1. The document provides important questions and answers related to maintenance engineering for slow learners. It covers topics like condition monitoring, reliability analysis, failure rate, mean time to failure, and availability.
2. The maintenance organization structure and economics are explained in detail. Different types of maintenance organization like decentralized, centralized, and partially centralized are described. Factors considered for maintenance planning and life cycle cost analysis are also summarized.
3. Availability is defined as the ratio of time equipment is available to the total time of operation and maintenance. Different types of availability like inherent, achieved and operational availability are stated along with the formula to calculate inherent availability.