BACKGROUND
Pertamina Hulu Kalimantan Timur, PHKT, own and
operates Lawe Lawe Process Plant located in East Kalimantan,
consist of four main areas; Process Plant, Crude Oil Tank Area,
Power House, Control Center. The facility was not built from zero
by PHKT and since operated by PHKT, numerous lightning strikes
occurred within area.
There was several previous lightning acidential has been
reported and than study, assessment lightning protection system &
grounding of lawe-lawe process plant has been conducted.
Recommendations with basic engineering regarding to lightning
protection system, grounding and surge protection devices at Lawe-
Lawe terminal has been submitted. It was found that the conducted
study with recommendations had not been followed up completely.
This might be caused by the report is in basic engineering stage
consist of site finding, recommendations and conceptual
engineering so dificullt to be applied.
Therefore, the further study needs to be done and
followed up with detailed engineering to provide detailed
installation design that can be verify and constructed. The
evaluation and assessment shall ensure operational safety of
Lawe-lawe process plant against lightning stroke both direct
strike and indirect strike.
Considering major impact to PHKT operations, it is not
simple to conduct Lawe Lawe Area engineering review on the
existing Lightning Protection System (LPS) and to arise with
recommendation and improvement plan.
The area to be covered by the study emphasises on
process plant, crude oil tank area, power house and control
center at process plant.
LAY OUT OF LAWE LAWE MAIN BASE OFFICE
TELECOMMUNICATION
TOWER
Assessment Lightning Protection System of
Main Base Office
Located behind office Building
Telecommunication Tower
Telecommunication Tower
Consist of Antennas and Telecommunication Equipment
Telecommunication Tower
Equipped with ESE (Early Streamer Emission)
Telecommunication Tower
ESE Equipped with lightning Counter
Telecommunication Tower
Control Box Grounding of ESE Cable & Tower Leg
Telecommunication Tower
Co-axial Antenna Cables
Telecommunication Tower
Co-axial Antenna Cables Connection to IT Room
Telecommunication Tower
Co-axial Antenna Cables Connection to IT Room
Telecommunication Tower
Co-axial Antenna Cables Connection to IT Room
Telecommunication Tower
Control Box Grounding of IT Room
IT EQUIPMENT ROOM
Assessment Lightning Protection System of
Main Base Office
IT Equipment Room
Room Layout
IT Equipment Room
Cable From Telecommunication Tower
IT Equipment Room
Cable From Telecommunication Tower
IT Equipment Room
Cable From Telecommunication Tower
IT Equipment Room
Cable From Telecommunication Tower
IT Equipment Room
Cable From Telecommunication Tower
IT Equipment Room
Cable From Telecommunication Tower
IT Equipment Room
Grounding Cable from outside connected inside the room
IT Equipment Room
Grounding Cable from outside connected inside the room
IT Equipment Room
Grounding of Equipment Frame
Grounding of Equipment Frame
IT Equipment Room
Grounding Station in the room
IT Equipment Room
Grounding Station in the room
IT Equipment Room
Grounding Station in the room
IT Equipment Room
Grounding Station in the room
IT Equipment Room
Grounding Station in the room
IT Equipment Room
Grounding Station in the room
IT Equipment Room
IT Devices Equipment Rack
IT Equipment Room
IT Equipment Room
UPS
UPS Panel Equipped with surge arrester
IT Equipment Room
AC Distribution Panel
IT Equipment Room
Grounding Cable AC Distribution Panel
IT Equipment Room
IT Equipment Room
Telkomsel Provider Equipment
IT Equipment Room
Telkomsel Provider Equipment
IT Equipment Room
Telkomsel Equipment Distribution panel with Arrester
Panel AC PDB Radio Mobilkom
IT Equipment Room
Telecomm Equipment Rack: Fiber Optic Converter
IT Equipment Room
IT Equipment Room
Telecomm Equipment Rack: Switch Hub
IT Equipment Room
Telecomm Equipment Rack: PABX
IT Equipment Room
Telecomm Equipment Rack: DC Supply
IT Equipment Room
Telecomm Rack (Rear) : AC Socket for Equipment Supply
IT Equipment Room
Telecomm Rack (Rear) : Terminal Grounding Panel
MAIN OFFICE DB PANEL
Assessment Lightning Protection System of
Main Base Office
Electrical Room
Electrical Room
Main Distribution Panel
Electrical Room
Main Distribution Panel
Electrical Room
Arrester MDP with Circuit Breaker
Electrical Room
Power Transformer
Electrical Room
Circuit Breaker
TRAFO SHELTER
Assessment Lightning Protection System of
Main Base Office
TRAFO SHLETER
Trafo Shelter TR-05 & TR-06
TRAFO SHLETER
Panel-06
PANEL-06 TRAFO SHLETER
CB to UPS 10 kVA in IT Room
PANEL-06 TRAFO SHLETER
CB to Main Office MDP
PANEL-06 TRAFO SHLETER
Terminal Grounding Panel
LABORATORY
Assessment Lightning Protection System of
Main Base Office
LABORATORY
Laboratory Building
OFFICE LABORATORY
Computer is not equipped with Socket Arrester
OFFICE LABORATORY
Main Distribution Panel
OFFICE LABORATORY
Power Transformer Connected to Main Distribution Panel
OFFICE LABORATORY
Main Distribution Panel
OFFICE LABORATORY
Main Distribution Panel equipped with Arrester
OFFICE LABORATORY
Arrester 3P +1 N
LABORATORY
Telecommunication Tower Behind Laboratory Office
a
a

