Mahmoud Shaaban
Citizenship : Egyptian ▪ Date of birth : 23 April 1983
Address
8th district, 1st sheiakha, Building No. 63, 6th of Octobre, Giza, EGYPT
Education
2000 to 2005 Bachelor of engineering, Mechanical power department (July 2005)
Helwan university, Faculty of engineering, Cairo
Final year grade: Good.
Cumulative grade: Pass.
Graduation project: "An investigation of soot formation in laminar diffusion flame".
Project grade: Excellent.
Work Experience
Juhayna (Egyfood)
Mechanical Maintenance Manager September, 2015
 Responsible for all mechanical work in the factory
 Assisting the maintenance manager putting the budget.
 Assisting the maintenance manager in improving the machine efficiency and reducing the consuming power
by applying the power saving methods.
 Follow the company strategies and achieving the required goals.
 Improve the maintenance team skills and maintainability.
Best Cheese Company for dairy product (BCC)
Lactalis international (Nestle & Lactel Yogurt),
Qalyoub
Mechanical head of section January, 2014
 Establish and manage the yearly, monthly, weekly maintenance plans to ensure essential maintenance
is completed within a reasonable time.
 Monitor plant/equipment to ensure optimal operation and reduction of planned/unplanned downtime.
 Optimize Predictive Maintenance technologies (Condition Monitoring and inspections) to minimize
unplanned downtime.
 Develop and implement improvements to minimize downtime for line change and cleaning.
 Liaise with Production, Quality Management on a daily basis to resolve technical and/or operational
issues. (Stoppage Analysis from Downtime Reporting System).
 Establish with Production, shutdown and start-up work programs to minimize the risks to the product,
people and production losses.
 Manage the technical stores, scheduled Work Orders, labor hour allocation and the equipment Bill of
Material (BOM).
 Ensure that the job planning, material and services planning is accurate and effective.
 Ensure that the equipment history, damage code and root cause analysis are completed correctly.
 Ensure that all mechanics and operators receive direct on the line coaching in machinery and line
operation skills in respect to the requirements of Hygienic engineering.
 Propose and monitor maintenance in accordance with the key performance indicators.
 Key Performance Indicators:
Contact
Tel : (002) 010 8553688
e-mail :
Engineering_mahmoud@Hotmail.com
o % Line efficiency(Overall equipment effectiveness)
o API – Asset Productivity Index
o Unplanned stoppages due to equipment failure, as % of NPH
o Planned maintenance vs. unplanned maintenance hours
o Work order completion on time as a % of total planned/generated work order
o % Mechanical team overtime
Golden Group for industrial systems, Cairo
Application engineer September, 2007
 Works as a solution provider ;
 Select, design and install the right pneumatic devices ;
 Installed complete air network in Grand Hyatt hotel contains filters, valves, dryer & compressor;
 Installed a complete control cylinder for El-Nasr for Cook coal;
 Fabricated & repaired many pneumatic cylinders;
 Control valves selection & installation.
 Water spray system for cement in the mill (National Cement Company).
 Control system for fluxo pump (Helwan Cement Company).
 Air chock maintenance (Suez Cement Company).
 Water spray system for cement in the mill ( Suez Cement Company )
 Vacuum conveying system for cement with 2.5 ton/hr. (National Cement Company).
 Dust suppression system for cement by-pass dust 60 ton/hr. (CEMEX Company).
EBD Arabia LTD , Saudi Arabia, Riyadh
Project Engineer
July to September, 2007
 Design & install a water desalination plant;
 A 150 L/day RO system for Saudi OGER LTD;
 A 1500 L/day RO system
RAMW for Tourism & Hotel, Sharm El-Sheikh
Project Engineer November 2006 to January 2007
 worked as a project engineer in Hyatt Regency Hotel in pluming, water supply lines, swimming pools, fire
fighting network & a 11,000 m³ lack in the hotel with its all lines such as water supply, drain lines,
fountains,...etc ;
United Group for Tourism & Hotel, Sharm El-Sheikh & Hurghada
Project Engineer October 2005 to October, 2006
 worked as a project engineer in Hyatt Regency Hotel;
 Worked in the desalination & sewage plant in HYATT Regency hotel-Sharm El-Sheikh for 4 months;
 Worked in Pyramisa hotel, Hurghada in pluming & landscape ;
 Worked in Carlos Hotel-Hurghada in pluming, landscape, fire fighting, water supply lines & swimming
pools.
Personal Data
Marital status
Military service
Married
Exempted
Languages
Arabic (native) English (very good) French (Fair)
Training course
MCV
PetroBel
Badger flow meter
Parker pneumatic
OMAL Italy
LESLIE, USA
ERCA, France
Summer 2003, Training in heavy vehicle assembly
Summer 2004, Training in Port Said offshore petroleum filed
December 2007 , Training in the Flow meters from Badger meter company
April 2008, Training in the pneumatic systems and filtration.
Jun. 2008, Training in motorized valves and actuators.
Oct. 2010, Training in control valve for sever conditions.
April 2014, Training in ERCA machines operation and maintenance.
ERMI, France October 2014, Training in ERMI machine operation and maintenance.
PRMG, AUC
HASSIA, Germany
Feb 2015, PRMG 025 & PRMG 070
November 2015, Training in maintenance for HASSIA yoghurt filling machine.
Key Skills
Proficient or familiar with the engineering drawing programs, Microsoft office and programming language, including:
Auto Cad (all ver.) Solidworks SAP Microsoft Office Networks (LAN)
Autodesk Inventor Microsoft Project Microsoft AX Dynamics Visual Basic 6.0 Computer Hardware

Mahmoud CV

  • 1.
