Operations Management Assignment
                    Dominos LLC




                 Prepared by Group 8
                 Achyut Gandham
                 Anuj Wilson
                 Biranchi Tripathy
                 Sudarshan Garg
                 Wisallaya Thaithammayanon
                 Zafar Shah




                 MBA Challum 2011/12
                 9th December 2011
                 Word Count – 5,970
Operations Management Assignment




                                            Table of Contents

Table of Contents ............................................................................................................. i

1       Executive Summary ...............................................................................................4

2       Operations Strategy...............................................................................................5

2.1     Introduction...............................................................................................................5

2.2     Corporate Vision ......................................................................................................5

2.3     Global Strategic objectives ......................................................................................6

2.4     Order qualifiers, Order winners................................................................................6

2.5     The Core Competencies of Dominos ......................................................................6

2.6     The Value Chain ......................................................................................................7

2.7     Product value chain .................................................................................................8

2.8     Operations Strategy Implications (Store Level) .......................................................9

2.9     Competitor Analysis ...............................................................................................10

Figure 7 Dominos versus its Competitors (UK) ..............................................................10

3       Product & Service Design ...................................................................................13

3.1     Introduction.............................................................................................................13

3.2     Product Life Cycle ..................................................................................................13

3.3     Failed Product and Product Re-design: ................................................................14

3.4     Operations Challenge of the Product/Service Mix ................................................16

4       Process Design ....................................................................................................17

4.1     Product Service Continuum ...................................................................................17


© Challum Group 8                                                                                                                      i
Operations Management Assignment




4.2    The Conversion Process........................................................................................17

4.3    The Production Process.........................................................................................19


       4.3.1 Store Layout…………………………………………………………………….. 23

4.4    Suggested Areas of Improvement .........................................................................24


       4.4.1 Process………………………………………………………………………….. 24

       4.4.2 Store and Production Layout………………………………………………….. 25

4.5    Proposed Improvements ........................................................................................25


       4.5.1 Process……………………………………………………………………………25

       4.5.2 Store Layout…………………………………………………………………….. 25

5      Planning and Control...........................................................................................26

5.1    Goldratt‟s Theory of Constraints (TOC) applied to Dominos: ...............................26

5.2    Demand Forecasting ..............................................................................................27

5.3    Promotions Planning ..............................................................................................27

6      Innovation and Improvements............................................................................29

6.1    Paradigm Innovation ..............................................................................................29


       6.1.1 Radical innovation: Need pull…………………………………………………..29

6.2    Position Innovation .................................................................................................30


       6.2.1 Radical innovation: Eureka moment………………………………………….. 30

6.3    Process Innovation ................................................................................................30


       6.3.1 Radical innovation: Need Pull & Eureka moment…………………………… 30

       6.3.2 Incremental innovation: Need Pull……………………………………………. 30

6.4    Product Innovation .................................................................................................30


       6.4.1 Radical innovation: Eureka moment………………………………………….. 30

© Challum Group 8                                                                                                                ii
Operations Management Assignment




       6.4.2 Incremental innovation: Need pull: Knowledge push……………………….. 30

7      Supply Chain Management .................................................................................31

7.1    Introduction.............................................................................................................31

7.2    Dominos Supply Chain ..........................................................................................31

7.3    Critic and recommendations ..................................................................................33

8      Quality Management ............................................................................................34

8.1    Introduction.............................................................................................................34

8.2    Quality Assurance and Quality Control..................................................................34

8.3    Critic and recommendations ..................................................................................34

9      Conclusion and Recommendations ..................................................................35

10     References ............................................................................................................36




© Challum Group 8                                                                                                                    iii
Operations Management Assignment




    1 Executive Summary
This report has been prepared to analyse the processes and strategies such as
control of operations systems, design and planning of Dominos LLC. Theoretical
frameworks have been applied to evaluate the company‟s operational strategy in
terms of it product and service offering. While the report considers Dominos LLC‟s
overall strategy, it also focuses on the daily operations of Dominos DPG franchises.
Particular focus has been placed on the daily operations processes of the Dominos
store located on Alexandra Parade in Glasgow, UK. The report is a result of team
research, case study analysis, a store visit, interviews and insights from Dominos
existing employees, application of theoretical concepts, models and prior experience.

The study evaluates how Dominos has been able to position itself as a leader in its
market segment and analyses the strengths and weakness in the company‟s existing
strategy. Upon dissecting various aspects of the company‟s processes, it provides an
appreciation of the company‟s efforts to continuously evolve in the changing market
conditions by incorporating new product design and being innovative to stay at par
with its competition.

Finally, upon identifying the areas of improvement in the company‟s existing strategy,
the report proposes changes and recommendations that can be incorporated in order
to further ensure operational efficiency thereby maximizing profits and increasing its
value offering.




© Challum Group 8                                                                    4
Operations Management Assignment




    2 Operations Strategy
2.1    Introduction
Dominos is one the leading pizza delivery companies globally. The Company has a
unique business and operation model and is a pioneer in the fast food industry. Since
1960, Dominos Pizza has successfully expanded from three outlets in the US to
9,350 stores operating in seventy countries. Dominos‟ operation in the UK and
overseas uses the franchise model. The parent company, Dominos Pizza LLC is
head quartered in Michigan, USA. It maintains overall control on the sourcing and
supplying of raw materials to the master franchises and enforces quality of the service
and products sold.

Figure 1 show the structure of the Dominos franchise model in the UK.

                                         Dominos Pizza
                                             LLC

                             Master Franchise



                         Sub-                   Sub-
                                                            Sub-Franchisees
                      Franchisees            Franchisees




         Figure 1: Domino's Franchise Model: UK


2.2    Corporate Vision
The Dominos Corporate Vision statement                        Passionate       Passionate
focuses on the following key areas:                                              about
                                                                about
                                                                                Quality
                                                               winning
        Being better than the competition.
        Ensuring a quality product.
        Providing excellent service.                         Passionate       Passionate
        Creating lasting relationships with its                about             about
                                                                Service       relationships
         employees and the communities
         within which it operates.



                                                           Figure 2 Corporate Vision: Dominos


A clear corporate vision ensures that the company and its franchises can work
towards meeting common goals thereby increasing its business in a potentially
virtuous cycle. Figure 2 show the graphical representation of the Dominos Vision. The
© Challum Group 8                                                                               5
Operations Management Assignment




overall global vision translates into specifics at a country level in a seamless manner
so that the overall strategic vision is kept in mind at all times.

2.3     Global Strategic objectives
Strategic objectives adhere to the company‟s vision statement, Dominos‟ key
strategic objectives are:

        Targeted international growth – competitors.
        Menu expansion, vary price points, 24 hour delivery model – competitors.
        Use Company owned stores in the US and Australia as a test bed for new
         innovations – IT Strategy.
        Increase investment in training and auditing of stores to provide a consistent
         service and good quality of products – Human Resource Strategy.
        Allow master franchisees to apply their knowledge of the local market and
         cuisines – Knowledge Management Strategy.


2.4    Order qualifiers, Order winners
Order qualifiers are the basic criteria the product meets to quality for selling. Order
winners are the criteria that win the customers when it comes to purchasing. Figure 3
shows the order qualifiers and order winning criteria‟s for Dominos.




                                                                         Order Winners for Dominos :
        Order Qualifiers for a            Potential Order losers :
                                                                        Core competency on Delivery :
    customer ordering take away :      Inconsistent taste : Delay in
                                                                         Consistent quality : Delivered
     Convenient : Tasty : Quick :        delivery : Poor quality of
                                                                         with no delays : Wide variety
               Cheap                   food : Pricing at a premium
                                                                               on menu : Tasty




                           Figure 3 Order Winner and Order Qualifiers: Dominos




2.5    The Core Competencies of Dominos
Dominos‟ core competencies have evolved over time. Their unique sets of strengths
have helped the Company dominate the pizza food service industry, and a leader in
the home delivery / take away.




© Challum Group 8                                                                                         6
Operations Management Assignment




                                               Unique Supply
                                               chain model :
                                               Better quality
                                               & consistency




                    Focussed on                                              Unique
                                          Dominos Competitive               GLOBAL
                      the core
                    competency              advantage - Global           model: Allows
                     of delivery           leader in Pizza take           flexibility at
                                          away / home delivery            the regional
                                                                              level




                                              Leaner Stores
                                                 : Better
                                                operating
                                                 margins




                                   Figure 4 Core Competencies: Dominos




2.6      The Value Chain
It is important to consider how a customer need drives Dominos to create the product.
The customer need that drives the entire value chain is the need for a dependable
take away restaurant, reasonably priced hot quality food and variety that suits the
local palette.

Dominos has focused on these key customer needs throughout the value chain, and
has not allowed any digressions in this area unlike other competitors who have
evolved a mixed model of full service restaurants and takeaway outlets, or a hybrid
combination of both. This has diluted their strengths in the segment Dominos focuses
on - Takeaway / Home delivery. Its global operational model allows for lean stores,
well-trained staff and flexibility at a country level to customise menus to suit customer
tastes. Operational requirements have prompted the use of technology to make the
customer experience more enriching, it has a history of firsts – they were the first to
use TV as a distribution channel, an online tracking system that allows customers to
track the pizza order and a proprietary point of sale system. A combination of the
Company level strategy and the Operational Strategy has resulted in Dominos having
a reputation for reliability and consistent pizza quality) – these strategies have
ensured that Dominos continues to meet its customer needs.




© Challum Group 8                                                                          7
Operations Management Assignment




                                                  Process Flow &
                                                  Infrastructure :
                                                Seamless from the
                                                customers point of
                                              view, centrally located
                                                       stores




                                                Customer Need :
                                              Dependable takeaway
                                              restaurant : Hot Food
                                                delivered reliably


                                                                         Operational Strategy :
                        Global Strategy :                                  Innovative use of
                     Franchise model, Lean                              technology to ease the
                     Stores, Investment in                                 transaction, Well
                      Staff, Robust quality                             trained staff with local
                              control                                         knowledge




                             Figure 5 Customer Value Chain: Dominos




2.7      Product value chain
Figure 6 illustrates Porters model, which depicts Dominos‟ operations as a collection
of value-adding activities. The five primary activities are processes that are mainly
concerned with the production of the products and services to the external customers.
These are necessary to the business processes. The activities indicated as support
activities are activities that are vital for the development of the appropriate
transforming resources. These can be looked as value adding activities, for instance
incorporating the use of technology such as being able to place orders by text
message add to the convenience Dominos provides and increases the accuracy of
order. All these constitute the business processes of the organization.




