Site Plan Kondisi Tanah
Pemilihan ALat
1. Stripping dan Cutting
Bulldozer Crawler CAT D5R
Kapasitas Blade : 4.28 m3
Rata-rata Kecepatan maju : 6.3 km/jam
Rata-rata Kecepatan mundur : 7 km/jam
Produktivitas : 229.1995 m3/jam
2. Loader
Wheel Loader CAT 938K
Kapasitas Bucket : 4 m3
Produktivitas : 285 m3/jam
3. Dump Truck
Kapasitas muatan :
18144 kg
Produktivitas : 56.7 m3/jam/truck
4.Compactor
Soil Compactor 825H
L(lebar efektif) : 1.814 m
V(Kecepatan) : 3 km/jam
Produktivitas : 40.815 m3/jam
Video Perencanaan Metode Konstruksi
Perhitungan
VOLUME TANAH:
-Volume Bank : 1251.2 m3
-Volume Stripping : 156.4 m3
-Volume Cutting : 1133.9 m3
-Volume Loose : 1360.68 m3
-Volume Compacting : 963.815 m3
 PEKERJAAN STRIPPING :
ALAT : BULLDOZER D5R
PRODUKTIVITAS : 229.1995 m3/jam
VOLUME STRIPPING : 156.4 m3
WAKTU :
= VOLUME STRIPPING / PRODUKTIVITAS ALAT
= 156.4 m3 / 229.1995 m3/jam
= 0.682 JAM  1 JAM
JUMLAH ALAT : 1 BUAH
 PEKERJAAN CUTTING :
ALAT : BULLDOZER D5R
PRODUKTIVITAS : 229.1995 m3/jam
VOLUME CUTTING : 1133.9 m3
WAKTU :
= VOLUME CUTTING / PRODUKTIVITAS ALAT
= 1133.9 m3/ 229.1995 m3/jam
= 4.95 JAM  5 JAM
 JUMLAH ALAT : 1 BUAH
 PEKERJAAN LOADING :
ALAT : Wheel Loader CAT 938K
PRODUKTIVITAS : 285 m3/jam
VOLUME LOOSE : 1360.68 m3
WAKTU :
= VOLUME STRIPPING / PRODUKTIVITAS ALAT
= 1360.68 m3/ 285 m3/jam
= 4.77 JAM  5 JAM
JUMLAH ALAT : 1 BUAH
 MOVING:
ALAT : Dump Truck
PRODUKTIVITAS TRUCK : 56.7 m3/jam
PRODUKTIVITAS LOADER : 285 m3/jam
JUMLAH TRUCK YANG DIBUTUHKAN :
= PRODUKTIVITAS LOADER / PRODUKTIVITAS TRUCK
= 285 m3/jam / 56.7 m3/jam
= 5 TRUCK
 PEKERJAAN COMPACTING :
ALAT : Soil Compactor 825H
PRODUKTIVITAS : 40.815 m3/jam
VOLUME COMPACT : 963.815 m3
WAKTU :
= VOLUME COMPACT / PRODUKTIVITAS ALAT
= 963.815 m3 / 40.815 m3/jam
= 23.614 JAM TIAP COMPACTOR
2 COMPACTOR  12 JAM PENGERJAAN
Perencanaan Jadwal
Rencana Anggaran Biaya
 NB : Anggaran biaya tersebut belum termasuk konsumsi dan rokok pekerja
TERIMA KASIH

More Related Content

What's hot

Produktivitas Alat Berat Dozer
Produktivitas Alat Berat DozerProduktivitas Alat Berat Dozer
Produktivitas Alat Berat Dozer
Elis Wahyuni
 
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrakPaket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Muhammad Yahya
 
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
FalmanFarez8
 
2. analisis tenaga alat berat
2. analisis tenaga alat berat2. analisis tenaga alat berat
2. analisis tenaga alat beratAhmad Wiratama
 
