Day 1
ü Receipt
Accounting
ü Cost Accounting
Cost Management Cloud | Workshop Agenda
1 Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
Day 4
ü Supply Chain Financial
Orchestration
Day 2
ü Discrete
Manufacturing Costing
ü Process Manufacturing
Costing
Day 3
ü Costing of Fulfillment
Flows
ü Landed Cost
Management
Cost Management Cloud
Manufacturing Costing
Vinit Poddar
Product Management Director
Oracle Development
The following is intended to outline our general product direction. It is intended for information purposes
only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or
functionality, and should not be relied upon in making purchasing decisions. The development, release,
timing, and pricing of any features or functionality described for Oracle’s products may change and remains
at the sole discretion of Oracle Corporation.
Statements in this presentation relating to Oracle’s future plans, expectations, beliefs, intentions and
prospects are “forward-looking statements” and are subject to material risks and uncertainties. A detailed
discussion of these factors and other risks that affect our business is contained in Oracle’s Securities and
Exchange Commission (SEC) filings, including our most recent reports on Form 10-K and Form 10-Q
under the heading “Risk Factors.” These filings are available on the SEC’s website or on Oracle’s website
at http://www.oracle.com/investor. All information in this presentation is current as of September 2019 and
Oracle undertakes no duty to update any statement in light of new information or future events.
Safe harbor statement
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
3
Agenda
• Manufacturing Costing Overview
• Discreet Manufacturing Costing
• Process Manufacturing Costing
• Reports
Overview | Manufacturing Process
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
5
Cost Planning features
Input
• Purchased
Components
(Subassemblies)
Process
• Resource
Consumption
Output
• Finished
Product
Typical Manufacturing Process
Estimate standard cost
for purchased items.
Estimate rates for resource
usage and overhead
absorptions.
Calculate rolled-up cost of
finished product.
Overview | Application Process
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
6
Define Items
Define Item
Structure*
Create Work
Definition
Publish
Standard Cost
Create Work
Order
Execute Order
Transfer and
Generate
Costing
Create
Accounting
Review Work
Order Costs
ü Costing Deep Dive
* Not required for process manufacturing
Overview | Cost Estimation
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
7
Work
Definitions
Work Definition Name: Primary
Version 1
As of Date: 1-Apr-15
Production Priority 2
Costing Priority 1
Input Items
Resources
Work Definition: Alternate
Work Definition: Alternate 1
Select
work
definitions
based
on
scenario
criteria
Standard Cost Estimation
Work Definition Criteria
Costing Priority 1
As of Date 1-Apr-15
Input/Buy item costs Resource and
Overhead Rates
Cost Rollup
Pass the
criteria
Get Work
Definition
Standard Cost for Sub
Assemblies/ Product
Recap | Configuration
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
8
InFusion Corporation
InFusion US1 LE
[BSV = 101]
InFusion US2 LE
[BSV = 102]
InFusion UK LE
[BSV = 201]
InFusion US1
Business Unit
InFusion US2
Business Unit
InFusion UK
Business Unit
InFusion US Ledger
[USD, Corp COA, US GAAP]
InFusion UK Ledger
[GBP, Corp COA,
IFRS]
InFusion UK Ledger
Secondary [USD,
Corp COA, US GAAP]
Item
Perpetual
Average Cost
Standard Cost Actual Cost
Primary Cost
Book
Secondary
Cost Book
Reporting
Cost Book
Periodic
Average Cost
Periodic Cost
Book
Agenda
• Manufacturing Costing Overview
• Discreet Manufacturing Costing
• Process Manufacturing Costing
• Reports
Discreet Manufacturing Costing | Use Case
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
10
Packing
1 Unit
Packing
Material
Packer
1 Hr / Unit
Plant
Overhead
Testing
Assembling
Tablet
Mother Board
1 Unit
Screen
1 Unit
Frame
2 Units
Assembler
1 Hr / Unit
Machine
1 Hr / Unit
Tester
1 Hrs / Unit
Material
Resource
Electricity
Overhead 9% Material Cost
Discreet Manufacturing Costing | Work Order Cost | Standard
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
11
WIP Material Issue
WIP Valuation 40 Dr
Inventory 40 Cr
WIP Valuation 30 Dr
Inventory 30 Cr
WIP Valuation 20 Dr
Inventory 20 Cr
WIP Valuation 5 Dr