    Mahmoud Shaaban Citizenship :Egyptian ▪ Date of birth : 23 April 1983 Address 8th district, 1st sheiakha, Building No. 63, 6th of Octobre, Giza, EGYPT Education 2000 to 2005 Bachelor of engineering, Mechanical power department (July 2005) Helwan university, Faculty of engineering, Cairo Final year grade: Good. Cumulative grade: Pass. Graduation project: "An investigation of soot formation in laminar diffusion flame". Project grade: Excellent. Work Experience Juhayna (Egyfood) Mechanical Maintenance Manager September, 2015  Responsible for all mechanical work in the factory  Assisting the maintenance manager putting the budget.  Assisting the maintenance manager in improving the machine efficiency and reducing the consuming power by applying the power saving methods.  Follow the company strategies and achieving the required goals.  Improve the maintenance team skills and maintainability. Best Cheese Company for dairy product (BCC) Lactalis international (Nestle & Lactel Yogurt), Qalyoub Mechanical head of section January, 2014  Establish and manage the yearly, monthly, weekly maintenance plans to ensure essential maintenance is completed within a reasonable time.  Monitor plant/equipment to ensure optimal operation and reduction of planned/unplanned downtime.  Optimize Predictive Maintenance technologies (Condition Monitoring and inspections) to minimize unplanned downtime.  Develop and implement improvements to minimize downtime for line change and cleaning.  Liaise with Production, Quality Management on a daily basis to resolve technical and/or operational issues. (Stoppage Analysis from Downtime Reporting System).  Establish with Production, shutdown and start-up work programs to minimize the risks to the product, people and production losses.  Manage the technical stores, scheduled Work Orders, labor hour allocation and the equipment Bill of Material (BOM).  Ensure that the job planning, material and services planning is accurate and effective.  Ensure that the equipment history, damage code and root cause analysis are completed correctly.  Ensure that all mechanics and operators receive direct on the line coaching in machinery and line operation skills in respect to the requirements of Hygienic engineering.  Propose and monitor maintenance in accordance with the key performance indicators.  Key Performance Indicators: Contact Tel : (002) 010 8553688 e-mail : Engineering_mahmoud@Hotmail.com
  • 2.
    o % Lineefficiency(Overall equipment effectiveness) o API – Asset Productivity Index o Unplanned stoppages due to equipment failure, as % of NPH o Planned maintenance vs. unplanned maintenance hours o Work order completion on time as a % of total planned/generated work order o % Mechanical team overtime Golden Group for industrial systems, Cairo Application engineer September, 2007  Works as a solution provider ;  Select, design and install the right pneumatic devices ;  Installed complete air network in Grand Hyatt hotel contains filters, valves, dryer & compressor;  Installed a complete control cylinder for El-Nasr for Cook coal;  Fabricated & repaired many pneumatic cylinders;  Control valves selection & installation.  Water spray system for cement in the mill (National Cement Company).  Control system for fluxo pump (Helwan Cement Company).  Air chock maintenance (Suez Cement Company).  Water spray system for cement in the mill ( Suez Cement Company )  Vacuum conveying system for cement with 2.5 ton/hr. (National Cement Company).  Dust suppression system for cement by-pass dust 60 ton/hr. (CEMEX Company). EBD Arabia LTD , Saudi Arabia, Riyadh Project Engineer July to September, 2007  Design & install a water desalination plant;  A 150 L/day RO system for Saudi OGER LTD;  A 1500 L/day RO system RAMW for Tourism & Hotel, Sharm El-Sheikh Project Engineer November 2006 to January 2007  worked as a project engineer in Hyatt Regency Hotel in pluming, water supply lines, swimming pools, fire fighting network & a 11,000 m³ lack in the hotel with its all lines such as water supply, drain lines, fountains,...etc ; United Group for Tourism & Hotel, Sharm El-Sheikh & Hurghada Project Engineer October 2005 to October, 2006  worked as a project engineer in Hyatt Regency Hotel;  Worked in the desalination & sewage plant in HYATT Regency hotel-Sharm El-Sheikh for 4 months;  Worked in Pyramisa hotel, Hurghada in pluming & landscape ;  Worked in Carlos Hotel-Hurghada in pluming, landscape, fire fighting, water supply lines & swimming pools. Personal Data Marital status Military service Married Exempted Languages Arabic (native) English (very good) French (Fair)
  • 3.
    Training course MCV PetroBel Badger flowmeter Parker pneumatic OMAL Italy LESLIE, USA ERCA, France Summer 2003, Training in heavy vehicle assembly Summer 2004, Training in Port Said offshore petroleum filed December 2007 , Training in the Flow meters from Badger meter company April 2008, Training in the pneumatic systems and filtration. Jun. 2008, Training in motorized valves and actuators. Oct. 2010, Training in control valve for sever conditions. April 2014, Training in ERCA machines operation and maintenance. ERMI, France October 2014, Training in ERMI machine operation and maintenance. PRMG, AUC HASSIA, Germany Feb 2015, PRMG 025 & PRMG 070 November 2015, Training in maintenance for HASSIA yoghurt filling machine. Key Skills Proficient or familiar with the engineering drawing programs, Microsoft office and programming language, including: Auto Cad (all ver.) Solidworks SAP Microsoft Office Networks (LAN) Autodesk Inventor Microsoft Project Microsoft AX Dynamics Visual Basic 6.0 Computer Hardware