiency with Mobility Presentation
 
Android Based Water Meter Reader for Water Comoanies
Android Based Water Meter Reader for Water ComoaniesAndroid Based Water Meter Reader for Water Comoanies
Android Based Water Meter Reader for Water Comoanies
 
Case study leading mnc apparel group co
Case study   leading mnc apparel group coCase study   leading mnc apparel group co
Case study leading mnc apparel group co
 
Are Those End-User Hardware Upgrades Necessary Right Now? Maybe Not
Are Those End-User Hardware Upgrades Necessary Right Now? Maybe NotAre Those End-User Hardware Upgrades Necessary Right Now? Maybe Not
Are Those End-User Hardware Upgrades Necessary Right Now? Maybe Not
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!
 
Sap tech ed13_asug_delivering_continuous_sap_solution_availability
Sap tech ed13_asug_delivering_continuous_sap_solution_availabilitySap tech ed13_asug_delivering_continuous_sap_solution_availability
Sap tech ed13_asug_delivering_continuous_sap_solution_availability
 
How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...
 
EMA Presentation: Driving Business Value with Continuous Operational Intellig...
EMA Presentation: Driving Business Value with Continuous Operational Intellig...EMA Presentation: Driving Business Value with Continuous Operational Intellig...
EMA Presentation: Driving Business Value with Continuous Operational Intellig...
 
Sunrun slide for informatica summit - Harish Ramachandraiah
Sunrun slide for informatica summit - Harish RamachandraiahSunrun slide for informatica summit - Harish Ramachandraiah
Sunrun slide for informatica summit - Harish Ramachandraiah
 
Solving 21st Century App Performance Problems Without 21 People
Solving 21st Century App Performance Problems Without 21 PeopleSolving 21st Century App Performance Problems Without 21 People
Solving 21st Century App Performance Problems Without 21 People
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
 
2-1 Remember the Help Desk with AFCU - Jared Flanders, Final
2-1 Remember the Help Desk with AFCU - Jared Flanders, Final2-1 Remember the Help Desk with AFCU - Jared Flanders, Final
2-1 Remember the Help Desk with AFCU - Jared Flanders, Final
 
2i solutions overview march18
2i solutions overview march182i solutions overview march18
2i solutions overview march18
 
Business Systems Analyst Resume
Business Systems Analyst ResumeBusiness Systems Analyst Resume
Business Systems Analyst Resume
 
Business Systems Analyst Resume
Business Systems Analyst ResumeBusiness Systems Analyst Resume
Business Systems Analyst Resume
 
Business Systems Analyst Resume
Business Systems Analyst ResumeBusiness Systems Analyst Resume
Business Systems Analyst Resume
 
data information and management system user prespective
data information and management system user prespectivedata information and management system user prespective
data information and management system user prespective
 

