Lynn Legacy 4.1.1
Welcome back to the Lynn legacy!  Before we get to the plottiness, here's a little who's-who/showing off them grown up. First up, Daisy Lynn!  Fourth generaration spare, she grew up pretty in my opinion!
Here's her twin sister, Rosemary, who doesn't normally look this creepy.  Though less pretty than Rosemary, she's still pretty, this picture just doesn't give her justice.
Tristessa Flynn's here, too.  She's going to be the one inheriting the Flynn “legacy”.  She resembles her mother, Tosha Go, too much for my liking, but she could be worse.
She could look like her sister, Keiko.  Well, actually, they already look pretty much similar, and Keiko's not too ugly either.  Just a little... Tosha-Goish.
Randy London is Tristessa's boyfriend.  He has the Pao face, and I'm curious as to how that'll mesh with Tristessa's Tosha-ish features.  I have to say, the Flynn line has been the least picky with their spouses- as long as they have enough bolts I'll let them marry anyone.
Opal here is the heiress of the other Lynn “legacy”- the one Nathan founded that has all the evil sims who, recently, have all been evil witches, too.  I couldn't get a good picture of her, what with the green fuzzies around her.  She's pretty, but her eyes don't really look good on her face and her cheeks are a bit sunken.  Oh well.  Like with the Flynns, it could be worse.
Her brother looks a lot like her, but his nose is fuglier and his lips are thinner.  Maybe it's just a guy thing- it seems all my in-game born guys are ugliers than the girls.
Here's the heir!  Of the real legacy this time!  Fir's nose is a bit big (it's his sister Daisy's nose, too, but it looks smaller on her) and his cheeks are somewhat sunk and his eyes are big at times, but the nose gives character and his eyes make for some hilarious expressions, so he'll be yet another not-perfectly-good-looking sim I'll let slide.  Besides, I bet you all of his genetics would look better on a girl, so with a good spouse he could have absolutely adorable kids.
Peacock Lynn is the daughter of Hummingbird Lynn and grandaughter of Birch Lynn, 2 nd  generation spare, and an alien PT.  Thanks to the Multi-PT hack I had, she's not bug-eyed and no-nosed, and is pretty.
Bluebird is the son of Owl Lynn and grandson of 2 nd  generation spare Oak.  His jaw/chin whatever is a little weird, and he has that big nose that I think comes from Pao/Meadow face.
Chickadee here is the daughter of Poplar, 3 rd  generation spare.  She's pretty, but she looks a lot like her dad, and her dad is a bit eh.  So if she has a son, it might turn out ugly.  On the other hand, maybe she has enough of her mom in her that it won't be a problem.
Last but not least, here's Mockingbird.  His mom's Brooke Flynn, the adopted daughter of Tynan and Anina Flynn, the Flynn couple of the second generation.
Oh, and I have to show you the newest couples!  I don't have pictures of Tristessa and Randy London getting back together, or of the proposals of any of the couples, but here's Daisy having her first kiss with JJ Bradshaw...
Rosemary and Ian Fancey (he's fugly and I don't like him, but they have bolts, and I couldn't deny Rosemary.  I regret it now, she could've easily gotten a cuter guy)...
Mockingbird fell for Merideth Andrews...
Then Bluebird and Jeannie Day kissed...
Chickadee chose Alejandro Turner...
Peacock discovered she was bi (and not attracted to any good-looking guys, only ugly ones >.<) and started dating Kana Grove.
The kids-of-spares and kids-of-kids-of-spares will be living in this maxis house, the Federal Fortress.  They will be members of the greek house, but not live there because there's not enough room.
And here's the greek house!  I won't bore you with a tour... at least not till it's finished, which might be by next semester- they're all painting to earn money whenever I can find the time.  But wait, what's that I see?  Fir and Aria?
“ Hi, I'm Aria Bohemian*!  I don't think I've seen you around...” “ Fir Lynn.  I just got to the campus recently.  But what are you doing here?  You don't look like go to this college.” “ I have some cousins at college, and I like to walk around the campus after visiting them.” _____ *It's about time I say that Aria comes from the Bohemian Legacy, written by DocGirlP
“ Well Aria, you can come in if you want.  I was about to go in so I could have dinner but-” _____ The Bohemian Legacy is really good, and I suggest you go read it after this if you haven't already!
“ I have a better idea.” Aria leaned in flirtatiously. “ Well, when you put it that way...”
Fin was a romance sim, so of course he didn't mind Aria's forwardness.  Before long, he was getting his first kiss.
