OBJECTIVE :
CAD professional with ‘12’ years’ experience primarily in serving GCC country clients. Possess in-depth
knowledge of a variety of disciplines including civil, infrastructure, and utilities development. Have
represented work for contractors, consultants and clients. Have a strong detail orientation and am
known for a high level of accuracy and efficiency that contributes to improved delivery times
QUALIFICATION :
Technical Diploma in Civil Engineering
(Recognized by Govt. Of India)
AutoCAD and CIVIL 3D
Academic Higher Secondary Education
(Board of Public Examination, Kerala)
Computer Proficiency MS Office (MS Word, Excel, Access, etc)
Key Skills Preparing Drawings for Authority approval
Preparing Shop drawings
Preparing As-Built drawings
Coordination of Utility drawings with Roads and MEP etc.
PROFESSIONAL EXPERIENCE:
Date: From March 2014 to
Present Date
WSP | PARSONS BRINCKERHOFF
Doha-Qatar
Position held: Senior CAD Technician – Infrastructure Utilities
Projects Involved:-
New Orbital Highway Contract – 1
Al Wakrah Bypass Road
People Mover System – Education City Tram Depot & Track Alignment
DC4 Safiya Stadium
Al Jemailya Village Road - Al Khor
Qatar science and Technology Park (QSTP)
Mirage Bluewater Master Planning Infrastructure – UAE
Al- Barari Development - UAE
Duties and Responsibilities
o Preparation of detailed drawings Sewerage, Storm, Irrigation, Water Supply and Dry Utilities,
layouts, long sections, general arrangements, Network Detailed Layout & Longitudinal Profiles
Page 2 of 4
drawings. It includes maintaining proper storage and managing submission of the completed
drawings to respective client, also responsible for reviewing and maintaining the high standard
of drawings. I always keep the standard bar high for others and lead by an example.
o Potable water layout plan with all valve i.e. gate valve, washout valve, air valve, non-return
valve, pressure reducer valve.
o Irrigation layout plan with fire hydrant, washout chamber, gate valve, air valve and details.
o Sewerage layout plan with house connection chamber, valve chamber, air valve, flow direction,
profiles and sewerage details.
o Storm water drainage layout plan with future connection, drainage manhole, gully chamber,
soak away, profiles and SWD details.
o Prepare shop drawings/sketches such as layout, sections, profiles and construction details for
additional works and variations to be issued to the Contractor for implementation on site.
o Verification of the accuracy of the shop drawings submitted by the contractor for site
implementation, Checking coordinates, potential conflicts and levels of all proposed utilities
submitted by the Contractor.
o Preparing the drawings for the presentation, concept design, .preliminary design, detailed
design, tender, and various utilities for Infrastructure.
o Prepare pipe route / following given corridors.
Date: From March 2006 to
February 2014
BEMCO ALMABANI ENGINEERING W.L.L
Doha-Qatar
Position held: CAD Technician – Utilities
Projects Involved:-
Dukhan Road Main Highway - East Contract Phase -2
New Doha International Airport (NDIA) CP-13
Qatar Foundation Education City South Site Central Plant CP-7
Duties and Responsibilities
o Underground Utility System
o Preparation of preliminary and final drawing of underground utilities such as potable, waste,
irrigation, high pressure, chilled water pipe lines, electrical and telecommunication duct banks.
o Detailing of shop drawings for mechanical and electrical layout such as isolation, washout, air
release valves, interface points, fire hydrant, duct banks manhole and hand hole and others as
per consultant requirements.
o Draw up cross section/ profile of underground utilities in compliance with the standard cover up
level and slopes in position with the existing /design ground levels.
o Make revision and modifications to existing plans based on instruction/sketches received from
surveyor/assigned engineers.
o Monitor incoming and outgoing drawings for documentation.
Page 3 of 4
o Performed other task assigned from time to time by superiors.
o Documents controlling for the project as per revision.
Projects Involved:-
Residential villas and shopping Complex
Hospital buildings and schools
Residential villas and Auditorium
Roads and Parking Area
Mosques and Shopping Complex
Workshops and Yards at Industrial Area
Cinema Theaters / Industrial workshop / Shed
Date: From September 2003 to
April 2004
CYRIX CONSTRUCTIONS
Kerala- India.
Position held: AutoCAD Draughtsman
Duties and Responsibilities
o Preparing drawings of Municipal, Industrial, Urban development projects, Housing compounds,
primary & supporting Industrial Park and all development works for planning department.
o Preparing “As-Built drawings”, construction schedule & progress bar chart by AutoCAD
o Preparing Infrastructure, include roads, utilities layouts and section details. Road crossing
details, layouts and profiles
PERSONAL PROFILE:
Personal Contact in Doha: P.O.Box No. 13885
Doha – Qatar
Tel: +974 77653256
+974 55653256
Permanent Address in India: Ambalathveetil
P.O.Thrithallur West ,Trichur Dist.
Kerala ,India – PIN: 680 619
Tel: +91 487 2292195
Date of Birth: April 20, 1982
Nationality: Indian
Passport no. J2054088
Visa Status Resident (Transferable)
Language Proficiency: English (Reading, writing and speaking)
Arabic (Reading and writing)
Hindi (Reading, writing and speaking)
Driving License: Valid Qatar Driving License
Date: From May 2004 to
February 2006
AL ITTIFAQ ENGINEERING CONSULTANTS
Doha-Qatar
Position held: CAD Operator

YOONAS_CV

  • 1.