Produktivitas alat berat pada Rigid Pavement
Produktivitas alat berat pada Rigid PavementProduktivitas alat berat pada Rigid Pavement
Produktivitas alat berat pada Rigid Pavement
afifsalim12
 
99160197 kendali-mutu-beton
99160197 kendali-mutu-beton99160197 kendali-mutu-beton
99160197 kendali-mutu-beton
marolop007
 
Metode Konstruksi Kelompok V Semester 6 UNS
Metode Konstruksi Kelompok V Semester 6 UNSMetode Konstruksi Kelompok V Semester 6 UNS
Metode Konstruksi Kelompok V Semester 6 UNS
TITAMAYABELLA
 
Tugas Besar Pemindahan Tanah Mekanis
Tugas Besar Pemindahan Tanah MekanisTugas Besar Pemindahan Tanah Mekanis
Tugas Besar Pemindahan Tanah Mekanis
Rendi Fahreza
 
Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...
Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...
Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...
samuelsagala1
 
07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...
07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...
07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...
AldiRamdani3
 
Soil Investigation - Uji Sondir
Soil Investigation - Uji SondirSoil Investigation - Uji Sondir
Soil Investigation - Uji Sondir
Edi Supriyanto
 
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Joy Irman
 
CONTOH METODE PELAKSANAAN
CONTOH METODE PELAKSANAANCONTOH METODE PELAKSANAAN
CONTOH METODE PELAKSANAAN
MOSES HADUN
 
TUGAS PERKERASAN JALAN RAYA
TUGAS PERKERASAN JALAN RAYA TUGAS PERKERASAN JALAN RAYA
TUGAS PERKERASAN JALAN RAYA
Ayuismoyosofiana
 
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
Sumarno Feriyal
 
LAPORAN HASIL UJI SONDIR.pdf
LAPORAN HASIL UJI SONDIR.pdfLAPORAN HASIL UJI SONDIR.pdf
LAPORAN HASIL UJI SONDIR.pdf
Muh. Aksal
 
SNI 03-2417-1991
SNI 03-2417-1991SNI 03-2417-1991
SNI 03-2417-1991
MaulidiyaSarifatuzzu
 
Metode bab ii b galian dan urugan
Metode bab ii b galian dan uruganMetode bab ii b galian dan urugan
Metode bab ii b galian dan urugan
Moe Hamzan
 
backup-data-jembatan.docx
backup-data-jembatan.docxbackup-data-jembatan.docx
backup-data-jembatan.docx
Andiarc1
 

What's hot (20)

Produktivitas Alat Berat Dozer
Produktivitas Alat Berat DozerProduktivitas Alat Berat Dozer
Produktivitas Alat Berat Dozer
 
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrakPaket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
 
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
 
2. analisis tenaga alat berat
2. analisis tenaga alat berat2. analisis tenaga alat berat
2. analisis tenaga alat berat
 
Produktivitas alat berat pada Rigid Pavement
Produktivitas alat berat pada Rigid PavementProduktivitas alat berat pada Rigid Pavement
Produktivitas alat berat pada Rigid Pavement
 
Dcp laporan
Dcp laporanDcp laporan
Dcp laporan
 
99160197 kendali-mutu-beton
99160197 kendali-mutu-beton99160197 kendali-mutu-beton
99160197 kendali-mutu-beton
 
Metode Konstruksi Kelompok V Semester 6 UNS
Metode Konstruksi Kelompok V Semester 6 UNSMetode Konstruksi Kelompok V Semester 6 UNS
Metode Konstruksi Kelompok V Semester 6 UNS
 
Tugas Besar Pemindahan Tanah Mekanis
Tugas Besar Pemindahan Tanah MekanisTugas Besar Pemindahan Tanah Mekanis
Tugas Besar Pemindahan Tanah Mekanis
 
Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...
Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...
Analisa produktivitas alat berat bulldozer pada pembangunan jalan ruas lingka...
 
07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...
07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...
07. pengujian abrasi agregat halus dan kasar menggunakan mesin los angeles (m...
 
