SlideShare a Scribd company logo
1 of 2
1135, Dona Rosa de Gusmão  Campinas, São Paulo, Brazil 13070-187  (Cell) +55 19 99963-2248
finardimarcos@gmail.com
ARCOS FINARDI ADVANCED ELECTRICALCONTROLSYSTEM ENGINEER
A top-ranked, highly accomplished Engineer with 26+ years of invaluable experience spearheading successful company
initiatives throughout the manufacturing industry. An industry leader, recognized for unmatched technical development skills
proven through delivery of US $50M in Capital Investment of New Production Lines achieving enhanced comprehensive market
access, slashing unit costs and aggressively driving revenue over the last 10 years. Possessing extensive experience and a
cultivated expertise in all phases of project management, utilizes calculated foresight and strategic analysis to consistently
maximize productivity and improve operations. Possessing exceptional interpersonal skills with a natural ability to lead and
drive teams towards continued success, is dedicated to top quality services based on the latest automation technologies
available. Areas of Expertise include:
 Rockwell PLC’s and HMI’s  Rockwell Motion System (VFD’s, Servos,
Motors)
 Industrial Networks (Ethernet IP,
ControlNet, Device Net)
 Safety Systems  Electrical Controls (Sensors, Commands,
Protection)
 Installation, Checkout, Start up
 Supervisory System (Wonderware,
iFix)
 Siemens, Yaskawa, ABB, Schneider (PLC,
Drives, etc...)
 Measurement Systems (Beta
Gauges, Infrared, MachineVision)
 Project Management (Technical/
Capital )
 MS Office (Word, Excel, PowerPoint)  MS Project/ AutoCAD Electrical
2014 Drawing
EXPERIENCE & NOTABLE CONTRIBUTIONS
3M BRAZIL Ltda. (Campinas)  São Paulo  May 2008-Present
ADVANCED ELECTRICAL CONTROL SYSTEM ENGINEER
Spearhead company success developing and executing electrical/automation projects as 3M corporate engineer supporting all
Brazil Plants. Instrumentally advance business goals strategically managing the four largest projects introducing new products
in the market driving growth and collaborating with 3M USA to preserve company intellectual property. As a key driver ensure
delivery of the highest automation platform to the lines, including but not limited to, supporting electric utilities implementation
(power, data network, etc.) for the complete operation of the production.
Selected Contributions:
 2012/2014 – New Acrylic Foam Tape Line in 3M Sumaré Plant – US $20M Investment, achieved full return in 3.2 years.
Reduced Unit Cost of Product by 10% and increased Production Capacity 15% based on the previous line. Earned Latin
America & Canada CTE&I awards 2014.
 2011/2012 – Pilot Coater Line –3M Sumaré Plant – US$ 2.5M, achieved full return within 2 years. Reduced preparation for
executing new product launches by at least 6 months. Saved 1 Million dollars in 2 years by optimizing operational
performance of the main lines and avoiding wasted films. Strategically ensured maximal line operation to date. Earned Latin
America & Canada CTE&I awards 2011.
 2010/2012 - Coater and Extrusion Tape Lines Transference – From 3M Argentina to 3M Itapetininga Plant – US $10M
Investment achieving full return within 3 years. Enhanced productivity increasing Production Capacity of Coating Tapes by
25% and providing Local Production of NOPP Tapes.
 2008/2010 - New Mechanical Close Tape Lines – 3M Itapetininga Plant – US$ 20M Investment, achieved full return in 3.6
years. Jumpstarted revenue growth increasing sales 6% in the first year by introducing new diaper tapes in the Brazilian
Market.
3M BRAZIL Ltda. (Itapetininga Plant)  São Paulo  February 2005-April 2008
SENIOR ELECTRICAL CONTROL SYSTEM ENGINEER
Radically transformed operational performance through sophisticated development and execution of electrical/automation
projects as 3M resident engineer. Through expert management of minor and medium projects maintained, improved, and
consistently ensured peak plant operation. Delivered full automation/upgrading lines, intricately supporting electric utilities
implementation (power, data network, etc...). Orchestrated the most structured and organized plant adhering to the highest in
3M standards through tactful collaboration with maintenance team.
Selected Contributions:
 2007/2008 – BOPP Electrical Control Upgrade – US $1M Investment. Radicallyreduced the obsolescence of controls
equipment, providing high reliability and improving the line speed and product quality.
 2006/2007 – Coater 5 Line Optimization – US $0.5M Investment. Reduced the obsolescence of controls equipment,
solving the splice problems eliminating at least 10% of film wasted.
M
1135, Dona Rosa de Gusmão  Campinas, São Paulo, Brazil 13070-187  (Cell) +55 19 99963-2248
finardimarcos@gmail.com
ROMI INDUSTRY SA (Santa Barbara D’Oeste)  São Paulo  May 2001-January 2005
SENIOR ELECTRICAL PROJECT ENGINEER
Streamlined company goals through innovative development of effective electrical and automation projects for Injection
Molding Machines, introducing new motors control (VFDs and Servo Motors) and delivering new types of machines to the
Brazilian market based on the latest technologies available.
Selected Contributions:
 Successfully brought the 2002 new Injection mold machine to market (based on VFD + Induction Motor) improving product
quality and reducing cost. Enhanced sales in 50 units per year.
 Launching the 2003 new Injection Mold Machine fully Servo System controlled. This state of the art machine was previously
available to Romi supply and the Brazilian market by import only.
EDUCATION & ADDITIONAL INFORMATION
Bachelor of Science, Electrical Engineering (Electronic Emphasis)
ESCOLA FEDERAL DE ENGENHARIA DE ITAJUBÁ | MG, Brazil | 1988
Technician, Electro Technical
COLÉGIO TÉCNICO DA UNICAMP (CAMPINAS) | SP, Brazil | 1980
Professional Development Courses: Automation Training at Rockwell and Siemens (PLC, HMI, Drives, Motion, Safety,
Networks, CNC) ♦ Electrical Hazard Operation ♦ Wonderware and iFix Supervisory
Additional Information:
Proficient in English, Portuguese Native Language, Basic in Spanish
International trip to USA, Mexico, China, Taiwan to visit 3M subsidiaries and suppliers
Green Belt Lean Six Sigma – 3M