By the end of the night they were already making out.
Fir. “ Creator?  I thought I couldn't hear you?” I can always be heard as long as I want to be heard.  Anyway, it's getting late and we need to talk, so say goodbye to Aria.
“ It's getting late Aria, and we don't have any extra space for you to spend the night, so you should probably go now.” “ You could always come with me, you know.” “ I have classes in the morning.  But I'll definitely call you after they're over.” “ 'K.  See ya then.” “ Goodbye.”
“ What do we need to talk about?” Aria. “ What about her?”
She's a playable sim, and you're the heir.  You need to marry a dormie, not a playable!  Especially not one that has evil tendencies. “ Marriage?  Who said anything about marriage?  I'm a romance sim, remember?” So is she, so I guess that was a bit silly to assume either of you wanted to get married.
I'm glad we had this talk.  Now, you should be looking for a spouse... “ Yeah, I know, I'll find some potential spouses.  Now if you don't mind, I think I'll head to bed now.” Okay, see you in the morning, Fir.
Meanwhile, Keiko had decided to take a break in the hot tob, but found someone already in there. “ I didn't expect you to be here,” she blushed.
Talin hadn't bothered to put on any clothes, as he hadn't expected anyone to join him, and he wasn't too shy. “ Well?  Are you coming in are not?”
Keiko took of her dress to reveal her blue bikini and got in besides him, however akward it seemed to her to be hot tubbing with him while he was naked. As far as she knew, Talin and his sister were from Belltown, and had no relation to the Flynns.  And in River Cove, green skin didn't always mean evil witch, and evil witch didn't always mean evil, despite that out of the two evil witches Keiko's dad knew, both were evil.
“ Do you always do this?” Keiko asked. “ Do what?” “ Soak in hot tubs naked.” “ Pretty much.  Do you always wear a swimsuit?” “ Pretty much.”
“ Prude,” Talin teased as he splashed her. “ Pervert,” Keiko laughed as she tried to block the water. Talin knew that the Flynns were helping out the Lynns.  But he was supposed to be laying low, and if the guy outgoing enough to hot tub naked didn't say a word to the girl hot tubbing with him, well, that would arouse suspicion.  Right?
“ You look tense.  Want a back massage?” “ Yes please!  I still have to write my term paper, and after that there won't be much time till finals, and... gah.  It's too much stress sometimes.” “ I hear you,” Talin said as he started massaging her.
Neither could say why what happened next happened.  But if they were being honest to themselves, both had wanted it.
It started with a kiss...
The kiss got more and more passionate...
Talin knew then he was in love with Keiko. Who happened to be the daughter of his mother's enemy, and not know it. Talin sighed.  When did his life get so complicated?
Rosemary was having problems of her own.  She'd been talking to a friend, waiting for Ian to come over after his classes.
Then Ethan Raha started getting a little too flirtatious...
“ Ethan, I have a boyfriend,” she said she she pussed him away.
Suddenly Ian came up and slapped her.  “I can't believe it!  You were cheating on me?!”
“ No, I pushed him away, you had to have seen that part!”
“ I saw you caressing another man, that's what I saw!” “ I wasn't caressing him!”
“ Ask him and he'll say the same thing!  I wasn't cheating on you!” “ Why should I believe the guy you were cheating on me with?”
“ That's it.  If you don't believe me, get out of here.” “ Are you breaking up with me?” “ I don't know.  Maybe.”
Ian Fancey started crying as Rosemary walked away.  He'd lost the only girlfriend he coud ever hope to get except for in an uglacy.
Suddenly a plan formed in his mind, and he smiled.  Things would finally start going his way.
Fir hadn't forgotten about Aria, and she'd become a frequent visitor, but he was also meeting- and flirting with- other girls.
His second girlfriend was Lyndsay London.  As far as Fir was concerned she wasn't as attractive as Aria, but she had potential.
It took longer with Lyndsay, but Fir eventually got her fully under his finger.
And for whatever reason he suddenly found himself engaged.
He was glad it was Lyndsay though, if he had to get married.  Which, as heir, he did.
“ He's engaged,” Aria hissed.
Aria turned away from the telescope.  “What did I do wrong?”  Why'd he cheat on her? Suddenly it hit her.  Duh!   Fir was a romance sim!  No wonder he'd been so willing and there'd been so much chemistry!  Aria couldn't believe she hadn't realized earlier.
Aria decided to get some confirmation and called Tosha Go.
“ Tosha!  Is Fir a romance sim?” “ Yes, why?” “ Because you didn't tell me and you should've.”