Inventory 5 Cr
WIP Resource Charging
WIP Valuation 50 Dr
Resource Absorption 50 Cr
WIP Valuation 30 Dr
Resource Absorption 30 Cr
WIP Valuation 30 Dr
Resource Absorption 30 Cr
WIP Valuation 12.50 Dr
Resource Absorption 12.50 Cr
WIP Product Completion
Inventory Valuation 95 Dr
WIP Valuation 95 Cr
Inventory Valuation 105 Dr
WIP Valuation 105 Cr
Inventory Valuation 30 Dr
WIP Valuation 30 Cr
Inventory Valuation 8.55 Dr
Material O/H Absorption 8.55 Cr
Estimated Costs:
Material = 40 + 30 + 20 + 5 = 95
Labor = 50 + 30 + 25 = 105
Machine = 30
Material Overhead = 9% X 95 =
8.55
WIP Job Close (Accounts for any
Variance)
WIP Valuation 12.50 Dr
Efficiency Variance 12.50 Cr
Component Cost Resource
Mother Board –
1*40 (40)
Screen – 1*30 (30)
Frame – 2*10 (20)
Packing – 1*5 (5)
Assembler – 1*50 (50)
Machine – 1*30 (30)
Tester – 2*15 (30)
Packer – 1*25 (25)
Material
Overhead –
9% of
Material
Cost
Overhead
Actual Costs:
Material = 40 + 30 + 20 + 5 = 95
Labor = 50 + 30 + 12.50 = 92.50
Machine = 30
Material Overhead = 9% X 95 =
8.55
Mother Board –
1*40 (40)
Screen – 1*30 (30)
Frame – 2*10 (20)
Packing – 1*5 (5)
Machine – 1*30 (30)
Tester – 2*15 (30)
Packer – 0.5*25 (12.50)
Material
Overhead –
9% of
Material
Cost
Budget
Actual
Assembler – 1*50 (50)
Discreet Manufacturing Costing | Work Order Cost | Actual / Average
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
12
WIP Material Issue *
WIP Valuation 40 Dr
Inventory 40 Cr
WIP Valuation 30 Dr
Inventory 30 Cr
WIP Valuation 20 Dr
Inventory 20 Cr
WIP Valuation 5 Dr
Inventory 5 Cr
WIP Resource Charging
WIP Valuation 50 Dr
Resource Absorption 50 Cr
WIP Valuation 30 Dr
Resource Absorption 30 Cr
WIP Valuation 30 Dr
Resource Absorption 30 Cr
WIP Valuation 12.50 Dr
Resource Absorption 12.50 Cr
WIP Product Completion
Inventory Valuation 95 Dr
WIP Valuation 95 Cr
Inventory Valuation 92.50 Dr
WIP Valuation 92.50 Cr
Inventory Valuation 30 Dr
WIP Valuation 30 Cr
Inventory Valuation 8.55 Dr
Material O/H Absorption 8.55 Cr
Estimated Costs:
Material = 40 + 30 + 20 + 5 = 95
Labor = 50 + 30 + 25 = 105
Machine = 30
Material Overhead = 9% X 95 =
8.55
WIP Job Close (Accounts for any
Variance)
No Accounting
Resource
Assembler – 1*50 (50)
Machine – 1*30 (30)
Tester – 2*15 (30)
Packer – 1*25 (25)
Material
Overhead –
9% of
Material
Cost
Overhead
Actual Costs:
Material = 40 + 30 + 20 + 5 = 95
Labor = 50 + 30 + 12.50 = 92.50
Machine = 30
Material Overhead = 9% X 95 =
8.55
Mother Board –
1*40 (40)
Screen – 1*30 (30)
Frame – 2*10 (20)
Packing – 1*5 (5)
Machine – 1*30 (30)
Tester – 2*15 (30)
Packer – 0.5*25 (12.50)
Material
Overhead –
9% of
Material
Cost
Budget
Actual
Assembler – 1*50 (50)
* In case charges like Non recoverable
tax, Invoice price variance, tax price
variance, overheads are available on
the item cost, the WIP valuation will
also be loaded with the corresponding
costs.
Agenda
• Manufacturing Costing Overview
• Discreet Manufacturing Costing
• Process Manufacturing Costing
• Reports
Process Manufacturing Costing | Use Case
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
14
Centrifugalizing
Plant
Overhead
Evaporation
Shredding
Raw Sugar
Raw
Material
Resource
Electricity
Overhead 9% Material Cost
Purification Drying & Cooling
Sugar
Cane
9,479 KG
Lime
Stone
1,185 KG
Sulphur
Di Oxide
5 KG
Products
&
By-product
Trash
47 KG
Press Mud
285 KG 1,000 KG
Crusher
Mills
2 Hr/Batch
Labor
1 Hr/Batch
Rotary
Filter
4 Hr/Batch
Labor
2 Hr/Batch
Vacuum
Pan
1 Hr/Batch
Labor
1 Hr/Batch
Centrifugal
1 Hr/Batch
Labor
1 Hr/Batch
Drier
2 Hr/Batch
Labor
1 Hr/Batch
Raw Sugar
Molasses
427 KG
Process Manufacturing Costing | Important Links
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
15
Process Manufacturing Introduction
Process Manufacturing Overview and Costing – Session 1
Process Manufacturing Overview and Costing – Session 2
Agenda
• Manufacturing Costing Overview
• Discreet Manufacturing
• Process Manufacturing
• Reports
Reports | Work Order Costs | Summary
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
17
Reports | Work Order Costs | Details
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
18
Reports | Work Order Costs | Variance
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
19
Reports | WIP Inventory Valuation
Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted
20
Thank You
21 Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted

More Related Content

Similar to Manufacturing Costing Manufacturing Costing Manufacturing Costing

Essences of semiconductor manufacturing 2024.pdf
Essences of semiconductor manufacturing 2024.pdfEssences of semiconductor manufacturing 2024.pdf
Essences of semiconductor manufacturing 2024.pdfLen Mei
 
Buying Into The Budget
Buying Into The BudgetBuying Into The Budget
Buying Into The Budgetjdparfett
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturingTonny Danny
 
Best Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxBest Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxsonutyagi20
 
Management & Leadership Skill Development Lecture 5.ppt
Management & Leadership Skill Development Lecture 5.pptManagement & Leadership Skill Development Lecture 5.ppt
Management & Leadership Skill Development Lecture 5.pptZafar831029
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going leanbwu.nl
 
Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...
Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...
Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...Ajjay Kumar Gupta
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Koch Modular Process Systems, LLC.
 
Data center insights summit 2015 disruptive force of clouds
Data center insights summit 2015   disruptive force of cloudsData center insights summit 2015   disruptive force of clouds
Data center insights summit 2015 disruptive force of cloudscrbraun
 
Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...
Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...
Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...Altair
 
Prioritizing waste reduction projects
Prioritizing waste reduction projectsPrioritizing waste reduction projects
Prioritizing waste reduction projectsGBX Summits
 
Discovering Lean at Hewlett Packard Laserjet Division
Discovering Lean at Hewlett Packard Laserjet DivisionDiscovering Lean at Hewlett Packard Laserjet Division
Discovering Lean at Hewlett Packard Laserjet DivisionIrina Dzhambazova
 

Similar to Manufacturing Costing Manufacturing Costing Manufacturing Costing (20)