07_Extending Workforce Management_Verizon (3)dp

  • 1. 1 of Extending workforce management support to the back office Debra Philips Verizon #NICEi2016
  • 2. 2 Verizon Enterprise Solutions Divisions include – Global Networking & Security Business Communications IT Solutions Managed Services Functions include – Order Management Provisioning Service Delivery & Assurance Billing Currently - VRM built for Americas, EMEA , India locations Verizon Employees and Contractors +4400 Resources Deliver the Connected World. Simply. Reliably. Securely. #NICEi2016
  • 3. 3 Resource Management – (Vision) 3 Agent & Admin Tools VECNotification Engine Fax Email Online • Billing Inquiry • Incidents • Change Requests • Provisioning • Ordering Screener Customer AIMS PhoneChat Customer Facing VECRM Internal Portal 360 Customer View Case Management (Ticket Initiation) VAD Agent Desktop ACD Resource Management Work Horses ETMS / WOW RT Dashboard Intra-day Mgmt. Work Dist. Metrics Feed iCI RT Dashboard Intra-day Mgmt. Work Dist. Metrics Feed UOTM RT Dashboard Intra-day Mgmt. Work Dist. Metrics Feed ACD Dashboard Chat Dashboard Data Data Data IEX Analytics HELM / PMRA MYINFO / DRIVE • Shrink Management • OT Management • Short-Term Forecasting • Schedule Optimization • Center Level Reporting • Agent Perf. Reporting • Coaching Log in/out data Metrics Metrics Metrics Metrics Agent Skills, functions Multi-Gen System Integration Project Focused on VES Workforce Performance & Measurement Long-Term High-Level Architecture #NICEi2016
  • 4. 4 Implementing the Vision with WFM (NICE) 4 PHASE 1 Implement Common Interface based on Inbound ACD format. • Historical 30-minute interval queue statistics PHASE 2 Implement agent-level data (more complex and limited based on work horse system design). • Historical agent queue statistics • Historical agent system statistics • Historical agent activity states PHASE 3 Automate file delivery based on custom interface integration for each system. PHASE 4 Integrate Verizon Agent Desktop (VAD) to workhorse data streams for additional timestamps for activities. What DATA can we get from our Work Horse Systems and How? #NICEi2016
  • 5. 5 Implementing the Vision with WFM (NICE) 1. Integrations of three Work Horse / Back Office systems • Ticket/Task feed for Trouble Ticket Management • Chat feed • Integrated billing system / task feed 2. Fourth Work Horse / Back Office system in development for Order Management PROGRESS 1. What data can we get? 2. How do we handle concurrent data streams? 3. How do we extract data from system to measure desired KPI’s? 4. Limitations of system (application vs webpage design) ISSUES #NICEi2016
  • 6. 6 Back Office Systems – Data Available 6 Agent Activity Agent Detail What events are available or already built into the application / webpage? Do we have time stamps available? How can the data groups be structured ? a) Work Groups b) Function c) Location What DATA can we get? #NICEi2016
  • 7. 77 The Data – Event Sets Chat System - limited Events based on binary structure #NICEi2016
  • 8. 8 The Data – Event Sets 8 Ticket System – basic States and adopted Reason codes #NICEi2016
  • 9. 99 The Data - Agent Activity (Multiple Streams) 10 – ACD feed 20 – Ticketing System 21 – Chat System #NICEi2016
  • 10. 1010 The Data - Agent Detail (Multiple Workgroups) 20 – Ticketing System ( 200+ function/locations) 21 – Chat System ( 40 locations) #NICEi2016
  • 11. 11 Back Office Systems – Data Available 11 Chat Ticket Billing Inquiry Ticket • Count of chats and length (Open to Close window) • Immediate response • Chat Groups, center location, subject • Deferred response with backlog • Tasks associated with Trouble Tickets • System Time – Login to Logout time stamps • Deferred response with backlog • Tasks associated with Billing/Orders Tickets • NO System Time – Webpage based ** (ISSUE) (continue integration with Agent Desktop screen capture) Queue Data #NICEi2016
