Lohith H S is seeking a senior level position in project planning, management, execution, EHS implementation, materials planning, and quality assurance. He has 7 years of experience in project coordination, sourcing, and machine building. His experience includes project planning, scheduling, installation, commissioning, and contract management for automation, material handling, and manufacturing projects. Currently he works as a project engineer handling projects for Saint-Gobain and prior worked as a project coordinator for Webb India on material handling systems for automotive and industrial clients.
They are the leading Manufacturer of boiler parts like Water Wall Panel, Header, Economizer Coil, Air preheater, Duct, Ceiling Girder, Structural Columns like Box column, Star column, Bracing box etc., & Buckstay beams supplying for M/s. Bharat Heavy Electricals Limited, M/s. Cethar Vessels Limited, M/s ISGEC Heavy Engineering Limited & M/s Doosan Power systems Limited. Kiln shell, Structural columns & Duct Supplying for M/s FLSmidth Limited and Tubular Windmill Tower supplying for M/s. Suzlon Energy Limited.
They are the leading Manufacturer of boiler parts like Water Wall Panel, Header, Economizer Coil, Air preheater, Duct, Ceiling Girder, Structural Columns like Box column, Star column, Bracing box etc., & Buckstay beams supplying for M/s. Bharat Heavy Electricals Limited, M/s. Cethar Vessels Limited, M/s ISGEC Heavy Engineering Limited & M/s Doosan Power systems Limited. Kiln shell, Structural columns & Duct Supplying for M/s FLSmidth Limited and Tubular Windmill Tower supplying for M/s. Suzlon Energy Limited.
Having 12 years of experience in Oil & Gas and Petrochemical industry with exposure to various profiles of maintenance, planning and project management.
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMMuhammad Awais
Project Mechanical Engineer (MS-PMgmt, BTech Engg, PGD, CPM, EngTech)
Oil & Gas Mechanical Engineering Energy Projects & Maintenance, Planning Services
Career Level 4+ years of Experience & 18 years Education
DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...ravikumar warad
A seasoned professional with more than 22 years of extensive experience in the field of Production Planning, Maintenance, Plant & Utility Operations, Safety, Budgeting/Costing & Forecasting, Project Management and Team Management. Proficient in managing production operations as per the defined time/ cost parameters & standards as well as experience of developing procedures for operational excellence. Has in-depth knowledge of legal requirements/approval to implement projects, quality system implementation such as ISO, and ISI, . Decent understanding of value engineering. Highly skilled in managing functions like installation & commissioning of plant and machineries, ensuring in time delivery, production control and planning. Proven track record of successfully executing & implementing various projects, handling all related administrative and functional control of plant activities. Instrumental in the implementation of 5S, Kaizen, . Adept in examining existing manufacturing methods in order to identify improvements and solving technical and processing problems. Possesses excellent analytical & managerial skills with strong leadership quality.
Having 12 years of experience in Oil & Gas and Petrochemical industry with exposure to various profiles of maintenance, planning and project management.
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMMuhammad Awais
Project Mechanical Engineer (MS-PMgmt, BTech Engg, PGD, CPM, EngTech)
Oil & Gas Mechanical Engineering Energy Projects & Maintenance, Planning Services
Career Level 4+ years of Experience & 18 years Education
DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...ravikumar warad
A seasoned professional with more than 22 years of extensive experience in the field of Production Planning, Maintenance, Plant & Utility Operations, Safety, Budgeting/Costing & Forecasting, Project Management and Team Management. Proficient in managing production operations as per the defined time/ cost parameters & standards as well as experience of developing procedures for operational excellence. Has in-depth knowledge of legal requirements/approval to implement projects, quality system implementation such as ISO, and ISI, . Decent understanding of value engineering. Highly skilled in managing functions like installation & commissioning of plant and machineries, ensuring in time delivery, production control and planning. Proven track record of successfully executing & implementing various projects, handling all related administrative and functional control of plant activities. Instrumental in the implementation of 5S, Kaizen, . Adept in examining existing manufacturing methods in order to identify improvements and solving technical and processing problems. Possesses excellent analytical & managerial skills with strong leadership quality.
Resume of an accomplished IT / Network leader with global experience in Program Management , Project management , Customer relations - across diverse industries
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
1. 1
LOHITH H S
RESIDENTIAL ADDRESS
SKANDA NILAYA
#50/1, 3rd
Main Road ,
Palace GuttaHalli,
Near Reliance Fresh mart
Bengaluru-560003.
Mobile No: +91-96117 66652 Email: - lohithhsl@gmail.com
OBJECTIVE
Seeking A Senior Level Assignment In Areas Of Project Planning & Management,
Execution Of Project Plan & Monitoring, EHS Implementation, Materials Planning, Machine
Building and Quality Assurance With A Progressive Organization Of Repute.
PERSONAL TRAITS
Hardworking, Self-Motivated, Capable of working in a Multi-Cultural Environment &
Optimistic Approach towards a task.