More Related Content

What's hot

What's hot (8)

J1939 stack integration with an advanced EPS system | Automotive Tier-I Suppl...
J1939 stack integration with an advanced EPS system | Automotive Tier-I Suppl...J1939 stack integration with an advanced EPS system | Automotive Tier-I Suppl...
J1939 stack integration with an advanced EPS system | Automotive Tier-I Suppl...
 
Cv stephen bullimore 8 july 2016
Cv stephen bullimore 8 july 2016Cv stephen bullimore 8 july 2016
Cv stephen bullimore 8 july 2016
 
Alexandre Roldan
Alexandre RoldanAlexandre Roldan
Alexandre Roldan
 
Eberri Kennedy CV
Eberri Kennedy CVEberri Kennedy CV
Eberri Kennedy CV
 
Quality Engineer
Quality EngineerQuality Engineer
Quality Engineer
 
Cv stephen bullimore 7 July 2016
Cv stephen bullimore 7 July 2016Cv stephen bullimore 7 July 2016
Cv stephen bullimore 7 July 2016
 
Resume
ResumeResume
Resume
 
resume 1 (3)
resume 1 (3)resume 1 (3)
resume 1 (3)
 

Viewers also liked

CV - Rufino B.Cada
CV - Rufino B.CadaCV - Rufino B.Cada
CV - Rufino B.Cadaruffy cada
 
Shane SHERRY Resume 2014
Shane SHERRY Resume 2014Shane SHERRY Resume 2014
Shane SHERRY Resume 2014Shane Sherry
 
Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016Gary Fitzsimmons
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJames Stults
 
Electrical inspector recommendation letter
Electrical inspector recommendation letterElectrical inspector recommendation letter
Electrical inspector recommendation letterKumr14
 
Crescencio Palacios - CV at October 2016
Crescencio Palacios - CV at October 2016Crescencio Palacios - CV at October 2016
Crescencio Palacios - CV at October 2016Crescencio Palacios
 
Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione Colecha
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs
 
Jesse Lopez Resume inspector revised - Copy
Jesse Lopez Resume  inspector revised - CopyJesse Lopez Resume  inspector revised - Copy
Jesse Lopez Resume inspector revised - CopyJesse Lopez
 
Alfred, silva electrical engineer resume 2015
Alfred, silva electrical engineer resume 2015Alfred, silva electrical engineer resume 2015
Alfred, silva electrical engineer resume 2015Alfredo Silva
 
Patricia Silva resume public
Patricia Silva resume publicPatricia Silva resume public
Patricia Silva resume publicPatricia Silva
 
CV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical EngineerCV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical EngineerJorge Elias Maia
 

Viewers also liked (14)

CV - Rufino B.Cada
CV - Rufino B.CadaCV - Rufino B.Cada
CV - Rufino B.Cada
 
Shane SHERRY Resume 2014
Shane SHERRY Resume 2014Shane SHERRY Resume 2014
Shane SHERRY Resume 2014
 
Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016
 
EIOGCPL 160316cvfs
EIOGCPL 160316cvfsEIOGCPL 160316cvfs
EIOGCPL 160316cvfs
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
Electrical inspector recommendation letter
Electrical inspector recommendation letterElectrical inspector recommendation letter
Electrical inspector recommendation letter
 
