Tantangan Pengelolaan Sumber Daya Air Nasional
Arie Setiadi Moerwanto
Perekayasa Ahli Utama
2
Paleo Global Climate Change
DitIrWa, 2022
PALEO WORLD MAP
THE GREAT DYING,
ATMOSPHERIC WARMING,
GREENHOUSE GASES
BY VOLCANIC ERUPTIONS
Christopher R Scotese. 2000. Paleo Climate.
Sobirin/2009/dari berbagai sumber
In fact, at this time, the earth's climate is very suitable for human life,
but the bad behavior of the human causes climate change occurs more quickly
3
Global Risks Landscape 2021
DitIrWa, 2022
PRINSIP DASAR
DALAM INFRASTRUKTUR BERKELANJUTAN
(Sung-Hwan KIM, 2023)
SUSTAINABILITY
(Sung-Hwan KIM, 2023)
PRESENT CONDITIONS
FLOODS IN THE WORLD
(Sung-Hwan KIM, 2023)
8
INDONESIAN CLIMATE
equator
DME
RETURN PERIOD:
15 MONTHS
TREND: 3-4 YEARS
ENSO
RETURN PERIOD:
5-7 YEARS
TREND: 4 YEARS
MONSOON
DEC-FEB
MONSOON
JUN-AGS
DARI BERBAGAI SUMBER/ SOBIRIN-MUBIAR/ DPKLTS/ 2003
INFLUENCED BY GLOBAL CLIMATE:
• MONSOON
• ENSO
• DME
9
Respon terhadap Sistem Peringatan Dini
Faktor Pengendali Iklim dan Cuaca Indonesia, BMKG 2021
Global sea current movement
Rainfall forecasting
Satellite observation
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
Januari Februari
Maret April
Mei Juni
Juli Agustus
10
Rasio Tampungan terhadap Debit Inflow Rerata Tahunan
Sumber : Direktorat Bendungan dan Danau
11
Early Release Strategy
12
Early Release Strategy
13
Pembaharuan dan Penerapan Peta Resiko Kegempaan
PENERAPAN PETA SUMBER & BAHAYA GEMPA INDONESIA
14
Peta Potensi Tsunami Indonesia
Badan
Geologi
2007/
Sukhiyar
2010
15
Desain Infrastruktur di Daerah Rawan Tsunami
Source: Kompas.com
× ◎ △
69 days △ 44 days ◎ 48 days ◎
6x5=30 N os,L=58.50m 4x4=16 N os,L=58.50m 4x4=16 N os,L=58.50m
E val
uati
on N otR ecom m ended R ecom m ended N otR ecom m ended
C onstructi
on Peri
od
C om parat
i
ve S t
udy ofP i
l
e Type f
orB ri
dge
Eval
uati
on I
tem
Al
ternati
ve 1:C ast-i
n-Pl
ace C oncrete
Pi
l
e(φ
1500)
Al
ternati
ve 2:C ast-i
n-Pl
ace C oncrete
Pi
l
e(φ
1800)
Al
ternati
ve 3:C ast-i
n-Pl
ace C oncrete
Pi
l
e(φ
2000)
C onstructi
on C ost R ati
o = 1.34 R ati
o = 1.00 R ati
o = 1.23
Schem ati
c Vi
ew
16
Respon Tata Ruang terhadap Infrastruktur Konektivitas
17
Dampak Infrastruktur Konektivitas terhadap Sawah Irigasi Teknik
18
Pengaruh Perubahan Iklim - Puncak Banjir
19
Pengaruh Perubahan Iklim - Puncak Banjir
1) Dari 24 lokasi berpotensi banjir di jalan tol
Jawa,distribusi CN yang merupakan parameter
yang berpotensi menghasilkan banjir adalah :
• Yang termasuk dalam Hydrologic Soil Group
(HSG) D dan guna lahan pemukiman sehingga
menghasilkan CN lebih dari 90.
• Yang termasuk dalam HSG C dan guna lahan
pemukiman dengan CN antara 80-90.
• Yang HSG di B dan kurang dari 80 hanya 8%
saja.
2) Dengan konsep Low Impact Development (LID)
DAS yang termasuk dalam kategori A dan B
sebaiknya dibangun kolam retensi untuk
menahan volume banjir sementara, sedangkan
kategori C dalam DAS yang bersangkutan
sebaiknya diterapkan bioretensi atau sumur
resapan
Distribusi CN Jalam Tol Jawa
(Kajian Penanganan Banjir Pada Ruas Jalan Tol Di Pulau Jawa – Wanni Adidarma, 2020)
20
Kisaran Land Subsidence di Indonesia
