Rig Name/#: BENNEVIS JSA Number : MA 010 Person Approving JSA: H.M
Work Activity (Job): Crane wire replacement ( Whip line ) Date Raised :
Work Team (Crew Members): BE/ ABE / Roustabouts / Crane-Operator Date Last Amended : None
Uncontrolled When Printed Page 1 of 3
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Safety Equipment To Do This Job(
Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers
Safety Boots x Work Vest Goggles x Lockout/Tagout
Safety Glasses x Safety Harness x Barricades x Work Permit Required x
Uncontrolled When Printed Page 2 of 3
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members-
Persons involved in task becoming injured by incorrect procedure
compliance
1. Take time to read correctly JSA . Be sure everything is
understood . If not ask your Supervisor
Supervisor
BE
2 . Preparing Tools & Spare wire drum on
support
2. Tools ( lewis snake grip – wire rope clips ) in bad
condition or not appropriate size . Cable wire not
conform . Pinch points . Wire drum support not enough
strong . Tools falling
2. Be sure of cable specifications before installing . Use
correct size tools equipment referring cable size . Prepare &
secure all tools top of crane cabin . Be sure wire drum is on
the right way
BE - ABE
Roustabouts
Crane Op
3. Removing headache ball from whip line
Disconnecting wire from hook
3. Being struck by ball - Wire whip line pay off – Pinch points –
Hands or fingers crushed by wire
3. Give enough slack on wire to disconnect safely . Secure
wire to a fix point to prevent any wire pay off . Watch hands
placement
BE - ABE
Roustabouts
Crane OP
4. Connecting old & new wire together with
lewis snake grip & spooling end of new wire
to crane drum .
4. Wire pay off when pulling it to crane drum –Snake not holding
Wire falling down on people - Wrong signals to crane operator
4. Learn crane signals – Only one person doing signals to
crane operator – Operate the crane slowly – Signal working
area - Connect & secure correctly lewis snake grip on wires
– Dispatch crew to follow the wire during spooling operation
BE - ABE
Roustabouts
Crane Op
5. Disconnecting lewis snake grip from wires 5. Wire pay off and fall down on people – Burs in wire 5. Secure wire on fix point before disconnecting lewis snake
grip – Signal working area
BE - ABE
Roustabouts
Crane Op
6. Removing old cable from crane drum &
coiling it on main-deck
6. Hands or fingers crushed by wire – Wire fall down on people 6. Operate the crane slowly – Watch hands placement –
Slack down slowly end wire on main deck with safety line –
Signal working area – Wear gloves
BE - ABE
Roustabouts
Crane Op
7. Connecting new wire on crane drum –
Spooling up new wire
7. Hands or fingers crushed by wire or crane drum – Wire fall
down on people 7. Operate the crane slowly to pull & install wire on crane
drum . Install correctly wire on drum – Secure wire when
connecting on crane drum – Watch hands placement –
Dispatch crew to follow the wire during pulling operation
BE - ABE
Roustabouts
Crane Op
8 . Reconnecting wire on hook & Pulling up -
Finishing job & clean up
8 . Pinch points – Tools falling down – Wire damage – Hands or
fingers crushed by wire – Hazards waste – Slips – Tools left out
creating trip hazards
8. Secure tools – Put back correctly clips & pin – Watch
hands placement – Operate crane slowly – Check wire
position – Clean up all areas – Put tools back to store
BE - ABE
Roustabouts
Crane Op
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Uncontrolled When Printed Page 3 of 3
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2

More Related Content

Similar to Ma 010 crane wire replacement ( whip line )

Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
Yousif Fikry
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Yousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
Yousif Fikry
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
Yousif Fikry
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
Yousif Fikry
 
Ma 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsMa 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legs
Yousif Fikry
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
Yousif Fikry
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodations
Yousif Fikry
 
Ma 040 emergency lowering of personnel lifting
Ma 040  emergency lowering of personnel liftingMa 040  emergency lowering of personnel lifting
Ma 040 emergency lowering of personnel lifting
Yousif Fikry
 
Ma 07 installing mooring ropes on legs
Ma 07  installing mooring ropes on legsMa 07  installing mooring ropes on legs
Ma 07 installing mooring ropes on legs
Yousif Fikry
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basket
Yousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
Yousif Fikry
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
Yousif Fikry
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
Yousif Fikry
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
Yousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
Yousif Fikry
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
Yousif Fikry
 
Break Down Management SC, BZA Divn..pptx
Break Down Management SC, BZA Divn..pptxBreak Down Management SC, BZA Divn..pptx
Break Down Management SC, BZA Divn..pptx
SSEOHEPSIMRK
 
Ma 002 welding in tanks
Ma 002  welding in tanksMa 002  welding in tanks
Ma 002 welding in tanks
Yousif Fikry
 
Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
Yousif Fikry
 

Similar to Ma 010 crane wire replacement ( whip line ) (20)

Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
 
Ma 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsMa 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legs
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodations
 
Ma 040 emergency lowering of personnel lifting
Ma 040  emergency lowering of personnel liftingMa 040  emergency lowering of personnel lifting
Ma 040 emergency lowering of personnel lifting
 
Ma 07 installing mooring ropes on legs
Ma 07  installing mooring ropes on legsMa 07  installing mooring ropes on legs
Ma 07 installing mooring ropes on legs
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basket
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Break Down Management SC, BZA Divn..pptx
Break Down Management SC, BZA Divn..pptxBreak Down Management SC, BZA Divn..pptx
Break Down Management SC, BZA Divn..pptx
 
Ma 002 welding in tanks
Ma 002  welding in tanksMa 002  welding in tanks
Ma 002 welding in tanks
 
Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 

More from Yousif Fikry

Welding operation
Welding operationWelding operation
Welding operation
Yousif Fikry
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
Yousif Fikry
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
Yousif Fikry
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
Yousif Fikry
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
Yousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
Yousif Fikry
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
Yousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
Yousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
Yousif Fikry
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
Yousif Fikry
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
Yousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
Yousif Fikry
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
Yousif Fikry
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
Yousif Fikry
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
Yousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
Yousif Fikry
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
Yousif Fikry
 

More from Yousif Fikry (17)

Welding operation
Welding operationWelding operation
Welding operation
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 

Ma 010 crane wire replacement ( whip line )

  • 1. Rig Name/#: BENNEVIS JSA Number : MA 010 Person Approving JSA: H.M Work Activity (Job): Crane wire replacement ( Whip line ) Date Raised : Work Team (Crew Members): BE/ ABE / Roustabouts / Crane-Operator Date Last Amended : None Uncontrolled When Printed Page 1 of 3 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 2. Safety Equipment To Do This Job( Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers Safety Boots x Work Vest Goggles x Lockout/Tagout Safety Glasses x Safety Harness x Barricades x Work Permit Required x Uncontrolled When Printed Page 2 of 3 Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials 1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members- Persons involved in task becoming injured by incorrect procedure compliance 1. Take time to read correctly JSA . Be sure everything is understood . If not ask your Supervisor Supervisor BE 2 . Preparing Tools & Spare wire drum on support 2. Tools ( lewis snake grip – wire rope clips ) in bad condition or not appropriate size . Cable wire not conform . Pinch points . Wire drum support not enough strong . Tools falling 2. Be sure of cable specifications before installing . Use correct size tools equipment referring cable size . Prepare & secure all tools top of crane cabin . Be sure wire drum is on the right way BE - ABE Roustabouts Crane Op 3. Removing headache ball from whip line Disconnecting wire from hook 3. Being struck by ball - Wire whip line pay off – Pinch points – Hands or fingers crushed by wire 3. Give enough slack on wire to disconnect safely . Secure wire to a fix point to prevent any wire pay off . Watch hands placement BE - ABE Roustabouts Crane OP 4. Connecting old & new wire together with lewis snake grip & spooling end of new wire to crane drum . 4. Wire pay off when pulling it to crane drum –Snake not holding Wire falling down on people - Wrong signals to crane operator 4. Learn crane signals – Only one person doing signals to crane operator – Operate the crane slowly – Signal working area - Connect & secure correctly lewis snake grip on wires – Dispatch crew to follow the wire during spooling operation BE - ABE Roustabouts Crane Op 5. Disconnecting lewis snake grip from wires 5. Wire pay off and fall down on people – Burs in wire 5. Secure wire on fix point before disconnecting lewis snake grip – Signal working area BE - ABE Roustabouts Crane Op 6. Removing old cable from crane drum & coiling it on main-deck 6. Hands or fingers crushed by wire – Wire fall down on people 6. Operate the crane slowly – Watch hands placement – Slack down slowly end wire on main deck with safety line – Signal working area – Wear gloves BE - ABE Roustabouts Crane Op 7. Connecting new wire on crane drum – Spooling up new wire 7. Hands or fingers crushed by wire or crane drum – Wire fall down on people 7. Operate the crane slowly to pull & install wire on crane drum . Install correctly wire on drum – Secure wire when connecting on crane drum – Watch hands placement – Dispatch crew to follow the wire during pulling operation BE - ABE Roustabouts Crane Op 8 . Reconnecting wire on hook & Pulling up - Finishing job & clean up 8 . Pinch points – Tools falling down – Wire damage – Hands or fingers crushed by wire – Hazards waste – Slips – Tools left out creating trip hazards 8. Secure tools – Put back correctly clips & pin – Watch hands placement – Operate crane slowly – Check wire position – Clean up all areas – Put tools back to store BE - ABE Roustabouts Crane Op Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 3. Uncontrolled When Printed Page 3 of 3 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2