Went in to assist in fixing things and redesign numerous plantings and reconstruct hardscape a month before the grand opening. Worked with incredible DAMAC staff, Jamie Coyne, Matt Empsal and Leander Styne to complete my tasks.
16. • Finalizing round-a-bout
works;
• Integrated dancing
fountain water show
with colored lighting;
• Plant replacements for
instant impact;
• Paving modifications
and sealing
17. • Finalizing round-a-bout
works;
• Integrated dancing
fountain water show
with colored lighting;
• Plant replacements for
instant impact;
• Paving modifications
and sealing
18. • Testing and commissioning of the round-a-bout water feature
19. • The addition of 11 –
11mWashingtonia
Palms to provide
vertical elements and
create enclosure
20. • Views from the
clubhouse over the
course
• Preparing for His
Highness Sheik
Mohammed Grand
Event
21. • Water leak at infinity
edge going down to GF
restaurant
• Poor workmanship on
pool deck;
• Poor workmanship on
pool tiling