Soil Investigation - Uji Sondir
Soil Investigation - Uji SondirSoil Investigation - Uji Sondir
Soil Investigation - Uji Sondir
 
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
 
CONTOH METODE PELAKSANAAN
CONTOH METODE PELAKSANAANCONTOH METODE PELAKSANAAN
CONTOH METODE PELAKSANAAN
 
TUGAS PERKERASAN JALAN RAYA
TUGAS PERKERASAN JALAN RAYA TUGAS PERKERASAN JALAN RAYA
TUGAS PERKERASAN JALAN RAYA
 
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
 
LAPORAN HASIL UJI SONDIR.pdf
LAPORAN HASIL UJI SONDIR.pdfLAPORAN HASIL UJI SONDIR.pdf
LAPORAN HASIL UJI SONDIR.pdf
 
SNI 03-2417-1991
SNI 03-2417-1991SNI 03-2417-1991
SNI 03-2417-1991
 
Metode bab ii b galian dan urugan
Metode bab ii b galian dan uruganMetode bab ii b galian dan urugan
Metode bab ii b galian dan urugan
 
backup-data-jembatan.docx
backup-data-jembatan.docxbackup-data-jembatan.docx
backup-data-jembatan.docx
 

Viewers also liked

Portal 3 sendi
Portal 3 sendiPortal 3 sendi
Portal 3 sendi
Tanjungpura Universuty
 
Bowplank
BowplankBowplank
Bowplank
Namaku Anda
 
Proyek pembuatan lahan parkir
Proyek pembuatan lahan parkirProyek pembuatan lahan parkir
Proyek pembuatan lahan parkir
MuhammadAdianto13
 
Proyek pembangunan parkir teknik
Proyek pembangunan parkir teknikProyek pembangunan parkir teknik
Proyek pembangunan parkir teknik
Ichsan Prasetyo
 
Setting Out Construction
Setting Out ConstructionSetting Out Construction
Setting Out Construction
Shopyan Sauri
 
123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung
Wendo Enyos
 
TUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILA
TUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILATUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILA
TUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILA
Stephanus Turnip
 
Handout mer iv d iii
Handout mer iv d iiiHandout mer iv d iii
Handout mer iv d iii
Junaida Wally
 
Metode pelaksanaan proyek
Metode pelaksanaan proyekMetode pelaksanaan proyek
Metode pelaksanaan proyek
Wesly Simarmata
 

Viewers also liked (9)

Portal 3 sendi
Portal 3 sendiPortal 3 sendi
Portal 3 sendi
 
Bowplank
BowplankBowplank
Bowplank
 
Proyek pembuatan lahan parkir
Proyek pembuatan lahan parkirProyek pembuatan lahan parkir
Proyek pembuatan lahan parkir
 
Proyek pembangunan parkir teknik
Proyek pembangunan parkir teknikProyek pembangunan parkir teknik
Proyek pembangunan parkir teknik
 
Setting Out Construction
Setting Out ConstructionSetting Out Construction
Setting Out Construction
 
123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung123756903 perhitungan-struktur-baja-gedung
123756903 perhitungan-struktur-baja-gedung
 
TUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILA
TUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILATUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILA
TUGAS BESAR ANALISIS STRUKTUR 3 TEKNIK SIPIL UNILA
 
Handout mer iv d iii
Handout mer iv d iiiHandout mer iv d iii
Handout mer iv d iii
 
Metode pelaksanaan proyek
Metode pelaksanaan proyekMetode pelaksanaan proyek
Metode pelaksanaan proyek
 

Similar to Metode Konstruksi - Proyek Persiapan Lahan Parkir Jurusan Teknik Sipil UNS

Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology Course
Sevar Dilkhaz
 
Productivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying ActivityProductivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying Activity
Manish Kumar PGP - NICMAR Pune
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILE
Sarnath R
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
Sagnik Datta
 
