Adresse : Cité 1850 N°2867 Hassi Messaoud, ALGERIA
                         Phone N°: 0661-83-31-14
                Mail box: messahli.massinissa@gmail.com


                            Messahli Massinissa




                                     29 years
PROFESSIONAL OBJECTIVE:

Seeking a responsible job with an opportunity for professional challenges
To enhance my professional skills in a dynamic and fast paced workplace
To use my skills in the best possible way for achieving the company’s goals
To solve problems in an effective/creative manner in a challenging position.

Summary

-Vast knowledge in logistics oilfield equipment management (drilling servicing
(pumping Stimulation Cementing coil tubing, administrative duties, problem solving
and excellent communication skills.
-Very skilled in adapting to change management process. I have been involved with
HR, and HSE administration, management, finance, operation
-Very goal oriented, and interested in continued learning.
-Good managerial and decision-making skills.
-Ability to coordinate and manage people.
-Very skilled in HR management
-Very skilled in logistic management, supply chain management
-7 years’ experience in oilfield servicing




                                           1
TRACK RECORDS:

Operation Support Coordinator 4 by 4 rotation
(Cementing Coil Tubing Stimulation & Pumping)
ALGERIA TUNISIA MOROCCO PROJECTS


Weatherford Oil Tool GmbH

ALGERIA, TUNISIA, MOROCCO PROJECTS
● Logistics Supervisor/ Material Management/ operation coordinator
●To provide effective logistics and administrative support for operations
●Following up all the Drilling & Cementing, Coil tubing, Pumping Services Operations
● providing a logistic support for the operation and following up all the equipment
movement,
● Preparing and Dispatching Chemicals and Cement Bland to the Rigs as per Cementing
Program
●Mobilization and demobilization for the equipment
●Materiel & Equipment inventory and Management
●Treating Iron Management, inventory control and certification



Preventive Maintenance Coordinator./ scheduler 2012 4 by 4
rotation
PARKER DRILLING Co. (Africa and Meddle East Division)

ROSNEFT, SONATRACH PROJECT (ALGERIA

●Train rig personnel on the use of Ivara (Parker maintenance system& equipment
management),
●Generate electrical and mechanical work orders of the equipment in the Rigs.

●Coordinate foreign and national personnel for the application of maintenance orders.

●Identification of new equipment and allocation of preventive maintenance.

●Assist rig personnel in closing open work orders as necessary.
●Perform equipment audits to ensure policies are being properly and safely followed.
●Coordinate the oil sampling process and ensure that specialist’s recommendations are
properly followed.
●Keep a control of equipment manuals and certifications and distribute as necessary.
●Coordinate contract inspectors on NDT inspections.
●IT & V-Sat Support.

                                           2
●Drilling equipment movement , inventory ●Equipment management (Drilling, Work
Over)
●Preventive maintenance scheduling planning and supervising



Hme-BUILD : CONSTRUCTION, DRILLING, WORKOVER, SNUBBING
Logistics & Warehouse Supervisor:

● Managing equipment, purchasing, material management
●Processing orders
●Organizing the dispatch and delivery of goods/RIG Moving /Down Equipment
Movement
●Ensuring goods are stored safely
●Keeping staff fully trained
●Maintaining health and safety standards
●Keeping accurate records
●Managing timesheets
●Develops logistics plan and set goals related to cost and parts availability with supply
chain leadership team.
●Defines logistics performance improvement plans in conjunction with supply chain
leadership team.
●Tracks and manages logistics performance indicators related cost, quality and delivery
of materials and services.
●Establishes and manages relationships with 3rd party transportation and logistics
service providers.
●Excellent negotiation skills
●Ability to prioritize and manage multiple tasks
●Ability to create and maintain strong business relationships

Field Operation & Dispatcher 4 by 4 rotation
(Cementing Coil Tubing Stimulation & Pumping)
ALGERIA TUNISIA MOROCCO PROJECTS

Weatherford Oil Tool GmbH
●Operations Coordinator
●Equipements control system, & paper work
●Equipments inventory
●Logistics coordinator


                                            3
●PRIMARY RESPONSIBILITIES: To co-ordinate all daily activities with regards to
equipment and personal movement in the field in accordance with the Q&HSE
procedures. To provide project support to the Project Manager, Cementing operational
personnel move, Truck – pickups papers validity. To ensure that the requirements of the
client are met with regards to Equipment and the Operation.


