CURRICULUM VITAE
I. PERSONAL DATA
Name : Mehrzad
SUR Name : Hosseini
Date Of Birth : 12-Sep-1972
Marital status : Single
Language & Dialects : English & Persian & Russian & Azerbaijani
Nationality : Iranian
Permanent Address : 19, East Line 8 - Nezami St. - Shahin Shahr - Isfahan - IRAN
12,Tagiyev St.,Baku,Azerbaijan
Residence Tel : +994 50 560 2852 & +98913-328-5200
E-mail : mehrzad195@yahoo.com
II. EDUCATIONAL QUALIFICATION
1996 : B.S - In Electrical Engineering - University of Isfahan
1992 : Associate’s degree in Electrical Engineering- Shiraz institute of
Technology
Computer skills : Good performance in Microsoft office, Auto Cad,
Electrical design soft wear such as ETAP,Dialux
HSE & Technical certificate : BP AzBU Integrated safe systems of work (ISSOW)
Basic Offshore Safety Induction & Emergency Training.
III. PROFESIONAL EXPERIENCE
Company : Rapid Solution LLC
Duration : June-2010 ~ Up to now
Project : UPS & Battery systems Maintenance Support
Client : BP Exploration (Caspian Sea) LTD
Position : Senior UPS system Engineer
Job Description : Maintenance ,repair,design, commissioning,service support for all
UPS & Battery systems
In all BP Facilities in Azerbaijan & Georgia including Sangachal
Terminal,BTS/SCP pipeline,WREP & NREP & SUPSA,Platforms
(Azeri,Shah Deniz,Chirag,Gnashli)
Company : Kentech Engineering & Construction Services LTD.
Duration : Oct-2005 ~ May-2010
Project : UPS & Battery systems Maintenance Support
Client : BP Exploration (Caspian Sea) LTD
Position : Senior UPS system Engineer
Job Description : Maintenance ,repair,design, commissioning,service support for all
UPS & Battery systems
In all BP Facilities in Azerbaijan & Georgia including Sangachal
Terminal,BTS/SCP pipeline,WREP & NREP & SUPSA,Platforms
(Azeri,Shah Deniz,Chirag,Gnashli)
Company : Kentech Caspian LTD.
Duration : Jun-2005 ~ Oct-2005
Project : Shah Deniz Gas Export Project (Off Shore Platform)- Azerbaijan
Client : BP Exploration LTD & Technip-Coflexip.
Position : Electrical & Instrument Field Engineer
Job Description :
- Preparation of construction job cards as per IPA system.
- Preparation of system packs.
- Working with PDMS
- Site surveying.
- Preparation of As-Built Drawing
Company : The join venture of Jahan pars & Keyson & Tehran jonoob .
Duration : Oct-2003 ~ May-2005
Project : Borzouyeh Petrochemical Co. (4th
Aromatics Plant) – IRAN
Position : Electrical Lead Engineer (power & control system)
Job Description : Installation,Test & Precommissioning of:
- Power Transformers (20KV/6.32KV 35MVA) & (6.3KV/0.42KV
2MV) (including NGR).
- 20KV & 6KV switch gears & 400V MCC.
- VSD panel & Heater control panel & Relay cabinet & Power
distribution panels.
- HV & MV & LV Bus duct (5000A & 4000A).
- Protection relay testing & setting configuration.
- UPS & battery charger & batteries & DC distribution panels.
- Capacitor bank (20 KV,500 VAR )
- Medium voltage, low voltage, & control cable laying .
- 2.5 MVA Emergency diesel generator (including control panel)
- Preparation of Precommissioning Procedure.
Company : Pars international development & engineering Co.
Duration : Nov-2002 ~ Oct-2003
Project : South Pars Gas Field Development phase 1 – IRAN (Gas Refinery)
Position : Commissioning Engineer
Job Description : Test,Precommissioning & commissioning of:
- Power Transformers (11KV/6.32KV 3.75MVA) &
(11KV/0.42KV 2.5MV) (including NGR).
- 6KV switch gears & 400V MCC.
- VSD panel & Heater control panel & Relay cabinet & Power
distribution panels.
- Protection relay testing & setting.
- UPS & battery charger & batteries & DC distribution panels.
- Power management system ( PMS ) (including Siemens PLC).
- Motor solo-run testing (400V,6KV,11KV).
- 700 KVA Emergency diesel generator (including control panel)
- DCS loop check for motor control.
Company : AZAR AB IND. CO.