EDUCATIONAL QUALIFICATION
Professional Qualification:-
“Master of Business Administration” - MBA-Project & Operation Management
CURRICULUM VITAE
2. 2
ACADEMIC QUALIFICATIONS
2014 - Master of Business Administration (MBA) in Operation and Project Management, First
Class (70%) , Manasagangotri – KSOU - Mysore, Karnataka
2011 - Masters Diploma in Project Planning Management (PPM), CADD Centre, Bangalore
2009 - Bachelor of Engineering in Mechanical First Class (61%), Visveswaraiah Technological
University, Belgaum, Karnataka. (K.S. Institute of Technology, Bangalore)
2005 - Diploma in Mechanical Engineering, First Class (65%), Govt Polytechnic Tumkur
2002 - 10th Standard (SSLC), First Class (75%), Sri Urigadigeswara Rural Res.H.S,
Bettallimutt, Kunigal (T), Tumkur (D)
Work Experience
Background
7Years Of Extensive Experience In The Field Of Project Planning & Management,
Project Co-ordination ,Sourcing team , Quality Assurance and Machine Building
Capable of Handling of Project in the field of Machine building & facilitating
Experience of Project Planning and Scheduling, Installation & Commissioning,
familiar in Material Handling system of Automobile, Aluminum and Process &
Construction Projects & Contract Management
Adept In Overall Planning, Development And Monitoring Of Projects Problem
Solving and Co-ordination Skills
Proficiency in Planning Software’s / Applications and Tools in MS Project &
Primavera
Employment Details
Saint-Gobain-GrindWell Norton Ltd- Project Engineering Group:
Since 27th
January 2012 to Till Now (4Years)
Project Engineering Group (PEG) is Saint-Gobain Grindwell Norton Ltd (GNO)
Division
3. 3
Handling the Projects of Saint-Gobain Group Companies and as well as External
Projects
Project Handled & Major Customers: Michelin - Tire Building Machine, BASF –
Dryer & Calciners, Industrial Oven, Process plant, SPM’s, Glass processing
machines, GNO & SG internal Customer
Roles & Responsibility:
Project Planning and Scheduling
Tracking and Progress report updating for Projects
Conducting Projects Review Meeting and update
Outsourcing of Manufacturing and Commercial items for SPM
Release of Purchase indent to commercial team
Bid comparison and Price Negation with major vendors
Effective Interaction with Customer, Vendor, Assembly Team Members, Quality,
Stores and Design Dept
Project schedule development, monitoring progress status and reporting to ensure
client satisfaction
Elaborate, Update & Revise Project schedule and documents in close co-operation
with the Project Manager
Follow-Up with vendors for Manufacturing and Commercial Components
Site Visit for Follow-up and Progress Updation
Co-ordination with Design team and Manufacturers for solving the issues arising
at manufacturing parts
Co-ordination with assembly team during FAT, Packing & Dispatch stage
Environment Health Safety (EHS) & QMS Implementation
Webb India Pvt Ltd: since 9th
Sep 2009 to 20th Jan 2012 (2.5Years )
Complete Automation of Design, Manufacturing, Installation & Commissioning of
Material Handling Systems
Power and free conveyer systems, Automatic baggage handling in airports, Skid-
conveyers for automobile industries, Belt conveyers, Roller conveyers, and Lifting
Equipment’s etc. are designed and supplied by Webb India
4. 4
Project Handled: Vedanta Aluminum Ltd & Bharath Aluminum Ltd - Anode
Handling system, Rodding shop, Bath Handling system, Cooling shop and Cement
Plant, Maruti-Suzuki, TATA Motors, General Motors, Ashok Leyland and Mahindra
& Mahindra.
Responsibility:
Material Follow-up and Planning & Project Scheduling
Projects Review Meeting
Project schedule development, monitoring progress status and reporting to ensure
client satisfaction
Elaborate, Update & Revise Project schedule procedure and documents in close
co-operation with the Project Manager
Interface with Project Site Management team and client counterparts for issues
related to planning and scheduling activities
Material Erection and commissioning Planning
Examine closely subcontractor’s execution schedule and progress reports and
Analyse and control subcontractors scheduling methodology
Check subcontractor’s progress measurement
Provide detailed site monthly progress report to be incorporated in to the Monthly
Project Report
Participate to reviews and technical audits on scheduling & Progress report as
required
Co-Ordination with Design, Production Planning, Procurement, Manufacturing,
Logistic, Production, QA ,Commercial & other agencies for execution
Commissioning Support to PLC & Electrical Team for System Process Flow Chart
Erection and commissioning of Belt conveyers, Roller conveyers, Bag filters,
Structural, Heavy storage Silos and Screw conveyers and Ducting works
Co-ordinate with the Webb-Australia and CITIC- China Team for Erection and
commissioning of AG Mill and Ball Mill ,Vibrating feeders and Cleaning M/C at
Vedanta Aluminium Plant at Jharsuguda ,Orissa
5. 5
HOBBIES
Reading books, listening Music
Marathon, Trekking, Swimming
Seminars and Browsing
PERSONAL DETAILS
Father’s Name : Shivaramu
Date of Birth : 14th
June 1985
Nationality : INDIAN
Language Known : Kannada, English, Hindi, Tamil, Telgu
Marital Status : Single
Permanent Address : S/o Shivaramu,
Hunasekuppe,
Bettalli Mutt (P),
Kunigal (T),
Tumkur (Dist) - 572126,
Karnataka – India
DECLARATION
I hereby declare that the above information is true and correct to the best of my Knowledge
and belief.
Date: May/2016
Place: Bengaluru
LOHITH H S
S/d