“ Well, you didn't ask.  And why should I have told you?” “ Because it's important!” “ Whatever.  I have to go now.  Bye, Aria. ” Aria frowned.  Tosha seemed less loyal than usual.
During this time Aria had come up with a plan.  A smile tugging at the corner of her lips, she called up Fir.
“ Hey, Fir, want to come over?” she said seductively. “ Sure,”  he agreed.
Aria didn't want to waste any time, and so pulled Fir in for a passionate kiss when he came over.
It wasn't hard to convince him to move things to the bedroom.
Aria smirked as she heard a soft lullaby.  Everything was going as planned.
Tosha sighed as she headed back inside.  She was getting too old to be mixed up in this business.
She knew Aria had seduced Fir, but she didn't know why.  Did Aria want to end the legacy?  Well, that failed.  Fir was engaged to Lyndsay, and even if he wasn't, one of his sisters could take his place.
caption
Tosha sighed.  She'd still have to monitor him and Aria.
Suddenly her phone rung. “ Hello?”
“ That boy is a freaking idiot,” I shook my head.  Why hadn't the boy had the sense to use protection?
My finger itched to bring out the sim blender and abort the pregnancy.  But my hacks wouldn't work on a legacy sim, and, well... I wanted to see what the baby would look like.
I got up and started pacing, but stopped.  It may work for some people, but I was better thinking when still. “ Why would Aria want to have Fir's baby?”
I sat down.  I knew exactly how I could figure out.
Finally I looked up. “ Hmmm...  Maybe that's why...”
Meanwhile, the fact that he was engaged didn't mean Fir wasn't still looking for even more girls.
Ratna Gothier, the cheerleader, became his third girlfriend.
Once again he wasn't as attracted to her as he was to Aria, and she didn't have that special something Lyndsay had that made him choose her to be his fiancee, but she was still fun.
Besides, she was willing.
Fir vaguely thought that it was weird he'd never been in the hot tub with Aria yet, but pushed it aside.  Some other day he'd get her in there, but for now, he'd enjoy Ratna.
Tristessa was also having her fun.
Ronan Darga, the streaker, was her choice.
She was glad Randy London had class, because she figured he wouldn't appreciate seeing his fiancee and the streaker going at it.
“ Sorry I broke you and your boyfriend up.” “ It's okay, you didn't mean to.” 'I'd say I regret what I did but I don't.”
Ethan moved closer to Rosemary. “ Will you give me a second chance?”
“ I think that could be arranged.”
Rosemary still missed Ian, but it'd been a long time, and she needed to get over him.  Besides, ever since the break-up, she'd been thinking about Ian alot.
Things quickly got heated up.
Considering they were both outgoing people who liked to skinny-dip, what happened next was pretty much inevitable.
The hot tub was getting a lot of use lately.
Rosemary and JJ gave it a go.
And of course Fir took Lyndsay into it.
Even Tristessa couldn't resist.
“ Okay Talin, we need a game plan.” “ Of course.”
“ You're job will be Fir.  Get him unconcious for a long period of time- alcohol, punching, poision, whatever- and bring him home.” “ What will you be doing?”
“ I'll make sure Keiko and Tristessa don't get in the way,” Opal grinned wickedly.  “Even kill them if neccessary.” “ Uh, can we switch jobs?” Talin said, trying not to show how nervous he was. She wanted to kill Keiko.
“ Like I'd give you the funner one!” Opal scoffed. “ It's the one without any glory, though.”
Opal paused as if to consider it.  “How about whoever can do either job first does it.” “ Deal,” Talin said.  He'd make sure Keiko survived. He didn't want to think of the alternative.
The end! Oh, and my simself has three bolts with the exterminator!  Anyway, hope you like the chapter, and comment please!

Lynn Legacy 4.1.1

  • 1.
  • 2.
    Welcome back tothe Lynn legacy! Before we get to the plottiness, here's a little who's-who/showing off them grown up. First up, Daisy Lynn! Fourth generaration spare, she grew up pretty in my opinion!
  • 3.
    Here's her twinsister, Rosemary, who doesn't normally look this creepy. Though less pretty than Rosemary, she's still pretty, this picture just doesn't give her justice.
  • 4.
    Tristessa Flynn's here,too. She's going to be the one inheriting the Flynn “legacy”. She resembles her mother, Tosha Go, too much for my liking, but she could be worse.
  • 5.
    She could looklike her sister, Keiko. Well, actually, they already look pretty much similar, and Keiko's not too ugly either. Just a little... Tosha-Goish.