  • 12. 12 How to Use the Data? And Issues 12 Baseline Data – What is it telling us? Key Observations • Large performance variations tied to system, process and reporting challenges • Continued human dependency to measure accurately KPI Calculations • Average Handle Time – (Sum(Task)(Sec)) / # Tasks • Lost Time - (SignOnTime – (Available Time + Handle Time)) / SignOnTime • Shrinkage - Sum of Time spent ( Meetings, Lunch, Doing Other Work) • Occupancy % - (SUM(Task) + Sum(ATW)) / (TIME Available) ** ISSUE - How can we extract concurrent data streams? Limitation of WFM reports primary or merged agent activity • SmartSync – Actual Activity Detail and Summary • (Internal) WFM Reporting Center – allows users to pull data by feed #NICEi2016
  • 13. 13 VRM Initial Baseline Plan 13 System Compliance Improvement VRM Improvement Process • Abandoned Task Cap (90 min) • Tasking Compliance (Start/Stop Task) • Log In / Log Off • Appropriate Code Usage • Clean Up of Legacy Workflows • Expand Measurable Workflows • Daily Four KPI Reports • Report & Shrink Checkbook Delivery • Weekly Performance Review by Director • Detailed Rollout Package • New 30 Day Baseline #NICEi2016
  • 14. 14 VRM KPIs Initial Baseline (sample report) 14 Systems, Workflow & VRM Process Enables Annualized Benefits ($11.8M) 7 Day KPI Report KPI 1- Mar 2- Mar 3- Mar 4- Mar 5- Mar 6- Mar 7- Mar 8- Mar 9- Mar 10- Mar 11- Mar 12- Mar 13- Mar 14- Mar 15- Mar 16- Mar 17- Mar 18- Mar 19- Mar 20- Mar 21- Mar 22- Mar 23- Mar 24- Mar 25- Mar 26- Mar 27- Mar 28- Mar 29- Mar 30- Mar 31- Mar AHT (sec) 4253 1242 1061 77 117 98 122 136 94 84 123 161 142 135 159 115 105 117 111 105 217 313 253 259 222 241 206 219 265 221 230 Lost time (hrs) 154 489 811 842 856 694 299 174 591 922 895 947 801 289 157 339 990 837 736 891 355 222 600 772 594 860 704 338 190 410 541 Shrinkage % - 159. 6 -3.6 - 156. 6 - 162. 3 - 116.8 -78.3 - 359.2 -46.5 -0.18 -87.5 -30.9 -48.9 -32.1 -84.9 -50.9 11.9 -26.7 -43.5 -5.25 -58.4 - 222.3 - 264.4 16.5 -38.6 6.5 -5.7 -15.7 -72.2 -45.9 14.8 1.3 Occupancy % KPI Calculations • Average Handle Time = ( Sum(Task)(Sec)) / # Tasks • Lost Time = (SignOnTime-(AvailableTime+HandleTime))/SignOnTIme • Shrinkage = Sum of Time spent (Meetings, Lunch, Doing other work) • Occupancy % = ( SUM(Task) + Sum(ATW)) / ( TIME AVAILABLE) Key Observations: • Large performance variations tied to system, process and reporting challenges • Continued human dependency to measure accurately System Compliance Improvement Abandoned Task Cap (90 min) IT Tasking Compliance (start/stop task) IT / VRM In Progress Log In / Log Off IT / VRM In Progress Appropriate Code Usage IT / VRM In Progress Clean Up of Legacy Workflows IT In Progress Expand Measurable Workflows IT April VRM Improvement Process Daily Four KPI Reports VRM Report & Shrink Checkbook Delivery VRM Weekly Performance Review by Director VRM / Field Detailed Rollout Package VRM / Field In Progress New 30 Day Baseline VRM April #NICEi2016
  • 15. 15 AHT by Skill Groups AHT by Skill Groups – Top 50% Outliers Agent Behavior Report Agent Behavior Report – Top 50% Outliers KPI Summary Reports, Trending Graphs and Sub Measurements VRM KPIs – Sample Reports 15 KPI Reports Data complied from WFM reports such as Time Utilization, Agent Detail and Agent Actual Activity through WebStation reports or SmartSync Pivot tables easily format reporting for roll up of data from agent to Supervisor/ Manager/ Director/ VP #NICEi2016
  • 16. 16 KPI Cadence (sample report) 16 • Organized by Director Groups • AHT • Shrinkage (Good) • Lost Shrinkage (Bad) • Occupancy #NICEi2016
  • 17. 17 VRM - Week Over Week KPI Performance 17#NICEi2016
  • 18. 18 VRM - April KPI Sub Measurements 18 0 20 40 60 80 100 0 1000 2000 3000 4000 5000 Tasks with Zero AHT- May/June 0 10 20 30 40 50 60 0 50 100 150 200 250 300 350 Count of Lost Time > 120min - May/June 0 0.2 0.4 0.6 0.8 1 0 0.2 0.4 0.6 0.8 1 Logout Event in Hours - May/June Sub Measurement Process Continues to Drive Improvement in Four Core KPIs #NICEi2016
  • 19. 19 Execution of the Vision w/Integrating Back Office Systems 19 69.0% 65.3% 68.2% 72.8% 79.1% 63.0% 78.3% 79.6% 81.2% 78.1% 50% 60% 70% 80% 90% Jun Jul Aug Sep Oct Abraldes Donovan 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 0.0 10.0 20.0 30.0 40.0 50.0 May Jun Jul Aug Sep Oct Lost Time Shrink RESULTS - KPI measurements Service Level Improvements – 5 month period • Abraldes Group - 63% to 79.1% • Donovan Group - 69.0% to 78.1% Lost Time Improvements – 5 month period • Avg 42 hrs per rep per month to 22 hrs Shrinkage Improvements – 5 month period • Avg 17 % per month to 35 % +25% +13% +50% +50% #NICEi2016