Crescencio Palacios - CV at October 2016
Crescencio Palacios - CV at October 2016Crescencio Palacios - CV at October 2016
Crescencio Palacios - CV at October 2016
 
Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0
 
Jesse Lopez Resume inspector revised - Copy
Jesse Lopez Resume  inspector revised - CopyJesse Lopez Resume  inspector revised - Copy
Jesse Lopez Resume inspector revised - Copy
 
Alfred, silva electrical engineer resume 2015
Alfred, silva electrical engineer resume 2015Alfred, silva electrical engineer resume 2015
Alfred, silva electrical engineer resume 2015
 
RicardoLinanresume
RicardoLinanresumeRicardoLinanresume
RicardoLinanresume
 
Patricia Silva resume public
Patricia Silva resume publicPatricia Silva resume public
Patricia Silva resume public
 
CV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical EngineerCV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical Engineer
 

Similar to Marcos-Finardi-Resume

Similar to Marcos-Finardi-Resume (20)

Curriculum Ulises Tonix Gil Eng
Curriculum Ulises Tonix Gil EngCurriculum Ulises Tonix Gil Eng
Curriculum Ulises Tonix Gil Eng
 
Sherief El Deeb Resume 1 (1)
Sherief El Deeb Resume 1 (1)Sherief El Deeb Resume 1 (1)
Sherief El Deeb Resume 1 (1)
 
Resume Caio Carvalho Jun'2015
Resume Caio Carvalho Jun'2015Resume Caio Carvalho Jun'2015
Resume Caio Carvalho Jun'2015
 
fsmcguirereseme2016
fsmcguirereseme2016fsmcguirereseme2016
fsmcguirereseme2016
 
Melvin L. Pedido III_CV url
Melvin L. Pedido III_CV urlMelvin L. Pedido III_CV url
Melvin L. Pedido III_CV url
 
Resume
ResumeResume
Resume
 
Manish Gujarathi - Copy
Manish Gujarathi  - CopyManish Gujarathi  - Copy
Manish Gujarathi - Copy
 
Marco resume.(3)
Marco resume.(3)Marco resume.(3)
Marco resume.(3)
 
Resume_Disnei Passoni
Resume_Disnei PassoniResume_Disnei Passoni
Resume_Disnei Passoni
 
mapp technology simplifies packaging automation
mapp technology simplifies packaging automationmapp technology simplifies packaging automation
mapp technology simplifies packaging automation
 
How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?
 
CWF_resume_042615
CWF_resume_042615CWF_resume_042615
CWF_resume_042615
 
Resume_GermanGomez
Resume_GermanGomezResume_GermanGomez
Resume_GermanGomez
 
Industrial Internet of Things in a Box
Industrial Internet of Things in a BoxIndustrial Internet of Things in a Box
Industrial Internet of Things in a Box
 
Investment pitch deck-v10
Investment pitch deck-v10Investment pitch deck-v10
Investment pitch deck-v10
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
13.spime senselabs
13.spime senselabs13.spime senselabs
13.spime senselabs
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Methode Presentation
Methode Presentation Methode Presentation
Methode Presentation
 