Essences of semiconductor manufacturing 2024.pdf
Essences of semiconductor manufacturing 2024.pdfEssences of semiconductor manufacturing 2024.pdf
Essences of semiconductor manufacturing 2024.pdf
 
Buying Into The Budget
Buying Into The BudgetBuying Into The Budget
Buying Into The Budget
 
Apqp la
Apqp laApqp la
Apqp la
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturing
 
ch03.ppt
ch03.pptch03.ppt
ch03.ppt
 
AMD at ITC 2014
AMD at  ITC 2014AMD at  ITC 2014
AMD at ITC 2014
 
Best Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxBest Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptx
 
Management & Leadership Skill Development Lecture 5.ppt
Management & Leadership Skill Development Lecture 5.pptManagement & Leadership Skill Development Lecture 5.ppt
Management & Leadership Skill Development Lecture 5.ppt
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
 
UV-Cured Powder Coating + Resource Productivity = Higher Profits
UV-Cured Powder Coating + Resource Productivity = Higher ProfitsUV-Cured Powder Coating + Resource Productivity = Higher Profits
UV-Cured Powder Coating + Resource Productivity = Higher Profits
 
Acct 505
Acct 505Acct 505
Acct 505
 
Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...
Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...
Thermocol Cups, Glass and Plates - Market Survey cum Detailed Techno Economic...
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
 
Data center insights summit 2015 disruptive force of clouds
Data center insights summit 2015   disruptive force of cloudsData center insights summit 2015   disruptive force of clouds
Data center insights summit 2015 disruptive force of clouds
 
Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...
Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...
Surrogate Model-Based Reliability Analysis of Composite UAV Wing facilitation...
 
Costing ass4
Costing ass4Costing ass4
Costing ass4
 
Prioritizing waste reduction projects
Prioritizing waste reduction projectsPrioritizing waste reduction projects
Prioritizing waste reduction projects
 
Discovering Lean at Hewlett Packard Laserjet Division
Discovering Lean at Hewlett Packard Laserjet DivisionDiscovering Lean at Hewlett Packard Laserjet Division
Discovering Lean at Hewlett Packard Laserjet Division
 

Recently uploaded

BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...soniya singh
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...OnePlan Solutions
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)OPEN KNOWLEDGE GmbH
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfAlina Yurenko
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...stazi3110
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software DevelopersVinodh Ram
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based projectAnoyGreter
 

Recently uploaded (20)

BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software Developers
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based project
 