21
Pola Penurunan Muka Tanah
Model sebelumnya menunjukkan wilayah pesisir Jakarta yang berpotensi tenggelam dan di bawah permukaan laut sekitar 28,08% pada
tahun 2035, sedangkan yang terbaru adalah 24,86%. Ada penurunan sebesar 3,22%. Model awal untuk tahun 2050 adalah sekitar
31,61% dan yang diperbarui adalah 28,33%. Ada pengurangan sebesar 3,22%. (Andreas, 2021)
22
Penanganan Land Subsidence di Talise
23
Land Subsidence di Semarang – Tanjung Mas
PT. Pembangunan Perumahan
25
Pahami Bagaimana Sistem Bekerja
Sistem Tata Air Tertutup Banger
26
• Rivers always respond to human activities and/or natural
processes in terms of morphological changes.
• With such changes, the river effectively adjusts itself so as to
approach a new condition of equilibrium.
• The changes may lead towards undesirable conditions, which
conflict with other interests and degradation of a river’s potential
resources.
• Measures need to be implemented to minimize, hinder or rectify
any negative impact of a river's morphological change.
• Inappropriate counter measures may generate even worse
conditions.
Basic School of Mind in River Dynamics
27
Dinamika
Sungai
28
Perubahan Morfologi Sungai Arah Horizontal
29
Pengendalian dengan Pengarah Arus + Bottom Panels
+4.00
+5.00
+10.00
+7.00
1
:
1
1 : 1
+4.00
+5.00
+7.00
Rib bertangga
Cerucuk/dolken kayu Ø 0.10 m
1 = 3 m dipasang tiap 1 m
Turap besi dipasang tiap 2 m
1 = 6 m
Turap besi dipasang rapat
1 = 12 m
+2.00
Blok beton terkunci
POTONGAN A - A
Skala 1 : 100
II
III
III
I
I
D E N A H
Skala 1 : 50
II
IV
IV
POTONGAN I : I
Skala 1 : 50
POTONGAN II - II
Skala 1 : 50
POTONGAN III : III
Skala 1 : 50
POTONGAN II - II
Skala 1 : 50
POTONGAN B - B
Skala 1 : 100
Blok beton terkunci
Turap besi dipasang rapat
1 = 12 m
Cerucuk/dolken kayu Ø 0.10 m
1 = 3 m dipasang tiap 1 m
+4.00
+5.00
Rib bertangga
+10.00
1 : 1
+7.00
+2.00
SUSUNAN BLOK BETON TERKUNCI
R
=
1
5
.
0
0
m
1
:
1
Turap besi dipasang
tiap 2m, l = 6m
SKALA 1 : 200
DENAH R
=
5
.5
0
m
1
:
1
Turap besi dipasang rapat
l = 12m
Cerucuk / dolken kayu O 0.10 m
l = 3m,dipasang tiap 1m
A
Beton blok tekunci o
117 30
Rib bertangga
A
1 : 1
1 : 1
R = 5m
+
1
0
.0
0
1
:
1
1 : 1
1 : 1
+ 10.00
+ 12.456
1
:
1
+ 10.00
B Tutup besi dipasang rapat
B
1
:
1
R
=
10.00
+ 10.00
13.530
30
Keberadaan Lapisan Perisai Dasar Sungai
31
Degradasi Dasar Sungai dan Gerusan Lokal
32
Analisis Respon Morfologi Sungai - Penyelidikan Lapangan
Pengukuran Lapangan:
• Geometri sungai;
• Debit sungai;
• Gradasi material dasar sungai;
• Bed-load dan Suspended load transport rate.
33
Important Elements in Improving the EnvironmentalSustainability
In Infrastructure
(Sung-Hwan KIM, 2023)
How to Achieve Sustainability
34
Reduction Methods of CO2 Emissions in Project
(Sung-Hwan KIM, 2023)
35
Reduction Potential in the Project Stages
36
Sustainability in BIM
37
VE in Design
(Sung-Hwan KIM, 2023)
38
Construction Materials
(Sung-Hwan KIM, 2023)
39
Soft Soil Treatment
(Sung-Hwan KIM, 2023)
40
TERIMA KASIH
The better the challenge,
The better the answer,
The better the world works.
• Diversity,
• Cohesiveness,
• Integrative.