  • 6.
    Randy London isTristessa's boyfriend. He has the Pao face, and I'm curious as to how that'll mesh with Tristessa's Tosha-ish features. I have to say, the Flynn line has been the least picky with their spouses- as long as they have enough bolts I'll let them marry anyone.
  • 7.
    Opal here isthe heiress of the other Lynn “legacy”- the one Nathan founded that has all the evil sims who, recently, have all been evil witches, too. I couldn't get a good picture of her, what with the green fuzzies around her. She's pretty, but her eyes don't really look good on her face and her cheeks are a bit sunken. Oh well. Like with the Flynns, it could be worse.
  • 8.
    Her brother looksa lot like her, but his nose is fuglier and his lips are thinner. Maybe it's just a guy thing- it seems all my in-game born guys are ugliers than the girls.
  • 9.
    Here's the heir! Of the real legacy this time! Fir's nose is a bit big (it's his sister Daisy's nose, too, but it looks smaller on her) and his cheeks are somewhat sunk and his eyes are big at times, but the nose gives character and his eyes make for some hilarious expressions, so he'll be yet another not-perfectly-good-looking sim I'll let slide. Besides, I bet you all of his genetics would look better on a girl, so with a good spouse he could have absolutely adorable kids.
  • 10.
    Peacock Lynn isthe daughter of Hummingbird Lynn and grandaughter of Birch Lynn, 2 nd generation spare, and an alien PT. Thanks to the Multi-PT hack I had, she's not bug-eyed and no-nosed, and is pretty.
  • 11.
    Bluebird is theson of Owl Lynn and grandson of 2 nd generation spare Oak. His jaw/chin whatever is a little weird, and he has that big nose that I think comes from Pao/Meadow face.
  • 12.
    Chickadee here isthe daughter of Poplar, 3 rd generation spare. She's pretty, but she looks a lot like her dad, and her dad is a bit eh. So if she has a son, it might turn out ugly. On the other hand, maybe she has enough of her mom in her that it won't be a problem.
  • 13.
    Last but notleast, here's Mockingbird. His mom's Brooke Flynn, the adopted daughter of Tynan and Anina Flynn, the Flynn couple of the second generation.
  • 14.
    Oh, and Ihave to show you the newest couples! I don't have pictures of Tristessa and Randy London getting back together, or of the proposals of any of the couples, but here's Daisy having her first kiss with JJ Bradshaw...
  • 15.
    Rosemary and IanFancey (he's fugly and I don't like him, but they have bolts, and I couldn't deny Rosemary. I regret it now, she could've easily gotten a cuter guy)...
  • 16.
    Mockingbird fell forMerideth Andrews...
  • 17.
    Then Bluebird andJeannie Day kissed...
  • 18.
  • 19.
    Peacock discovered shewas bi (and not attracted to any good-looking guys, only ugly ones >.<) and started dating Kana Grove.
  • 20.
    The kids-of-spares andkids-of-kids-of-spares will be living in this maxis house, the Federal Fortress. They will be members of the greek house, but not live there because there's not enough room.
  • 21.
    And here's thegreek house! I won't bore you with a tour... at least not till it's finished, which might be by next semester- they're all painting to earn money whenever I can find the time. But wait, what's that I see? Fir and Aria?
  • 22.
    “ Hi, I'mAria Bohemian*! I don't think I've seen you around...” “ Fir Lynn. I just got to the campus recently. But what are you doing here? You don't look like go to this college.” “ I have some cousins at college, and I like to walk around the campus after visiting them.” _____ *It's about time I say that Aria comes from the Bohemian Legacy, written by DocGirlP
  • 23.
    “ Well Aria,you can come in if you want. I was about to go in so I could have dinner but-” _____ The Bohemian Legacy is really good, and I suggest you go read it after this if you haven't already!
  • 24.
    “ I havea better idea.” Aria leaned in flirtatiously. “ Well, when you put it that way...”
  • 25.
    Fin was aromance sim, so of course he didn't mind Aria's forwardness. Before long, he was getting his first kiss.
  • 26.
    By the endof the night they were already making out.
  • 27.
    Fir. “ Creator? I thought I couldn't hear you?” I can always be heard as long as I want to be heard. Anyway, it's getting late and we need to talk, so say goodbye to Aria.
  • 28.
    “ It's gettinglate Aria, and we don't have any extra space for you to spend the night, so you should probably go now.” “ You could always come with me, you know.” “ I have classes in the morning. But I'll definitely call you after they're over.” “ 'K. See ya then.” “ Goodbye.”