© Challum Group 8                                                                                  8
Operations Management Assignment




                                Figure 6 Product Value Chain: Dominos

2.8   Operations Strategy Implications (Store Level)
Dominos operations strategy mainly focuses on the providing high service quality to the
customer:

   1. Minimize operations cost: To minimize the operating cost by improving the
      efficiencies and process at the stores.
   2. Strategic store locations to facilitate the delivery service: To leverage the
      strategic location of the store in order to facilitate quick service to the customer
      and maximize the revenue.
   3. Production oriented store designs: To utilize the production oriented store design
      in order to facilitate efficient production and quick service to the customer.
   4. Efficient order taking, production and delivery: To execute an efficient operational
      process that includes order taking, pizza preparation, cooking, boxing and
      delivery.
   5. Use of Domino‟s PULSE point-of-sale system: Use of Dominos PULSE system to
      improve operating efficiencies, provide corporate management with easy access
      to financial and marketing data and reduce time consumption and expenses.
   6. Product and process innovations: To promote an innovative culture that
      increases both quality and efficiency.
   7. A focused menu: To maintain a focused menu that is designed to present an
      attractive quality offering to customers, while minimizing order errors, and
      expediting the order taking and food preparation processes.
   8. A comprehensive store operations evaluation program: To utilize a
      comprehensive store audit program to ensure that stores are meeting both as
      the expectations of the customers.




    © Challum Group 8                                                                        9
Operations Management Assignment




2.9      Competitor Analysis



                    Brand Shares of Chained 100% HD/TA
          80
          70
          60
          50
          40
          30
          20
          10
           0




                            Figure 7 Dominos versus its Competitors (UK)



      1. Dominos DPG is the leading player in home-delivery and take-away food
         services in the UK region (Figure 7). It has the highest market share when
         compared to other food outlets such as Yum! and Papa John‟s over the last five
         years. This is a huge contribution in sales due to the fact that no other pizza
         companies offer delivery as fast as Dominos (Order-qualifying criteria).




                              Figure 8: Dominos versus its Competitors (Global)


      2. From a global perspective, it ranks 12th among all the top food chains in world.
         Other snacks joints and coffee shops are a long way ahead. Figure 8 shows that



© Challum Group 8                                                                       10
Operations Management Assignment




         Dominos needs to implement some new strategies in order to rank itself higher
         relative with other food chains.




                                   Figure 9 Performance Prioritizing Curve



         The Slack Model of Performance Prioritizing (Figure 9) would help Dominos in
         prioritizing its operational strategies based on the order-winning criteria and the
         current issues it faces in relation to the competition.
         A. Excess zone – Dominos invests in promotional strategy to a greater extent
             as compared to other food chain outlets. It offers many discount coupons to
             attract customers. Discount offers do help to some extent in attracting
             customers but too many discount and promotions tend to lower the brand
             image. So Dominos need to cut down some expenses in that section which
             will not affect its sales.
         B. Appropriate zone – Dominos has got an excellent unmatched home delivery
             service through which it stays ahead of its rivals. The ‟30-minute luxury‟ of
             Dominos has given the brand a strong image among the customers. This
             gives Dominos a clear balance between its competitors and customers.
         C. Improve zone – Dominos need to improve its product quality in order to
             maintain reputed. It needs to emphasize on the pizza quality and prioritizing
             all aspects that relate to the customer. For example, Pizza Hut specifies the
             calories consumption in each pizza as illustrated in Figure 10. This reflects
             the brand concern for the customer. So Dominos should also initiate some
             measures which would foster the „emotional connection‟ to its customers.




© Challum Group 8                                                                         11
Operations Management Assignment




                                   Figure 10 Comparison to competition


         D. Urgent action zone – In order to increase the service to customers,
            Dominos should ensure speedy delivery of pizzas to customers. For this,
            Dominos need to work on its existing process design. There should be
            enough space and staff for service and extra machines to handle any
            machinery failure during peak periods.




© Challum Group 8                                                                12
Operations Management Assignment




      3 Product & Service Design
3.1        Introduction
Dominos has positioned and established itself as the pioneer in the pizza delivery
service. Pizza comprises the company‟s core product with additional items such as
subs, chicken strips/bites, wings, garlic bread and potatoes wedges. A fair degree of
flexibility is available where customers can customize their pizza and can choose to
purchase “combos” thereby providing better value for money. Additional items such as
soft drinks accompany these choices. Dominos has successfully implemented this
concept of mass customization by catering to customer‟s individual needs through
unique combinations of modular components. Dominos standard product and services
offering is universal across the world – quality pizza delivery in approximately thirty
minutes. Across all geographical regions, the target segment is a cost conscious
consumer whose prime concern is convenience.

It is useful to analyse the company‟s product performance and use it to evaluate how
successful the product has been, this sets the stage for Dominos product redesign.

3.2       Product Life Cycle


         Idea Generation phase - The concept of „pizza‟ had been around for a while and
          was adopted by Dominos in the 1960s. It started from USA and then established
          its stores in UK and other parts of the world, which were controlled by the USA
          headquarters.
         Concept Development phase - The concept of pizza took a concrete hold in the
          market. Local franchisees took over the existing stores in UK. There was a
          paradigm shift as the online ordering and interactive TV ordering replaced the
          traditional methods. This period witnesses a substantial rise in sales.
         “Production” phase - The existing pizza phenomena continued for two decades
          until there was a sudden decline in sales in 2009. "The fact is, we love our pizza,
          but as times change, so do consumer tastes," said Russell Weiner, Domino's
          Chief Marketing Officer.
         Service -There was nearly 80% change in existing menu. New items like oven-
          baked sandwiches and crunch cakes were introduced to the stores. The ‟30-
          minute delivery‟ doctrine was highly stressed upon. Also, Dominos launched new
          iPhone apps and the „pizza-tracker‟ to maximize its services.
         Withdrawal – Since the new consumers needed freshness in Dominos‟ menu.
          The company addressed this decline in sale by analyzing its failed product and
          re-designing its core product. Figure 11 below show the breakdown of product
          life cycle at Dominos.




© Challum Group 8                                                                          13
Operations Management Assignment




                                   Figure 11 Evolution of Dominos

3.3     Failed Product and Product Re-design:
A good example of how Dominos re-designed its core product is to look at a how the
company dealt with its core product failing in the past. It was a bold move for the
company to a publically acknowledge that their pizza tasted bad. Additionally it is
refreshing to see a corporation openly acknowledge shortcomings and use customer
feedback constructively to revise their strategy and approach. In an effort to design their
core competency, the company reconfigured its recipe. They tested several
combinations of cheeses, sauces and crust to finally arrive at a recipe that was
welcomed by the public. It is useful to note that the end customer was heavily involved
in the process of the product being re-designed and influenced the outcome largely. This
approach of using customer feedback can be credited the company witnessing an
increase in sales following the redesigning of their product. Figure 12 and Table 1 iterate
this.




© Challum Group 8                                                                        14
Operations Management Assignment




                               Figure 12 New Product Development




      Customer Role       NPD Phase           Key Issue/Managerial Challenge

      Customer        as Ideation             Select customer opinion to develop new
      resource                                product Market researchers collect customer
                                              information by studying customer buying
                                              patterns and using tools such as customer
                                              surveys and focus groups.

      Customer as co- Design and Gather customer opinion that is utilized in
      creator         development the design and development task. Set new
                                  product    approach    along   with     core
                                  competency of the company. Product
                                  development team works on exploratory
                                  project by mixing component and taste test.

      Customer as user    Product             Blind taste test to ensure taste and quality
                          testing             compared to competitor.




                          Product             Work with advertising agency to present new
                          support             product and development and do a road
                                              show with franchisees. Get feedback from
                                              customer and support customer interaction


                      Table 1 Product Re-design using the customer feedback




© Challum Group 8                                                                        15
Operations Management Assignment




3.4     Operations Challenge of the Product/Service Mix
Outside the US, Dominos does not have any corporate stores. There are over 4,500
franchised stores. This one aspect can pose as a problem. The Youtube video that
surfaced in 2009 illustrates how employees can tarnish an employer‟s reputation and
eventually sales. The video showed two Domino employees violating numerous health
codes standards in a Dominos store. To make matters worse one of the employees has
a criminal record. Better hiring practises and enforcing a stringent code of ethics will
help the company deal with issues such as these. Additionally the thirty minutes delivery
guarantee that was initially introduced but later cancelled due to a relatively high
incidence of accidents. This is an example of a service delivery challenge the company
faced. Recognizing that the thirty-minute delivery was an attractive option for the
customer, Dominos reintroduced the concept, however allowing itself some leeway and
positioning it as a “gift” to the customer.




© Challum Group 8                                                                      16
4 Process Design
4.1    Product Service Continuum
Dominos as an entity is rather unique in that it straddles both the product based supported
by a service package and Service based with a product element in the Product-Service
continuum.




        Product Based supported by a service
        package - The Product (Pizza) not only         Service Based with product element -
        needs to be manufactured acurately,              The Customer buys into a service
          it needs to be delivered to the end          which delivers an end product in the
         customer within a specified amount                       form of a Pizza
           of time and in optimal conditions




                             Figure 13 Product Service Continuum: Dominos

4.2     The Conversion Process
The value conversion process has tangible and intangible elements, with the customer being
present in important stages in the value chain. With the introduction of open kitchens, the
customer who is waiting for his / her takeaway is a part of the entire experience right from the
time the order placement to the food consumption.