●MAIN ROLES: The role includes the overall responsibility for the Cementing
Mobilization and Demobilization activities on a day to day basis, which include but are
not limited to the following activities:

●Establish and maintain regular communication with the Weatherford Operations
Manager, Field supervisors. Providing feedback and regular mobilization advise to all
parties concerned.
●Evaluate, prepare and assist with the day to day operational activities, whilst
coordinating all equipment paperwork requirements with the Operations Manager and
Operations Supervisors.
●Provide overall equipment and personal responsibility for Weatherford’s cementing
operation with assistance / support from the Project Manager and Operations
Supervisors
●Provide overall Q&HSE responsibility for Weatherford’s activities in the Base & field
ensuring full compliance to equipment and personal with the assistance from the QHSE
reps.
●Daily operational focal point for all equipment and personal Mobilization activities and
issues relating to Truck & pickups rental.
●Conduct daily meetings to discuss the current QHSE issues along with the daily
operational activities. Allocate daily personal driving from the base to the field.
●Ensure that all Mobilization & Demobilization activities are recorded and filed in the
Weatherford Work Order format. (Load Out Manifest & Load Back Manifest LOM/LBM)
●Provide a summary of completed and ongoing Work Order’s on a weekly basis and to
provide a look ahead of base operations.
●Provide a comprehensive weekly forecast of Mobilization & Demobilization.
Cementing Coil Tubing Stimulation


Travel Agency Manager                 HASSI Touring
Responsible for developing strategies to hit or exceed sales targets.
Promoting and marketing the business, sometimes to new and "niche"
Markets.

● managing budgets and maintaining statistical/financial records;
● selling travel products and tour packages;
● sourcing products and destinations, to meet consumer demands for
bespoke travel and sustainable tourism;
● taking part in familiarization visits to new destinations, in order to

                                              4
gain information on issues and amenities of interest to consumers;
● liaising with travel partners, including airlines and hotels, to manage
bookings and schedules often one year in advance;
● dealing with customer enquiries and aiming to meet their
expectations;
● overseeing the smooth, efficient running of the business.
●constantly motivating the sales team to hit their targets and thus
ensure the profitability of the company;
● meeting regularly with team leaders to give them sales figures and
plan how they approach their work;
● meeting company directors who advise on strategy, and finding out
about any local issues and future trends;
● overseeing the recruitment, selection and retention of staff, payroll
matters, and staff training;
● organizing incentives, bonus schemes and competitions;
● communicating with sales consultants and providing encouragement,
Help and advice;
●dealing with disciplinary matters and customer complain
 ●Strong written and communicational skills.
●Knowledge of financial and business strategies.
●Aspiration to work in travel and tourism area.
●Good managerial and decision-making skills.
●Ability to coordinate and manage people.

ADM coordinator & Dispatcher
(Cementing Coil Tubing Stimulation & Pumping)

Weatherford Oil Tool GmbH

●Coordinator administrator
●Operations assistant
●Equipements control system
●Equipments inventory
●treating iron high &low pressure management & inventory & certification
●Document controller and recording
Logistics coordinator
   *March/August 2009*               Foraid Algérie                         Hassi Messaoud
   ALGERIA

                           SPIE oil & gas services

Purchasing and transit and covering
   ●Purchaser ( (local purchases and foreigners)
   ●Material Management

                                             5
___________________________________________________________

   *June/till September 2008*       Foraid Algérie               Hassi Messaoud

                             SPIE oil & gas services
Logistic assistant

   ●Foreign relations
   ●purchaser
   ___________________________________________________________

 *June/till September 2007 *       Foraid Algérie                Hassi Messaoud

                                SPIE oil & gas services

Administrative officer

   ●Finances Assistant
   ●Document controller
   ___________________________________________________________

2005 Hme-BUILD : CONSTRUCTION, DRILLING, WORKOVER, SNUBBING
Logistic assistant
   Equipment management and dispatching
   Purchasing, material inventory,

   TRAINING:
   _____________________________________________________________

*2010-2011*

●Master Degree in management of the companies (in progress) General management,
Management of human resources, Management of quality production, strategy
management, finance and accounting, logistics and supply chain management