  • 29.
    “ What dowe need to talk about?” Aria. “ What about her?”
  • 30.
    She's a playablesim, and you're the heir. You need to marry a dormie, not a playable! Especially not one that has evil tendencies. “ Marriage? Who said anything about marriage? I'm a romance sim, remember?” So is she, so I guess that was a bit silly to assume either of you wanted to get married.
  • 31.
    I'm glad wehad this talk. Now, you should be looking for a spouse... “ Yeah, I know, I'll find some potential spouses. Now if you don't mind, I think I'll head to bed now.” Okay, see you in the morning, Fir.
  • 32.
    Meanwhile, Keiko haddecided to take a break in the hot tob, but found someone already in there. “ I didn't expect you to be here,” she blushed.
  • 33.
    Talin hadn't botheredto put on any clothes, as he hadn't expected anyone to join him, and he wasn't too shy. “ Well? Are you coming in are not?”
  • 34.
    Keiko took ofher dress to reveal her blue bikini and got in besides him, however akward it seemed to her to be hot tubbing with him while he was naked. As far as she knew, Talin and his sister were from Belltown, and had no relation to the Flynns. And in River Cove, green skin didn't always mean evil witch, and evil witch didn't always mean evil, despite that out of the two evil witches Keiko's dad knew, both were evil.
  • 35.
    “ Do youalways do this?” Keiko asked. “ Do what?” “ Soak in hot tubs naked.” “ Pretty much. Do you always wear a swimsuit?” “ Pretty much.”
  • 36.
    “ Prude,” Talinteased as he splashed her. “ Pervert,” Keiko laughed as she tried to block the water. Talin knew that the Flynns were helping out the Lynns. But he was supposed to be laying low, and if the guy outgoing enough to hot tub naked didn't say a word to the girl hot tubbing with him, well, that would arouse suspicion. Right?
  • 37.
    “ You looktense. Want a back massage?” “ Yes please! I still have to write my term paper, and after that there won't be much time till finals, and... gah. It's too much stress sometimes.” “ I hear you,” Talin said as he started massaging her.
  • 38.
    Neither could saywhy what happened next happened. But if they were being honest to themselves, both had wanted it.
  • 39.
    It started witha kiss...
  • 40.
    The kiss gotmore and more passionate...
  • 41.
    Talin knew thenhe was in love with Keiko. Who happened to be the daughter of his mother's enemy, and not know it. Talin sighed. When did his life get so complicated?
  • 42.
    Rosemary was havingproblems of her own. She'd been talking to a friend, waiting for Ian to come over after his classes.
  • 43.
    Then Ethan Rahastarted getting a little too flirtatious...
  • 44.
    “ Ethan, Ihave a boyfriend,” she said she she pussed him away.
  • 45.
    Suddenly Ian cameup and slapped her. “I can't believe it! You were cheating on me?!”
  • 46.
    “ No, Ipushed him away, you had to have seen that part!”
  • 47.
    “ I sawyou caressing another man, that's what I saw!” “ I wasn't caressing him!”
  • 48.
    “ Ask himand he'll say the same thing! I wasn't cheating on you!” “ Why should I believe the guy you were cheating on me with?”
  • 49.
    “ That's it. If you don't believe me, get out of here.” “ Are you breaking up with me?” “ I don't know. Maybe.”
  • 50.
    Ian Fancey startedcrying as Rosemary walked away. He'd lost the only girlfriend he coud ever hope to get except for in an uglacy.
  • 51.
    Suddenly a planformed in his mind, and he smiled. Things would finally start going his way.
  • 52.
    Fir hadn't forgottenabout Aria, and she'd become a frequent visitor, but he was also meeting- and flirting with- other girls.
  • 53.
    His second girlfriendwas Lyndsay London. As far as Fir was concerned she wasn't as attractive as Aria, but she had potential.
  • 54.
    It took longerwith Lyndsay, but Fir eventually got her fully under his finger.
  • 55.
    And for whateverreason he suddenly found himself engaged.
  • 56.
    He was gladit was Lyndsay though, if he had to get married. Which, as heir, he did.
  • 57.
  • 58.
    Aria turned awayfrom the telescope. “What did I do wrong?” Why'd he cheat on her? Suddenly it hit her. Duh! Fir was a romance sim! No wonder he'd been so willing and there'd been so much chemistry! Aria couldn't believe she hadn't realized earlier.
  • 59.