Duration : Sep-2001 ~ Sep-2002
Project : South Pars Gas Field Development phase 1 – IRAN (Gas Refinery)
Position : Electrical Engineer (Technical office & Quality control & executive)
Job Description : Installation of:
- Power Transformers (11KV/6.32KV 3.75MVA) &
(11KV/0.42KV 2.5MV) (including NGR).
- 6KV switch gears & 400V MCC.
- Bus duct (5000A & 4000A).
- UPS & battery charger & batteries & DC distribution panels.
- PMS system installation.
- High voltage, low voltage, & control cable laying.
Company : HYUNDAI ENGINEERING & CONSTRACTION CO.Ltd.
Duration : 7-Feb-2000 ~ 23-Apr-2001
Project : TOTAL South Pars Project Phases II & III –IRAN (Gas Refinery)
Position : Electrical Engineer
Job Description : Installation, Test, Precommissioning of:
- Power transformers (33KV/6.3 16MVA)
& (6.6KV / 0.4KV 2.5MVA).
- 33 KV , 6.6 KV , 0.4 KV Switch gears & relay
- Cathodic protection sys.
- UPS & DC distribution panels & Battery.
- High Voltage, Low voltage & Fiber Optic Cable laying.
- Lighting, Earthing, Telecommunication, & Cable tray.
Company : TNC CONSTRUCTION & ERECTION OF INDUSTRIAL
PROJECTS CO.Ltd.(TOSE EH NIROU CO)
Duration : 29-Nov-1998 ~ 3-Feb-2000
Project : Arak Thermal Power Plant - IRAN
Position : Electrical Field Engineer
Job Description : Installation, Testing, Pre Commissioning of:
- Station Transformers (63 MVA, 230/20 kV)Including Protection
System.
- Unit Transformers ( 20 MVA , 20 / 6.6 KV ) including protection
System
- Auxiliary Transformer ( 6.6 / 0.4 KV )
- 6.6. KV, 0.4 kV, Switchgear & M.C.C., Power Distribution,
Relay.
- DC System (220,110,48) VDC Including Batteries and Battery
Charger, UPS & DC distribution Panels.
- Electrical Utility System (lighting, Earthing, Telephone & Alarm
System).
Company : SHINHWA Engineering & Construction Co, Ltd.
Duration : 19 - Jan. - 93 ~ 23 - Oct. - 93.
Project : Isfahan Petrochemical Complex -IRAN.
Position : Electrical Supervisor.
Job Description : Panel installation, Cable pulling, Earthing, Ligthing.

Mehrzad_Hosseini2

  • 1.
    CURRICULUM VITAE I. PERSONALDATA Name : Mehrzad SUR Name : Hosseini Date Of Birth : 12-Sep-1972 Marital status : Single Language & Dialects : English & Persian & Russian & Azerbaijani Nationality : Iranian Permanent Address : 19, East Line 8 - Nezami St. - Shahin Shahr - Isfahan - IRAN 12,Tagiyev St.,Baku,Azerbaijan Residence Tel : +994 50 560 2852 & +98913-328-5200 E-mail : mehrzad195@yahoo.com II. EDUCATIONAL QUALIFICATION 1996 : B.S - In Electrical Engineering - University of Isfahan 1992 : Associate’s degree in Electrical Engineering- Shiraz institute of Technology Computer skills : Good performance in Microsoft office, Auto Cad, Electrical design soft wear such as ETAP,Dialux HSE & Technical certificate : BP AzBU Integrated safe systems of work (ISSOW) Basic Offshore Safety Induction & Emergency Training. III. PROFESIONAL EXPERIENCE Company : Rapid Solution LLC Duration : June-2010 ~ Up to now Project : UPS & Battery systems Maintenance Support Client : BP Exploration (Caspian Sea) LTD Position : Senior UPS system Engineer Job Description : Maintenance ,repair,design, commissioning,service support for all UPS & Battery systems In all BP Facilities in Azerbaijan & Georgia including Sangachal Terminal,BTS/SCP pipeline,WREP & NREP & SUPSA,Platforms (Azeri,Shah Deniz,Chirag,Gnashli) Company : Kentech Engineering & Construction Services LTD. Duration : Oct-2005 ~ May-2010 Project : UPS & Battery systems Maintenance Support Client : BP Exploration (Caspian Sea) LTD Position : Senior UPS system Engineer Job Description : Maintenance ,repair,design, commissioning,service support for all UPS & Battery systems In all BP Facilities in Azerbaijan & Georgia including Sangachal Terminal,BTS/SCP pipeline,WREP & NREP & SUPSA,Platforms (Azeri,Shah Deniz,Chirag,Gnashli) Company : Kentech Caspian LTD.
  • 2.