*2010-2011-2012 *

●BASIC Oil Field calculation (Weatherford training center)
●Rig equipment’s & drilling operations (Weatherford training center)
●Handling Hazardous Materials
●Weatherford Trade Compliance E-Policy
●Weatherford Anti-Money Laundering Compliance E-Policy
                                           6
●Weatherford Anti-Corruption Compliance E-policy
●Weatherford Conflicts of Interest E-Policy
● Weatherford & petroleum industry
●Very good skills in JD Edwards preventive maintenance inventory management ,

*2005-2009*
● Qualification in Hotel management & tourism (University of the
Tourism-Hotel Aurassi Algiers)
4 years in university
● hospitality management and tourism, Management of catering,
● Management of the travel agencies
● Management of air transport, Organization and production of the Travel, Food and
Beverage management, hygiene and food Safety & environmental
●Supervising catering and control of the food (good knowledge in HACCP) •
_____________________________________________________________
   *2008*
   ●Training into Spanish 4th level (Institut of Spanish state) Cervantes,
   ●English course 5th level (Phoenix school)

    ●General English intermediate level (ALC School)

   ●Business English intermediate level (ALC School)
   _____________________________________________________________
   *2005-2006*

   ●1 year technical English “University of Bouzareah DEA”
   _____________________________________________________________
   *2004-2005*:
   ●1 year science of Management University of Constantine
   _____________________________________________________________
   *2004*:
   ●BAC: (UFC) University
   2004:
   ●*BAC*: Management & Economy
   _____________________________________________________________

   LANGUAGES:

    ● Arab: Very well Read, Spoken, and written
    ● French: Very well Read, Spoken, and written

                                              7
● English: Well Read, Spoken, and written
   ● Spanish: Well Read, Spoken
   _____________________________________________________________
   COMPUTER SKILLS

   ●Microsoft Office XP, Microsoft Office 2000, Microsoft Office 2007, MS Word, MS
   Access, MS Excel, MS FrontPage, MS Project, MS Visio, , Internet Explorer, Outlook,
   Outlook Express, PowerPoint, Adobe Photoshop,
   Windows 7, Windows XP, Windows NT, Windows ME, Windows 2000, Mac 0SX, Mac
   OS 8.6, Mac 0S9, Solaris, UNIX, AIX, Linux
●IT & V-Sat Support.

   OTHERS:

   ●Driving license light weight category B
   ● Team spirit
   ●Physical good condition
   ● Available of continuation
   ● Direction of responsibility
   ●Free of any engagement
   ●Ready to work, day and night