Anantharaja_resume
Anantharaja_resumeAnantharaja_resume
Anantharaja_resume
anantharaja ganeshan
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading Mechanism
IRJET Journal
 
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
HafidzQadli1
 
01 general 59889
01 general 5988901 general 59889
01 general 59889
Alejandro Nolasco Facundo
 
Equipos RESEMIN
Equipos RESEMINEquipos RESEMIN
Equipos RESEMIN
cabrerafalconsebasti
 
Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
Safdar Ali
 
Mc closkey tf80 enhancements september 5 2013 (2)
Mc closkey tf80 enhancements september 5 2013 (2)Mc closkey tf80 enhancements september 5 2013 (2)
Mc closkey tf80 enhancements september 5 2013 (2)
Oscar044
 
Nh90 brochure 2016
Nh90 brochure 2016Nh90 brochure 2016
Nh90 brochure 2016
jihoon lee
 
2015 CV V8 Template
2015 CV V8 Template2015 CV V8 Template
2015 CV V8 Template
Dennis Weathers
 
NEW - Divemex Tidal Anchor - NEW
NEW - Divemex Tidal Anchor - NEWNEW - Divemex Tidal Anchor - NEW
NEW - Divemex Tidal Anchor - NEW
Martin Slade
 
PRODUCT KNOWLEDGE buma.pptx
PRODUCT KNOWLEDGE buma.pptxPRODUCT KNOWLEDGE buma.pptx
PRODUCT KNOWLEDGE buma.pptx
HeruSupriyanto20
 
presentation about guns...
presentation about guns...presentation about guns...
presentation about guns...
Ilhaan Marwat
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
Safdar Ali
 
Africa popular rotary dryer
Africa popular rotary dryerAfrica popular rotary dryer
Africa popular rotary dryer
Evita Lee
 
Piling equipment Delmag Sennebogen
Piling equipment Delmag Sennebogen Piling equipment Delmag Sennebogen
Piling equipment Delmag Sennebogen
Maquiandes Colombia
 

Similar to Metode Konstruksi - Proyek Persiapan Lahan Parkir Jurusan Teknik Sipil UNS (20)

Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology Course
 
Productivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying ActivityProductivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying Activity
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILE
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
 
Anantharaja_resume
Anantharaja_resumeAnantharaja_resume
Anantharaja_resume
 
Development Of Tipper Unloading Mechanism
Development Of Tipper Unloading MechanismDevelopment Of Tipper Unloading Mechanism
Development Of Tipper Unloading Mechanism
 
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
 
01 general 59889
01 general 5988901 general 59889
01 general 59889
 
Equipos RESEMIN
Equipos RESEMINEquipos RESEMIN
Equipos RESEMIN
 
Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
 
Mc closkey tf80 enhancements september 5 2013 (2)
Mc closkey tf80 enhancements september 5 2013 (2)Mc closkey tf80 enhancements september 5 2013 (2)
Mc closkey tf80 enhancements september 5 2013 (2)
 
Nh90 brochure 2016
Nh90 brochure 2016Nh90 brochure 2016
Nh90 brochure 2016
 
2015 CV V8 Template
2015 CV V8 Template2015 CV V8 Template
2015 CV V8 Template
 
NEW - Divemex Tidal Anchor - NEW
NEW - Divemex Tidal Anchor - NEWNEW - Divemex Tidal Anchor - NEW
NEW - Divemex Tidal Anchor - NEW
 
PRODUCT KNOWLEDGE buma.pptx
PRODUCT KNOWLEDGE buma.pptxPRODUCT KNOWLEDGE buma.pptx
PRODUCT KNOWLEDGE buma.pptx
 
presentation about guns...
presentation about guns...presentation about guns...
presentation about guns...
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Africa popular rotary dryer
Africa popular rotary dryerAfrica popular rotary dryer
Africa popular rotary dryer
 