    Page 1 of4 YOONAS.AH P.O.BOX No. 13885 DOHA – QATAR Mob: +974 77653256 +974 55653256 younas.ah@gmail.com OBJECTIVE : CAD professional with ‘12’ years’ experience primarily in serving GCC country clients. Possess in-depth knowledge of a variety of disciplines including civil, infrastructure, and utilities development. Have represented work for contractors, consultants and clients. Have a strong detail orientation and am known for a high level of accuracy and efficiency that contributes to improved delivery times QUALIFICATION : Technical Diploma in Civil Engineering (Recognized by Govt. Of India) AutoCAD and CIVIL 3D Academic Higher Secondary Education (Board of Public Examination, Kerala) Computer Proficiency MS Office (MS Word, Excel, Access, etc) Key Skills Preparing Drawings for Authority approval Preparing Shop drawings Preparing As-Built drawings Coordination of Utility drawings with Roads and MEP etc. PROFESSIONAL EXPERIENCE: Date: From March 2014 to Present Date WSP | PARSONS BRINCKERHOFF Doha-Qatar Position held: Senior CAD Technician – Infrastructure Utilities Projects Involved:- New Orbital Highway Contract – 1 Al Wakrah Bypass Road People Mover System – Education City Tram Depot & Track Alignment DC4 Safiya Stadium Al Jemailya Village Road - Al Khor Qatar science and Technology Park (QSTP) Mirage Bluewater Master Planning Infrastructure – UAE Al- Barari Development - UAE Duties and Responsibilities o Preparation of detailed drawings Sewerage, Storm, Irrigation, Water Supply and Dry Utilities, layouts, long sections, general arrangements, Network Detailed Layout & Longitudinal Profiles
  • 2.
    Page 2 of4 drawings. It includes maintaining proper storage and managing submission of the completed drawings to respective client, also responsible for reviewing and maintaining the high standard of drawings. I always keep the standard bar high for others and lead by an example. o Potable water layout plan with all valve i.e. gate valve, washout valve, air valve, non-return valve, pressure reducer valve. o Irrigation layout plan with fire hydrant, washout chamber, gate valve, air valve and details. o Sewerage layout plan with house connection chamber, valve chamber, air valve, flow direction, profiles and sewerage details. o Storm water drainage layout plan with future connection, drainage manhole, gully chamber, soak away, profiles and SWD details. o Prepare shop drawings/sketches such as layout, sections, profiles and construction details for additional works and variations to be issued to the Contractor for implementation on site. o Verification of the accuracy of the shop drawings submitted by the contractor for site implementation, Checking coordinates, potential conflicts and levels of all proposed utilities submitted by the Contractor. o Preparing the drawings for the presentation, concept design, .preliminary design, detailed design, tender, and various utilities for Infrastructure. o Prepare pipe route / following given corridors. Date: From March 2006 to February 2014 BEMCO ALMABANI ENGINEERING W.L.L Doha-Qatar Position held: CAD Technician – Utilities Projects Involved:- Dukhan Road Main Highway - East Contract Phase -2 New Doha International Airport (NDIA) CP-13 Qatar Foundation Education City South Site Central Plant CP-7 Duties and Responsibilities o Underground Utility System o Preparation of preliminary and final drawing of underground utilities such as potable, waste, irrigation, high pressure, chilled water pipe lines, electrical and telecommunication duct banks. o Detailing of shop drawings for mechanical and electrical layout such as isolation, washout, air release valves, interface points, fire hydrant, duct banks manhole and hand hole and others as per consultant requirements. o Draw up cross section/ profile of underground utilities in compliance with the standard cover up level and slopes in position with the existing /design ground levels. o Make revision and modifications to existing plans based on instruction/sketches received from surveyor/assigned engineers. o Monitor incoming and outgoing drawings for documentation.
  • 3.
    Page 3 of4 o Performed other task assigned from time to time by superiors. o Documents controlling for the project as per revision. Projects Involved:- Residential villas and shopping Complex Hospital buildings and schools Residential villas and Auditorium Roads and Parking Area Mosques and Shopping Complex Workshops and Yards at Industrial Area Cinema Theaters / Industrial workshop / Shed Date: From September 2003 to April 2004 CYRIX CONSTRUCTIONS Kerala- India. Position held: AutoCAD Draughtsman Duties and Responsibilities o Preparing drawings of Municipal, Industrial, Urban development projects, Housing compounds, primary & supporting Industrial Park and all development works for planning department. o Preparing “As-Built drawings”, construction schedule & progress bar chart by AutoCAD o Preparing Infrastructure, include roads, utilities layouts and section details. Road crossing details, layouts and profiles PERSONAL PROFILE: Personal Contact in Doha: P.O.Box No. 13885 Doha – Qatar Tel: +974 77653256 +974 55653256 Permanent Address in India: Ambalathveetil P.O.Thrithallur West ,Trichur Dist. Kerala ,India – PIN: 680 619 Tel: +91 487 2292195 Date of Birth: April 20, 1982 Nationality: Indian Passport no. J2054088 Visa Status Resident (Transferable) Language Proficiency: English (Reading, writing and speaking) Arabic (Reading and writing) Hindi (Reading, writing and speaking) Driving License: Valid Qatar Driving License Date: From May 2004 to February 2006 AL ITTIFAQ ENGINEERING CONSULTANTS Doha-Qatar Position held: CAD Operator