    Transforming                       Transformed                           Product -
     Resources -                        resources -
                                                                             Pizza's &
       (1) Staff                             (1)
     (2) Kitchen                        Ingredients
                                                                            other food
     Equipment                          (2) Recipies                           items




                              Figure 14 The Conversion Process: Dominos
Operations Management Assignment




Dominos is also in a unique position when it comes to the product they manufacture:

Volume: High volume – the overall volume justifies modern kitchens and trained staff who
operate the kitchen and the front desk.

Variety: While the overall products are standard (pizzas), the customers might, based on their
own preferences ask for certain toppings to be added or removed which means the system
needs to cope and be flexible.

Variation in demand: The order volume peaks during lunch and dinner times. Alternatively,
there are periods in the day where the demand is low.

Degree of visibility: This varies from very high to low, given the open kitchen format that
Dominos has adopted, a customer choosing the takeaway format has full visibility of the
production process while a customer choosing the home delivery option has no visibility until
such time the product reaches his doorstep.

Dominos has chosen a unique Product / Service mix that reflect in the production line method
the company follows.




                        Figure 15 Volume Variety Mix: Assembly Line: Dominos

© Challum Group 8                                                                           18
Operations Management Assignment




Given that the pizzas and other items need to be prepared with a high degree of consistency,
Dominos has chosen to use the assembly line approach to produce its pizzas, while at the
same time they have retained the flexibility of a batch flow process. Essentially, the production
process at a Dominos kitchen utilizes the consistency and efficiencies that comes from using an
assembly line approach while retaining the flexibility that comes from adopting a batch type
manufacturing process. It is useful to note that using the assembly line approach also gives a
Dominos outlet the flexibility to meet higher volumes during peak hours. Dominos calls the
assembly line the “make line”.

4.3      The Production Process
The production process is very streamlined and structured - from the order placement to the
final delivery to the end customer.

Step 1: The customer initiates the order. It could be through the phone, internet or a walk-in to
the restaurant.




                                   Figure 16 Dominos: Order Taking

Step 2: The Dominos representative takes the order and enters it into the Dominos PULSE
system (a proprietary system that streamlines the order taking process).

The PULSE system increases efficiencies at a store level. The key functions of this system are:

         (a) Touch screen ordering: Improves order taking accuracy and efficiency especially
             during busy periods.
         (b) Delivery driver routing system: Improves delivery efficiency.
         (c) Improved MIS capabilities.

© Challum Group 8                                                                              19
Operations Management Assignment




Step 3: The order displayed on the screen on the assembly line along with the customer‟s
specifications.




                               Figure 17 Dominos: Assembly Line

Step 4: One of the team members in the assembly line picks up the work order, prepares the
dough and applies the sauce and cheese accordingly.

Step 5: In the next step of the “make line” another team member add the appropriate type /
amount of toppings, and then places it into the oven.




© Challum Group 8                                                                       20
Operations Management Assignment




                                   Figure 18 Dominos: Oven Baking

Step 6: After the allotted baking time, a third member of staff removes the pizza from the oven,
and places it in a box (which has the order type & number displayed to ensure accuracy of
delivery). The pizza is then ready for delivery.




                                     Figure 19 Packing: Dominos

Step 7: The pizza box is put into a hot-bag and is dispatched through a delivery driver or
handed out for collection by the waiting customer.
© Challum Group 8                                                                             21
Operations Management Assignment




The following figures further illustrate various aspects of Dominos operations. Figure
below establishes the entire value chain until delivery.




                                       •Pizza
                                        •Personal
                                        •Small
                                        •Medium                                       •Personal
                                        •Large                                         Box
                                       •Side Orders                                   •Small
                                        •Chicken                                       Box
             •Phone
                                         Strips                    Placed             •Medium
    Order    •Web        Assembly
                                        •Chicken         Cooking     in     Packing    Box        Sales   •Delivery
    Placed   •Collecti     Line
                                         Dunkers                    Oven              •Large              •Collection
              on
                                        •Potato                                        Box
                                         Wedges                                       •Side
                                        •Chicken                                       Orders
                                         Wings                                         Boxes
                                        •Drinks
                                        •Ice-
                                         creams




     Master Franchise               Dough production, ingredients and equipment purchasing and supply,
                                    training, operations, IT, marketing, PR, finance, HR, property, franchise
     Support Services                      sales, leasing, transport, warehousing and administration.




                                       Figure 20 Process Flow Design: Dominos




© Challum Group 8                                                                                                       22
Operations Management Assignment




Figure 21 diagram establishes the volume based positioning of Dominos:




                            Figure 21 Volume Based Positioning: Dominos




4.3.1    Store Layout:


Dominos adopts a process dominated store layout wherein common processes are
clubbed together as the product moves between stations. The integrated floor plan at most
Dominos stores facilitate the movement of products and team members between stations
to manage capacity during peak hours and minimize bottlenecks.

The store layout is designed to cope with the average peak hour movement of goods and
people. The storage area is setup to stock the ingredients for three days. The layout
design enables the optimal use of space and equipment thereby enhancing the skills and
efficiency of the team members, it also allows them to adapt to different level of production.
Dominos also ensures that the health and safety norms are adhered to in order to maintain
safe working conditions for the staff. The standardization of the surface materials for the
interiors across all its stores in UK provides a comfortable environment for the staff and the
customer and enforces the brand image.

A typical Dominos store layout includes the following: Reception, Assembly Line, Oven
Packing area, Office, Cold Storage, and Washing Area. Figure 22 shows the typical layout
of the Dominos Store.

© Challum Group 8                                                                           23
Operations Management Assignment




               Storage                                Washing Area




                                                                           Cold Storage

                    Office
                                           Oven                              Assembly
                                                                                 Line




      Packing Area / Ready for
                  Delivery are




                     Reception                             Waiting Area


                                 Figure 22 Typical Store Layout: Dominos




4.4     Suggested Areas of Improvement
4.4.1 Process:
One of the common problems faced at the Domino‟s make line is that by its nature, the line
is not balanced, and this is because of two factors:

    (1) Time taken for each activity is not the same.
    (2) Since the process is not automated, individual efficiencies of team members results
        in an uneven flow of work.

The above two reasons tend to cause inefficiencies in the make line and results in
bottlenecks, especially during peak hours in the evenings.

Another major concern facing the local Glasgow franchise is that the drivers are not
equipped a GPS based navigation system, efficient on-time deliveries are primarily
dependent on the topographical knowledge of the individual drivers and once again, it is
left to an individual‟s capabilities to ensure on time deliveries, which account for 70% of the
total sales.




© Challum Group 8                                                                            24
Operations Management Assignment




4.4.2 Store and Production Layout:
While the typical dimensions of the floor enhance efficiency and facilitate optimum usage
of floor space, serious health and safety hazards exist for team members working in close
proximity to the oven - there have been cases of severe burns. A detailed interview with
some of the stores employees who have requested for anonymity indicates that this hazard
peaks during the busiest hours. The store we visited was the busiest Dominos in Scotland
– as it handled sales for both Central & Eastern Glasgow (in terms of sales / and number
of units produced), so clearly there quite literally is “space” for improvement - the store
might want to provide more space around the oven.

It is understood that the given the limited space only one oven with two conveyor belts can
be accommodated. This creates a serious bottleneck when the conveyor belts of the oven
fail or if the oven breaks down. Primary investigation suggests that during peak hours the
demand is significantly higher than the capacity of the oven resulting in severe delay in
service times.

Additionally, there is no dedicated parking for the delivery driver in the proximity of the
store. This results in illegal parking in the loading areas in front of the store and the Co-op
Parking. This creates serious hazardous conditions for the drivers and other road users in
the proximity for the store with series legal implications.

4.5     Proposed Improvements
4.5.1 Process:
The assembly lines need automation in order to remove the inefficiencies caused by the
manual movement of products along the assembly line. The provisions of mobile phone
with blue tooth headset and navigation system would enable a reduction in the delivery
times, and thus driving up overall efficiencies.

4.5.2 Store Layout:
The store space needs restructuring to create more space for movement of goods and
people especially during peak hours. Consideration should be given to the idea of
separating the operations of the Dominos store for Central Glasgow and Eastern Glasgow
to manage the demand.

 The oven needs to be re-located to make it safer for the team members to work in the
area. This is especially important from health and safety point of view during busy hours.
The parking for the dominos delivery drivers should be clearly marked. The drivers must be
restricted from using the loading area to eliminate the potential hazardous conditions.

Given these changes to the store structure, and operational aspects, we believe that the
store can create a healthier, more efficient atmosphere within the store, and drive up
efficiencies across the value chain.




© Challum Group 8                                                                            25
Operations Management Assignment




      5 Planning and Control
5.1       Goldratt’s Theory of Constraints (TOC) applied to Dominos:
         The maximum capacity of baking pizzas simultaneously is 24, which is a bottleneck
          in case of getting a bulk order, or during peak demand.
         In case of excess demand on one outlet, the load should be shared with the
          nearest outlet. In case the load is persistently high on a particular outlet, then the
          baking capacity should be upgraded.




                             Figure 23 Production Constraints: Dominos Store




© Challum Group 8                                                                             26
Operations Management Assignment




                               Figure 24 Dominos Demand Strategy




5.2      Demand Forecasting
Dominos uses the „Prescient‟ distribution-planning suite for its inventory and demand
planning (forecasting). With the help of Prescient, Dominos created a solution called
„Matched receipts to demand module‟ which maximizes their overall supply chain efficiency
by facilitating „lean‟ operations.

The prescient-planning suite monitors inventory and determines when a distribution centre
needs a product. It optimizes the orders by looking at the minimum material required for
each product, based on the existing inventory levels at the distribution centre.

The planning suite receives requests from its retail stores through the company‟s
PeopleSoft Enterprise Resource Planning (ERP) system; it aggregates these requests to
establish replenishment requirements. It also considers any constraints such as dollar
amount per purchase order – the next order is then based on the prior order.

5.3    Promotions Planning
The Prescient-planning tool manages promotions, which substantially increase the supply
chain demand for certain products.