More Related Content

Similar to Materi_1711171625.pdf pelajaran baru 2023

Diskusi Akhir Tondano.pptx
Diskusi Akhir Tondano.pptxDiskusi Akhir Tondano.pptx
Diskusi Akhir Tondano.pptxdenyainur
 
Pertemuan 1 Drainase - Pengenalan.pptx
Pertemuan 1 Drainase - Pengenalan.pptxPertemuan 1 Drainase - Pengenalan.pptx
Pertemuan 1 Drainase - Pengenalan.pptxErniMulyandari1
 
bahan webinar 8922-2.pdf
bahan webinar 8922-2.pdfbahan webinar 8922-2.pdf
bahan webinar 8922-2.pdfvrooghprime
 
Sce3110 soalan struktur_dan_esey2
Sce3110 soalan struktur_dan_esey2Sce3110 soalan struktur_dan_esey2
Sce3110 soalan struktur_dan_esey2anandhavalli
 
Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...
Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...
Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...Dasapta Erwin Irawan
 
Materi M Wachyudi Memed.pdf
Materi M Wachyudi Memed.pdfMateri M Wachyudi Memed.pdf
Materi M Wachyudi Memed.pdfHackEuy
 
Penyediaan Air Bersih.pptx
Penyediaan Air Bersih.pptxPenyediaan Air Bersih.pptx
Penyediaan Air Bersih.pptxIzzulFikri12
 
jurnal bendungan ok
jurnal bendungan okjurnal bendungan ok
jurnal bendungan okalam luas
 
Gambar D.I Senai.pdf
Gambar D.I Senai.pdfGambar D.I Senai.pdf
Gambar D.I Senai.pdfssuser947ae6
 
Topik 5 Kuliah-irigasi permukaan-dkk
Topik 5 Kuliah-irigasi permukaan-dkkTopik 5 Kuliah-irigasi permukaan-dkk
Topik 5 Kuliah-irigasi permukaan-dkkDedi Kusnadi Kalsim
 
konservasi catchmen area.pptx
konservasi catchmen area.pptxkonservasi catchmen area.pptx
konservasi catchmen area.pptxssuser68effa
 
Final Report Presentation
Final Report PresentationFinal Report Presentation
Final Report PresentationFarhan Helmy
 

Similar to Materi_1711171625.pdf pelajaran baru 2023 (20)

Tb. irbang 2 ok
Tb. irbang 2 okTb. irbang 2 ok
Tb. irbang 2 ok
 
Diskusi Akhir Tondano.pptx
Diskusi Akhir Tondano.pptxDiskusi Akhir Tondano.pptx
Diskusi Akhir Tondano.pptx
 
Pertemuan 1 Drainase - Pengenalan.pptx
Pertemuan 1 Drainase - Pengenalan.pptxPertemuan 1 Drainase - Pengenalan.pptx
Pertemuan 1 Drainase - Pengenalan.pptx
 
bahan webinar 8922-2.pdf
bahan webinar 8922-2.pdfbahan webinar 8922-2.pdf
bahan webinar 8922-2.pdf
 
Sce3110 soalan struktur_dan_esey2
Sce3110 soalan struktur_dan_esey2Sce3110 soalan struktur_dan_esey2
Sce3110 soalan struktur_dan_esey2
 
Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...
Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...
Analisis Kualitas Airtanah Dengan Statistik Multivariat Untuk Identifikasi Si...
 
