2. TOTAL SWIMMING POOL
REFURBISHMENT SOLUTIONS
REMOVAL OF EXISTING FIBRERGLASS
LINER AND MOSIAC TILING OF POOL,
PAINTING OF CONCRETE TILE
SURROUND, ACID AND HOT WASH OF
EXISTING FLAGS, FITTING NEW DOSING
SYSTEM, REPAIR TO PIPEWORK, NEW
POOL COVER, IMPROVEMENT TO CLEAN
WATER DISTRIBUTION SYSTEM
4. TOTAL SWIMMING POOL
REFURBISHMENT SOLUTIONS
ALL THE EXISTING
FIBREGLASS
LINING (510
SQUARE METRES)
HAD TO BE
REMOVED – THIS
WAS A
PAINSTAKING
PROJECT
5. TOTAL SWIMMING POOL
REFURBISHMENT SOLUTIONS
SHOWN IS ONE OF
OUR OPERATIVES
PAINSTAKINGLY
REMOVING THE GLASS
LINING AND
SCABBLING THE
NEWLY EXPOSED
WALLS TO ENSURE
CORRECT THOROUGH
PREPARATION
10. TOTAL SWIMMING POOL
REFURBISHMENT SOLUTIONS
SHOWN IS ONE OF
OUR FEMALE
OPERATIVES
GIVING THE
FINISHED
SHALLOW END
THE “WOMANS
TOUCH” PRIOR TO
POOL FILLING
15. BEFORE AND
AFTER – WHAT A
TRANSFORMATION
ON TIME AND IN
BUDGET!!
TOTAL SWIMMING POOL
REFURBISHMENT SOLUTIONS
16. TOTAL SWIMMING POOL
REFURBISHMENT SOLUTIONS
Comments made by Mr Mark Hart
“Operations Manager” of the School
“Thank you very much for all you have
done for us to date an excellent job, I
very much look forward to working with
you all again”