                                          8

Massou cv eng updated

  • 1.
    Adresse : Cité1850 N°2867 Hassi Messaoud, ALGERIA Phone N°: 0661-83-31-14 Mail box: messahli.massinissa@gmail.com Messahli Massinissa 29 years PROFESSIONAL OBJECTIVE: Seeking a responsible job with an opportunity for professional challenges To enhance my professional skills in a dynamic and fast paced workplace To use my skills in the best possible way for achieving the company’s goals To solve problems in an effective/creative manner in a challenging position. Summary -Vast knowledge in logistics oilfield equipment management (drilling servicing (pumping Stimulation Cementing coil tubing, administrative duties, problem solving and excellent communication skills. -Very skilled in adapting to change management process. I have been involved with HR, and HSE administration, management, finance, operation -Very goal oriented, and interested in continued learning. -Good managerial and decision-making skills. -Ability to coordinate and manage people. -Very skilled in HR management -Very skilled in logistic management, supply chain management -7 years’ experience in oilfield servicing 1
  • 2.
    TRACK RECORDS: Operation SupportCoordinator 4 by 4 rotation (Cementing Coil Tubing Stimulation & Pumping) ALGERIA TUNISIA MOROCCO PROJECTS Weatherford Oil Tool GmbH ALGERIA, TUNISIA, MOROCCO PROJECTS ● Logistics Supervisor/ Material Management/ operation coordinator ●To provide effective logistics and administrative support for operations ●Following up all the Drilling & Cementing, Coil tubing, Pumping Services Operations ● providing a logistic support for the operation and following up all the equipment movement, ● Preparing and Dispatching Chemicals and Cement Bland to the Rigs as per Cementing Program ●Mobilization and demobilization for the equipment ●Materiel & Equipment inventory and Management ●Treating Iron Management, inventory control and certification Preventive Maintenance Coordinator./ scheduler 2012 4 by 4 rotation PARKER DRILLING Co. (Africa and Meddle East Division) ROSNEFT, SONATRACH PROJECT (ALGERIA ●Train rig personnel on the use of Ivara (Parker maintenance system& equipment management), ●Generate electrical and mechanical work orders of the equipment in the Rigs. ●Coordinate foreign and national personnel for the application of maintenance orders. ●Identification of new equipment and allocation of preventive maintenance. ●Assist rig personnel in closing open work orders as necessary. ●Perform equipment audits to ensure policies are being properly and safely followed. ●Coordinate the oil sampling process and ensure that specialist’s recommendations are properly followed. ●Keep a control of equipment manuals and certifications and distribute as necessary. ●Coordinate contract inspectors on NDT inspections. ●IT & V-Sat Support. 2
  • 3.
    ●Drilling equipment movement, inventory ●Equipment management (Drilling, Work Over) ●Preventive maintenance scheduling planning and supervising Hme-BUILD : CONSTRUCTION, DRILLING, WORKOVER, SNUBBING Logistics & Warehouse Supervisor: ● Managing equipment, purchasing, material management ●Processing orders ●Organizing the dispatch and delivery of goods/RIG Moving /Down Equipment Movement ●Ensuring goods are stored safely ●Keeping staff fully trained ●Maintaining health and safety standards ●Keeping accurate records ●Managing timesheets ●Develops logistics plan and set goals related to cost and parts availability with supply chain leadership team. ●Defines logistics performance improvement plans in conjunction with supply chain leadership team. ●Tracks and manages logistics performance indicators related cost, quality and delivery of materials and services. ●Establishes and manages relationships with 3rd party transportation and logistics service providers. ●Excellent negotiation skills ●Ability to prioritize and manage multiple tasks ●Ability to create and maintain strong business relationships Field Operation & Dispatcher 4 by 4 rotation (Cementing Coil Tubing Stimulation & Pumping) ALGERIA TUNISIA MOROCCO PROJECTS Weatherford Oil Tool GmbH ●Operations Coordinator ●Equipements control system, & paper work ●Equipments inventory ●Logistics coordinator 3
  • 4.
    ●PRIMARY RESPONSIBILITIES: Toco-ordinate all daily activities with regards to equipment and personal movement in the field in accordance with the Q&HSE procedures. To provide project support to the Project Manager, Cementing operational personnel move, Truck – pickups papers validity. To ensure that the requirements of the client are met with regards to Equipment and the Operation. ●MAIN ROLES: The role includes the overall responsibility for the Cementing Mobilization and Demobilization activities on a day to day basis, which include but are not limited to the following activities: ●Establish and maintain regular communication with the Weatherford Operations Manager, Field supervisors. Providing feedback and regular mobilization advise to all parties concerned. ●Evaluate, prepare and assist with the day to day operational activities, whilst coordinating all equipment paperwork requirements with the Operations Manager and Operations Supervisors. ●Provide overall equipment and personal responsibility for Weatherford’s cementing operation with assistance / support from the Project Manager and Operations Supervisors ●Provide overall Q&HSE responsibility for Weatherford’s activities in the Base & field ensuring full compliance to equipment and personal with the assistance from the QHSE reps. ●Daily operational focal point for all equipment and personal Mobilization activities and issues relating to Truck & pickups rental. ●Conduct daily meetings to discuss the current QHSE issues along with the daily operational activities. Allocate daily personal driving from the base to the field. ●Ensure that all Mobilization & Demobilization activities are recorded and filed in the Weatherford Work Order format. (Load Out Manifest & Load Back Manifest LOM/LBM) ●Provide a summary of completed and ongoing Work Order’s on a weekly basis and to provide a look ahead of base operations. ●Provide a comprehensive weekly forecast of Mobilization & Demobilization. Cementing Coil Tubing Stimulation Travel Agency Manager HASSI Touring Responsible for developing strategies to hit or exceed sales targets. Promoting and marketing the business, sometimes to new and "niche" Markets. ● managing budgets and maintaining statistical/financial records; ● selling travel products and tour packages; ● sourcing products and destinations, to meet consumer demands for bespoke travel and sustainable tourism; ● taking part in familiarization visits to new destinations, in order to 4