Smart Industry
Smart IndustrySmart Industry
Smart Industry
 

Marcos-Finardi-Resume

  • 1. 1135, Dona Rosa de Gusmão  Campinas, São Paulo, Brazil 13070-187  (Cell) +55 19 99963-2248 finardimarcos@gmail.com ARCOS FINARDI ADVANCED ELECTRICALCONTROLSYSTEM ENGINEER A top-ranked, highly accomplished Engineer with 26+ years of invaluable experience spearheading successful company initiatives throughout the manufacturing industry. An industry leader, recognized for unmatched technical development skills proven through delivery of US $50M in Capital Investment of New Production Lines achieving enhanced comprehensive market access, slashing unit costs and aggressively driving revenue over the last 10 years. Possessing extensive experience and a cultivated expertise in all phases of project management, utilizes calculated foresight and strategic analysis to consistently maximize productivity and improve operations. Possessing exceptional interpersonal skills with a natural ability to lead and drive teams towards continued success, is dedicated to top quality services based on the latest automation technologies available. Areas of Expertise include:  Rockwell PLC’s and HMI’s  Rockwell Motion System (VFD’s, Servos, Motors)  Industrial Networks (Ethernet IP, ControlNet, Device Net)  Safety Systems  Electrical Controls (Sensors, Commands, Protection)  Installation, Checkout, Start up  Supervisory System (Wonderware, iFix)  Siemens, Yaskawa, ABB, Schneider (PLC, Drives, etc...)  Measurement Systems (Beta Gauges, Infrared, MachineVision)  Project Management (Technical/ Capital )  MS Office (Word, Excel, PowerPoint)  MS Project/ AutoCAD Electrical 2014 Drawing EXPERIENCE & NOTABLE CONTRIBUTIONS 3M BRAZIL Ltda. (Campinas)  São Paulo  May 2008-Present ADVANCED ELECTRICAL CONTROL SYSTEM ENGINEER Spearhead company success developing and executing electrical/automation projects as 3M corporate engineer supporting all Brazil Plants. Instrumentally advance business goals strategically managing the four largest projects introducing new products in the market driving growth and collaborating with 3M USA to preserve company intellectual property. As a key driver ensure delivery of the highest automation platform to the lines, including but not limited to, supporting electric utilities implementation (power, data network, etc.) for the complete operation of the production. Selected Contributions:  2012/2014 – New Acrylic Foam Tape Line in 3M Sumaré Plant – US $20M Investment, achieved full return in 3.2 years. Reduced Unit Cost of Product by 10% and increased Production Capacity 15% based on the previous line. Earned Latin America & Canada CTE&I awards 2014.  2011/2012 – Pilot Coater Line –3M Sumaré Plant – US$ 2.5M, achieved full return within 2 years. Reduced preparation for executing new product launches by at least 6 months. Saved 1 Million dollars in 2 years by optimizing operational performance of the main lines and avoiding wasted films. Strategically ensured maximal line operation to date. Earned Latin America & Canada CTE&I awards 2011.  2010/2012 - Coater and Extrusion Tape Lines Transference – From 3M Argentina to 3M Itapetininga Plant – US $10M Investment achieving full return within 3 years. Enhanced productivity increasing Production Capacity of Coating Tapes by 25% and providing Local Production of NOPP Tapes.  2008/2010 - New Mechanical Close Tape Lines – 3M Itapetininga Plant – US$ 20M Investment, achieved full return in 3.6 years. Jumpstarted revenue growth increasing sales 6% in the first year by introducing new diaper tapes in the Brazilian Market. 3M BRAZIL Ltda. (Itapetininga Plant)  São Paulo  February 2005-April 2008 SENIOR ELECTRICAL CONTROL SYSTEM ENGINEER Radically transformed operational performance through sophisticated development and execution of electrical/automation projects as 3M resident engineer. Through expert management of minor and medium projects maintained, improved, and consistently ensured peak plant operation. Delivered full automation/upgrading lines, intricately supporting electric utilities implementation (power, data network, etc...). Orchestrated the most structured and organized plant adhering to the highest in 3M standards through tactful collaboration with maintenance team. Selected Contributions:  2007/2008 – BOPP Electrical Control Upgrade – US $1M Investment. Radicallyreduced the obsolescence of controls equipment, providing high reliability and improving the line speed and product quality.  2006/2007 – Coater 5 Line Optimization – US $0.5M Investment. Reduced the obsolescence of controls equipment, solving the splice problems eliminating at least 10% of film wasted. M
  • 2. 1135, Dona Rosa de Gusmão  Campinas, São Paulo, Brazil 13070-187  (Cell) +55 19 99963-2248 finardimarcos@gmail.com ROMI INDUSTRY SA (Santa Barbara D’Oeste)  São Paulo  May 2001-January 2005 SENIOR ELECTRICAL PROJECT ENGINEER Streamlined company goals through innovative development of effective electrical and automation projects for Injection Molding Machines, introducing new motors control (VFDs and Servo Motors) and delivering new types of machines to the Brazilian market based on the latest technologies available. Selected Contributions:  Successfully brought the 2002 new Injection mold machine to market (based on VFD + Induction Motor) improving product quality and reducing cost. Enhanced sales in 50 units per year.  Launching the 2003 new Injection Mold Machine fully Servo System controlled. This state of the art machine was previously available to Romi supply and the Brazilian market by import only. EDUCATION & ADDITIONAL INFORMATION Bachelor of Science, Electrical Engineering (Electronic Emphasis) ESCOLA FEDERAL DE ENGENHARIA DE ITAJUBÁ | MG, Brazil | 1988 Technician, Electro Technical COLÉGIO TÉCNICO DA UNICAMP (CAMPINAS) | SP, Brazil | 1980 Professional Development Courses: Automation Training at Rockwell and Siemens (PLC, HMI, Drives, Motion, Safety, Networks, CNC) ♦ Electrical Hazard Operation ♦ Wonderware and iFix Supervisory Additional Information: Proficient in English, Portuguese Native Language, Basic in Spanish International trip to USA, Mexico, China, Taiwan to visit 3M subsidiaries and suppliers Green Belt Lean Six Sigma – 3M