Dominos plans promotional forecasts by looking at 4 months of historical and internal
information. The Prescient system contains a library of promotion profiles and real-time
analysis of the current period, and can overlay new knowledge from the corporate
© Challum Group 8                                                                      27
Operations Management Assignment




marketing department that is likely to influence the new promotion. Based on this data, it
provides recommendations for promotion adjustments.




© Challum Group 8                                                                       28
Operations Management Assignment




      6 Innovation and Improvements
Over the last 50 years, Dominos has innovated many new products and processes hence
increasing its quality and efficiency. The company has developed its innovative
approaches in four main areas:

        Paradigm Innovation
        Position Innovation
        Process Innovation
        Product innovation
As shown in the Figure 25 below, each of these are at times a combination of Market
based, Eureka and Resource Based sources of innovation. Each area is examined in detail
below.




                                   Figure 25 Innovation: Dominos




6.1      Paradigm Innovation
    6.1.1 Radical innovation: Need pull
This is one of the radical innovations the company incorporated. Expansion of the business
created a need for the company to develop its own system of supply chain, which is
vertically integrated. This topic is explored in detail under the “Supply Chain” section of the
report. This shift of operating procedures can be looked at as a “need pull” factor. Simply


© Challum Group 8                                                                            29
Operations Management Assignment




put, the need for a new more effective innovation approaches to save cost and time
resulted in this strategy.

6.2     Position Innovation
    6.2.1 Radical innovation: Eureka moment
 This innovation is another radical approach where Dominos invented the three
dimensional car top signs. Being the first to this invent this marketing technique was a
“eureka” moment for Dominos. Due to its viral marketing effects, Dominos is able to reach
out to various customer bases and position itself as a highly recognized pizza delivery
brand.

6.3      Process Innovation
     6.3.1 Radical innovation: Need Pull & Eureka moment
The Company has developed several innovative approaches in their processes. The need
for more efficient and multi-functional tools resulted in the development of the “Spoodle”
which is a saucing tool that combines a spoon and a ladle. Their “eureka” innovation was
the introduction of the mesh screen that helped cooked the pizza crust more evenly. In
addition to this, the need to be the more attractive option in the market resulted in the 30-
minute delivery guarantee. Again, Dominos were the first to come up with innovative
approaches like these. Thirdly, the company improved the routing software for Dominos
delivery vehicles further cutting costs and delivery time. All these approaches stemmed
from the need to outperform the competition in terms of quality, cut costs and operate more
efficiently.

    6.3.2 Incremental innovation: Need Pull
Dominos has also successfully incorporated incremental innovations such as online
ordering with additional feature like a Pizza Tracker and Pizza builder (available in certain
locations), smart phone apps through which customers can place their order and text
message order placing. Additionally the “Out of the door time” concept was introduced –
the time it takes between new orders being placed online or in store and the ready to eat
pizza leaving the store en route to the customer – reduced from 17 minutes to 13 minutes.

6.4     Product Innovation
    6.4.1 Radical innovation: Eureka moment
Another radical innovation was applied to Dominos product. The Corrugated pizza box
protects the pizza from physical damage, weakening due to moisture, and prevents cheese
from sticking to the top during delivery. The latest „Heat Wave‟ bags have a patented
insulation system that keeps pizzas both hot and crisp.
    6.4.2 Incremental innovation: Need pull: Knowledge push
The need for incremental innovation was developed by creating a dependency between
two previously unrelated variables – price and delivery time thereby creating a high value
proposition for the customer. The Company has also expanded its core product to include
products such as Cheesy bread and Cinna Stix, Domino‟s Oven Baked Sandwiches, etc.
This expansion is credited to the knowledge push Dominos has in relation to the product
offering.

© Challum Group 8                                                                          30
Operations Management Assignment




    7 Supply Chain Management
7.1     Introduction
Dominos Pizza has adopted the Make-to-Stock Approach for its Supply Chain
Management. The company supply chain is supports lean production and is based on just
in time stock management and stock control.

7.2     Dominos Supply Chain
Dominos has an innovative supply chain model that ensures all purchases are managed
centrally across all franchises around the world. The core entity, which runs the supply
chain network is called Dominos supply chain services – a fully owned subsidiary which
supplies the dough, raw materials (the condiments, and ingredients that go into the food
products), the kitchen equipment / machinery.

This entity supplies to all the master franchises – effectively giving the company a few key
advantages:

     (1) With a centralized buying department, the company is able to leverage its buying
         power, and is able to negotiate the best costs for its purchases. This also ensures
         purchases on a scale which makes suppliers want to tie into the Dominos supply
         chain services. For instance Coca-Cola is integrated into Dominos‟ supply chain
         network, and is seen more as a partner rather than a supplier; this was made
         possible because centrally Dominos has agreed to only sell Coca-Cola products at
         all its outlets around the world.

     (2) Consistency and Quality of products across the board- Since the sourcing is
         centralized, this ensures consistent quality of food products used, and similar
         machines / kitchen equipment that make training easy for staff.


     (3) Economies of scale: Dominos is also able to use its large buying power to hedge
         better costs when commodity prices fluctuate, it also gives it a better bargaining
         power with suppliers.




© Challum Group 8                                                                             31
Operations Management Assignment




                       Farmers                                    Producers



                                Dominos Commissaries




                    Store           Store                     Store            Store
                        s               s                         s                s

               C            C            C                    C        C             C
     (4)

                                   Figure 22 Supply Chain Model


Even at a master franchisee level, Dominos has been able to standardise and centralise
the supply chain services. Taking the UK‟s supply chain as an example, we look at the
country level supply chain works:

    (1) All the raw materials and food stuffs (dough, ingredients) are prepared at a central
        commissary in the UK – located at Milton Keynes.
    (2) The commissary, then supplies to distribution centers which are located in Milton
        Keynes, Penrith and Nass.
    (3) The distribution centers then supply to the individual stores once in 3 days (to
        ensure a JIT philosophy) – it could be on a more need basis, and this is tracked by
        the PULSE system which keeps track of stocks at an individual store level.




© Challum Group 8                                                                         32
Operations Management Assignment




                             Figure 23 Supply Chain at a Country Level


7.3     Critic and recommendations
It is useful to note that the stores have faced issues with stock of dough, side orders and
packing boxes when the demand has exceeded the predicted demand in the past. It also
needs a stock check on a daily basis to arrive at the quantity for the next order. A more
sophisticated and comprehensive stock management and control tool to enable store to
predict the demand and manage its stock is highly recommended.




© Challum Group 8                                                                        33
Operations Management Assignment




    8 Quality Management
8.1     Introduction
Quality of products and service is very essential to for Dominos to maintain its brand image
and reputation as a company that serves quality products; this becomes even more critical
considering the fact that pizza is often stereotyped as an “unhealthy” food.

8.2     Quality Assurance and Quality Control
Dominos owns its own supply chain network, 99% of its Master franchises source their
ingredients and other requirements from this entity, these are then stocked at central
commissaries, which then distribute the items needed to the smaller franchises / stores
directly on a 3 day basis, hence reducing the need for stockpiling of resources, and
ensuring a JIT type set-up. This central control on supplies ensures consistency is
maintained in all the raw materials that go into the food produced by the restaurants.

Dominos‟ Pizza Group has a documented Supplier Approval Procedure in place. Dominos
is in agreement with all suppliers of food ingredients and packaging to a detailed product
specification for the products supplied. This is reviewed by a Food Technologist to ensure
that the product is safe, legal and consistently of high quality.

Dominos ensures that all food products are risk assessed and their production is either
audited by Food Technologist or is certified to the BRC Global Standard for Food Safety. A
database of Domino‟s approved products and suppliers is maintained. Suppliers are
continually assessed in various ways. Quality checks carried out on delivery, samples sent
for analysis or feedback received from stores or consumers.

8.3     Critic and recommendations
Dominos has some high quality standards for the food, however when it comes to service it
does very little to ensure the quality of service, a more robust approach to ensuring quality
of customer service is recommended to maintain, build customer loyalty.




© Challum Group 8                                                                          34
Operations Management Assignment




    9 Conclusion and Recommendations
Based on our study of Dominos operations, and its global operating model – we
summarize that Dominos is currently in a state of flux.

As a company, Dominos has in the past shown resilience and an ability to innovate in the
face of competition, but this has been more push-based rather then pull-based. Dominos
has shown the ability to innovate but it has been more as a “catch-up” and not as a more
intuitive customer led change. The reworking of the recipe in the US market in 2009 was a
brilliant test case in a company reacting to change, and Dominos had to do this because it
was losing market share to other competitors, and there was consistent negative feedback
from US customers on the poor quality of its pizzas.

Dominos needs to drive changes more intuitive and customer led, rather than use one
successful operating model in an unchanged manner, it needs to make adjustments to it
when needed rather than just go in for one overall revamp.

Dominos also seems to be diluting its core proposition, which is:

    (1) Delivery / Takeaway of Pizza‟s
    (2) On-time, speedy delivery of Pizza‟s
    (3) Minimum number of products / product base which enables quick delivery of
        Pizza‟s

In response to a potential threat from other fast food companies Dominos is expanding its
product base - the Dominos Sub sandwich is an example of Dominos moving away from its
core-value proposition. This has some potential drawbacks such as complicating the
supply chain networks, potentially increasing cooking times and thereby increasing service
delivery times. If Dominos manages this expansion well, then it can add to its product
offerings while leveraging its core strengths, which might increase its market share.

A big threat for Dominos is that it is a service entity but it has adopted a product
manufacturing approach. The company‟s key focus areas have always been to deliver
pizza on time. Over time, Dominos has not been focusing on its service aspect, and in a
increasingly customer centric world it is critical that Dominos improves its hiring / training
practices and deliver world class customer service along with the best in class product that
it currently offers.