    Aria decided toget some confirmation and called Tosha Go.
  • 60.
    “ Tosha! Is Fir a romance sim?” “ Yes, why?” “ Because you didn't tell me and you should've.”
  • 61.
    “ Well, youdidn't ask. And why should I have told you?” “ Because it's important!” “ Whatever. I have to go now. Bye, Aria. ” Aria frowned. Tosha seemed less loyal than usual.
  • 62.
    During this timeAria had come up with a plan. A smile tugging at the corner of her lips, she called up Fir.
  • 63.
    “ Hey, Fir,want to come over?” she said seductively. “ Sure,” he agreed.
  • 64.
    Aria didn't wantto waste any time, and so pulled Fir in for a passionate kiss when he came over.
  • 65.
    It wasn't hardto convince him to move things to the bedroom.
  • 66.
    Aria smirked asshe heard a soft lullaby. Everything was going as planned.
  • 67.
    Tosha sighed asshe headed back inside. She was getting too old to be mixed up in this business.
  • 68.
    She knew Ariahad seduced Fir, but she didn't know why. Did Aria want to end the legacy? Well, that failed. Fir was engaged to Lyndsay, and even if he wasn't, one of his sisters could take his place.
  • 69.
  • 70.
    Tosha sighed. She'd still have to monitor him and Aria.
  • 71.
    Suddenly her phonerung. “ Hello?”
  • 72.
    “ That boyis a freaking idiot,” I shook my head. Why hadn't the boy had the sense to use protection?
  • 73.
    My finger itchedto bring out the sim blender and abort the pregnancy. But my hacks wouldn't work on a legacy sim, and, well... I wanted to see what the baby would look like.
  • 74.
    I got upand started pacing, but stopped. It may work for some people, but I was better thinking when still. “ Why would Aria want to have Fir's baby?”
  • 75.
    I sat down. I knew exactly how I could figure out.
  • 76.
    Finally I lookedup. “ Hmmm... Maybe that's why...”
  • 77.
    Meanwhile, the factthat he was engaged didn't mean Fir wasn't still looking for even more girls.
  • 78.
    Ratna Gothier, thecheerleader, became his third girlfriend.
  • 79.
    Once again hewasn't as attracted to her as he was to Aria, and she didn't have that special something Lyndsay had that made him choose her to be his fiancee, but she was still fun.
  • 80.
  • 81.
    Fir vaguely thoughtthat it was weird he'd never been in the hot tub with Aria yet, but pushed it aside. Some other day he'd get her in there, but for now, he'd enjoy Ratna.
  • 82.
    Tristessa was alsohaving her fun.
  • 83.
    Ronan Darga, thestreaker, was her choice.
  • 84.
    She was gladRandy London had class, because she figured he wouldn't appreciate seeing his fiancee and the streaker going at it.
  • 85.
    “ Sorry Ibroke you and your boyfriend up.” “ It's okay, you didn't mean to.” 'I'd say I regret what I did but I don't.”
  • 86.
    Ethan moved closerto Rosemary. “ Will you give me a second chance?”
  • 87.
    “ I thinkthat could be arranged.”
  • 88.
    Rosemary still missedIan, but it'd been a long time, and she needed to get over him. Besides, ever since the break-up, she'd been thinking about Ian alot.
  • 89.
  • 90.
    Considering they wereboth outgoing people who liked to skinny-dip, what happened next was pretty much inevitable.
  • 91.
    The hot tubwas getting a lot of use lately.
  • 92.
    Rosemary and JJgave it a go.
  • 93.
    And of courseFir took Lyndsay into it.
  • 94.
  • 95.
    “ Okay Talin,we need a game plan.” “ Of course.”
  • 96.
    “ You're jobwill be Fir. Get him unconcious for a long period of time- alcohol, punching, poision, whatever- and bring him home.” “ What will you be doing?”
  • 97.
    “ I'll makesure Keiko and Tristessa don't get in the way,” Opal grinned wickedly. “Even kill them if neccessary.” “ Uh, can we switch jobs?” Talin said, trying not to show how nervous he was. She wanted to kill Keiko.
  • 98.
    “ Like I'dgive you the funner one!” Opal scoffed. “ It's the one without any glory, though.”
  • 99.
    Opal paused asif to consider it. “How about whoever can do either job first does it.” “ Deal,” Talin said. He'd make sure Keiko survived. He didn't want to think of the alternative.
  • 100.
    The end! Oh,and my simself has three bolts with the exterminator! Anyway, hope you like the chapter, and comment please!