Piling equipment Delmag Sennebogen
Piling equipment Delmag Sennebogen Piling equipment Delmag Sennebogen
Piling equipment Delmag Sennebogen
 

Recently uploaded

Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
shivani5543
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 

Recently uploaded (20)

Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 

Metode Konstruksi - Proyek Persiapan Lahan Parkir Jurusan Teknik Sipil UNS

  • 1. Metode Konstruksi (Stripping, Cutting, dan Compacting di Samping Gedung 4 Fakultas Teknik UNS Kelompok: Andreas Nur HadiI I0113013 Baggus Prastyo I0113023 Dede Zakiyah I0113031 Fika Giri Aspia I0112052 Himamul A’la I0112075
  • 3.
  • 4. Pemilihan ALat 1. Stripping dan Cutting Bulldozer Crawler CAT D5R Kapasitas Blade : 4.28 m3 Rata-rata Kecepatan maju : 6.3 km/jam Rata-rata Kecepatan mundur : 7 km/jam Produktivitas : 229.1995 m3/jam
  • 5. 2. Loader Wheel Loader CAT 938K Kapasitas Bucket : 4 m3 Produktivitas : 285 m3/jam
  • 6. 3. Dump Truck Kapasitas muatan : 18144 kg Produktivitas : 56.7 m3/jam/truck
  • 7. 4.Compactor Soil Compactor 825H L(lebar efektif) : 1.814 m V(Kecepatan) : 3 km/jam Produktivitas : 40.815 m3/jam
  • 9. Perhitungan VOLUME TANAH: -Volume Bank : 1251.2 m3 -Volume Stripping : 156.4 m3 -Volume Cutting : 1133.9 m3 -Volume Loose : 1360.68 m3 -Volume Compacting : 963.815 m3
  • 10.  PEKERJAAN STRIPPING : ALAT : BULLDOZER D5R PRODUKTIVITAS : 229.1995 m3/jam VOLUME STRIPPING : 156.4 m3 WAKTU : = VOLUME STRIPPING / PRODUKTIVITAS ALAT = 156.4 m3 / 229.1995 m3/jam = 0.682 JAM  1 JAM JUMLAH ALAT : 1 BUAH
  • 11.  PEKERJAAN CUTTING : ALAT : BULLDOZER D5R PRODUKTIVITAS : 229.1995 m3/jam VOLUME CUTTING : 1133.9 m3 WAKTU : = VOLUME CUTTING / PRODUKTIVITAS ALAT = 1133.9 m3/ 229.1995 m3/jam = 4.95 JAM  5 JAM  JUMLAH ALAT : 1 BUAH
  • 12.  PEKERJAAN LOADING : ALAT : Wheel Loader CAT 938K PRODUKTIVITAS : 285 m3/jam VOLUME LOOSE : 1360.68 m3 WAKTU : = VOLUME STRIPPING / PRODUKTIVITAS ALAT = 1360.68 m3/ 285 m3/jam = 4.77 JAM  5 JAM JUMLAH ALAT : 1 BUAH
  • 13.  MOVING: ALAT : Dump Truck PRODUKTIVITAS TRUCK : 56.7 m3/jam PRODUKTIVITAS LOADER : 285 m3/jam JUMLAH TRUCK YANG DIBUTUHKAN : = PRODUKTIVITAS LOADER / PRODUKTIVITAS TRUCK = 285 m3/jam / 56.7 m3/jam = 5 TRUCK
  • 14.  PEKERJAAN COMPACTING : ALAT : Soil Compactor 825H PRODUKTIVITAS : 40.815 m3/jam VOLUME COMPACT : 963.815 m3 WAKTU : = VOLUME COMPACT / PRODUKTIVITAS ALAT = 963.815 m3 / 40.815 m3/jam = 23.614 JAM TIAP COMPACTOR 2 COMPACTOR  12 JAM PENGERJAAN
  • 16. Rencana Anggaran Biaya  NB : Anggaran biaya tersebut belum termasuk konsumsi dan rokok pekerja