Materi M Wachyudi Memed.pdf
Materi M Wachyudi Memed.pdfMateri M Wachyudi Memed.pdf
Materi M Wachyudi Memed.pdf
 
Soal OSK Geografi 2017
Soal OSK Geografi 2017Soal OSK Geografi 2017
Soal OSK Geografi 2017
 
Penyediaan Air Bersih.pptx
Penyediaan Air Bersih.pptxPenyediaan Air Bersih.pptx
Penyediaan Air Bersih.pptx
 
Presentasi Seminar KP
Presentasi Seminar KPPresentasi Seminar KP
Presentasi Seminar KP
 
Ksl rentang baru
Ksl rentang baruKsl rentang baru
Ksl rentang baru
 
jurnal bendungan ok
jurnal bendungan okjurnal bendungan ok
jurnal bendungan ok
 
2124 3757-1-sm
2124 3757-1-sm2124 3757-1-sm
2124 3757-1-sm
 
Gambar D.I Senai.pdf
Gambar D.I Senai.pdfGambar D.I Senai.pdf
Gambar D.I Senai.pdf
 
Kelompok vi persentasi
Kelompok vi persentasiKelompok vi persentasi
Kelompok vi persentasi
 
Topik 5 Kuliah-irigasi permukaan-dkk
Topik 5 Kuliah-irigasi permukaan-dkkTopik 5 Kuliah-irigasi permukaan-dkk
Topik 5 Kuliah-irigasi permukaan-dkk
 
Kajian aspek lingkungan restorasi dan rehabilitasi kubah gambut
Kajian aspek lingkungan restorasi dan rehabilitasi kubah gambutKajian aspek lingkungan restorasi dan rehabilitasi kubah gambut
Kajian aspek lingkungan restorasi dan rehabilitasi kubah gambut
 
Pemanasan Global.pdf
Pemanasan Global.pdfPemanasan Global.pdf
Pemanasan Global.pdf
 
konservasi catchmen area.pptx
konservasi catchmen area.pptxkonservasi catchmen area.pptx
konservasi catchmen area.pptx
 
Final Report Presentation
Final Report PresentationFinal Report Presentation
Final Report Presentation
 

More from AhmadMuhtadi11

39. RPS Perumahan Revian 3 Maret 2020.pdf
39. RPS Perumahan Revian 3 Maret 2020.pdf39. RPS Perumahan Revian 3 Maret 2020.pdf
39. RPS Perumahan Revian 3 Maret 2020.pdfAhmadMuhtadi11
 
PPT-HUKUM-PIDANA.ppt terbaru dan terlengkap
PPT-HUKUM-PIDANA.ppt terbaru dan terlengkapPPT-HUKUM-PIDANA.ppt terbaru dan terlengkap
PPT-HUKUM-PIDANA.ppt terbaru dan terlengkapAhmadMuhtadi11
 
POLNEP Brosur.pdfsdas fdasda asdasdas fdds
POLNEP Brosur.pdfsdas fdasda asdasdas fddsPOLNEP Brosur.pdfsdas fdasda asdasdas fdds
POLNEP Brosur.pdfsdas fdasda asdasdas fddsAhmadMuhtadi11
 
675064139-Kecelakaan-Kerja-2.ppt terbaru
675064139-Kecelakaan-Kerja-2.ppt terbaru675064139-Kecelakaan-Kerja-2.ppt terbaru
675064139-Kecelakaan-Kerja-2.ppt terbaruAhmadMuhtadi11
 
sejarahlistrik-200401235807.pptx 2024 terbaru
sejarahlistrik-200401235807.pptx 2024 terbarusejarahlistrik-200401235807.pptx 2024 terbaru
sejarahlistrik-200401235807.pptx 2024 terbaruAhmadMuhtadi11
 