    Duration : Jun-2005~ Oct-2005 Project : Shah Deniz Gas Export Project (Off Shore Platform)- Azerbaijan Client : BP Exploration LTD & Technip-Coflexip. Position : Electrical & Instrument Field Engineer Job Description : - Preparation of construction job cards as per IPA system. - Preparation of system packs. - Working with PDMS - Site surveying. - Preparation of As-Built Drawing Company : The join venture of Jahan pars & Keyson & Tehran jonoob . Duration : Oct-2003 ~ May-2005 Project : Borzouyeh Petrochemical Co. (4th Aromatics Plant) – IRAN Position : Electrical Lead Engineer (power & control system) Job Description : Installation,Test & Precommissioning of: - Power Transformers (20KV/6.32KV 35MVA) & (6.3KV/0.42KV 2MV) (including NGR). - 20KV & 6KV switch gears & 400V MCC. - VSD panel & Heater control panel & Relay cabinet & Power distribution panels. - HV & MV & LV Bus duct (5000A & 4000A). - Protection relay testing & setting configuration. - UPS & battery charger & batteries & DC distribution panels. - Capacitor bank (20 KV,500 VAR ) - Medium voltage, low voltage, & control cable laying . - 2.5 MVA Emergency diesel generator (including control panel) - Preparation of Precommissioning Procedure. Company : Pars international development & engineering Co. Duration : Nov-2002 ~ Oct-2003 Project : South Pars Gas Field Development phase 1 – IRAN (Gas Refinery) Position : Commissioning Engineer Job Description : Test,Precommissioning & commissioning of: - Power Transformers (11KV/6.32KV 3.75MVA) & (11KV/0.42KV 2.5MV) (including NGR). - 6KV switch gears & 400V MCC. - VSD panel & Heater control panel & Relay cabinet & Power distribution panels. - Protection relay testing & setting. - UPS & battery charger & batteries & DC distribution panels. - Power management system ( PMS ) (including Siemens PLC). - Motor solo-run testing (400V,6KV,11KV). - 700 KVA Emergency diesel generator (including control panel) - DCS loop check for motor control. Company : AZAR AB IND. CO. Duration : Sep-2001 ~ Sep-2002 Project : South Pars Gas Field Development phase 1 – IRAN (Gas Refinery) Position : Electrical Engineer (Technical office & Quality control & executive) Job Description : Installation of: - Power Transformers (11KV/6.32KV 3.75MVA) & (11KV/0.42KV 2.5MV) (including NGR). - 6KV switch gears & 400V MCC. - Bus duct (5000A & 4000A). - UPS & battery charger & batteries & DC distribution panels.
  • 3.
    - PMS systeminstallation. - High voltage, low voltage, & control cable laying. Company : HYUNDAI ENGINEERING & CONSTRACTION CO.Ltd. Duration : 7-Feb-2000 ~ 23-Apr-2001 Project : TOTAL South Pars Project Phases II & III –IRAN (Gas Refinery) Position : Electrical Engineer Job Description : Installation, Test, Precommissioning of: - Power transformers (33KV/6.3 16MVA) & (6.6KV / 0.4KV 2.5MVA). - 33 KV , 6.6 KV , 0.4 KV Switch gears & relay - Cathodic protection sys. - UPS & DC distribution panels & Battery. - High Voltage, Low voltage & Fiber Optic Cable laying. - Lighting, Earthing, Telecommunication, & Cable tray. Company : TNC CONSTRUCTION & ERECTION OF INDUSTRIAL PROJECTS CO.Ltd.(TOSE EH NIROU CO) Duration : 29-Nov-1998 ~ 3-Feb-2000 Project : Arak Thermal Power Plant - IRAN Position : Electrical Field Engineer Job Description : Installation, Testing, Pre Commissioning of: - Station Transformers (63 MVA, 230/20 kV)Including Protection System. - Unit Transformers ( 20 MVA , 20 / 6.6 KV ) including protection System - Auxiliary Transformer ( 6.6 / 0.4 KV ) - 6.6. KV, 0.4 kV, Switchgear & M.C.C., Power Distribution, Relay. - DC System (220,110,48) VDC Including Batteries and Battery Charger, UPS & DC distribution Panels. - Electrical Utility System (lighting, Earthing, Telephone & Alarm System). Company : SHINHWA Engineering & Construction Co, Ltd. Duration : 19 - Jan. - 93 ~ 23 - Oct. - 93. Project : Isfahan Petrochemical Complex -IRAN. Position : Electrical Supervisor. Job Description : Panel installation, Cable pulling, Earthing, Ligthing.