More Related Content

Similar to LPS Assessment Main Office Building.pdf

Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns Group
Akankha Ahmed
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
Erik Ong
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
Erik Ong
 
Project report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and DrivesProject report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and Drives
RAGHAVENDRA M R
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
Lingeswaran Padmanabhan
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-final
khaikeat16
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
Himmelstern
 
SebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault LocatorsSebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault Locators
Thorne & Derrick International
 
Data Centre Design Guideline and Standards
Data Centre Design Guideline and StandardsData Centre Design Guideline and Standards
Data Centre Design Guideline and Standards
Bangladesh Network Operators Group
 
RESUME CV
RESUME CVRESUME CV
RESUME CV
Nasrul Irfan
 
bhelppt2
bhelppt2bhelppt2
bhelppt2
Nidhi Gopal
 
Structured cabling
Structured cablingStructured cabling
Structured cabling
Chris McAndrew
 
Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++
Somchai Jeenlhong
 
Jameel 25-Feb-16
Jameel  25-Feb-16Jameel  25-Feb-16
Jameel 25-Feb-16
Jameel Ahmed
 
Why choose high performance induction heating machine for the metal melting ...
Why choose high performance induction heating machine  for the metal melting ...Why choose high performance induction heating machine  for the metal melting ...
Why choose high performance induction heating machine for the metal melting ...
Zhengzhou Ketchan Electronic Co.,Ltd
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
Đinh Công Thiện Taydo University
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
Đinh Công Thiện Taydo University
 
Ivan new_cv_updated
Ivan new_cv_updatedIvan new_cv_updated
Ivan new_cv_updated
Ivan Horan
 
Bringing IT to the factory floor.ppt
Bringing IT to the factory floor.pptBringing IT to the factory floor.ppt
Bringing IT to the factory floor.ppt
Jeffrey Lam
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
Mathivanan K
 

Similar to LPS Assessment Main Office Building.pdf (20)

Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns Group
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
 
Project report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and DrivesProject report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and Drives
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-final
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 
SebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault LocatorsSebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault Locators
 
Data Centre Design Guideline and Standards
Data Centre Design Guideline and StandardsData Centre Design Guideline and Standards
Data Centre Design Guideline and Standards
 
RESUME CV
RESUME CVRESUME CV
RESUME CV
 
bhelppt2
bhelppt2bhelppt2
bhelppt2
 
Structured cabling
Structured cablingStructured cabling
Structured cabling
 
Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++Somchai J.'s CV_2016 ++
Somchai J.'s CV_2016 ++
 
Jameel 25-Feb-16
Jameel  25-Feb-16Jameel  25-Feb-16
Jameel 25-Feb-16
 
Why choose high performance induction heating machine for the metal melting ...
Why choose high performance induction heating machine  for the metal melting ...Why choose high performance induction heating machine  for the metal melting ...
Why choose high performance induction heating machine for the metal melting ...
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
 
Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0Ome201101 gsm bts312 hardware structure issue4.0
Ome201101 gsm bts312 hardware structure issue4.0
 
Ivan new_cv_updated
Ivan new_cv_updatedIvan new_cv_updated
Ivan new_cv_updated
 
Bringing IT to the factory floor.ppt
Bringing IT to the factory floor.pptBringing IT to the factory floor.ppt
Bringing IT to the factory floor.ppt
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 

LPS Assessment Main Office Building.pdf