Sosialisasi_PPKB_Intakindo sosialisasi.pptx
Sosialisasi_PPKB_Intakindo sosialisasi.pptxSosialisasi_PPKB_Intakindo sosialisasi.pptx
Sosialisasi_PPKB_Intakindo sosialisasi.pptxAhmadMuhtadi11
 
k3listrik-200813021513 k3 listrik mudah dan gampang
k3listrik-200813021513 k3 listrik mudah dan gampangk3listrik-200813021513 k3 listrik mudah dan gampang
k3listrik-200813021513 k3 listrik mudah dan gampangAhmadMuhtadi11
 
k3 Mekanik belajar k3 itu mudah dan gampang
k3 Mekanik belajar k3 itu mudah dan gampangk3 Mekanik belajar k3 itu mudah dan gampang
k3 Mekanik belajar k3 itu mudah dan gampangAhmadMuhtadi11
 
366712124-Norma-k3-Mekanik - belajar k3 mudah
366712124-Norma-k3-Mekanik - belajar k3 mudah366712124-Norma-k3-Mekanik - belajar k3 mudah
366712124-Norma-k3-Mekanik - belajar k3 mudahAhmadMuhtadi11
 
SKKNI 2014-350 peraturan pemerintah tentang
SKKNI 2014-350 peraturan pemerintah tentangSKKNI 2014-350 peraturan pemerintah tentang
SKKNI 2014-350 peraturan pemerintah tentangAhmadMuhtadi11
 

More from AhmadMuhtadi11 (10)

39. RPS Perumahan Revian 3 Maret 2020.pdf
39. RPS Perumahan Revian 3 Maret 2020.pdf39. RPS Perumahan Revian 3 Maret 2020.pdf
39. RPS Perumahan Revian 3 Maret 2020.pdf
 
PPT-HUKUM-PIDANA.ppt terbaru dan terlengkap
PPT-HUKUM-PIDANA.ppt terbaru dan terlengkapPPT-HUKUM-PIDANA.ppt terbaru dan terlengkap
PPT-HUKUM-PIDANA.ppt terbaru dan terlengkap
 
POLNEP Brosur.pdfsdas fdasda asdasdas fdds
POLNEP Brosur.pdfsdas fdasda asdasdas fddsPOLNEP Brosur.pdfsdas fdasda asdasdas fdds
POLNEP Brosur.pdfsdas fdasda asdasdas fdds
 
675064139-Kecelakaan-Kerja-2.ppt terbaru
675064139-Kecelakaan-Kerja-2.ppt terbaru675064139-Kecelakaan-Kerja-2.ppt terbaru
675064139-Kecelakaan-Kerja-2.ppt terbaru
 
sejarahlistrik-200401235807.pptx 2024 terbaru
sejarahlistrik-200401235807.pptx 2024 terbarusejarahlistrik-200401235807.pptx 2024 terbaru
sejarahlistrik-200401235807.pptx 2024 terbaru
 
Sosialisasi_PPKB_Intakindo sosialisasi.pptx
Sosialisasi_PPKB_Intakindo sosialisasi.pptxSosialisasi_PPKB_Intakindo sosialisasi.pptx
Sosialisasi_PPKB_Intakindo sosialisasi.pptx
 
k3listrik-200813021513 k3 listrik mudah dan gampang
k3listrik-200813021513 k3 listrik mudah dan gampangk3listrik-200813021513 k3 listrik mudah dan gampang
k3listrik-200813021513 k3 listrik mudah dan gampang
 
k3 Mekanik belajar k3 itu mudah dan gampang
k3 Mekanik belajar k3 itu mudah dan gampangk3 Mekanik belajar k3 itu mudah dan gampang
k3 Mekanik belajar k3 itu mudah dan gampang
 
366712124-Norma-k3-Mekanik - belajar k3 mudah
366712124-Norma-k3-Mekanik - belajar k3 mudah366712124-Norma-k3-Mekanik - belajar k3 mudah
366712124-Norma-k3-Mekanik - belajar k3 mudah
 