© Challum Group 8                                                                           35
Operations Management Assignment




    10              References
    1. Charlene Li, Harvard Business Review: The Art of Admitting Failure, 2011
       http://blogs.hbr.org/cs/2011/03/the_art_of_admitting_failure.html

    2. BIS John Reynolds, Dominos Pizza Inc.
       http://web.ebscohost.com/ehost/detail?sid=5b87caa3-d294-4899-9e92-
       9941787fd7ab%40sessionmgr14&vid=3&hid=12&bdata=JnNpdGU9ZWhvc3QtbGl2
       ZQ%3d%3d#db=bth&AN=53576535

    3. Geoff Riley, Dominos Pizza - Growth & Strategy (Part 2) - Innovation, Service
       and Smart, Operations, 2010
       http://tutor2u.net/blog/index.php/business-studies/comments/dominos-pizza-
       growth-strategy-part-2-innovation-service-and-smart-operation/
    4. Dominos Corporate profile
       http://phx.corporate-ir.net/phoenix.zhtml?c=135383&p=irol-homeprofile

    5. Global Logistics & Supply Chain Strategies, Planning, Sourcing,
       Replenishment Are Easy as (Pizza) Pie, 2008
       http://www.supplychainbrain.com/content/industry-verticals/food-beverage/single-
       article-page/article/planning-sourcing-replenishment-are-easy-as-pizza-pie/

    6. Dominos annual report 2011
       http://www.dominos.com.au/corporate/investors/investors.aspx

    7. Stephanie Clifford, The New York Times, Video Prank at Domino’s Taints
       Brand, 2009
       http://www.nytimes.com/2009/04/16/business/media/16dominos.html

    8. Jacob Goldenberg, David Mazursky, The Cambridge Press, Creativity in
       Product innovation, 2002
       http://catdir.loc.gov/catdir/samples/cam033/2001018106.pdf

    9. BIS: Euro Monitor – Dominos company profile 06 Sept 2011




© Challum Group 8                                                                         36