Manufacturing Costing Manufacturing Costing Manufacturing Costing

  • 1. Day 1 ü Receipt Accounting ü Cost Accounting Cost Management Cloud | Workshop Agenda 1 Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted Day 4 ü Supply Chain Financial Orchestration Day 2 ü Discrete Manufacturing Costing ü Process Manufacturing Costing Day 3 ü Costing of Fulfillment Flows ü Landed Cost Management
  • 2. Cost Management Cloud Manufacturing Costing Vinit Poddar Product Management Director Oracle Development
  • 3. The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, timing, and pricing of any features or functionality described for Oracle’s products may change and remains at the sole discretion of Oracle Corporation. Statements in this presentation relating to Oracle’s future plans, expectations, beliefs, intentions and prospects are “forward-looking statements” and are subject to material risks and uncertainties. A detailed discussion of these factors and other risks that affect our business is contained in Oracle’s Securities and Exchange Commission (SEC) filings, including our most recent reports on Form 10-K and Form 10-Q under the heading “Risk Factors.” These filings are available on the SEC’s website or on Oracle’s website at http://www.oracle.com/investor. All information in this presentation is current as of September 2019 and Oracle undertakes no duty to update any statement in light of new information or future events. Safe harbor statement Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 3
  • 4. Agenda • Manufacturing Costing Overview • Discreet Manufacturing Costing • Process Manufacturing Costing • Reports
  • 5. Overview | Manufacturing Process Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 5 Cost Planning features Input • Purchased Components (Subassemblies) Process • Resource Consumption Output • Finished Product Typical Manufacturing Process Estimate standard cost for purchased items. Estimate rates for resource usage and overhead absorptions. Calculate rolled-up cost of finished product.
  • 6. Overview | Application Process Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 6 Define Items Define Item Structure* Create Work Definition Publish Standard Cost Create Work Order Execute Order Transfer and Generate Costing Create Accounting Review Work Order Costs ü Costing Deep Dive * Not required for process manufacturing
  • 7. Overview | Cost Estimation Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 7 Work Definitions Work Definition Name: Primary Version 1 As of Date: 1-Apr-15 Production Priority 2 Costing Priority 1 Input Items Resources Work Definition: Alternate Work Definition: Alternate 1 Select work definitions based on scenario criteria Standard Cost Estimation Work Definition Criteria Costing Priority 1 As of Date 1-Apr-15 Input/Buy item costs Resource and Overhead Rates Cost Rollup Pass the criteria Get Work Definition Standard Cost for Sub Assemblies/ Product
  • 8. Recap | Configuration Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 8 InFusion Corporation InFusion US1 LE [BSV = 101] InFusion US2 LE [BSV = 102] InFusion UK LE [BSV = 201] InFusion US1 Business Unit InFusion US2 Business Unit InFusion UK Business Unit InFusion US Ledger [USD, Corp COA, US GAAP] InFusion UK Ledger [GBP, Corp COA, IFRS] InFusion UK Ledger Secondary [USD, Corp COA, US GAAP] Item Perpetual Average Cost Standard Cost Actual Cost Primary Cost Book Secondary Cost Book Reporting Cost Book Periodic Average Cost Periodic Cost Book
  • 9. Agenda • Manufacturing Costing Overview • Discreet Manufacturing Costing • Process Manufacturing Costing • Reports
  • 10. Discreet Manufacturing Costing | Use Case Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 10 Packing 1 Unit Packing Material Packer 1 Hr / Unit Plant Overhead Testing Assembling Tablet Mother Board 1 Unit Screen 1 Unit Frame 2 Units Assembler 1 Hr / Unit Machine 1 Hr / Unit Tester 1 Hrs / Unit Material Resource Electricity Overhead 9% Material Cost