SKKNI 2014-350 peraturan pemerintah tentang
SKKNI 2014-350 peraturan pemerintah tentangSKKNI 2014-350 peraturan pemerintah tentang
SKKNI 2014-350 peraturan pemerintah tentang
 

Recently uploaded

sample for Flow Chart Permintaan Spare Part
sample for Flow Chart Permintaan Spare Partsample for Flow Chart Permintaan Spare Part
sample for Flow Chart Permintaan Spare Parthusien3
 
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxyoodika046
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxAndimarini2
 
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdfPengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdfPusatKeteknikanKehut
 
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdfPengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdffitriAnnisa54
 
B_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdf
B_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdfB_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdf
B_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdf114210034
 
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptxEnginerMine
 
LAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdfLAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdfIftitahKartika
 
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...rororasiputra
 
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxArisatrianingsih
 
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptPresentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptarifyudianto3
 
Konsep rangkaian filter aktif berbasis operational amplifier
Konsep rangkaian filter aktif berbasis operational amplifierKonsep rangkaian filter aktif berbasis operational amplifier
Konsep rangkaian filter aktif berbasis operational amplifierbudi194705
 
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptBAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptDellaEkaPutri2
 
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptxVinaAmelia23
 
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxManajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxarifyudianto3
 
perbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxperbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxMuhamadIrfan190120
 
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE TriwulanpptxLaporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptxilanarespatinovitari1
 
PEMELIHARAAN JEMBATAN pada Ujian Kompete
PEMELIHARAAN JEMBATAN pada Ujian KompetePEMELIHARAAN JEMBATAN pada Ujian Kompete
PEMELIHARAAN JEMBATAN pada Ujian KompeteIwanBasinu1
 

Recently uploaded (19)

sample for Flow Chart Permintaan Spare Part
sample for Flow Chart Permintaan Spare Partsample for Flow Chart Permintaan Spare Part
sample for Flow Chart Permintaan Spare Part
 
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
 
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdfPengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
Pengeloaan Limbah NonB3 KLHK-Upik-090921.pdf
 
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdfPengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
 
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get CytotecAbortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
 
B_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdf
B_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdfB_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdf
B_Kelompok 4_Tugas 2_Arahan Pengelolaan limbah pertambangan Bauksit_PPT.pdf
 
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
 
LAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdfLAJU RESPIRASI.teknologi hasil pertanianpdf
LAJU RESPIRASI.teknologi hasil pertanianpdf
 
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
Lecture 02 - Kondisi Geologi dan Eksplorasi Batubara untuk Tambang Terbuka - ...
 
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
 
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptPresentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
 
Konsep rangkaian filter aktif berbasis operational amplifier
Konsep rangkaian filter aktif berbasis operational amplifierKonsep rangkaian filter aktif berbasis operational amplifier
Konsep rangkaian filter aktif berbasis operational amplifier
 
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptBAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
 
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
397187784-Contoh-Kasus-Analisis-Regresi-Linear-Sederhana.pptx
 
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxManajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
 
perbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptxperbedaan jalan raya dan rel bahasa Indonesia.pptx
perbedaan jalan raya dan rel bahasa Indonesia.pptx
 
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE TriwulanpptxLaporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
 
PEMELIHARAAN JEMBATAN pada Ujian Kompete
PEMELIHARAAN JEMBATAN pada Ujian KompetePEMELIHARAAN JEMBATAN pada Ujian Kompete
PEMELIHARAAN JEMBATAN pada Ujian Kompete
 

