2. 2
Paleo Global Climate Change
DitIrWa, 2022
PALEO WORLD MAP
THE GREAT DYING,
ATMOSPHERIC WARMING,
GREENHOUSE GASES
BY VOLCANIC ERUPTIONS
Christopher R Scotese. 2000. Paleo Climate.
Sobirin/2009/dari berbagai sumber
In fact, at this time, the earth's climate is very suitable for human life,
but the bad behavior of the human causes climate change occurs more quickly
8. 8
INDONESIAN CLIMATE
equator
DME
RETURN PERIOD:
15 MONTHS
TREND: 3-4 YEARS
ENSO
RETURN PERIOD:
5-7 YEARS
TREND: 4 YEARS
MONSOON
DEC-FEB
MONSOON
JUN-AGS
DARI BERBAGAI SUMBER/ SOBIRIN-MUBIAR/ DPKLTS/ 2003
INFLUENCED BY GLOBAL CLIMATE:
• MONSOON
• ENSO
• DME
9. 9
Respon terhadap Sistem Peringatan Dini
Faktor Pengendali Iklim dan Cuaca Indonesia, BMKG 2021
Global sea current movement
Rainfall forecasting
Satellite observation
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
109 109.8
-7
Januari Februari
Maret April
Mei Juni
Juli Agustus
15. 15
Desain Infrastruktur di Daerah Rawan Tsunami
Source: Kompas.com
× ◎ △
69 days △ 44 days ◎ 48 days ◎
6x5=30 N os,L=58.50m 4x4=16 N os,L=58.50m 4x4=16 N os,L=58.50m
E val
uati
on N otR ecom m ended R ecom m ended N otR ecom m ended
C onstructi
on Peri
od
C om parat
i
ve S t
udy ofP i
l
e Type f
orB ri
dge
Eval
uati
on I
tem
Al
ternati
ve 1:C ast-i
n-Pl
ace C oncrete
Pi
l
e(φ
1500)
Al
ternati
ve 2:C ast-i
n-Pl
ace C oncrete
Pi
l
e(φ
1800)
Al
ternati
ve 3:C ast-i
n-Pl
ace C oncrete
Pi
l
e(φ
2000)
C onstructi
on C ost R ati
o = 1.34 R ati
o = 1.00 R ati
o = 1.23
Schem ati
c Vi
ew
19. 19
Pengaruh Perubahan Iklim - Puncak Banjir
1) Dari 24 lokasi berpotensi banjir di jalan tol
Jawa,distribusi CN yang merupakan parameter
yang berpotensi menghasilkan banjir adalah :
• Yang termasuk dalam Hydrologic Soil Group
(HSG) D dan guna lahan pemukiman sehingga
menghasilkan CN lebih dari 90.
• Yang termasuk dalam HSG C dan guna lahan
pemukiman dengan CN antara 80-90.
• Yang HSG di B dan kurang dari 80 hanya 8%
saja.
2) Dengan konsep Low Impact Development (LID)
DAS yang termasuk dalam kategori A dan B
sebaiknya dibangun kolam retensi untuk
menahan volume banjir sementara, sedangkan
kategori C dalam DAS yang bersangkutan
sebaiknya diterapkan bioretensi atau sumur
resapan
Distribusi CN Jalam Tol Jawa
(Kajian Penanganan Banjir Pada Ruas Jalan Tol Di Pulau Jawa – Wanni Adidarma, 2020)
21. 21
Pola Penurunan Muka Tanah
Model sebelumnya menunjukkan wilayah pesisir Jakarta yang berpotensi tenggelam dan di bawah permukaan laut sekitar 28,08% pada
tahun 2035, sedangkan yang terbaru adalah 24,86%. Ada penurunan sebesar 3,22%. Model awal untuk tahun 2050 adalah sekitar
31,61% dan yang diperbarui adalah 28,33%. Ada pengurangan sebesar 3,22%. (Andreas, 2021)
26. 26
• Rivers always respond to human activities and/or natural
processes in terms of morphological changes.
• With such changes, the river effectively adjusts itself so as to
approach a new condition of equilibrium.
• The changes may lead towards undesirable conditions, which
conflict with other interests and degradation of a river’s potential
resources.
• Measures need to be implemented to minimize, hinder or rectify
any negative impact of a river's morphological change.
• Inappropriate counter measures may generate even worse
conditions.
Basic School of Mind in River Dynamics
29. 29
Pengendalian dengan Pengarah Arus + Bottom Panels
+4.00
+5.00
+10.00
+7.00
1
:
1
1 : 1
+4.00
+5.00
+7.00
Rib bertangga
Cerucuk/dolken kayu Ø 0.10 m
1 = 3 m dipasang tiap 1 m
Turap besi dipasang tiap 2 m
1 = 6 m
Turap besi dipasang rapat
1 = 12 m
+2.00
Blok beton terkunci
POTONGAN A - A
Skala 1 : 100
II
III
III
I
I
D E N A H
Skala 1 : 50
II
IV
IV
POTONGAN I : I
Skala 1 : 50
POTONGAN II - II
Skala 1 : 50
POTONGAN III : III
Skala 1 : 50
POTONGAN II - II
Skala 1 : 50
POTONGAN B - B
Skala 1 : 100
Blok beton terkunci
Turap besi dipasang rapat
1 = 12 m
Cerucuk/dolken kayu Ø 0.10 m
1 = 3 m dipasang tiap 1 m
+4.00
+5.00
Rib bertangga
+10.00
1 : 1
+7.00
+2.00
SUSUNAN BLOK BETON TERKUNCI
R
=
1
5
.
0
0
m
1
:
1
Turap besi dipasang
tiap 2m, l = 6m
SKALA 1 : 200
DENAH R
=
5
.5
0
m
1
:
1
Turap besi dipasang rapat
l = 12m
Cerucuk / dolken kayu O 0.10 m
l = 3m,dipasang tiap 1m
A
Beton blok tekunci o
117 30
Rib bertangga
A
1 : 1
1 : 1
R = 5m
+
1
0
.0
0
1
:
1
1 : 1
1 : 1
+ 10.00
+ 12.456
1
:
1
+ 10.00
B Tutup besi dipasang rapat
B
1
:
1
R
=
10.00
+ 10.00
13.530
32. 32
Analisis Respon Morfologi Sungai - Penyelidikan Lapangan
Pengukuran Lapangan:
• Geometri sungai;
• Debit sungai;
• Gradasi material dasar sungai;
• Bed-load dan Suspended load transport rate.
33. 33
Important Elements in Improving the EnvironmentalSustainability
In Infrastructure
(Sung-Hwan KIM, 2023)
How to Achieve Sustainability