  • 11. Discreet Manufacturing Costing | Work Order Cost | Standard Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 11 WIP Material Issue WIP Valuation 40 Dr Inventory 40 Cr WIP Valuation 30 Dr Inventory 30 Cr WIP Valuation 20 Dr Inventory 20 Cr WIP Valuation 5 Dr Inventory 5 Cr WIP Resource Charging WIP Valuation 50 Dr Resource Absorption 50 Cr WIP Valuation 30 Dr Resource Absorption 30 Cr WIP Valuation 30 Dr Resource Absorption 30 Cr WIP Valuation 12.50 Dr Resource Absorption 12.50 Cr WIP Product Completion Inventory Valuation 95 Dr WIP Valuation 95 Cr Inventory Valuation 105 Dr WIP Valuation 105 Cr Inventory Valuation 30 Dr WIP Valuation 30 Cr Inventory Valuation 8.55 Dr Material O/H Absorption 8.55 Cr Estimated Costs: Material = 40 + 30 + 20 + 5 = 95 Labor = 50 + 30 + 25 = 105 Machine = 30 Material Overhead = 9% X 95 = 8.55 WIP Job Close (Accounts for any Variance) WIP Valuation 12.50 Dr Efficiency Variance 12.50 Cr Component Cost Resource Mother Board – 1*40 (40) Screen – 1*30 (30) Frame – 2*10 (20) Packing – 1*5 (5) Assembler – 1*50 (50) Machine – 1*30 (30) Tester – 2*15 (30) Packer – 1*25 (25) Material Overhead – 9% of Material Cost Overhead Actual Costs: Material = 40 + 30 + 20 + 5 = 95 Labor = 50 + 30 + 12.50 = 92.50 Machine = 30 Material Overhead = 9% X 95 = 8.55 Mother Board – 1*40 (40) Screen – 1*30 (30) Frame – 2*10 (20) Packing – 1*5 (5) Machine – 1*30 (30) Tester – 2*15 (30) Packer – 0.5*25 (12.50) Material Overhead – 9% of Material Cost Budget Actual Assembler – 1*50 (50)
  • 12. Discreet Manufacturing Costing | Work Order Cost | Actual / Average Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 12 WIP Material Issue * WIP Valuation 40 Dr Inventory 40 Cr WIP Valuation 30 Dr Inventory 30 Cr WIP Valuation 20 Dr Inventory 20 Cr WIP Valuation 5 Dr Inventory 5 Cr WIP Resource Charging WIP Valuation 50 Dr Resource Absorption 50 Cr WIP Valuation 30 Dr Resource Absorption 30 Cr WIP Valuation 30 Dr Resource Absorption 30 Cr WIP Valuation 12.50 Dr Resource Absorption 12.50 Cr WIP Product Completion Inventory Valuation 95 Dr WIP Valuation 95 Cr Inventory Valuation 92.50 Dr WIP Valuation 92.50 Cr Inventory Valuation 30 Dr WIP Valuation 30 Cr Inventory Valuation 8.55 Dr Material O/H Absorption 8.55 Cr Estimated Costs: Material = 40 + 30 + 20 + 5 = 95 Labor = 50 + 30 + 25 = 105 Machine = 30 Material Overhead = 9% X 95 = 8.55 WIP Job Close (Accounts for any Variance) No Accounting Resource Assembler – 1*50 (50) Machine – 1*30 (30) Tester – 2*15 (30) Packer – 1*25 (25) Material Overhead – 9% of Material Cost Overhead Actual Costs: Material = 40 + 30 + 20 + 5 = 95 Labor = 50 + 30 + 12.50 = 92.50 Machine = 30 Material Overhead = 9% X 95 = 8.55 Mother Board – 1*40 (40) Screen – 1*30 (30) Frame – 2*10 (20) Packing – 1*5 (5) Machine – 1*30 (30) Tester – 2*15 (30) Packer – 0.5*25 (12.50) Material Overhead – 9% of Material Cost Budget Actual Assembler – 1*50 (50) * In case charges like Non recoverable tax, Invoice price variance, tax price variance, overheads are available on the item cost, the WIP valuation will also be loaded with the corresponding costs.
  • 13. Agenda • Manufacturing Costing Overview • Discreet Manufacturing Costing • Process Manufacturing Costing • Reports
  • 14. Process Manufacturing Costing | Use Case Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 14 Centrifugalizing Plant Overhead Evaporation Shredding Raw Sugar Raw Material Resource Electricity Overhead 9% Material Cost Purification Drying & Cooling Sugar Cane 9,479 KG Lime Stone 1,185 KG Sulphur Di Oxide 5 KG Products & By-product Trash 47 KG Press Mud 285 KG 1,000 KG Crusher Mills 2 Hr/Batch Labor 1 Hr/Batch Rotary Filter 4 Hr/Batch Labor 2 Hr/Batch Vacuum Pan 1 Hr/Batch Labor 1 Hr/Batch Centrifugal 1 Hr/Batch Labor 1 Hr/Batch Drier 2 Hr/Batch Labor 1 Hr/Batch Raw Sugar Molasses 427 KG
  • 15. Process Manufacturing Costing | Important Links Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 15 Process Manufacturing Introduction Process Manufacturing Overview and Costing – Session 1 Process Manufacturing Overview and Costing – Session 2
  • 16. Agenda • Manufacturing Costing Overview • Discreet Manufacturing • Process Manufacturing • Reports
  • 17. Reports | Work Order Costs | Summary Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 17
  • 18. Reports | Work Order Costs | Details Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 18
  • 19. Reports | Work Order Costs | Variance Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 19
  • 20. Reports | WIP Inventory Valuation Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted 20
  • 21. Thank You 21 Copyright © 2021, Oracle and/or its affiliates | Confidential: Restricted