Materi_1711171625.pdf pelajaran baru 2023

  • 1. 1 Tantangan Pengelolaan Sumber Daya Air Nasional Arie Setiadi Moerwanto Perekayasa Ahli Utama
  • 2. 2 Paleo Global Climate Change DitIrWa, 2022 PALEO WORLD MAP THE GREAT DYING, ATMOSPHERIC WARMING, GREENHOUSE GASES BY VOLCANIC ERUPTIONS Christopher R Scotese. 2000. Paleo Climate. Sobirin/2009/dari berbagai sumber In fact, at this time, the earth's climate is very suitable for human life, but the bad behavior of the human causes climate change occurs more quickly
  • 3. 3 Global Risks Landscape 2021 DitIrWa, 2022
  • 4. PRINSIP DASAR DALAM INFRASTRUKTUR BERKELANJUTAN (Sung-Hwan KIM, 2023)
  • 7. FLOODS IN THE WORLD (Sung-Hwan KIM, 2023)
  • 8. 8 INDONESIAN CLIMATE equator DME RETURN PERIOD: 15 MONTHS TREND: 3-4 YEARS ENSO RETURN PERIOD: 5-7 YEARS TREND: 4 YEARS MONSOON DEC-FEB MONSOON JUN-AGS DARI BERBAGAI SUMBER/ SOBIRIN-MUBIAR/ DPKLTS/ 2003 INFLUENCED BY GLOBAL CLIMATE: • MONSOON • ENSO • DME
  • 9. 9 Respon terhadap Sistem Peringatan Dini Faktor Pengendali Iklim dan Cuaca Indonesia, BMKG 2021 Global sea current movement Rainfall forecasting Satellite observation 109 109.8 -7 109 109.8 -7 109 109.8 -7 109 109.8 -7 109 109.8 -7 109 109.8 -7 109 109.8 -7 109 109.8 -7 Januari Februari Maret April Mei Juni Juli Agustus
  • 10. 10 Rasio Tampungan terhadap Debit Inflow Rerata Tahunan Sumber : Direktorat Bendungan dan Danau
  • 13. 13 Pembaharuan dan Penerapan Peta Resiko Kegempaan PENERAPAN PETA SUMBER & BAHAYA GEMPA INDONESIA
  • 14. 14 Peta Potensi Tsunami Indonesia Badan Geologi 2007/ Sukhiyar 2010
  • 15. 15 Desain Infrastruktur di Daerah Rawan Tsunami Source: Kompas.com × ◎ △ 69 days △ 44 days ◎ 48 days ◎ 6x5=30 N os,L=58.50m 4x4=16 N os,L=58.50m 4x4=16 N os,L=58.50m E val uati on N otR ecom m ended R ecom m ended N otR ecom m ended C onstructi on Peri od C om parat i ve S t udy ofP i l e Type f orB ri dge Eval uati on I tem Al ternati ve 1:C ast-i n-Pl ace C oncrete Pi l e(φ 1500) Al ternati ve 2:C ast-i n-Pl ace C oncrete Pi l e(φ 1800) Al ternati ve 3:C ast-i n-Pl ace C oncrete Pi l e(φ 2000) C onstructi on C ost R ati o = 1.34 R ati o = 1.00 R ati o = 1.23 Schem ati c Vi ew
  • 16. 16 Respon Tata Ruang terhadap Infrastruktur Konektivitas
  • 17. 17 Dampak Infrastruktur Konektivitas terhadap Sawah Irigasi Teknik
  • 18. 18 Pengaruh Perubahan Iklim - Puncak Banjir
  • 19. 19 Pengaruh Perubahan Iklim - Puncak Banjir 1) Dari 24 lokasi berpotensi banjir di jalan tol Jawa,distribusi CN yang merupakan parameter yang berpotensi menghasilkan banjir adalah : • Yang termasuk dalam Hydrologic Soil Group (HSG) D dan guna lahan pemukiman sehingga menghasilkan CN lebih dari 90. • Yang termasuk dalam HSG C dan guna lahan pemukiman dengan CN antara 80-90. • Yang HSG di B dan kurang dari 80 hanya 8% saja. 2) Dengan konsep Low Impact Development (LID) DAS yang termasuk dalam kategori A dan B sebaiknya dibangun kolam retensi untuk menahan volume banjir sementara, sedangkan kategori C dalam DAS yang bersangkutan sebaiknya diterapkan bioretensi atau sumur resapan Distribusi CN Jalam Tol Jawa (Kajian Penanganan Banjir Pada Ruas Jalan Tol Di Pulau Jawa – Wanni Adidarma, 2020)