  • 5.
    gain information onissues and amenities of interest to consumers; ● liaising with travel partners, including airlines and hotels, to manage bookings and schedules often one year in advance; ● dealing with customer enquiries and aiming to meet their expectations; ● overseeing the smooth, efficient running of the business. ●constantly motivating the sales team to hit their targets and thus ensure the profitability of the company; ● meeting regularly with team leaders to give them sales figures and plan how they approach their work; ● meeting company directors who advise on strategy, and finding out about any local issues and future trends; ● overseeing the recruitment, selection and retention of staff, payroll matters, and staff training; ● organizing incentives, bonus schemes and competitions; ● communicating with sales consultants and providing encouragement, Help and advice; ●dealing with disciplinary matters and customer complain ●Strong written and communicational skills. ●Knowledge of financial and business strategies. ●Aspiration to work in travel and tourism area. ●Good managerial and decision-making skills. ●Ability to coordinate and manage people. ADM coordinator & Dispatcher (Cementing Coil Tubing Stimulation & Pumping) Weatherford Oil Tool GmbH ●Coordinator administrator ●Operations assistant ●Equipements control system ●Equipments inventory ●treating iron high &low pressure management & inventory & certification ●Document controller and recording Logistics coordinator *March/August 2009* Foraid Algérie Hassi Messaoud ALGERIA SPIE oil & gas services Purchasing and transit and covering ●Purchaser ( (local purchases and foreigners) ●Material Management 5
  • 6.
    ___________________________________________________________ *June/till September 2008* Foraid Algérie Hassi Messaoud SPIE oil & gas services Logistic assistant ●Foreign relations ●purchaser ___________________________________________________________ *June/till September 2007 * Foraid Algérie Hassi Messaoud SPIE oil & gas services Administrative officer ●Finances Assistant ●Document controller ___________________________________________________________ 2005 Hme-BUILD : CONSTRUCTION, DRILLING, WORKOVER, SNUBBING Logistic assistant Equipment management and dispatching Purchasing, material inventory, TRAINING: _____________________________________________________________ *2010-2011* ●Master Degree in management of the companies (in progress) General management, Management of human resources, Management of quality production, strategy management, finance and accounting, logistics and supply chain management *2010-2011-2012 * ●BASIC Oil Field calculation (Weatherford training center) ●Rig equipment’s & drilling operations (Weatherford training center) ●Handling Hazardous Materials ●Weatherford Trade Compliance E-Policy ●Weatherford Anti-Money Laundering Compliance E-Policy 6
  • 7.
    ●Weatherford Anti-Corruption ComplianceE-policy ●Weatherford Conflicts of Interest E-Policy ● Weatherford & petroleum industry ●Very good skills in JD Edwards preventive maintenance inventory management , *2005-2009* ● Qualification in Hotel management & tourism (University of the Tourism-Hotel Aurassi Algiers) 4 years in university ● hospitality management and tourism, Management of catering, ● Management of the travel agencies ● Management of air transport, Organization and production of the Travel, Food and Beverage management, hygiene and food Safety & environmental ●Supervising catering and control of the food (good knowledge in HACCP) • _____________________________________________________________ *2008* ●Training into Spanish 4th level (Institut of Spanish state) Cervantes, ●English course 5th level (Phoenix school) ●General English intermediate level (ALC School) ●Business English intermediate level (ALC School) _____________________________________________________________ *2005-2006* ●1 year technical English “University of Bouzareah DEA” _____________________________________________________________ *2004-2005*: ●1 year science of Management University of Constantine _____________________________________________________________ *2004*: ●BAC: (UFC) University 2004: ●*BAC*: Management & Economy _____________________________________________________________ LANGUAGES: ● Arab: Very well Read, Spoken, and written ● French: Very well Read, Spoken, and written 7
  • 8.
    ● English: WellRead, Spoken, and written ● Spanish: Well Read, Spoken _____________________________________________________________ COMPUTER SKILLS ●Microsoft Office XP, Microsoft Office 2000, Microsoft Office 2007, MS Word, MS Access, MS Excel, MS FrontPage, MS Project, MS Visio, , Internet Explorer, Outlook, Outlook Express, PowerPoint, Adobe Photoshop, Windows 7, Windows XP, Windows NT, Windows ME, Windows 2000, Mac 0SX, Mac OS 8.6, Mac 0S9, Solaris, UNIX, AIX, Linux ●IT & V-Sat Support. OTHERS: ●Driving license light weight category B ● Team spirit ●Physical good condition ● Available of continuation ● Direction of responsibility ●Free of any engagement ●Ready to work, day and night 8