MBA Operations Management Assignment

  • 1.
    Operations Management Assignment Dominos LLC Prepared by Group 8 Achyut Gandham Anuj Wilson Biranchi Tripathy Sudarshan Garg Wisallaya Thaithammayanon Zafar Shah MBA Challum 2011/12 9th December 2011 Word Count – 5,970
  • 2.
    Operations Management Assignment Table of Contents Table of Contents ............................................................................................................. i 1 Executive Summary ...............................................................................................4 2 Operations Strategy...............................................................................................5 2.1 Introduction...............................................................................................................5 2.2 Corporate Vision ......................................................................................................5 2.3 Global Strategic objectives ......................................................................................6 2.4 Order qualifiers, Order winners................................................................................6 2.5 The Core Competencies of Dominos ......................................................................6 2.6 The Value Chain ......................................................................................................7 2.7 Product value chain .................................................................................................8 2.8 Operations Strategy Implications (Store Level) .......................................................9 2.9 Competitor Analysis ...............................................................................................10 Figure 7 Dominos versus its Competitors (UK) ..............................................................10 3 Product & Service Design ...................................................................................13 3.1 Introduction.............................................................................................................13 3.2 Product Life Cycle ..................................................................................................13 3.3 Failed Product and Product Re-design: ................................................................14 3.4 Operations Challenge of the Product/Service Mix ................................................16 4 Process Design ....................................................................................................17 4.1 Product Service Continuum ...................................................................................17 © Challum Group 8 i
  • 3.
    Operations Management Assignment 4.2 The Conversion Process........................................................................................17 4.3 The Production Process.........................................................................................19 4.3.1 Store Layout…………………………………………………………………….. 23 4.4 Suggested Areas of Improvement .........................................................................24 4.4.1 Process………………………………………………………………………….. 24 4.4.2 Store and Production Layout………………………………………………….. 25 4.5 Proposed Improvements ........................................................................................25 4.5.1 Process……………………………………………………………………………25 4.5.2 Store Layout…………………………………………………………………….. 25 5 Planning and Control...........................................................................................26 5.1 Goldratt‟s Theory of Constraints (TOC) applied to Dominos: ...............................26 5.2 Demand Forecasting ..............................................................................................27 5.3 Promotions Planning ..............................................................................................27 6 Innovation and Improvements............................................................................29 6.1 Paradigm Innovation ..............................................................................................29 6.1.1 Radical innovation: Need pull…………………………………………………..29 6.2 Position Innovation .................................................................................................30 6.2.1 Radical innovation: Eureka moment………………………………………….. 30 6.3 Process Innovation ................................................................................................30 6.3.1 Radical innovation: Need Pull & Eureka moment…………………………… 30 6.3.2 Incremental innovation: Need Pull……………………………………………. 30 6.4 Product Innovation .................................................................................................30 6.4.1 Radical innovation: Eureka moment………………………………………….. 30 © Challum Group 8 ii
  • 4.
    Operations Management Assignment 6.4.2 Incremental innovation: Need pull: Knowledge push……………………….. 30 7 Supply Chain Management .................................................................................31 7.1 Introduction.............................................................................................................31 7.2 Dominos Supply Chain ..........................................................................................31 7.3 Critic and recommendations ..................................................................................33 8 Quality Management ............................................................................................34 8.1 Introduction.............................................................................................................34 8.2 Quality Assurance and Quality Control..................................................................34 8.3 Critic and recommendations ..................................................................................34 9 Conclusion and Recommendations ..................................................................35 10 References ............................................................................................................36 © Challum Group 8 iii
  • 5.
    Operations Management Assignment 1 Executive Summary This report has been prepared to analyse the processes and strategies such as control of operations systems, design and planning of Dominos LLC. Theoretical frameworks have been applied to evaluate the company‟s operational strategy in terms of it product and service offering. While the report considers Dominos LLC‟s overall strategy, it also focuses on the daily operations of Dominos DPG franchises. Particular focus has been placed on the daily operations processes of the Dominos store located on Alexandra Parade in Glasgow, UK. The report is a result of team research, case study analysis, a store visit, interviews and insights from Dominos existing employees, application of theoretical concepts, models and prior experience. The study evaluates how Dominos has been able to position itself as a leader in its market segment and analyses the strengths and weakness in the company‟s existing strategy. Upon dissecting various aspects of the company‟s processes, it provides an appreciation of the company‟s efforts to continuously evolve in the changing market conditions by incorporating new product design and being innovative to stay at par with its competition. Finally, upon identifying the areas of improvement in the company‟s existing strategy, the report proposes changes and recommendations that can be incorporated in order to further ensure operational efficiency thereby maximizing profits and increasing its value offering. © Challum Group 8 4
  • 6.
    Operations Management Assignment 2 Operations Strategy 2.1 Introduction Dominos is one the leading pizza delivery companies globally. The Company has a unique business and operation model and is a pioneer in the fast food industry. Since 1960, Dominos Pizza has successfully expanded from three outlets in the US to 9,350 stores operating in seventy countries. Dominos‟ operation in the UK and overseas uses the franchise model. The parent company, Dominos Pizza LLC is head quartered in Michigan, USA. It maintains overall control on the sourcing and supplying of raw materials to the master franchises and enforces quality of the service and products sold. Figure 1 show the structure of the Dominos franchise model in the UK. Dominos Pizza LLC Master Franchise Sub- Sub- Sub-Franchisees Franchisees Franchisees Figure 1: Domino's Franchise Model: UK 2.2 Corporate Vision The Dominos Corporate Vision statement Passionate Passionate focuses on the following key areas: about about Quality winning  Being better than the competition.  Ensuring a quality product.  Providing excellent service. Passionate Passionate  Creating lasting relationships with its about about Service relationships employees and the communities within which it operates. Figure 2 Corporate Vision: Dominos A clear corporate vision ensures that the company and its franchises can work towards meeting common goals thereby increasing its business in a potentially virtuous cycle. Figure 2 show the graphical representation of the Dominos Vision. The © Challum Group 8 5
  • 7.
    Operations Management Assignment overallglobal vision translates into specifics at a country level in a seamless manner so that the overall strategic vision is kept in mind at all times. 2.3 Global Strategic objectives Strategic objectives adhere to the company‟s vision statement, Dominos‟ key strategic objectives are:  Targeted international growth – competitors.  Menu expansion, vary price points, 24 hour delivery model – competitors.  Use Company owned stores in the US and Australia as a test bed for new innovations – IT Strategy.  Increase investment in training and auditing of stores to provide a consistent service and good quality of products – Human Resource Strategy.  Allow master franchisees to apply their knowledge of the local market and cuisines – Knowledge Management Strategy. 2.4 Order qualifiers, Order winners Order qualifiers are the basic criteria the product meets to quality for selling. Order winners are the criteria that win the customers when it comes to purchasing. Figure 3 shows the order qualifiers and order winning criteria‟s for Dominos. Order Winners for Dominos : Order Qualifiers for a Potential Order losers : Core competency on Delivery : customer ordering take away : Inconsistent taste : Delay in Consistent quality : Delivered Convenient : Tasty : Quick : delivery : Poor quality of with no delays : Wide variety Cheap food : Pricing at a premium on menu : Tasty Figure 3 Order Winner and Order Qualifiers: Dominos 2.5 The Core Competencies of Dominos Dominos‟ core competencies have evolved over time. Their unique sets of strengths have helped the Company dominate the pizza food service industry, and a leader in the home delivery / take away. © Challum Group 8 6
  • 8.
    Operations Management Assignment Unique Supply chain model : Better quality & consistency Focussed on Unique Dominos Competitive GLOBAL the core competency advantage - Global model: Allows of delivery leader in Pizza take flexibility at away / home delivery the regional level Leaner Stores : Better operating margins Figure 4 Core Competencies: Dominos 2.6 The Value Chain It is important to consider how a customer need drives Dominos to create the product. The customer need that drives the entire value chain is the need for a dependable take away restaurant, reasonably priced hot quality food and variety that suits the local palette. Dominos has focused on these key customer needs throughout the value chain, and has not allowed any digressions in this area unlike other competitors who have evolved a mixed model of full service restaurants and takeaway outlets, or a hybrid combination of both. This has diluted their strengths in the segment Dominos focuses on - Takeaway / Home delivery. Its global operational model allows for lean stores, well-trained staff and flexibility at a country level to customise menus to suit customer tastes. Operational requirements have prompted the use of technology to make the customer experience more enriching, it has a history of firsts – they were the first to use TV as a distribution channel, an online tracking system that allows customers to track the pizza order and a proprietary point of sale system. A combination of the Company level strategy and the Operational Strategy has resulted in Dominos having a reputation for reliability and consistent pizza quality) – these strategies have ensured that Dominos continues to meet its customer needs. © Challum Group 8 7
  • 9.
    Operations Management Assignment Process Flow & Infrastructure : Seamless from the customers point of view, centrally located stores Customer Need : Dependable takeaway restaurant : Hot Food delivered reliably Operational Strategy : Global Strategy : Innovative use of Franchise model, Lean technology to ease the Stores, Investment in transaction, Well Staff, Robust quality trained staff with local control knowledge Figure 5 Customer Value Chain: Dominos 2.7 Product value chain Figure 6 illustrates Porters model, which depicts Dominos‟ operations as a collection of value-adding activities. The five primary activities are processes that are mainly concerned with the production of the products and services to the external customers. These are necessary to the business processes. The activities indicated as support activities are activities that are vital for the development of the appropriate transforming resources. These can be looked as value adding activities, for instance incorporating the use of technology such as being able to place orders by text message add to the convenience Dominos provides and increases the accuracy of order. All these constitute the business processes of the organization. © Challum Group 8 8
  • 10.
    Operations Management Assignment Figure 6 Product Value Chain: Dominos 2.8 Operations Strategy Implications (Store Level) Dominos operations strategy mainly focuses on the providing high service quality to the customer: 1. Minimize operations cost: To minimize the operating cost by improving the efficiencies and process at the stores. 2. Strategic store locations to facilitate the delivery service: To leverage the strategic location of the store in order to facilitate quick service to the customer and maximize the revenue. 3. Production oriented store designs: To utilize the production oriented store design in order to facilitate efficient production and quick service to the customer. 4. Efficient order taking, production and delivery: To execute an efficient operational process that includes order taking, pizza preparation, cooking, boxing and delivery. 5. Use of Domino‟s PULSE point-of-sale system: Use of Dominos PULSE system to improve operating efficiencies, provide corporate management with easy access to financial and marketing data and reduce time consumption and expenses. 6. Product and process innovations: To promote an innovative culture that increases both quality and efficiency. 7. A focused menu: To maintain a focused menu that is designed to present an attractive quality offering to customers, while minimizing order errors, and expediting the order taking and food preparation processes. 8. A comprehensive store operations evaluation program: To utilize a comprehensive store audit program to ensure that stores are meeting both as the expectations of the customers. © Challum Group 8 9
  • 11.
    Operations Management Assignment 2.9 Competitor Analysis Brand Shares of Chained 100% HD/TA 80 70 60 50 40 30 20 10 0 Figure 7 Dominos versus its Competitors (UK) 1. Dominos DPG is the leading player in home-delivery and take-away food services in the UK region (Figure 7). It has the highest market share when compared to other food outlets such as Yum! and Papa John‟s over the last five years. This is a huge contribution in sales due to the fact that no other pizza companies offer delivery as fast as Dominos (Order-qualifying criteria). Figure 8: Dominos versus its Competitors (Global) 2. From a global perspective, it ranks 12th among all the top food chains in world. Other snacks joints and coffee shops are a long way ahead. Figure 8 shows that © Challum Group 8 10
  • 12.