  • 21. 21 Pola Penurunan Muka Tanah Model sebelumnya menunjukkan wilayah pesisir Jakarta yang berpotensi tenggelam dan di bawah permukaan laut sekitar 28,08% pada tahun 2035, sedangkan yang terbaru adalah 24,86%. Ada penurunan sebesar 3,22%. Model awal untuk tahun 2050 adalah sekitar 31,61% dan yang diperbarui adalah 28,33%. Ada pengurangan sebesar 3,22%. (Andreas, 2021)
  • 23. 23 Land Subsidence di Semarang – Tanjung Mas
  • 25. 25 Pahami Bagaimana Sistem Bekerja Sistem Tata Air Tertutup Banger
  • 26. 26 • Rivers always respond to human activities and/or natural processes in terms of morphological changes. • With such changes, the river effectively adjusts itself so as to approach a new condition of equilibrium. • The changes may lead towards undesirable conditions, which conflict with other interests and degradation of a river’s potential resources. • Measures need to be implemented to minimize, hinder or rectify any negative impact of a river's morphological change. • Inappropriate counter measures may generate even worse conditions. Basic School of Mind in River Dynamics
  • 28. 28 Perubahan Morfologi Sungai Arah Horizontal
  • 29. 29 Pengendalian dengan Pengarah Arus + Bottom Panels +4.00 +5.00 +10.00 +7.00 1 : 1 1 : 1 +4.00 +5.00 +7.00 Rib bertangga Cerucuk/dolken kayu Ø 0.10 m 1 = 3 m dipasang tiap 1 m Turap besi dipasang tiap 2 m 1 = 6 m Turap besi dipasang rapat 1 = 12 m +2.00 Blok beton terkunci POTONGAN A - A Skala 1 : 100 II III III I I D E N A H Skala 1 : 50 II IV IV POTONGAN I : I Skala 1 : 50 POTONGAN II - II Skala 1 : 50 POTONGAN III : III Skala 1 : 50 POTONGAN II - II Skala 1 : 50 POTONGAN B - B Skala 1 : 100 Blok beton terkunci Turap besi dipasang rapat 1 = 12 m Cerucuk/dolken kayu Ø 0.10 m 1 = 3 m dipasang tiap 1 m +4.00 +5.00 Rib bertangga +10.00 1 : 1 +7.00 +2.00 SUSUNAN BLOK BETON TERKUNCI R = 1 5 . 0 0 m 1 : 1 Turap besi dipasang tiap 2m, l = 6m SKALA 1 : 200 DENAH R = 5 .5 0 m 1 : 1 Turap besi dipasang rapat l = 12m Cerucuk / dolken kayu O 0.10 m l = 3m,dipasang tiap 1m A Beton blok tekunci o 117 30 Rib bertangga A 1 : 1 1 : 1 R = 5m + 1 0 .0 0 1 : 1 1 : 1 1 : 1 + 10.00 + 12.456 1 : 1 + 10.00 B Tutup besi dipasang rapat B 1 : 1 R = 10.00 + 10.00 13.530
  • 31. 31 Degradasi Dasar Sungai dan Gerusan Lokal
  • 32. 32 Analisis Respon Morfologi Sungai - Penyelidikan Lapangan Pengukuran Lapangan: • Geometri sungai; • Debit sungai; • Gradasi material dasar sungai; • Bed-load dan Suspended load transport rate.
  • 33. 33 Important Elements in Improving the EnvironmentalSustainability In Infrastructure (Sung-Hwan KIM, 2023) How to Achieve Sustainability
  • 34. 34 Reduction Methods of CO2 Emissions in Project (Sung-Hwan KIM, 2023)
  • 35. 35 Reduction Potential in the Project Stages
  • 40. 40 TERIMA KASIH The better the challenge, The better the answer, The better the world works. • Diversity, • Cohesiveness, • Integrative.