  • 20. 2020 Execution of the Vision w/Integrating Back Office Systems EXECUTION – VRM Processes & Communication Service Level Management Daily Command Center calls Weekly outlook meetings Field Engagement KPI meetings Centralized / Offshore support model (VRM functions) Command Center Implementation Streamlined communication with CC 800# and consolidated email box IEX project - continued integration with VAD (Agent Desktop) to improve task model-based tools #NICEi2016
  • 21. 2121 Execution of the Vision w/Integrating Back Office Systems PLANNING – Forecasting & Scheduling FTL ( Force to Load) • Pipeline reduction plan outlined for OM • Gathered revenue plan by circuit • Vendor FTL meetings • Revised plan incorporated Scheduling • Arrival pattern analysis • Vacation bid Field Engagement • Skill group alignment • Vendor hiring recommendation #NICEi2016
  • 22. 22 • Review BO system design with IT Developers, End Users, and WFM • Discuss how widgets are counted and does it make sense to count or is there another way • Discuss with IT their method for counting and ability to change • Phased approach on system integration and population of users to measure for a baseline Recommendations Do’s • Don’t be limited by current reporting methods or structure • Don’t assume users are following the same process – they always find the shortcuts or work around • Don’t ignore outlier data – review for potential system design issues or process changes. Don’ts 22
  • 24. 24 Biography – Debra Phillips Debra Phillips is currently an IT Systems Engineer supporting the NICE IEX WFM software platform for Verizon’s Wireline and Enterprise Solutions Organizations. This includes implementation, design and build, user acceptance testing, training, and tier 2 support of software/hardware issues. Debra has over 20 years experience in Workforce Management and Contact Centers that include Sales, Customer Service, and Outsourcing supporting Telecom/Cable, Healthcare, Retail, Catalog, and Government Industries. She has extensive experience in strategic and operational functions of Workforce Management in the Contact Center environment, covering scheduling, forecasting, budgeting, and intraday management process design, implementation, and operations. Design and operational experience in multi-contact type and multi-skilled agent environments. #NICEi2016
  • 25. 25 Appendix 25 • Sample Reports • AHT by Skill and Rep • Zero AHT by Skill Outliers - System Limitation /Design • Agent Behavior Report - Schedule and System Activity Summary • Agent Behavior Report Outliers – System States or Lost Time
  • 26. 26 AHT by Skill Report (Tickets) 26 AHT Report • The AHT Report provides an AHT breakout by Skill with a month to date view, as well as the capability to view by day. • Rep AHT by skill provides a summary of the AHT by skill for Director, Manager and Agent with a month to date view, as well as the capability to select by day. • Currently available for agents in ETMS pilot. #NICEi2016
  • 27. 27 AHT by Skill Report (Tickets) – Outliers 27#NICEi2016
  • 28. 28 Agent Behavior Report 28 Metric Definition Calculation Lost Time / MTD % of time signed in, not associated with inbound calls (SignOnTime- (AvailableTime+IBHandleTime))/SignOnTIme Agent Behavior Report • Agent Behavior Report captures Lost Time and Lost Shrinkage • Will provide a detailed view of lost time by Director, Manager and Agent • Provides the ability to view the time agents are spending on each status and the percentage deviated from the original schedule in IEX • Compiled from Schedule Activity and Actual Events from phone & BO systems #NICEi2016
  • 29. 29 Agent Behavior Report - Outliers 29 • Line of Sight to recorded activity based on events states from BO System. • Large data points led to investigation • Enhance System processes / expanded reason codes • Reclassify production / unproductive codes #NICEi2016
  • 30. 30 Share your thoughts with #NICEi2016 and your feedback using the NICE app