    Operations Management Assignment Dominos needs to implement some new strategies in order to rank itself higher relative with other food chains. Figure 9 Performance Prioritizing Curve The Slack Model of Performance Prioritizing (Figure 9) would help Dominos in prioritizing its operational strategies based on the order-winning criteria and the current issues it faces in relation to the competition. A. Excess zone – Dominos invests in promotional strategy to a greater extent as compared to other food chain outlets. It offers many discount coupons to attract customers. Discount offers do help to some extent in attracting customers but too many discount and promotions tend to lower the brand image. So Dominos need to cut down some expenses in that section which will not affect its sales. B. Appropriate zone – Dominos has got an excellent unmatched home delivery service through which it stays ahead of its rivals. The ‟30-minute luxury‟ of Dominos has given the brand a strong image among the customers. This gives Dominos a clear balance between its competitors and customers. C. Improve zone – Dominos need to improve its product quality in order to maintain reputed. It needs to emphasize on the pizza quality and prioritizing all aspects that relate to the customer. For example, Pizza Hut specifies the calories consumption in each pizza as illustrated in Figure 10. This reflects the brand concern for the customer. So Dominos should also initiate some measures which would foster the „emotional connection‟ to its customers. © Challum Group 8 11
  • 13.
    Operations Management Assignment Figure 10 Comparison to competition D. Urgent action zone – In order to increase the service to customers, Dominos should ensure speedy delivery of pizzas to customers. For this, Dominos need to work on its existing process design. There should be enough space and staff for service and extra machines to handle any machinery failure during peak periods. © Challum Group 8 12
  • 14.
    Operations Management Assignment 3 Product & Service Design 3.1 Introduction Dominos has positioned and established itself as the pioneer in the pizza delivery service. Pizza comprises the company‟s core product with additional items such as subs, chicken strips/bites, wings, garlic bread and potatoes wedges. A fair degree of flexibility is available where customers can customize their pizza and can choose to purchase “combos” thereby providing better value for money. Additional items such as soft drinks accompany these choices. Dominos has successfully implemented this concept of mass customization by catering to customer‟s individual needs through unique combinations of modular components. Dominos standard product and services offering is universal across the world – quality pizza delivery in approximately thirty minutes. Across all geographical regions, the target segment is a cost conscious consumer whose prime concern is convenience. It is useful to analyse the company‟s product performance and use it to evaluate how successful the product has been, this sets the stage for Dominos product redesign. 3.2 Product Life Cycle  Idea Generation phase - The concept of „pizza‟ had been around for a while and was adopted by Dominos in the 1960s. It started from USA and then established its stores in UK and other parts of the world, which were controlled by the USA headquarters.  Concept Development phase - The concept of pizza took a concrete hold in the market. Local franchisees took over the existing stores in UK. There was a paradigm shift as the online ordering and interactive TV ordering replaced the traditional methods. This period witnesses a substantial rise in sales.  “Production” phase - The existing pizza phenomena continued for two decades until there was a sudden decline in sales in 2009. "The fact is, we love our pizza, but as times change, so do consumer tastes," said Russell Weiner, Domino's Chief Marketing Officer.  Service -There was nearly 80% change in existing menu. New items like oven- baked sandwiches and crunch cakes were introduced to the stores. The ‟30- minute delivery‟ doctrine was highly stressed upon. Also, Dominos launched new iPhone apps and the „pizza-tracker‟ to maximize its services.  Withdrawal – Since the new consumers needed freshness in Dominos‟ menu. The company addressed this decline in sale by analyzing its failed product and re-designing its core product. Figure 11 below show the breakdown of product life cycle at Dominos. © Challum Group 8 13
  • 15.
    Operations Management Assignment Figure 11 Evolution of Dominos 3.3 Failed Product and Product Re-design: A good example of how Dominos re-designed its core product is to look at a how the company dealt with its core product failing in the past. It was a bold move for the company to a publically acknowledge that their pizza tasted bad. Additionally it is refreshing to see a corporation openly acknowledge shortcomings and use customer feedback constructively to revise their strategy and approach. In an effort to design their core competency, the company reconfigured its recipe. They tested several combinations of cheeses, sauces and crust to finally arrive at a recipe that was welcomed by the public. It is useful to note that the end customer was heavily involved in the process of the product being re-designed and influenced the outcome largely. This approach of using customer feedback can be credited the company witnessing an increase in sales following the redesigning of their product. Figure 12 and Table 1 iterate this. © Challum Group 8 14
  • 16.
    Operations Management Assignment Figure 12 New Product Development Customer Role NPD Phase Key Issue/Managerial Challenge Customer as Ideation Select customer opinion to develop new resource product Market researchers collect customer information by studying customer buying patterns and using tools such as customer surveys and focus groups. Customer as co- Design and Gather customer opinion that is utilized in creator development the design and development task. Set new product approach along with core competency of the company. Product development team works on exploratory project by mixing component and taste test. Customer as user Product Blind taste test to ensure taste and quality testing compared to competitor. Product Work with advertising agency to present new support product and development and do a road show with franchisees. Get feedback from customer and support customer interaction Table 1 Product Re-design using the customer feedback © Challum Group 8 15
  • 17.
    Operations Management Assignment 3.4 Operations Challenge of the Product/Service Mix Outside the US, Dominos does not have any corporate stores. There are over 4,500 franchised stores. This one aspect can pose as a problem. The Youtube video that surfaced in 2009 illustrates how employees can tarnish an employer‟s reputation and eventually sales. The video showed two Domino employees violating numerous health codes standards in a Dominos store. To make matters worse one of the employees has a criminal record. Better hiring practises and enforcing a stringent code of ethics will help the company deal with issues such as these. Additionally the thirty minutes delivery guarantee that was initially introduced but later cancelled due to a relatively high incidence of accidents. This is an example of a service delivery challenge the company faced. Recognizing that the thirty-minute delivery was an attractive option for the customer, Dominos reintroduced the concept, however allowing itself some leeway and positioning it as a “gift” to the customer. © Challum Group 8 16
  • 18.
    4 Process Design 4.1 Product Service Continuum Dominos as an entity is rather unique in that it straddles both the product based supported by a service package and Service based with a product element in the Product-Service continuum. Product Based supported by a service package - The Product (Pizza) not only Service Based with product element - needs to be manufactured acurately, The Customer buys into a service it needs to be delivered to the end which delivers an end product in the customer within a specified amount form of a Pizza of time and in optimal conditions Figure 13 Product Service Continuum: Dominos 4.2 The Conversion Process The value conversion process has tangible and intangible elements, with the customer being present in important stages in the value chain. With the introduction of open kitchens, the customer who is waiting for his / her takeaway is a part of the entire experience right from the time the order placement to the food consumption. Transforming Transformed Product - Resources - resources - Pizza's & (1) Staff (1) (2) Kitchen Ingredients other food Equipment (2) Recipies items Figure 14 The Conversion Process: Dominos
  • 19.
    Operations Management Assignment Dominosis also in a unique position when it comes to the product they manufacture: Volume: High volume – the overall volume justifies modern kitchens and trained staff who operate the kitchen and the front desk. Variety: While the overall products are standard (pizzas), the customers might, based on their own preferences ask for certain toppings to be added or removed which means the system needs to cope and be flexible. Variation in demand: The order volume peaks during lunch and dinner times. Alternatively, there are periods in the day where the demand is low. Degree of visibility: This varies from very high to low, given the open kitchen format that Dominos has adopted, a customer choosing the takeaway format has full visibility of the production process while a customer choosing the home delivery option has no visibility until such time the product reaches his doorstep. Dominos has chosen a unique Product / Service mix that reflect in the production line method the company follows. Figure 15 Volume Variety Mix: Assembly Line: Dominos © Challum Group 8 18
  • 20.
    Operations Management Assignment Giventhat the pizzas and other items need to be prepared with a high degree of consistency, Dominos has chosen to use the assembly line approach to produce its pizzas, while at the same time they have retained the flexibility of a batch flow process. Essentially, the production process at a Dominos kitchen utilizes the consistency and efficiencies that comes from using an assembly line approach while retaining the flexibility that comes from adopting a batch type manufacturing process. It is useful to note that using the assembly line approach also gives a Dominos outlet the flexibility to meet higher volumes during peak hours. Dominos calls the assembly line the “make line”. 4.3 The Production Process The production process is very streamlined and structured - from the order placement to the final delivery to the end customer. Step 1: The customer initiates the order. It could be through the phone, internet or a walk-in to the restaurant. Figure 16 Dominos: Order Taking Step 2: The Dominos representative takes the order and enters it into the Dominos PULSE system (a proprietary system that streamlines the order taking process). The PULSE system increases efficiencies at a store level. The key functions of this system are: (a) Touch screen ordering: Improves order taking accuracy and efficiency especially during busy periods. (b) Delivery driver routing system: Improves delivery efficiency. (c) Improved MIS capabilities. © Challum Group 8 19
  • 21.
    Operations Management Assignment Step3: The order displayed on the screen on the assembly line along with the customer‟s specifications. Figure 17 Dominos: Assembly Line Step 4: One of the team members in the assembly line picks up the work order, prepares the dough and applies the sauce and cheese accordingly. Step 5: In the next step of the “make line” another team member add the appropriate type / amount of toppings, and then places it into the oven. © Challum Group 8 20
  • 22.
    Operations Management Assignment Figure 18 Dominos: Oven Baking Step 6: After the allotted baking time, a third member of staff removes the pizza from the oven, and places it in a box (which has the order type & number displayed to ensure accuracy of delivery). The pizza is then ready for delivery. Figure 19 Packing: Dominos Step 7: The pizza box is put into a hot-bag and is dispatched through a delivery driver or handed out for collection by the waiting customer. © Challum Group 8 21
  • 23.
    Operations Management Assignment Thefollowing figures further illustrate various aspects of Dominos operations. Figure below establishes the entire value chain until delivery. •Pizza •Personal •Small •Medium •Personal •Large Box •Side Orders •Small •Chicken Box •Phone Strips Placed •Medium Order •Web Assembly •Chicken Cooking in Packing Box Sales •Delivery Placed •Collecti Line Dunkers Oven •Large •Collection on •Potato Box Wedges •Side •Chicken Orders Wings Boxes •Drinks •Ice- creams Master Franchise Dough production, ingredients and equipment purchasing and supply, training, operations, IT, marketing, PR, finance, HR, property, franchise Support Services sales, leasing, transport, warehousing and administration. Figure 20 Process Flow Design: Dominos © Challum Group 8 22
  • 24.
    Operations Management Assignment Figure21 diagram establishes the volume based positioning of Dominos: Figure 21 Volume Based Positioning: Dominos 4.3.1 Store Layout: Dominos adopts a process dominated store layout wherein common processes are clubbed together as the product moves between stations. The integrated floor plan at most Dominos stores facilitate the movement of products and team members between stations to manage capacity during peak hours and minimize bottlenecks. The store layout is designed to cope with the average peak hour movement of goods and people. The storage area is setup to stock the ingredients for three days. The layout design enables the optimal use of space and equipment thereby enhancing the skills and efficiency of the team members, it also allows them to adapt to different level of production. Dominos also ensures that the health and safety norms are adhered to in order to maintain safe working conditions for the staff. The standardization of the surface materials for the interiors across all its stores in UK provides a comfortable environment for the staff and the customer and enforces the brand image. A typical Dominos store layout includes the following: Reception, Assembly Line, Oven Packing area, Office, Cold Storage, and Washing Area. Figure 22 shows the typical layout of the Dominos Store. © Challum Group 8 23
  • 25.
    Operations Management Assignment Storage Washing Area Cold Storage Office Oven Assembly Line Packing Area / Ready for Delivery are Reception Waiting Area Figure 22 Typical Store Layout: Dominos 4.4 Suggested Areas of Improvement 4.4.1 Process: One of the common problems faced at the Domino‟s make line is that by its nature, the line is not balanced, and this is because of two factors: (1) Time taken for each activity is not the same. (2) Since the process is not automated, individual efficiencies of team members results in an uneven flow of work. The above two reasons tend to cause inefficiencies in the make line and results in bottlenecks, especially during peak hours in the evenings. Another major concern facing the local Glasgow franchise is that the drivers are not equipped a GPS based navigation system, efficient on-time deliveries are primarily dependent on the topographical knowledge of the individual drivers and once again, it is left to an individual‟s capabilities to ensure on time deliveries, which account for 70% of the total sales. © Challum Group 8 24
  • 26.
    Operations Management Assignment 4.4.2Store and Production Layout: While the typical dimensions of the floor enhance efficiency and facilitate optimum usage of floor space, serious health and safety hazards exist for team members working in close proximity to the oven - there have been cases of severe burns. A detailed interview with some of the stores employees who have requested for anonymity indicates that this hazard peaks during the busiest hours. The store we visited was the busiest Dominos in Scotland – as it handled sales for both Central & Eastern Glasgow (in terms of sales / and number of units produced), so clearly there quite literally is “space” for improvement - the store might want to provide more space around the oven. It is understood that the given the limited space only one oven with two conveyor belts can be accommodated. This creates a serious bottleneck when the conveyor belts of the oven fail or if the oven breaks down. Primary investigation suggests that during peak hours the demand is significantly higher than the capacity of the oven resulting in severe delay in service times. Additionally, there is no dedicated parking for the delivery driver in the proximity of the store. This results in illegal parking in the loading areas in front of the store and the Co-op Parking. This creates serious hazardous conditions for the drivers and other road users in the proximity for the store with series legal implications. 4.5 Proposed Improvements 4.5.1 Process: The assembly lines need automation in order to remove the inefficiencies caused by the manual movement of products along the assembly line. The provisions of mobile phone with blue tooth headset and navigation system would enable a reduction in the delivery times, and thus driving up overall efficiencies. 4.5.2 Store Layout: The store space needs restructuring to create more space for movement of goods and people especially during peak hours. Consideration should be given to the idea of separating the operations of the Dominos store for Central Glasgow and Eastern Glasgow to manage the demand. The oven needs to be re-located to make it safer for the team members to work in the area. This is especially important from health and safety point of view during busy hours. The parking for the dominos delivery drivers should be clearly marked. The drivers must be restricted from using the loading area to eliminate the potential hazardous conditions. Given these changes to the store structure, and operational aspects, we believe that the store can create a healthier, more efficient atmosphere within the store, and drive up efficiencies across the value chain. © Challum Group 8 25
  • 27.
    Operations Management Assignment 5 Planning and Control 5.1 Goldratt’s Theory of Constraints (TOC) applied to Dominos:  The maximum capacity of baking pizzas simultaneously is 24, which is a bottleneck in case of getting a bulk order, or during peak demand.  In case of excess demand on one outlet, the load should be shared with the nearest outlet. In case the load is persistently high on a particular outlet, then the baking capacity should be upgraded. Figure 23 Production Constraints: Dominos Store © Challum Group 8 26
  • 28.
    Operations Management Assignment Figure 24 Dominos Demand Strategy 5.2 Demand Forecasting Dominos uses the „Prescient‟ distribution-planning suite for its inventory and demand planning (forecasting). With the help of Prescient, Dominos created a solution called „Matched receipts to demand module‟ which maximizes their overall supply chain efficiency by facilitating „lean‟ operations. The prescient-planning suite monitors inventory and determines when a distribution centre needs a product. It optimizes the orders by looking at the minimum material required for each product, based on the existing inventory levels at the distribution centre. The planning suite receives requests from its retail stores through the company‟s PeopleSoft Enterprise Resource Planning (ERP) system; it aggregates these requests to establish replenishment requirements. It also considers any constraints such as dollar amount per purchase order – the next order is then based on the prior order. 5.3 Promotions Planning The Prescient-planning tool manages promotions, which substantially increase the supply chain demand for certain products. Dominos plans promotional forecasts by looking at 4 months of historical and internal information. The Prescient system contains a library of promotion profiles and real-time analysis of the current period, and can overlay new knowledge from the corporate © Challum Group 8 27
  • 29.
    Operations Management Assignment marketingdepartment that is likely to influence the new promotion. Based on this data, it provides recommendations for promotion adjustments. © Challum Group 8 28
  • 30.
    Operations Management Assignment 6 Innovation and Improvements Over the last 50 years, Dominos has innovated many new products and processes hence increasing its quality and efficiency. The company has developed its innovative approaches in four main areas:  Paradigm Innovation  Position Innovation  Process Innovation  Product innovation As shown in the Figure 25 below, each of these are at times a combination of Market based, Eureka and Resource Based sources of innovation. Each area is examined in detail below. Figure 25 Innovation: Dominos 6.1 Paradigm Innovation 6.1.1 Radical innovation: Need pull This is one of the radical innovations the company incorporated. Expansion of the business created a need for the company to develop its own system of supply chain, which is vertically integrated. This topic is explored in detail under the “Supply Chain” section of the report. This shift of operating procedures can be looked at as a “need pull” factor. Simply © Challum Group 8 29
  • 31.
    Operations Management Assignment put,the need for a new more effective innovation approaches to save cost and time resulted in this strategy. 6.2 Position Innovation 6.2.1 Radical innovation: Eureka moment This innovation is another radical approach where Dominos invented the three dimensional car top signs. Being the first to this invent this marketing technique was a “eureka” moment for Dominos. Due to its viral marketing effects, Dominos is able to reach out to various customer bases and position itself as a highly recognized pizza delivery brand. 6.3 Process Innovation 6.3.1 Radical innovation: Need Pull & Eureka moment The Company has developed several innovative approaches in their processes. The need for more efficient and multi-functional tools resulted in the development of the “Spoodle” which is a saucing tool that combines a spoon and a ladle. Their “eureka” innovation was the introduction of the mesh screen that helped cooked the pizza crust more evenly. In addition to this, the need to be the more attractive option in the market resulted in the 30- minute delivery guarantee. Again, Dominos were the first to come up with innovative approaches like these. Thirdly, the company improved the routing software for Dominos delivery vehicles further cutting costs and delivery time. All these approaches stemmed from the need to outperform the competition in terms of quality, cut costs and operate more efficiently. 6.3.2 Incremental innovation: Need Pull Dominos has also successfully incorporated incremental innovations such as online ordering with additional feature like a Pizza Tracker and Pizza builder (available in certain locations), smart phone apps through which customers can place their order and text message order placing. Additionally the “Out of the door time” concept was introduced – the time it takes between new orders being placed online or in store and the ready to eat pizza leaving the store en route to the customer – reduced from 17 minutes to 13 minutes. 6.4 Product Innovation 6.4.1 Radical innovation: Eureka moment Another radical innovation was applied to Dominos product. The Corrugated pizza box protects the pizza from physical damage, weakening due to moisture, and prevents cheese from sticking to the top during delivery. The latest „Heat Wave‟ bags have a patented insulation system that keeps pizzas both hot and crisp. 6.4.2 Incremental innovation: Need pull: Knowledge push The need for incremental innovation was developed by creating a dependency between two previously unrelated variables – price and delivery time thereby creating a high value proposition for the customer. The Company has also expanded its core product to include products such as Cheesy bread and Cinna Stix, Domino‟s Oven Baked Sandwiches, etc. This expansion is credited to the knowledge push Dominos has in relation to the product offering. © Challum Group 8 30
  • 32.
    Operations Management Assignment 7 Supply Chain Management 7.1 Introduction Dominos Pizza has adopted the Make-to-Stock Approach for its Supply Chain Management. The company supply chain is supports lean production and is based on just in time stock management and stock control. 7.2 Dominos Supply Chain Dominos has an innovative supply chain model that ensures all purchases are managed centrally across all franchises around the world. The core entity, which runs the supply chain network is called Dominos supply chain services – a fully owned subsidiary which supplies the dough, raw materials (the condiments, and ingredients that go into the food products), the kitchen equipment / machinery. This entity supplies to all the master franchises – effectively giving the company a few key advantages: (1) With a centralized buying department, the company is able to leverage its buying power, and is able to negotiate the best costs for its purchases. This also ensures purchases on a scale which makes suppliers want to tie into the Dominos supply chain services. For instance Coca-Cola is integrated into Dominos‟ supply chain network, and is seen more as a partner rather than a supplier; this was made possible because centrally Dominos has agreed to only sell Coca-Cola products at all its outlets around the world. (2) Consistency and Quality of products across the board- Since the sourcing is centralized, this ensures consistent quality of food products used, and similar machines / kitchen equipment that make training easy for staff. (3) Economies of scale: Dominos is also able to use its large buying power to hedge better costs when commodity prices fluctuate, it also gives it a better bargaining power with suppliers. © Challum Group 8 31
  • 33.
    Operations Management Assignment Farmers Producers Dominos Commissaries Store Store Store Store s s s s C C C C C C (4) Figure 22 Supply Chain Model Even at a master franchisee level, Dominos has been able to standardise and centralise the supply chain services. Taking the UK‟s supply chain as an example, we look at the country level supply chain works: (1) All the raw materials and food stuffs (dough, ingredients) are prepared at a central commissary in the UK – located at Milton Keynes. (2) The commissary, then supplies to distribution centers which are located in Milton Keynes, Penrith and Nass. (3) The distribution centers then supply to the individual stores once in 3 days (to ensure a JIT philosophy) – it could be on a more need basis, and this is tracked by the PULSE system which keeps track of stocks at an individual store level. © Challum Group 8 32
  • 34.
    Operations Management Assignment Figure 23 Supply Chain at a Country Level 7.3 Critic and recommendations It is useful to note that the stores have faced issues with stock of dough, side orders and packing boxes when the demand has exceeded the predicted demand in the past. It also needs a stock check on a daily basis to arrive at the quantity for the next order. A more sophisticated and comprehensive stock management and control tool to enable store to predict the demand and manage its stock is highly recommended. © Challum Group 8 33
  • 35.
    Operations Management Assignment 8 Quality Management 8.1 Introduction Quality of products and service is very essential to for Dominos to maintain its brand image and reputation as a company that serves quality products; this becomes even more critical considering the fact that pizza is often stereotyped as an “unhealthy” food. 8.2 Quality Assurance and Quality Control Dominos owns its own supply chain network, 99% of its Master franchises source their ingredients and other requirements from this entity, these are then stocked at central commissaries, which then distribute the items needed to the smaller franchises / stores directly on a 3 day basis, hence reducing the need for stockpiling of resources, and ensuring a JIT type set-up. This central control on supplies ensures consistency is maintained in all the raw materials that go into the food produced by the restaurants. Dominos‟ Pizza Group has a documented Supplier Approval Procedure in place. Dominos is in agreement with all suppliers of food ingredients and packaging to a detailed product specification for the products supplied. This is reviewed by a Food Technologist to ensure that the product is safe, legal and consistently of high quality. Dominos ensures that all food products are risk assessed and their production is either audited by Food Technologist or is certified to the BRC Global Standard for Food Safety. A database of Domino‟s approved products and suppliers is maintained. Suppliers are continually assessed in various ways. Quality checks carried out on delivery, samples sent for analysis or feedback received from stores or consumers. 8.3 Critic and recommendations Dominos has some high quality standards for the food, however when it comes to service it does very little to ensure the quality of service, a more robust approach to ensuring quality of customer service is recommended to maintain, build customer loyalty. © Challum Group 8 34
  • 36.
    Operations Management Assignment 9 Conclusion and Recommendations Based on our study of Dominos operations, and its global operating model – we summarize that Dominos is currently in a state of flux. As a company, Dominos has in the past shown resilience and an ability to innovate in the face of competition, but this has been more push-based rather then pull-based. Dominos has shown the ability to innovate but it has been more as a “catch-up” and not as a more intuitive customer led change. The reworking of the recipe in the US market in 2009 was a brilliant test case in a company reacting to change, and Dominos had to do this because it was losing market share to other competitors, and there was consistent negative feedback from US customers on the poor quality of its pizzas. Dominos needs to drive changes more intuitive and customer led, rather than use one successful operating model in an unchanged manner, it needs to make adjustments to it when needed rather than just go in for one overall revamp. Dominos also seems to be diluting its core proposition, which is: (1) Delivery / Takeaway of Pizza‟s (2) On-time, speedy delivery of Pizza‟s (3) Minimum number of products / product base which enables quick delivery of Pizza‟s In response to a potential threat from other fast food companies Dominos is expanding its product base - the Dominos Sub sandwich is an example of Dominos moving away from its core-value proposition. This has some potential drawbacks such as complicating the supply chain networks, potentially increasing cooking times and thereby increasing service delivery times. If Dominos manages this expansion well, then it can add to its product offerings while leveraging its core strengths, which might increase its market share. A big threat for Dominos is that it is a service entity but it has adopted a product manufacturing approach. The company‟s key focus areas have always been to deliver pizza on time. Over time, Dominos has not been focusing on its service aspect, and in a increasingly customer centric world it is critical that Dominos improves its hiring / training practices and deliver world class customer service along with the best in class product that it currently offers. © Challum Group 8 35
  • 37.
    Operations Management Assignment 10 References 1. Charlene Li, Harvard Business Review: The Art of Admitting Failure, 2011 http://blogs.hbr.org/cs/2011/03/the_art_of_admitting_failure.html 2. BIS John Reynolds, Dominos Pizza Inc. http://web.ebscohost.com/ehost/detail?sid=5b87caa3-d294-4899-9e92- 9941787fd7ab%40sessionmgr14&vid=3&hid=12&bdata=JnNpdGU9ZWhvc3QtbGl2 ZQ%3d%3d#db=bth&AN=53576535 3. Geoff Riley, Dominos Pizza - Growth & Strategy (Part 2) - Innovation, Service and Smart, Operations, 2010 http://tutor2u.net/blog/index.php/business-studies/comments/dominos-pizza- growth-strategy-part-2-innovation-service-and-smart-operation/ 4. Dominos Corporate profile http://phx.corporate-ir.net/phoenix.zhtml?c=135383&p=irol-homeprofile 5. Global Logistics & Supply Chain Strategies, Planning, Sourcing, Replenishment Are Easy as (Pizza) Pie, 2008 http://www.supplychainbrain.com/content/industry-verticals/food-beverage/single- article-page/article/planning-sourcing-replenishment-are-easy-as-pizza-pie/ 6. Dominos annual report 2011 http://www.dominos.com.au/corporate/investors/investors.aspx 7. Stephanie Clifford, The New York Times, Video Prank at Domino’s Taints Brand, 2009 http://www.nytimes.com/2009/04/16/business/media/16dominos.html 8. Jacob Goldenberg, David Mazursky, The Cambridge Press, Creativity in Product innovation, 2002 http://catdir.loc.gov/catdir/samples/cam033/2001018106.pdf 9. BIS: Euro Monitor – Dominos company profile 06 Sept 2011 © Challum Group 8 36